36C25023B0028.docx

DOCX document 18 KB Posted

Attached to
Z1DA--Install Lab Water Supply 610A4-23-508 Federal contract opportunity
Solicitation number
36C25023B0028
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Install Lab Water Supply 610A4-23-508, newest first.
File Type Posted
S04 Install Lab Water Supply Sign-In.pdf PDF
36C25023B0028 0002.pdf PDF
36C25023B0028 0001-1.pdf PDF
Attachment II - Wage Determination.pdf PDF
Attachment IV - Design and Construction.pdf PDF
Attachment III - Minimum_Property_Requirement.pdf PDF
Attachment V - Request for Information.pdf PDF
Attachment VI - Drawings.pdf PDF
36C25023B0028_1.pdf PDF
Attachment VII - VHA Directive 1192.01.pdf PDF
Attachment I - Install Lab Water Supply Spec.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Presolicitation Notice Presolicitation Notice

SUBJECT*
Install Lab Water Supply 610A4-23-508

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
46240
SOLICITATION NUMBER*
36C25023B0028
RESPONSE DATE/TIME/ZONE
04-12-2023 11:30 EASTERN TIME, NEW YORK, USA
ARCHIVE
7 DAYS AFTER THE RESPONSE DATE

SET-ASIDE

PRODUCT SERVICE CODE*
Z1DA
NAICS CODE*
238220
PLACE OF PERFORMANCE
Department of Veterans Affairs

Northern Indiana Healthcare System

Fort Wayne-Campus

2121 Lake Avenue

Fort Wayne Indiana

POSTAL CODE
46805
COUNTRY
USA

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240

POINT OF CONTACT*

Contract Specialist Eric Sweatt eric.sweatt@va.gov 317-988-1511

ADDITIONAL INFORMATION

AGENCY’S URL
https://www.va.gov
URL DESCRIPTION
Homepage
AGENCY CONTACT’S EMAIL ADDRESS
eric.sweatt@va.gov
EMAIL DESCRIPTION
Preferred form of communcation

DESCRIPTION

Install Lab Water Supply Project Number: 610A4-23-508

I. DESCRIPTION OF SERVICES:

GENERAL:

Contractor shall provide all needed labor, materials, parts (to Include system components), Supervision, Project Management, Equipment, Quality and Safety Assurance, and all other necessary resources required to run a redundancy water line to the labs analyzers to prevent an interruption of utilities during outages at VA Northern Indiana Health Care System –Fort Wayne Campus located at 2121 Lake Avenue, Fort Wayne, IN 46805.

SCOPE:

To include:

A.Contractors work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide all construction and related services as specified.
1.Contractor Shall provide all related contractor administration services to perform the work such as quality control, contractor financial control, preparing and submitting required reports, and submitting necessary information as specified under this contract and within the individual TOS.
2.The work shall be conducted by the contractor in strict accordance with the contract, to include all applicable federal, state and municipal laws, codes, regulations, and directives and specifications.
3.Design shall comply with applicable sections of the Technical Information Library on the Office of Construction and Facilities Management (CFM) website www.cfm.va.gov. Project is to be designed to comply with the latest codes as outlined in the VHA Program Guide PG-18-3, Topic 1 – Codes, Standards, and Executive Orders on the TIL. Contractor will be responsible for complete functional design and provide bidding documents meeting those requirements.
4.The contractor shall coordinate all shutdowns with the COR at least 3 weeks in advance of the shutdown. This shall include interior and exterior such as work involving cranes, taking parking spaces, utilities, and public spaces.
5.Representatives of the Contractor shall be required to attend a Pre-Construction Conference prior to scheduling work, mobilizing or performing any work for any issued task order.
6.The Pre-Construction Conference shall be conducted by the CO or the designated COR and will consist of a formal review of project requirements and establish the Notice to Proceed (NTP).

7.

B.Contractor shall install a fully operational redundancy water line to the lab’s analyzers.
1.Contractor shall provide an appropriate means of disposing of all waste from remodel.
2.Contractor shall provide an inventory of waste items by weight to the VA.
3.Contractor shall install a tee fitting on the water line bypass located in the basement ceiling outside room 44.
4.Contractor shall install an insulated ¾” copper water line from the bypass in the basement up to the labs analyzer water supply located on 2nd floor in room 249
5.A tee fitting shall be installed on the water supply for the analyzers in the lab.
6.Two valves will be installed on the line so that it can be isolated with one located at the basement tie-in and one located at the lab supply tie-in on second floor.
7.Valves Shall be readily accessible to maintenance staff.
8.Pipe shall be clearly labeled as lab redundancy water supply at both ends.
9.Contractor shall provide a detailed construction plan showing means and methods to complete the project to the VA for approval before the start of construction.
10.Contractor shall provide a detailed project schedule to the VA providing timelines and milestones to the VA for approval before the start of construction
11.Contractor shall provide the VA with an estimate broken down by line items and a schedule of values as part of their proposal.
C.Regulations and requirements.
1.Work Shall be performed during normal business hours, 7:00 A.M. – 3:00 P.M. Monday through Friday.
2.The Contractor shall coordinate project expectations with the subcontractors to ensure everything in the SOW and on the specifications and drawings is included in subcontractor bids and work is properly completed prior to the final inspection.
3.Contractor shall provide a site-specific safety plan.
4.Contractor shall provide a construction schedule before the start of work.
5.Contractor shall provide Submittals to COR prior to install.

6.

D. Retainage.

(1) The Contracting Officer may retain funds—

(i) Where performance under the contract has been determined to be deficient or the Contractor has performed in an unsatisfactory manner in the past; or

(ii) As the contract nears completion, to ensure that deficiencies will be corrected and that completion is timely.

(2) Examples of deficient performance justifying a retention of funds include, but are not restricted to, the following—

(i) Unsatisfactory progress as determined by the Contracting Officer;

(ii) Failure to meet schedule in Schedule of Work Progress;

(iii) Failure to present submittals in a timely manner; or

(iv) Failure to comply in good faith with approved subcontracting plans, certifications, or contract requirements.

(3) Any level of retention shall not exceed 10 percent either where there is determined to be unsatisfactory performance, or when the retainage is to ensure satisfactory completion.

Retained amounts shall be paid promptly upon completion of all contract requirements, but nothing contained in this paragraph (a)(3) shall be construed as limiting the Contracting Officer’s right to withhold funds under other provisions of the contract or in accordance with the general law and regulations regarding the administration of Government contracts.

Formal review of project requirements shall include but is not limited to:

Designation of COR, Task Order and Site-Specific Information, Infection Control, Interim Life Safety Measures, Safety, Badging and Identification requirements, parking access to premises and building; space for material and equipment storage; delivery of materials and use of approaches; and use of corridors, stairways, elevators, eating spaces, and restrooms for Contractor personnel.

The CO will issue the Notice to Proceed before any work or mobilization is authorized to begin.

Contractors shall clearly include the solicitation number (prior to award) or the contract number (as appropriate) on all documents submitted to the VA.

TO Identification: After successful award of each task order the contractor shall clearly include the contract number, task order number, obligation number and project number on all correspondence submitted to the VA.

The solicitation number, contract number, task order number, obligation and project numbers are displayed and be easily found on all official government documents issued by the VA.

"No Government personnel, other than the Contracting Officer, have the authority to change or alter these requirements. The COR shall clarify technical points or supply relevant technical information, but no requirements in this scope of work may be altered as a sole result of such verbal clarification."

II. PAYMENT FOR SERVICES:

Payment is to be made in arrears by certified invoice. Failure to provide purchase order number on the invoice may result in the return of the invoice.