BID SCHEDULE 506-19-103.docx
DOCX document 23 KB Posted
- Attached to
- Z1DA-- Repair Parking Structure - 506-19-103 Federal contract opportunity
- Solicitation number
- 36C25020B0045
About this file
This bid schedule and solicitation announcement call for bids for repair work on parking structures at the VA Ann Arbor Healthcare System in Ann Arbor, Michigan. The project includes repairing concrete surfaces, installing fall protection systems, replacing LED lighting fixtures, tuckpointing bricks, replacing expansion joints, repainting parking markings, replacing signage, repairing storm piping, painting ceilings, renovating a hospital entrance, repairing roof leaks, renovating stairwells, and adding ventilation to stairwells. Bids are due by an unspecified date in June 2020. The contract will be a firm fixed price contract awarded within 120 days of bid receipt. The North American Industry Classification System code is 2389900 and the size standard is $16.5 million. The contract value is estimated between $1 million and $5 million. The contractor must complete all work within 380 calendar days of the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
36C250XXXXXX
Project 506-19-103 Repair Parking Structures
ALL ITEMS MUST BE PRICED IN ORDER TO BE RESPONSIVE TO THE SOLICITATION
Per Veterans Affairs Acquisition Regulation (VAAR) Provision 852.236-92 – NOTICE TO BIDDERS – ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019) The low bid shall be the Bidder that—
(i) Is otherwise eligible for award; and
(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.
The included Deductive Bid Items are listed in descending order of priority in the event funds are not available to award Bid Item I, Base Bid, Entire Project. Deductive No. 1 is the highest priority, Deductive No. 2 second highest priority, Deductive No. 3 third highest priority, Deductive No. 4 fourth highest priority and Deductive No. 5 is the lowest priority.
BID ITEMS
Bid Item No. I, Base Bid, Entire Project: Contractor shall furnish all labor, materials, equipment, supervision, and all other necessary items to complete entire project 506-19-103 Repair Parking Structures per contract documents. Work location is the VA Ann Arbor Healthcare System, 2215 Fuller Road, Ann Arbor, MI 48105
Performance Period for Bid Item I, Base Bid, Entire Project is Three Hundred Eighty (380) Calendar Days after receipt of Notice to Proceed.
Total Bid Item No. I Base Bid, Entire Project: $________________________ (Lump Sum)
Bid Item No. II, Deductive No. 1: Deduct all work related to the level C entrance modernization of the east garage.
Performance Period for Bid Item No. II, Deductive No. 1 is Three Hundred Eighty (380) Calendar Days after receipt of Notice to Proceed.
Deductive Amount No. 1: Subtract -$________________________
Bid Item No. III, Deductive No. 2: Deduct all work related to the ceiling painting of level C of the east garage.
Performance Period for Bid Item No. III, Deductive No. 2 is Three Hundred Eighty (380) Calendar Days after receipt of Notice to Proceed.
Deductive Amount No. 2: Subtract -$________________________
Bid Item No. IV, Deductive No. 3: Deduct all work related to the signage replacement of the west garage.
Performance Period for Bid Item No. IV, Deductive No. 3 is Three Hundred Eighty (380) Calendar Days after receipt of Notice to Proceed.
Deductive Amount No. 3: Subtract -$________________________
Bid Item No. V, Deductive No. 4: Deduct all work related to the lighting replacement of the west garage.
Performance Period for Bid Item No. V, Deductive No. 4 is Three Hundred Fifty (350) Calendar Days after receipt of Notice to Proceed.
Deductive Amount No. 4: Subtract -$________________________
Bid Item No. VI, Deductive No. 5: Deduct all work related to the signage replacement of the east garage.
Performance Period for Bid Item No. VI, Deductive No. 5 is Three Hundred Fifty (350) Calendar Days after receipt of Notice to Proceed.
Deductive Amount No. 5: Subtract -$________________________
File details come from the government source that posted it. Updated .