36C25219B0009_0003.docx

DOCX document 32 KB Posted

Attached to
Upgrade Electrical Deficiencies Bldg-98 550-14-102B
Solicitation number
36C25219B0009
Issued by

About this file

36C25219B0009 0003 36C25219B0009 0003.docx

View the file

Other files

File Type Posted
36C25219B0009_0004.docx DOCX document
WAGE_DETERMINATION_checked_12-7-18.pdf PDF
550-14-102B_Specifications_12-11-2018_(002).pdf PDF
550-14-102_Drawings_Sheet_ED161C-12-11-18_(002).pdf PDF
B98_Life_Safety_Drawings_(002).pdf PDF
550-14-102B_Pre-Bid_Site_Visit_Sign-in_Sheet.pdf PDF
36C25219B0009_0002.docx DOCX document
36C25219B0009-0001000.docx DOCX document
36C25219B0009-002.pdf PDF
36C25219B0009-001.docx DOCX document
36C25219B0009-004.pdf PDF
36C25219B0009-005.pdf PDF
36C25219B0009-003.pdf PDF
36C25219B0009-000.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-13-2018 550-19-1-6921-0001 550-14-102B 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago IL 60064 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago IL 60064 To all Offerors/Bidders

36C25219B0009 10-21-2018

X X x

** HOUR & DATE for Receipt of Offers is EXTENDED to:

December 26, 2018 at 3:30pm CST** X SOLICITATION 36C25219B0009; Amendment 00003 550-14-102B: Upgrade Electrical Deficiencies Bldg-98 at VA Illiana Health Care System, Danville, IL

The purpose of Amendment 00003 to solicitation 36C25219B0009 is as follows:

1. To publish Government responses to Contractor Inquiries/RFI Questions.

2. To publish B98 Life Safety Drawings.

3. To publish revised Drawing Sheet ED161C.

4. To publish revised Specifications

5. To change the bid opening date and time to December 26, 2018 at 3:30pm CST.

Jason Hardy Contracting Officer

VA-VHA-SAOC-2019-2BB29B17

550-14-102B Upgrade, Correct Electrical Deficiencies Building #98 Government Responses to Contractor Inquiries/RFI Questions

1QCan you provide or reference any special requirements relative to infection control required by the contractor in the performance of the work?
1ASpecifications section 01 35 26 (Safety Requirements) has been updated and the following specification sections have been added to the revised project manual dated December 11, 2018, included as part of this amendment to better address VAIHCS infection control requirements: 01 01 10 IC (Infection Control); 01 01 10 FSS (Fire and Safety Control); and 01 01 10 1-HR (1 Hour Construction Smoke Barriers). Referencing specification section 01 01 10 IC (Infection Control), it is anticipated most of the work in Building 98 non-patient care areas need to comply with Type C, Group 1 (Low Risk), Class II infection control requirements; work in Building 98 patient care areas need to comply with Type C, Group 2 (Medium Risk), Class III infection control requirements. See revised ED161C included with this amendment.
2QOn Sheet ED161C, the load leaving ATS #3 Note 4 indicates to remove the feed going to EMCC-1. On Sheet ED161E Note 5 indicates the same feeder to remain. Please clarify.
2ANote 5, feeder to remain, is the correct note. The note of Sheet ED161C has been corrected. See revised ED161C included with this amendment.
3QThe specs call for set screw EMT fittings. Please confirm. There is also no mention of insulated throats on the fittings.
3ASpecification section 26 05 33 paragraph 2.1.C.2.c. has been changed to address this question. The paragraph now reads “Compression Couplings and Connectors: Concrete-tight and rain-tight, with connectors having insulated throats.”. The following was deleted: “Setscrew Couplings and Connectors: Use setscrews of case-hardened steel with hex head and cup point, to firmly seat in wall of conduit for positive grounding.”. See Specification section 26 05 33 in the revised project manual dated December 11, 2018, included as part of this amendment.
4QCan the Site Supt. be the SSHO?
4AYes.
5QThe notes on the panel schedules dictate which circuits in the existing panel extend to which new panel however the breaker sizes are not given on many of the branch circuits indicated on the panel schedule. Are we to assume most of these circuits will be 20Amps? For example existing panel EM-1A, EDP-2A, CB-1, AG-1A, etc show no breaker sizes.
5AThis information isn’t necessary on the existing electrical panel drawing sheets. Drawing sheets ES171 thru ES175 contain the existing electrical panel schedules. Beneath each panel are notes indicating the disposition of the panel. Drawing sheets ES181 thru ES-185 contain the revised electrical panel schedules all of which indicate the breaker sizes. For example, while the electrical panel schedule for EM-1A on sheet ES171 doesn’t show the existing breaker sizes, the notes for the panel state to extend the existing circuits to new panels SLBB1 and ELBB1. Drawing sheet ES181contains the panel schedules with breaker sizes for new panels SLBB1 and ELBB1..
6QPer the specifications we are responsible for lead based paint removal and disposal. Is there a Lead-Based paint inspection and Risk Assessment Report available for the facility?
6ANo, there is not a Lead-Based paint inspection and Risk Assessment Report available for this facility.
7 QPer the specifications, the following Signage work is required for this project:
"A. This section specifies the removal and replacement of interior signage with existing or new signage in areas of work and temporary interior signs as required for temporary conditions during construction.
1. Replace existing room identification signage with new if room function has changed as well as directional signage in the area that shall refer to the original function."
The room function has not been changed, so there should be no new signage needed for this project. However, contractor and the signage contractor would like to have some clarifications on the "temporary interior sign": We would need to know what groups would be moving to what locations, what those location layouts are so we could determine how many signs might be needed.
7AThere are no group moves anticipated as part of this project, so no temporary interior signs are needed.
8QWill premium time be required for cut overs from one panel to another or for panels being replaced?
8APower outages affecting patient care areas for cut overs from one panel to another will need to be done during off hours.
9QSPEC 26DWG/SECT. ED161KEY NOTE 7 - "EQUIPMENT TO REMAIN. FEEDER SHALL BE REVISED. ARRANGE FEEDERS INTO PANEL EDHBB1." HOW DOES THIS NOTE APPLY TO ED161B AT PANEL 98/EDP-2?
9AWhat this note means is the equipment (load) these feeders are connected to will remain. The feeders for these equipment items need to be moved to panel EDHBB1. As indicated on drawing sheet ED161B, panel 98/EDP-2 will be replaced by EDHBB1.
10QSPEC 26DWG/SECT. ED161KEY NOTE 30 CALLS FOR THE USE OF AN EXTERNAL GENERATOR DURING OUTAGES NOT TO EXCEED 90 MINUTES. PLEASE ADVISE IF THE CONTRACTOR RESPONSIBLE FOR PROVIDING A GENERATOR? PLEASE ADVISE IF THE FACILITY IS PROVIDING GENERATOR USE. IF YES, IS THE CONTRACTOR RESPONSIBLE FOR FUEL COSTS INCURRED DURING OUTAGES?
10ASee drawing sheet ED161F panel 98/P-P for where Note 30 applies. Currently this panel is on the Building 98 essential emergency power system which is backed-up by the Building 98 generator. At any time when facility normal and facility back-up generator power are not available to this panel more than 90 minutes, the contractor is responsible for providing a generator to power this panel. The contractor is responsible for fueling the contractor provided generator. The contractor is not responsible for fueling the VA Building 98 generator.
11QSPEC 26DWG/SECT. ES001KEY NOT 6 STATES THAT ALL WORK SHALL COMPLY WITH THE LATEST ADOPTED EDITION OF THE NATIONAL ELECTRICAL CODE, AND OTHER CODES IN FORCE. PLEASE ADVISE WHAT YEAR OF CODE IS APPLICABLE TO THIS PROJECT.
11A2017
12QSPEC 26DWG/SECT. ED161PLEASE INDICATE WHERE ESWB-1 IS LOCATED. THERE ARE REFERENCES THAT THIS IS TO BE IN ED161.
12ADrawing sheet ED161 contains the overall removal electrical riser diagram. There is no panel ESWB-1 on this drawing.
13QSPEC 26DWG/SECT. ES141PLEASE ADVISE IF THERE IS AN EXISTING GROUND FIELD TO BE REMOVED. ADDITIONALY, PLEASE ADVISE WHERE THE NEW GROUND FIELD IS TO BE LOCATED.
13AThe Contractor does not need to remove the existing ground field. The new grounding field rods shall be drilled through the floor of BB4 (Transformer Room) near the MDP.
14QSPEC 1DWG/SECT. N/APLEASE PROVIDE INFECTION CONTROL REQUIREMENTS FOR THIS PROJECT.
14ASee RFI 1Q response 1A.
15QSPEC 1DWG/SECT. N/APLEASE PROVIDE DRAWINGS INDICATING RATED PARTITIONS AND BARRIERS THAT WILL REQUIRE FIRESTOPPING.
15ASee Building 98 Life Safety Drawings provided with this amendment.
16QSPEC 1DWG/SECT. N/APLEASE ADVISE ON THE DURATION BETWEEN OUTAGES TO SCHEDULE MULTIPLE SHUTDOWNS IN THE SAME AREA.
16AOutages affecting patient care areas may be done Monday thru Friday between the hours of 6:00pm to 6:00am and weekends.
17QSPEC 1DWG/SECT. N/APLEASE ADVISE ON THE CONTRACT WORKING HOURS FOR THIS PROJECT.
17ASee specifications section 01 00 00 paragraphs 1.4.C.2 and 1.4.C.4. and outages affecting patient care areas may be done Monday thru Friday between the hours of 6:00pm to 6:00am and weekends.
18QSPEC 1DWG/SECT. N/ASPECIFICATIONS STATE CONTRACTOR SHALL PROVIDE ACCESS THROUGH OTHER CONSTRUCTION AREAS TO SERVE AS ROUTES OF ACCESS. PLEASE ADVISE WHY THIS IS NEEDED. PLEASE ADVISE IF THE FACILITY WILL PROVIDE ALTERNATE WAY FINDING SIGNAGE TO REDIRECT PATIENTS AND STAFF
18AWhen working in the various electrical closets, the contractor needs to ensure the construction barriers don’t block corridor through access and access to rooms/doors adjacent to the construction area. For example, Electrical Closet 1063 is near the doors for Corridor C1-15. Through access to this area can’t be blocked. It is not anticipated that alternate way finding signage will be needed as part of this project.
19QSPEC 1DWG/SECT. N/APLEASE INDICATE AREAS THAT WILL REQUIRE UNINTERRUPTED OPERATIONS DURING THE CONSTRUCTION PERIOD. IS THE CONTRACTOR RESPONSIBLE FOR PROVIDING A GENERATOR TO SUPPORT OUTAGES.
19ASee project manual Exhibit “A” Attachment to Section 01 32 16.15 Building B98 Design Phasing Plan and Drawing Sheet ED161 Note 30.
20QSPEC 1DWG/SECT. N/ASPECIFICATIONS STATE: "WHEN A BUILDING OR CONSTRUCTION SITE IS TURNED OVER TO CONTRACTOR, CONTRACTOR SHALL ACCEPT ENTIRE RESPONSIBILITY. THEREFORE, CONTRACTOR SHALL MAINTAIN A MINIMUM INSIDE TEMP. OF 40 DEGREES FARENHEIT AT ALL TIMES, EXCEPT AS OTHERWISE SPECIFIED." IS IT ACCEPTABLE TO ALLOW INTERIOR TEMPERATURE TO DROP BELOW 40 DEGREES FARENHEIT. IF NO, PLEASE ADVISE ON METHODS TO BE UTILZED TO MAINTAIN INTERIOR TEMPERATURES.
20AOnly rooms or closets that are part of this project will be turned over to the contractor. The Contractor will not have control of the HVAC for these areas.

See attached document: 550-14-102B Specifications_12-11-2018 (002).

See attached document: B98 Life Safety Drawings (002).

See attached document: 550-14-102 Drawings_Sheet ED161C-12-11-18 (002).

File details come from the government source that posted it.