5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
583-22-4-669-0065
None
36C250
Department of Veterans Affairs
Network Contracting Office (NCO) 10
260 E. University Avenue
Cincinnati OH 45219
36C250
Department of Veterans Affairs
Network Contracting Office (NCO) 10
260 E. University Avenue
Cincinnati OH 45219
To all Offerors/Bidders
36C25022Q0950
08-25-2022
X
X X
3620162-669-850300-2543-583 010055590
This amendment is being posted to answer questions received about the project's scope. That information begins on page two.
Quotes will be due, via email, 09/01/2022 at 10:00 A.M. EST.
Luke A. Turner
Contracting Officer
Begin Q&A:
Do we have to use the Mobile Containment Cart on every damper where a ceiling tile or panel is removed? The scope of work says, "where the facility deems necessary". Although a containment cart is safe they significantly increase the time it takes to complete damper inspections
– Only in patient care areas. The majority of the dampers are located within mech. spaces. A very small percentage are located within patient care areas.
Is the following statement in the contract accurate? "The contractor shall plan to provide all work after hours (i.e., after 5:30 p.m. during the week) and on weekends."
– Yes. All work will need to be accomplished after hours. There will be times when an AHU will need to be shut down in order to test certain dampers, especially the smoke dampers. The smoke dampers make up a much smaller percentage of the dampers to be tested overall.
Please Confirm Fusibile Link Replacement on every damper?
– Yes. The fusible link on a fire damper will need to be replaced if it has been heated or damaged during testing.
Please confirm vacuuming and lubricating every damper?
– No. This is a testing service project only. Damper maintenance is not a requirement.
Will all the dampers need to be tested in base year instead of Option Year 1 & 2?
– We would like for the Year 1 dampers (284) to be tested first and the date that they are all tested documented.
The remaining dampers can be tested any time after that within the required period of performance.
Can you please confirm the Period of Performance for the fire dampers?
– Complete all required work within 365 cal. days. The SOW states “180 cal. days for Year 1 dampers, another
180 cal. days for Year 2 dampers, and another 180 cal. days for Year 3 dampers, but that’s because the work was originally going to be accomplished on a year-to-year basis. The Year 1 dampers must be addressed first within the first 180 cal. days to meet compliance with NFPA 101 requirements.
Can you confirm if a pre-survey of the fire dampers will be required? If so, what would a pre-survey include?
Normally the survey and inspection of a damper is done at the same time?
– Yes, it is required by the SOW. It is highly recommended that a survey to locate and identify all dampers be conducted prior to testing each group of dampers because the workers could show up to work an 8-hour shift and not be able to find the dampers that they were scheduled to test. Thus, wasting their time.
Can you confirm that the fire/smoke dampers will need to be updated on As-Built Drawings provided by the VA?
Do the current drawings show the location and damper ID number?
– Yes, as-built drawings are required to document all of the dampers that are required to be tested. The current drawings that have been provided show the unique ID and location of each damper, which is probably 99% accurate. The contractor will need to update (red line) the drawings if any changes are required.
End Q&A
***END OF AMENDMENT***