S05 RFIs-Solicitation 36C25223B0028 Answers.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 36C25223B0028
About this file
This document contains an RFI list related to a solicitation to replace campus sidewalks at a Department of Veterans Affairs facility. The solicitation number is 36C25223B0028 and seeks to replace sidewalks for Project 550-24-201. Work is projected to start in November 2023 and have a 90 day period of performance, which will include cold weather conditions. One question from a vendor regarding winter work was answered by the VA to confirm the projected performance timeline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 550-24-201 Updated Requirement Driveway Detail Drawing.pdf | ||
| 36C25223B0028 0001.docx | DOCX document | |
| Wage Determination 10-12-2023.pdf | ||
| SOW Synopsis.pdf | ||
| Pre-Construction Checklist.pdf | ||
| Drawing and Specification.pdf | ||
| 36C25223B0028_1.docx | DOCX document | |
| Wage Detrmination 09-06-2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI LIST: | |||
| Date: | 10/12/23 | ||
| Project: | Replace Campus Sidewalk (CON) | ||
| Project #: | 550-24-201 | ||
| Solicitation #: | 36C25223B0028 | ||
| RFI # | VENDOR | RFI | VA RESPONSE |
| 1 | Troop Contracting | Will this project take place over winter months, which would require winter conditions, or is this for Spring of ’24 work? | This project is projected to have a performance start date in November 2023 with a 90 day period of performance. Work will include cold weather conditions. |