36C25219B0033-015.docx
DOCX document 578 KB Posted
- Attached to
- Replace steam and condensate lines between buildings 20 & 37 Federal contract opportunity
- Solicitation number
- 36C25219B0033
About this file
36C25219B0033 P01 - SOW Attachment 14) Spec STC-013300 SUBMITTAL REGISTER.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25219B0033-0001000.docx | DOCX document | |
| 36C25219B0033-002.pdf | ||
| 36C25219B0033-005.pdf | ||
| 36C25219B0033-007.pdf | ||
| 36C25219B0033-004.pdf | ||
| 36C25219B0033-012.pdf | ||
| 36C25219B0033-011.pdf | ||
| 36C25219B0033-017.docx | DOCX document | |
| 36C25219B0033-014.docx | DOCX document | |
| 36C25219B0033-010.pdf | ||
| 36C25219B0033-006.pdf | ||
| 36C25219B0033-008.pdf | ||
| 36C25219B0033-016.pdf | ||
| 36C25219B0033-009.pdf | ||
| 36C25219B0033-003.pdf | ||
| 36C25219B0033-013.pdf | ||
| 36C25219B0033-001.docx | DOCX document | |
| 36C25219B0033-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL REGISTER
CONTRACT NO.
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
A C T I V I T Y
N O
TRANS- MITTAL NO.
I T E M
SPECIFICATION PARAGRAPH NUMBER
DESCRIPTION OF ITEM SUBMITTED
D A T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
S T A T E M E N T S
R E P O R T S
C E R T I F I C A T E S
S A M P L E S
R E C O R D S
O & M
M A N U A L S I N F O R M A T I O N
O N L Y
G O V E R N M E N T
A P P R O V E D
R E V I E W E R
APPROVA L NEEDED
MATERIAL NEEDED
C O D E
SUBMIT TO GOVERN- MENT
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
DIVISION 1-GENERAL REQUIREMENTS
01 30 00 Administrative Requirements
| 1.3 |
| List of contact personnel |
| X |
X x
| 1.1 |
| View location map |
X x
| 1.1 |
| Progress and Completion Pictures |
X x
01 32 01 Project Schedule
| 1.2 |
| Preliminary Project Schedule |
| X |
X
X x
| 1.2 |
| File naming Convention |
| X |
X
X
X
| 1.2 |
| Initial Project Schedule |
x
| 1.2 |
| Periodic Schedule Updates |
X
X
X
01 35 26 Government Safety Requirements
| 1.2 |
| Accident Prevention Plan (APP) |
| x |
x x x x
| 1.2 |
| Crane Critical Lift Plan |
| x |
x x x x
| 1.2 |
| Activity Hazard Analysis (AHA) |
| x |
x x x
| 1.2 |
| Emergency Response Plan |
| 1.2 |
| Fall Protection and Prevention Plan |
| x |
x x x x
| 1.2 |
| Qualification of Competent Person |
| x |
| x |
| x |
x x
| 1.2 |
| Qualification of Site Safety and Health Officer |
x x x
| 1.2 |
| Excavation Permit |
| x |
x x x
| 1.2 |
| Licenses, Permits and Notifications |
x
X x x
| 1.2 |
| Accident Reports |
x x
| 1.2 |
| USACE Prime Contractor Monthly Record of Work-Related Injuries/Illnesses & |
Safety Exposure Reports
| x |
| x |
x
| 1.2 |
| Regulatory Citations and Violations |
x x x
| 1.2 |
| Summary of Worker Compensation Claim |
| x |
x x
| 1.2 |
| Confined Space Entry Permit |
| x |
x x x
| 1.2 |
| Hot Work Permit |
x x x
| 1.2 |
| License Certificates |
| x |
x x x x
| 1.2 |
| Excavator Certificate of Compliance |
x x
01 45 01 Quality Control
| 1.4 |
| Quality Control Plan |
| x |
x x x x
| 1.4 |
| Daily Contractor Quality Control Reports (CQC) |
x x
VA Medical Center – Electrical System Upgrade Project FY10 01 33 00 - 1A ENG FORM 4288, Jul 96 Submittal Register
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
01 45 35 Special Inspection for Seismic-Resisting Systems
| 1.3 |
| Certification for Qualification of Special Inspector |
| x |
| x |
x
| 1.3 |
| QC Plan covered with a Certificate |
| x |
| x |
x
01 50 00 Temporary Facilities and Controls
| 1.3 |
| Construction Site Plan |
x
| x |
| x |
x
01 57 20.00 10 Environmental Protection
| 1.4 |
| Environmental Protection Plan |
x
| 1.4 |
| Condition Survey Reports |
| 1.4 |
| Hazardous Waste Manifests |
| 1.4 |
| Non-Hazardous Solid Waste Diversion Report |
01 57 23 Temporary Storm Water Pollution
| 1.4 |
| Storm Water Pollution Prevention Plan |
| x |
| x |
| 1.4 |
| Storm Water Notice of Intent |
| x |
| x |
| 1.4 |
| Storm Water Inspection Reports for General Permit |
x
| 1.4 |
| Certificate Attesting Met All Requirements |
x
01 74 19 Construction and Demolition Waste Management
| 1.5 |
| Demolition Debris Management Plan |
| 1.5 |
| Monthly Construction & Demolition Debris Diversion and Disposal |
| x |
| x |
x
01 78 23 Operation and Maintenance Data
| 1.2 |
| Operations and Maintenance Data |
| x |
| x |
| x |
| 1.2 |
| Manufacturer’s Instructions |
| x |
| x |
| x |
1.2
Spare Parts Data
01 78 29 Final Site Survey
| 1.2 |
| Final Cleaning |
| x |
| x |
| x |
01 78 29 Warranties
| 1.2 |
| Warranty Tags |
| x |
| x |
| x |
| Warranty Management Plan |
| x |
| x |
| x |
01 78 39 Project Record Documents
| 1.1 |
| As-Built Record of Equipment and Materials |
| x |
| x |
| x |
| 1.1 |
| Record Drawings |
| x |
x x
01 33 00 - 2A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
DIVISION 03-CONCRETE
03 30 53 (Short Form) Cast-in-Place Concrete
| 1.5 |
| Concrete Mix Design |
| x |
x x
| 1.5 |
| Shop Drawings: Reinforcing Steel |
x x
| 1.5 |
| Manufacturer's Certificates |
x x
DIVISION 04-MASONRY
04 05 13 Masonry Mortaring
| 1.5 |
| Certificates |
x x
| 1.5 |
| Laboratory Test Reports |
x x
| 1.5 |
| Manufacturer's Literature and Data |
| x |
x
04 05 16 Masonry Grouting
| 1.4 |
| Certificates |
x x
| 1.4 |
| Laboratory Test Reports |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
04 20 00 Unit Masonry
| 1.3 |
| Samples |
x x
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Certificates |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
04 73 00 Simulated Stone
| 1.3 |
| Samples |
x x
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Certificates |
x x
| 1.3 |
| Manufacturers Test Results |
x x
| 1.3 |
| Laboratory Data |
| x |
x
| 1.3 |
| List of Jobs Furnished by Manufacture |
x x
DIVISION 05- METALS
01 33 00 - 3A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
05 12 00 Structural Steel Framing
| 1.6 |
| Shop and Erection Drawings |
x x
| 1.6 |
| Certificates |
x x
| 1.6 |
| Test Reports |
| 1.6 |
| Record Surveys |
x x x x
05 36 00 Composite Metal Decking
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Manufacturer's Written Recommendation |
x x
| 1.4 |
| Test Report |
x x
| 1.4 |
| Shear Stud Layouts |
x x
| 1.4 |
| Certifications |
x x
05 40 00 Cold-Formed Metal Framing
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
05 50 00 Metal Fabrications
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Certificates |
x x
| 1.3 |
| Design Calculations |
| x |
| x |
x
| 1.3 |
| Furnished Setting Drawings and Instructions |
| x |
| x |
x
DIVISION 06-WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
| 1.3 |
| Shop Drawings |
x x
06 16 63 Cementitious Sheathing
| 1.2 |
| Samples |
x x
| 1.2 |
| Product Data |
| x |
x
06 20 00 Finish Carpentry
01 33 00 - 4A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Samples |
x x
| 1.3 |
| Certificates |
x x
| 1.3 |
| List of Acceptable Sealers |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
06 65 00 Solid Polymer Fabrications
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Samples |
x x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Maintenance Data |
| x |
x
DIVISION 07- THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Certificates |
x x
07 22 00 Roof and Deck Insulation
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Samples |
x x
| 1.4 |
| Certificates |
x x
| 1.4 |
| Laboratory Test Reports |
x x
| 1.4 |
| Layout of Tapered Roof System |
x x
| 1.4 |
| Documentation of Supervisors Training & Experience |
x x
07 46 40 Mineral Fiber Cement Siding
| 1.2 |
| Samples |
x x
| 1.2 |
| Product Data |
| x |
x
07 51 00 Build-Up Bituminous Roofing
| 1.6 |
| Product Data |
| x |
x
| 1.6 |
| Certificates |
x x
| /1.6 |
| Warranty |
x x
07 60 00 Flashing and Sheet Metal
01 33 00 - 5A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
07 71 00 Roof Specialities
| 1.4 |
| Samples |
x x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Certificates |
x x
07 72 00 Roof Accessories
| 1.4 |
| Samples |
x x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Certificates |
x x
07 84 00 Firestopping
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| List of FM, UL, or WH Classification |
x x
| 1.3 |
| Certified Laboratory Test Reports |
x x
07 92 00 Joint Sealants
| 1.4 |
| Manufacturer's Installation Instructions |
x x
| 1.4 |
| Samples |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
07 95 13 Expansion Joint Cover Assemblies
| 1.5 |
| Manufacturer's Literature and Data |
| x |
x
| 1.5 |
| Certificates |
x x
| 1.5 |
| Shop Drawings |
x x
| 1.5 |
| Samples |
x x
DIVISION 08- OPENINGS
01 33 00 - 6A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
08 14 00 Interior Wood Doors
| 1.3 |
| Samples |
x x
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Laboratory Test Reports |
x x
08 31 13 Access Doors and Frames
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
08 33 13 Coiling Counter Doors
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Shop Drawings |
x x
08 41 13 Aluminum-Framed Entrances and Storefronts
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Samples |
x x
| 1.3 |
| Manufacturer's Certificates |
x x
08 71 00 Door Hardware
| 1.4 |
| Hardware Schedule |
x x
| 1.4 |
| Samples and Manufacturers' Literature |
x x
| 1.4 |
| Certificates of Compliance and Test Reports |
x x
08 80 00 Glazing
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Warranty |
x x
| 1.3 |
| Samples |
x x
| 1.3 |
| Manufacturer's Certificates |
x x
| 1.3 |
| Preconstruction Adhession and Compatibility Test Report |
x x
08 90 00 Louvers
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
DIVISION 09- FINISHES
01 33 00 - 7A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
09 22 16 Non-Structural Metal Framing
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Test Results |
x x
09 24 00 Portland Cement Plastering
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Samples |
x x
09 29 00 Gypsum Board
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Samples |
x x
| 1.4 |
| Test Results |
x x
09 30 13 Ceramic Tiling
| 1.3 |
| Samples |
x x
| 1.3 |
| Product Data |
| x |
x
| 1.3 |
| Certification |
x x
09 51 00 Acoustical Ceilings
| 1.3 |
| Samples |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Manufacturer's Certificates |
x x
09 65 13 Resilient Base and Accessories
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Samples |
x x
09 65 16 Resilient Sheet Flooring
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Samples |
x x
01 33 00 - 8A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
09 65 19 Resilient Tile Flooring
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Samples |
x x
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Test Reports |
x x
09 68 00 Carpeting
| .4 |
| Product Data |
| x |
x
| 1.4 |
| Samples |
x x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Maintenance Data |
| x |
x
09 91 00 Painting
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Sample Panels |
x x
| 1.3 |
| Sample of Identity Markers |
x x
| 1.3 |
| Manufacturers' Certificates |
x x
DIVISION 10-SPECIALTIES
10 21 23 Cubicle Curtain Tracks
| 1.3 |
| Samples |
x x
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Literature and Data |
x x
10 26 00 Wall and Door Protection
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Test Report |
x x
10 28 00 Toilet and Bath Accessories
| 1.5 |
| Manufacturer's Literature and Data |
| x |
x
| 1.5 |
| Warranty |
x x
| 1.5 |
| Manufacturer's Certificates |
x x
| 1.5 |
| Samples |
x x
| 1.5 |
| Shop Drawings |
x x
01 33 00 - 9A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
10 44 13 Fire Extinguisher Cabinets
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
10 70 50 Exterior Sunshades
| 1.6 |
| Certificates |
x x
| 1.6 |
| Samples |
x x
| 1.6 |
| Shop Drawings |
x x
| 1.6 |
| Design Calculations |
| x |
x
DIVISION 11- EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System
| 1.4 |
| Certificates of Compliance |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Individual Room Layouts |
| x |
x
DIVISION 12- FURNISHES
12 31 00 Manufactured Metal Casework
| 1.4 |
| Certificates |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Samples |
x x
12 36 00 Countertops
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Samples |
x x
DIVISION 13- SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components
| 1.4 |
| Equipment Anchorage Drawings |
| 1.4 |
| Bracing Drawings for Seismic Protection of Piping |
| 1.4 |
| Seismic Protection of Suspended Ductword and Electrical |
01 33 00 - 10A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
13 49 00 Radiation Protection
| 1.5 |
| Shop Drawings |
| 1.5 |
| Samples |
| 1.5 |
| Manufacturer's Literature and Data |
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results for Plumbing
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Coordination Drawings |
x x
| 1.4 |
| Maintenance Data and Operating Instructions |
| x |
| x |
| x |
21 13 13 Wet-Pipe Sprinkler Systems
| 1.3 |
| Qualifications |
x x
| 1.3 |
| Drawings |
x x
| 1.3 |
| Manufacturer's Data Sheets |
| x |
x
| 1.3 |
| Calculations Sheets |
| x |
x
| 1.3 |
| Final Document Submittals |
| x |
x
| 1.3 |
| Design Basis Information |
x x
| x |
| x |
x x
DIVISION 22-PLUMBING
22 05 11 Common Work Results for Plumbing
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Coordination Drawings |
x x
| 1.4 |
| Maintenance Data and Operating Instructions |
| x |
x
22 05 19 Meters and Gages for Plumbing Piping
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
22 05 23 General-Duty Valves for Plumbing Piping
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
01 33 00 - 11A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
22 11 00 Facility Water Distribution
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
22 13 00 Facility Sanitary Sewerage
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Shop Drawings of Clamping Device and Extensions |
x x
22 14 00 Facility Storm Drainage
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Shop Drawings of Clamping Device and Extensions |
x x
22 34 00 Fuel-Fired Domestic Water Heaters
| 1.4 |
| Water heaters and Associated Accessories |
| x |
| x |
| x |
x
| 1.4 |
| Pressure and Temperature Relief Valves |
| x |
| x |
| x |
x
| 1.4 |
| Coaxial Vent Piping and Roof Jack |
| x |
| x |
| x |
x
| 1.4 |
| Thermometers |
| x |
| x |
| x |
x
| 1.4 |
| Pressure Gages |
| x |
| x |
| x |
x
| 1.4 |
| Vacuum Breakers |
| x |
| x |
| x |
x
22 40 00 Plumbing Fixtures
| 1.3 |
| Plumbing Fixture Information |
| x |
| x |
x
DIVISION 23-HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
01 33 00 - 12A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
23 05 11 Common Work Results for HVAC
| 1.4 |
| Samples |
x x
| 1.4 |
| Layout Drawings |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| HVAC Maintenance Data and Operating Instructions |
| x |
x
| 1.4 |
| Approved HVAC Equipment |
| x |
| x |
x
23 05 12 General Motor Requirements for HVAC Equipment
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Certification |
x x
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Load Calculations for Selection of Isolators |
| x |
| x |
x
| 1.3 |
| Seismic Requirements |
| x |
| x |
x x
23 05 93 Testing, Adjusting, and Balancing for HVAC
| 1.4 |
| Names and Qualifications of TAB Agency and TAB Specialists |
| x |
| x |
| x |
x
| 1.4 |
| AABC and NEBB Publications |
| x |
| x |
| x |
x
| 1.4 |
| Design Review Report |
x x
| 1.4 |
| Systems Inspection Report |
x x
| 1.4 |
| Duct Air Leakage Test Report |
x x
| 1.4 |
| Systems Readiness Report |
x x
| 1.4 |
| Intermediate and Final TAB Reports |
x x
| 1.4 |
| Final Reports |
x x
| 1.4 |
| Completed Test and Balance Report |
x x x x
23 07 11 HVAC, Plumbing, and Boiler Plant Insulation
| 1.4 |
| Shop Drawings |
| x |
| x |
x
| 1.4 |
| Samples |
x x
23 09 23 Direct-Digital Control System for HVAC
| 1.6 |
| Manufacturer's Literature and Data |
| x |
x
| 1.6 |
| Product Certificates |
x x
01 33 00 - 13A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.6 |
| As Built Control Drawings |
x x
| 1.6 |
| Operation and Maintenance (O&M) Manuals |
| x |
| x |
| 1.6 |
| Performance Report for Final Inspection |
x x
23 11 23 Facility Natural-Gas Piping
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Shop Drawings of Clamping Device |
x x
23 21 13 Hydronic Piping
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Manufacturer's Certified Data Report |
x x
| 1.4 |
| Certificate of Welder's Certification |
x x
| 1.4 |
| Coordination Drawings |
x x
| 1.4 |
| As Built Piping Diagrams |
x x
23 21 23 Hydronic Pumps
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Manufacturer's Installation, Maintenance, & Operating Instructions |
x x
| 1.4 |
| Characteristic Curves |
| x |
| x |
x
23 23 00 Refrigerant Piping
| 1.4 |
| Shop Drawings |
x x
| /1.4 |
| Certification |
x x
23 25 00 HVAC Water Treatment
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Water Analysis Verification |
x x
| 1.4 |
| Material Safety Data Sheet |
| x |
x
| 1.4 |
| Maintenance and Operating Instructions |
| x |
| x |
23 31 00 HVAC Ducts and Casings
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Coordination Drawings |
x x
23 34 00 HVAC Fans
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
01 33 00 - 14A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.4 |
| Certified Sound Power Levels for each fan |
x x
| 1.4 |
| Motor Ratings Types, Electrical Characteristics and Accessories |
| x |
| x |
| x |
x
| 1.4 |
| Roof Curbs |
| x |
| x |
x
| 1.4 |
| Belt Guards |
| x |
| x |
x
| 1.4 |
| Maintenance and Operating Manuals |
| x |
| x |
| 1.4 |
| Certified Fan Performance Curves |
x x
23 36 00 Air Terminal Units
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Certificates |
x x
| 1.4 |
| Operation and Maintenance Data |
| x |
x
23 37 00 Air Outlets and Inlets
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Coordination Drawings |
x x
23 40 00 HVAC Air Cleaning Devices
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Air Filter Performance Reports |
x x
| 1.4 |
| Suppliers Warranty |
x
| x |
| x |
| 1.4 |
| Field Test Results from HEPA Filters |
x x x x
23 51 00 Breeching, Chimneys, and Stacks
| 1.4 |
| Design, Materials, Weights, Construction, Pressure, Temperature Limitations |
| x |
x x
| 1.4 |
| Drawings Showing Components, System Arrangement, and Dimensions |
x x
| 1.4 |
| Design, Construction, Allowable Movements, Movement Forces, etc. |
| x |
x x
| 1.4 |
| Damper Design, Construction, Pressure and Temperature Limitations etc. |
| x |
| x |
x
| 1.4 |
| Support Design, Locations, and Loads for Entire Assembly |
| x |
| x |
x
| 1.4 |
| Written Statement from Boiler/Burner Manufacture |
x x
23 52 34 Water-Tube Condensing Boilers
| 1.4 |
| Boiler |
| x |
| x |
x
| 1.4 |
| Burner and Fuel Trains |
| x |
| x |
x
| 1.4 |
| Burner Management (Flame Safeguard) Control System |
| x |
| x |
x
| 1.4 |
| Seismic Data |
| x |
x
| 1.4 |
| Boiler and Burner Predicted Performance Data |
| x |
| x |
x
01 33 00 - 15A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.4 |
| Pretest Data |
| x |
x
| 1.4 |
| Final Test Report |
x x
23 64 00 Packaged Water Chillers
| 1.6 |
| Manufacturer's Literature and Data |
| x |
x
| 1.6 |
| Maintenance and Operating Manuals |
x x
| 1.6 |
| Run Test Report for All Chillers |
x x
| 1.6 |
| Product Certificates |
x x
| 1.6 |
| Provide Seismic Restraints for Refrigeration Equipment |
| x |
| x |
x
23 74 13 Packaged, Outdoor, Central-Station Air Handling
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Maintenance and Operating Manuals |
x x
| 1.4 |
| Written Test Procedures |
x x
23 81 00 Decentralized Unitary HVAC Equipment
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Certification |
x x
| 1.4 |
| Performance Rating |
x x
| 1.4 |
| Operating and Maintenance Manual |
| x |
| x |
23 82 00 Convection Heating and Cooling Units
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Certificates |
x x
| 1.4 |
| Operating and Maintenance Manual |
| x |
| x |
23 82 16 Air Coils
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Installation, Operating, and Maintenance Data |
x x
| 1.4 |
| Certification Compliance |
x x
DIVISION 26-ELECTRICAL
26 05 11 Requirements for Electrical Installations
| 1.11 |
| Manuals |
| x |
| x |
01 33 00 - 16A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.11 |
| Samples |
| x |
| x |
26 05 13 Cables, High Voltage (Above 600 Volts)
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Samples |
x x
| 1.3 |
| Certifications |
x x
| 1.3 |
| Installer Approval |
x x
| 1.3 |
| Cable Voltage Ratings |
| x |
| x |
x
26 05 21 Low Voltage Electrical Power Conductors and Cables
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Certificates |
x x
26 05 26 Grounding and Bonding for Electrical Systems
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Test Reports |
x x
| 1.3 |
| Certifications |
x x
26 05 33 Raceway and Boxes for Electrical Systems
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Certification |
x x
26 05 36 Cable Tray Systems
| 1.3 |
| Materials List |
x x
| 1.3 |
| Manufacturer's Descriptive Literature and Sample |
| x |
x
| 1.3 |
| Shop Drawings |
x x
26 05 41 Underground Electrical Construction
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Certificates |
x x
26 05 71 Electrical System Protective Device Study
| 1.3 |
| Certification |
x x
| 1.3 |
| Short-Circuit and coordination Study |
| 1.3 |
| Protective Device Study |
01 33 00 - 17A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
26 09 26 Lighting Control Systems
| 1.3 |
| System Description |
x x
| 1.3 |
| Bill of Materials |
x x
| 1.3 |
| Manufacturer's Data |
| x |
x
| 1.3 |
| Operation and Maintenance Instructions Manuals |
| x |
| x |
26 12 19 Pad-Mounted Liquid Filled, Medium Voltage Transformers
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Final Up-Dated Maintenance and Operations Manual |
| x |
| x |
| 1.3 |
| Certifications |
x x
26 22 00 Low Voltage Transformers
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Certifications |
x x
26 24 11 Distribution Switchboards
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Manuals |
x
| 1.4 |
| Certifications |
x x
| 1.4 |
| Manufacturer's Seismic Qualification Certification |
x x x
26 24 16 Panelboards
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Certification |
x x
26 27 26 Wiring Devices
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Certifications |
x x
26 29 11 Low Voltage Motor Starters
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Updated Maintenance and Operating Manual |
| x |
| x |
| 1.3 |
| Certification |
x x
01 33 00 - 18A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
26 29 21 Disconnect Switches
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Certification |
x x
26 36 23 Automatic Transfer Switches
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Manuals |
| x |
| x |
| 1.4 |
| Certifications |
x x
26 51 00 Interior Lighting
| 1.4 |
| Shop Drawings |
x x
| 1.4 |
| Samples |
x x
26 56 00 Exterior Lighting
| 1.3 |
| Shop Drawings |
x x
| 1.3 |
| Manuals |
| x |
| x |
| 1.3 |
| Certifications |
x x
DIVISION 27-COMMUNICATIONS
27 05 11 Requirements for Communications Installations
| 1.10 |
| Manuals |
| x |
| x |
| 1.10 |
| Shop Drawings |
x x
27 10 00 Structured Cabling
| 1.3 |
| Manufacturer Literature and Data |
| x |
x
| 1.3 |
| Certificates |
x x
27 11 00 Communications Equipment Room Fittings
| 1.5 |
| Environmental Requirements |
x x x
| 1.5 |
| Documents |
| x |
x x
| 1.5 |
| Test Equipment List |
x x
| 1.5 |
| Samples |
x x
01 33 00 - 19A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.5 |
| Certifications |
x x
| 1.5 |
| Equipment Manuals |
x x
| 1.5 |
| Record Wiring Diagram |
| x |
| x |
x
| 1.5 |
| Surveys |
| x |
| x |
x x
27 15 00 Communications Horizontal Cabling
| 1.5 |
| Environmental Requirements |
x x
| 1.5 |
| Test Equipment List |
| 1.5 |
| Samples |
| 1.5 |
| Certifications |
| 1.5 |
| Equipment Manuals |
| 1.5 |
| Record Wiring Diagrams |
DIVISION 28- ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm
| 1.4 |
| Drawings |
x x
| 1.4 |
| Manuals |
| x |
| x |
| 1.4 |
| Certifications |
x x
DIVISION 31- EARTHWORK
31 20 11 Earth Moving (Short Form)
| 1.6 |
| Rock Excavation Report |
x x
| 1.6 |
| Soil Samples |
x x
32 05 23 Cement and Concrete for Exterior Improvements
| 1.6 |
| Manufacturer's Certificates and Data |
| x |
x
| 1.6 |
| Data and Test Reports |
| x |
x x
32 12 16 Asphalt Paving
| 1.5 |
| Data and Test Reports |
| x |
x x
| 1.5 |
| Certifications |
x x
| 1.5 |
| State Highway Department Specifications |
| x |
| x |
| 1.5 |
| Material Safety Data Sheets (MSDS) for all chemicals |
| x |
| x |
01 33 00 - 20A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
32 14 16 Brick Unit Paving
| 1.3 |
| Samples |
x x
| 1.3 |
| Test Samples |
x x
32 17 23 Pavement Markings
| 1.2 |
| Paint |
| x |
x
| 1.2 |
| Reflective Glass Beads |
| x |
x x
32 31 13 Chain Link Fences
| 1.3 |
| Manufacturer's Literature and Data |
| x |
x
| 1.3 |
| Manufacturer's Certificates |
x x
| 1.3 |
| Shop Drawings for Chain Link Fence |
x x
32 84 00 Planting Irrigation
| 1.4 |
| Manufacturer's Literature and Data |
| x |
| x |
x
| 1.4 |
| Information of a permanent service organization |
x x x
| 1.4 |
| Reproducible "as-built" drawings |
x x
| 1.4 |
| Controllable Chart |
| x |
x
32 90 00 Planting
| 1.4 |
| Samples |
x x
| 1.4 |
| Certificates of Conformance or Compliance |
x x
| 1.4 |
| Manufacturer's Literature and Data |
| x |
x
| 1.4 |
| Soil Laboratory Testing Results |
| x |
x x
DIVISION 33-UTILITIES
33 10 00 Water Utilities
| 1.5 |
| Manufacturer's Literature and Data |
| x |
x
| 1.5 |
| Testing Certifications |
x x
33 30 00 Sanitary Sewerage Utilities
| 1.4 |
| Manufacturer's Literature and Data |
| x |
| x |
x
33 40 00 Storm Drainage Utilities
| 1.4 |
| Manufacturer's Literature and Data |
| x |
| x |
x
01 33 00 - 21A
| SUBMITTAL REGISTER |
| CONTRACT NO. |
(ER 415 1-10)
| TITLE AND LOCATION VA MEDICAL CENTER ELECTRICAL SYSTEMS UPGRADES, 4150 CLEMENT STREET, SA FRANCISCO, CA |
| CONTRACTOR |
| SPECIFICATION SECTION |
| TYPE OF SUBMITTAL |
| CLASSI- FICATION |
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
M A N U A L S I N F O R M A T I O N
| SUBMIT |
| BY |
| BY |
DATE
| DATE |
| REMARKS |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| g. |
| h. |
| i. |
| j. |
| k. |
| l. |
| m. |
| n. |
| o. |
| p. |
| q. |
| r. |
| s. |
| t. |
| u. |
| v. |
| w. |
| x. |
| y. |
| z. |
| aa. |
| 1.4 |
| Department of Transportation Details of Manholes, Inlets, and Catch Basins |
| x |
| x |
x
33 51 00 Natural-Gas Distribution
| 1.5 |
| Piping |
| x |
| x |
| x |
x x
| 1.5 |
| Pipe Coatings |
| x |
| x |
| x |
x x
| 1.5 |
| Pipe Fittings and Flanges |
| x |
| x |
| x |
x x
| 1.5 |
| Manual Valves |
| x |
| x |
| x |
x x
| 1.5 |
| Earthquake Automatic Gas Shut-off |
| x |
| x |
| x |
x x
| 1.5 |
| Valve Boxes |
| x |
| x |
| x |
x x
| 1.5 |
| Gas Filter |
| x |
| x |
| x |
x x
| 1.5 |
| Gas Pressure Regulator |
| x |
| x |
| x |
x x
| 1.5 |
| Meter |
| x |
| x |
| x |
x
| 1.5 |
| Certificates of Compliance with pressure tests on gas system |
x x
DIVISION 34- TRANSPORTATION (N/A)
01 33 00 - 22A