Attachment VI - Drawings.pdf
PDF 409 KB Posted
- Attached to
- Z1DA--Install Lab Water Supply 610A4-23-508 Federal contract opportunity
- Solicitation number
- 36C25023B0028
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S04 Install Lab Water Supply Sign-In.pdf | ||
| 36C25023B0028 0002.pdf | ||
| 36C25023B0028 0001-1.pdf | ||
| 36C25023B0028_1.pdf | ||
| Attachment II - Wage Determination.pdf | ||
| Attachment IV - Design and Construction.pdf | ||
| Attachment III - Minimum_Property_Requirement.pdf | ||
| Attachment V - Request for Information.pdf | ||
| Attachment VII - VHA Directive 1192.01.pdf | ||
| Attachment I - Install Lab Water Supply Spec.pdf | ||
| 36C25023B0028.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP UP
UP UP
UP
UP
UP
UP
UP
DN
PHARMACY
STORAGE
VESTIBULE
BC110 SHELL
SPACE
(FUTURE
STAIR)
BCST9OFFICE
(FUTURE
ELEV)
B609
PURCHASING
B610
LOGISTICS
MANAGEMENT
B611
LOGISTICS
SUPERVISOR
B611A
LOGISTICS
DIRECTOR
B611B
HAC
B612
OFFICE
B613
CORRIDOR
BCC3
WAREHOUSE
B614
STERILE/NON-STERILE
STORAGE
B615
WOMENS
LOCKER
ROOM
B608B
MENS
LOCKER
ROOM
B608A
LOUNGE,
STAFF
B608
ELECTRICAL
B607
B606
DATA
CONFERENCE
B604
OFFICE
B603A
CUBICLE,
CLERIVAL
STAFF
B603
OFFICE
B602
OFFICE
B601
STORAGE
B619
HAC
B618A
STORAGE
B618B
SCOPE
DECONTAMINATION
B618C
SCOPE
STERILIZATION
B605A
AUTOMATIC
CART WASH
B618E
CART PREP
B605
STORAGE
(FUTURE
DUMBWAITER)
B605D
STORAGE
(FUTURE
EQUIP.
ROOM)
B615A
HAC
B605C
PREP/ASSEMBLY
B605B
STERILIZER
ACCESS
B614A
SPS
ASSITANT
OFFICE
B616C
LOUNGE
B616
WOMENS
LOCKER
ROOM
B616A
MENS
LOCKER
ROOM
B616B
DECONTAMINATION
B618
STAIR 10
BCST10
CORRIDOR
BCC1
CORRIDOR
BCC2
TEMP
STORAGE
(FUTURE
MECH)
B617
STORAGE
MECH
WATER
TREATMENT
049C
CORRIDOR
BBC4
MAIL ROOM
049A
BIOMETRICS
(ARMAMENTARIUM
REINTEGRATION)
STAIR
MECH
DATA
053A
TOILET
CLOSET
STAIR #4
CORRIDOR
CORRIDOR
MORGUE
DATA
SOILED
UTILITY
HAC
OFFICE
ELEC
ELEC
42A
MECH
MECH
STAIR 2
STORAGE
MECH
029A
STORAGE
TOILETTOILET
REFRIGERATOR
R02
FREEZER
F01
PHARMACY
STORAGE
005A
MECH
STORAGE
008B
ELEVATOR
ELEVATOR
ELEVATOR
WET VAC
STORAGE
HAC
DATA
OFFICE
OXYGEN
STORAGE
HAC
063A
LOUNGE
045B
STORAGE
STORAGE
STORAGE
FIRE
PROTECTION
VESTIBULE
STORAGE
MECH
022A
STORAGE
STORAGE
SUPERVISOR
030A
LINEN
STORAGE
030B
STORAGE
OFFICE
030C
BREAKROOM
PHARMACY
EMS OFFICE
STORAGE
MENS
TOILET
WOMENS
TOILET
MECH
MENS
LOCKER
ROOM
TOILET
045A
MAINTENANCE
WORKSHOP
044A
MECH
036A
SOILED
UTILITY
HAC
BIO MED
OFFICE
KITCHEN
REFRIGERATOR
R01
OFFICE
FOOD
STORAGE
OFFICE
OFFICE
MECH/STORAGE
OFFICE
FOOD
PANTRY
CANTEEN
STORAGE
008A
HAC
BATH
060B
STORAGE
WOMENS
LOCKER
ROOM
EMS
DISHWASHER
EMS
STORAGE
030D
STORAGE
028A
VESTIBULE
025A
REFRIGERATOR
R03
OFFICE
050A
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/17/2020 10:06:00 AM
BIM Master Record Drawings
02.21.2020
BASEMENT FLOOR PLAN
01-A.100
506-17-601
Fort Wayne, Indiana (610A4)
VA Station No:
610A4
Jacob Morrical
Record Drawing 18007.00
Scale: 1/16" = 1'-0"
BASEMENT FLOOR PLAN
KEY PLAN
Revisions Date
STAIR 9
VHANINHammeD Gate Valve
VHANINHammeD Gate Valve
VHANINHammeD Gate Valve
VHANINHammeD Gate Valve
VHANINHammeD Gate Valve
VHANINHammeD Pen
VHANINHammeD Line
VHANINHammeD Line
VHANINHammeD Line
VHANINHammeD Line
VHANINHammeD Line
VHANINHammeD Line
VHANINHammeD Cloud+
VHANINHammeD Cloud+ 4" copper Tee with 1" valve
VHANINHammeD Cloud+
VHANINHammeD Cloud+ 1" copper line source #1
VHANINHammeD Cloud+
VHANINHammeD Cloud+ 4" copper Tee with 1" valve
VHANINHammeD Cloud+
VHANINHammeD Cloud+ 1" copper line source #2
VHANINHammeD Cloud+
VHANINHammeD Cloud+ 1" - 3/4" copper valves. 3/4" copper Tee's. 2 each
VHANINHammeD Line
VHANINHammeD Cloud+
VHANINHammeD Cloud+ 3/4" copper back flow/check valve
| Sheets |
| 01-A.100 - BASEMENT FLOOR PLAN |
| 01-A.101 - FIRST FLOOR PLAN |
| 01-A.102 - SECOND FLOOR PLAN |
| 01-A.103 - THIRD FLOOR PLAN |
| 01-A.104 - FOURTH FLOOR PLAN |
| 01-A.105 - FIFTH FLOOR PLAN |
| 01-A.106 - PENTHOUSE FLOOR PLAN |
| 01-A.120 - RCP - BASEMENT |
| 01-A.121 - RCP - FIRST FLOOR |
| 01-A.122 - RCP - SECOND FLOOR |
| 01-A.123 - RCP - THIRD FLOOR |
| 01-A.124 - RCP - FOURTH FLOOR |
| 01-A.125 - RCP - FIFTH FLOOR |
| 01-A.200 - EAST & WEST ELEVATIONS |
| 01-A.201 - NORTH & SOUTH ELEVATIONS |
| 01-CAI.100 - CAI - BASEMENT |
| 01-CAI.101 - CAI - FIRST FLOOR |
| 01-CAI.102 - CAI - SECOND FLOOR |
| 01-CAI.103 - CAI - THIRD FLOOR |
| 01-CAI.104 - CAI - FOURTH FLOOR |
| 01-CAI.105 - CAI - FIFTH FLOOR |
| 01-CAI.106 - CAI - PENTHOUSE FLOOR |
| 01-SOC.100 - SOC - BASEMENT |
| 01-SOC.101 - SOC - FIRST FLOOR |
| 01-SOC.102 - SOC - SECOND FLOOR |
| 01-SOC.103 - SOC - THIRD FLOOR |
| 01-SOC.104 - SOC - FOURTH FLOOR |
| 01-SOC.105 - SOC - FIFTH FLOOR |
| G.001 - COVER SHEET |
| SOC.000 - DESCRIPTION PAGE |
File details come from the government source that posted it. Updated .