36C25518Q0166-00002001.pdf

PDF 56 KB Posted

Attached to
657-18-1-1529-0092 AC Replacement - STL JC
Solicitation number
36C25518Q0166
Issued by

About this file

36C25518Q0166 00002 RFI Responses.pdf

View the file

Other files

File Type Posted
36C25518Q0166-00002002.pdf PDF
36C25518Q0166-00002003.pdf PDF
36C25518Q0166-00002005.pdf PDF
36C25518Q0166-00002006.pdf PDF
36C25518Q0166-00002000.docx DOCX document
36C25518Q0166-00002004.pdf PDF
36C25518Q0166-00001000.docx DOCX document
36C25518Q0166-002.docx DOCX document
36C25518Q0166-003.docx DOCX document
36C25518Q0166-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 36C25518Q0166

RFI 1:

After reviewing the wage determination, I believe that this is a construction contract not a service contract. This is not maintaining a unit this is replacing one. This falls under the definition of construction. Please address why you listed this not under the Davis Bacon Act.

This will be a service contract. There are no changes, additions, or up-grades being made to facilities structure. This is primarily the replacement of the existing AC unit.

RFI 2: Please provide a mechanical plan showing the unit so that piping and duct connections can be verified.

Attached H8, H9 and H10

RFI 3:What is the specification on the mechanical insulation for duct and piping?

See attachment: HVAC Pipe Insulation

RFI 4: What is the specification for the piping material and fittings?

See attachment: Piping Materials

RFI 5: What is the specification on the electrical division?

AC 21 is currently fed from BEP1 (Motor Starter) and will be refed re-piped (In hard conduit) to panel BEQ1, located in CB03 on the south wall. BEQ1 is a 200 amp 208 volt 3 phase GE panel fed from ATS- EQ3 DB. I have verified plenty of space available in the panel, although contractor will need to provide breakers for AC21 installation sized accordingly to needs of new equipment.

RFI 6:Please provide a drawing on DDC controls for this unit if this is to have such controls included.

None Available

RFI 7:Will the VA allow service elevators to be used?

Yes service elevator can be used but being this unit is located in the basement it should not be needed.

RFI 8:What is the Brand, Model, and Serial number of the existing unit?

Brand: TRANE Model: Climate Changer Serial Number: K77A12549

RFI 9:What time can Work start and what time does it have to have the unit up and running?

Work can start on a Friday after 5pm and will be needed to put back in service by 11:59pm Sunday.