36C25020B0053 0001.docx
DOCX document 29 KB Posted
- Attached to
- Y1PZ--PARKING STRUCTURE FALL PROTECTION 506-20-105 Federal contract opportunity
- Solicitation number
- 36C25020B0053
About this file
This announcement describes a forthcoming solicitation for fall protection fence installation work. The Department of Veterans Affairs will issue an invitation for bid on or around June 11th, 2020 for project 506-20-105 at the Ann Arbor VA Medical Center. The selected contractor will remove existing railings on levels C, D and E of the West Parking Structure, repair concrete, fabricate and install fall deterrent fencing per plans to a height of 96 inches. The contractor must prepare a phasing plan and shop drawings for review. The project completion period is 150 days. The NAICS code is 236220 and size standard is $39.5 million. The government intends to award a firm fixed price contract within 120 days of bid receipt. Interested parties should monitor the Federal Business Opportunities website for solicitation documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0053 0005.docx | DOCX document | |
| Porject 506-20-105 RFI Answers.docx | DOCX document | |
| 36C25020B0053 0004.docx | DOCX document | |
| 36C25020B0053 0003.docx | DOCX document | |
| 36C25020B0053 0002_1.docx | DOCX document | |
| Wage Rates - MI2020100 Updated 7-10-2020.pdf | ||
| 506-20-105 Specifications - Revised 7-20-2020.pdf | ||
| 506-20-105 West Parking Structure Fall Protection Drawings - Revised 7-20-2020.pdf | ||
| 506-20-105 West Parking Structure Fall Protection Drawings.pdf | ||
| 506-20-105 Specifications.pdf | ||
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C25020B0053_1.docx | DOCX document | |
| 506-20-105 RFI Form.docx | DOCX document | |
| MI20200100 01-24-2020.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-23-2020 506-20-105 Department of Veterans Affairs Network Contracting Office (NCO) 10 6150 Oak Tree Blvd., Suite 300 Independence OH 44131 Department of Veterans Affairs Network Contracting Office (NCO) 10 6150 Oak Tree Blvd., Suite 300 Independence OH 44131 To all Offerors/Bidders
36C25020B0053
X x
***IMPORTANT BID OPENING INFORMATION***
1. There is NO visitor access to Dominos Farm. Contracting personnel will be waiting by the entrance to Lobby M to receive dropped off bids. You may drop off your bid, observing social distancing, and call in from your vehicles.
DATE: Thursday, July 30, 2020 TI M E: 2:00PM Local Time (May join VANTS call at 1:50 PM Local Time) DROP OFF LOCATION: 24 Frank Lloyd Wright Drive, Lobby M Entrance, Ann Arbor, MI 48105, or by mail through FedEx or UPS.
VANTS LINE: 1 (800) 767-1750 CODE 09363#, may join at 1:50PM Local Time
2. Revised Scope of Work, Specifications, and Drawings - RFI Responses and Sign-in sheet.
3. See SF 30 Continuation Page for details.
RICHMOND L MCCLOUD
Contracting Officer West Parking Structure Fall Protection Project # 506-20-105 SF-30 Continuation Page
Changes to Description of Work
The scope of work description shall be amended to read as follows:
The intent of this project is to install fall deterrent fence on levels C, D and E of the West Parking Structure located at the VA Ann Arbor Healthcare System, 2215 Fuller Road, Ann Arbor, Michigan. The Contractor shall fabricate fall deterrent fence and install to meet VA standards and governing codes. Existing spandrel beam railings shall remain in place. According to the VA Parking Design Manual, the top of the fall deterrent fence must be 96” from the parking surface. The fall deterrent fence on level E shall be a continuous barrier across columns and walls. The Contractor shall prepare a phasing plan and shop drawings for VA review.
Changes to Specifications
Section 05 12 00:
· Deleted entire section
Section 05-50-00
· 1.2 Related Work: deleted reference to Section 09 06 00 Schedule for finishes
· 1.2 Related Work: deleted reference to Section 09 91 00 Painting
· Page 7: deleted spec writer notes
· Page 8: deleted spec writer notes
Section 26 05 11
· Deleted entire section
Section 26 05 26
· Deleted entire section
Section 26 41 00
· Deleted entire section
Changes to Plans
Sheet GI003
· Revised numerical order of phases
· Added notes for phasing plan – see revision cloud
Sheet AS104
· Deleted notes for lightning protection
· Added detail 10 – see revision cloud
Request for Information (RFI) Responses
1. 1.2B references Painting Section 09 91 00. Will this specification section be issued?
Response: Section 05 12 00 and the referenced painting section 09 91 00 is not applicable to this project. Section 05 12 00 will be entirely removed from the specification in an upcoming amendment.
2. Section 26 05 11 Part 1, 1.1 B&C; Part 1.10 A reference drawings for location of electrical equipment, electrical systems, conduit ampacities.
Section 26 05 26 Part 2.1 C states conduit sizes shown on drawings
Section 26 41 00 Part 3.1 references drawings
Will electrical drawings be issued?
Response: Section 26 05 11, Section 26 05 26, and Section 26 41 00, along with the associated work described in those sections, are not applicable to this project’s scope of work. These sections will be removed from the specification in an upcoming amendment.
List of Attachments See attached document: 506-20-105 Specifications - Revised 7-20-2020.
See attached document: 506-20-105 West Parking Structure Fall Protection Drawings - Revised 7-20-2020.
See attached document: Wage Rates - MI2020100 Updated 7-10-2020.
File details come from the government source that posted it. Updated .