539-22-207 Bathroom Deficiency Remediation SOW.docx
DOCX document 22 KB Posted
- Attached to
- Y1DA--Bathroom Deficiency Remediation 539-22-207
- Solicitation number
- 36C25023B0054
About this file
This scope of work document and related federal contract opportunity outline requirements for bathroom deficiency remediation projects at a Veterans Affairs medical center. The scope of work involves renovating the basement bathrooms in the main hospital building to make them ADA compliant. This will require general construction, alterations, and mechanical and electrical work, as well as necessary demolition and removal of flooring, walls, thresholds, ceilings, piping, and ductwork. Some work must be scheduled outside normal business hours due to required utility shutdowns. Bidding materials for solicitation number 36C25023B0054 will be posted at beta.SAM.gov and this is the only official location for obtaining bidding documents and amendments. The statement of work constitutes a basic project outline and bidders are advised to conduct due diligence inspections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25023B0054.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. 539-22-207
SOW
Bathroom Deficiency Remediation
SCOPE OF WORK
1. GENERAL INTENTION: The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Bathroom Deficiencies Remediation Project (539-22-207) All work shall be completed in accordance with the project drawings and specifications.
2. STATEMENT OF WORK: The scope of work involves renovation of the basement bathrooms in the main hospital and to make them ADA compliant. Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, necessary demolition and removal of flooring, thresholds, walls, ceilings, piping, ductwork and certain other items necessary for completion and installation of new work. Due to the utility shutdowns required, some of this work will have to be scheduled outside of normal facility business hours. A full list of requirements and further details are provided in the project drawings and specifications.
The scope of work involves renovation of the basement bathrooms in the main hospital and to make them ADA compliant. Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, necessary demolition and removal of flooring, thresholds, walls, ceilings, piping, ductwork and certain other items necessary for completion and installation of new work. Due to the utility shutdowns required, some of this work will have to be scheduled outside of normal facility business hours. A full list of requirements and further details are provided in the project drawings and specifications.
The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project. The period of performance is 365 calendar days.