RFI Responses.pdf
PDF 336 KB Posted
- Attached to
- Z1DA--Repair Building 8 610-20-202
- Solicitation number
- 36C25020B0034
About this file
This document contains responses to requests for information (RFIs) related to a federal construction contract opportunity. The contract involves repair work at Building 8 of the Northern Indiana Veterans Affairs Medical Center in Marion, Indiana. The scope of work includes mold remediation, fire suppression system repairs, ceiling and flooring replacements, and other repairs. The RFI responses clarify specification details, material requirements, safety protocols, and other project questions from potential offerors. Specific issues addressed relate to mold remediation standards, fire suppression specifications, required on-site supervision, hazardous materials handling, finish materials, insulation thickness, marking and layout guidelines, and additional scope items. The responses aim to ensure offerors have the information needed to understand requirements and prepare responsive bids for the opportunity when solicited.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 36C25020B0034 A00002.pdf | ||
| Amendment 36C25020B0034 A00001.docx | DOCX document | |
| 36C25020B0034-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
PROJECT NUMBER: 610-20-202 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Repair Building 8
PROJECT LOCATION:
Northern IN VAMC Marion 1700 E. 38th Street, Marion, IN 46953
TO:
Nathan Heikkinen, Contract Specialist Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Nathan.heikkinen@va.gov
RFI NO.:01
DATE:5/18/2020
SPEC/DWG. REFERENCE(s):
MOLD REMEDIATION SPEC
REPLY NEEDED BY: ASAP
INFORMATION NEEDED:
Please provide specification for the DIV 02 - Mold Remediation scope of work noted on the solicitation.
REPLY:
RFI’s will be answered by amendment(s) posted to Contract Opportunities (FBO).
There is no Mold spec under DIV 02. Mold remediation shall be completed per industry standards.
REPLY FROM: Zach McDaniel DATE: 5/21/2020
ATTACHMENTS: COPY TO: Nathan Heikkinen the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:02
FIRE SUPPRESSION SPEC
Please provide specification section for the DIV 21 – Fire Suppression scope of work noted in the solicitation.
RFI’s will be answered by amendment(s) posted to Contract Opportunities (FBO).
No spec will be provided. Busted sprinkler head shall be replaced to match existing.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:03
SUPERINTENDENCE FOR PROJECT
On sheet 20-101M Drawings Note 9 – please confirm if the foreman, superintendent, or other representative must be provided by the prime contractor.
RFI’s will be answered by amendment(s) posted to Contract Opportunities (FBO).
Yes, On-site superintendent provided by Prime Contractor.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:04
WOOD FLOORING
Please confirm specification for the wood planked ceiling that prime contractor is to match. Do you have a basis of design that you can provide?
Match Existing the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:05
20-101M – FIRE SUPPRESSION
Are we to paint all existing fire suppression piping “red” as noted on the contract documents, or just the new work to be put in place?
Yes, all except attic. Only new work is replacement of busted sprinkler head in attic.
ATTACHMENTS: COPY TO:
Nathan Heikkinen the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:06
GENERAL REQUIREMENTS
Please confirm on site management expectations from contractor. Is a full-time superintendent required at all times during construction? Can the SSHO and Superintendent have collateral duties?
30 OSHA Superintendent must be on site at all times.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:07
20-1010 / 01 35 26
Please confirm that the prime contractor is responsible to provide third party CSP or CSHT for all hazardous material work.
Certified Industrial Hygienist is required for all hazardous material work.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:08
20-1010 / 01 35 26
Please confirm if there is an existing hazardous material report that can be provided for the scope of work.
No report is available.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:09
FINISH SCHEDULE – 09 06 00
Please confirm manufacturer for carpet that is scheduled for installation. Please provide basis of design for bidding purposes. This is not shown in either the finish schedule or carpet specification.
Please confirm manufacturer for painting that is scheduled for installation. Please provide for basis of design purposes. This is not shown in either the finish schedule or paint specification.
REPLY:
Carpet is = to Interface-Composure
Paint is = to Sherwin-Williams Superpaint Satin finish. Floor Epoxy is = to Sherwin-Williams Armorseal 8100.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:10
INSULATION THICKNESS
20-101
Please confirm extend contractor is to remove and replace of insulation in the attic. Also, please confirm material type and specification for this. To what thickness are we to install this to?
REPLY:
RFI’s will be answered by amendment(s) posted to Contract Opportunities (FBO).
Contractor is to remove and replace foam insulation in the attic. Material is spray foamed in-place Polyurethane. Min. 5" thick or R-30.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:11
20-101M
Per coordinating notes and site walk – there are marking requirements per general note 18. Is there a line layout the VA could provide that we could match existing?
Layout is not available, Contractor shall match existing.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.:12
20-101M
Please confirm scope of work that is required on the ramp between the first and second floors of the building. It was mentioned on the site walk there is some painting required in the space. Is there any other scope of work prime contractor is to consider?
Painting only for ramp area. Per Painting Specs.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 13 DATE: 5/18/20
Drawing #2 General note 13
REPLY NEEDED BY: 5/22/20
INFORMATION NEEDED: Can the ceiling be primed before install?
RFl's will be answered by amendment{s} posted to Contract Opportunities (FBO}.
Yes.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 14 DATE: 5/18/20
Drawing #2 General note 13
INFORMATION NEEDED: Can the paint be sprayed in the Gym?
RFl's will be answered by amendment(s) posted to Contract Opportunities (FBO).
Yes. However, back rolling is required for all coats. Contractor is responsible for cleaning all overspray.
ATTACHMENTS : COPY TO: Nathan Heikkinen
PROJECT TITLE: Repair Building 8 requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 15 DATE: 5/18/20
Drawing #2 General note 10
INFORMATION NEEDED: Will a 2 person lift approximately 3,000lbs be allowed on concrete under the wood floor?
REPLY:
RFl's will be answered by amendment(s} posted to Contract Opportunities (FBO).
Yes.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submtited. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from respondina in a timelv manner.
PROJECT
LOCATION:
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 16
DATE: 5/18/20
Drawing #2 General note 12
INFORMATION NEEDED: The duct sock above the Gym floor must be removed, dismantled, & cleaned.
Is it possible to replace with new if the cost is similar?
Yes if it matches existing.
REQUEST FOR INFORMATION (RFI}
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.: 17 DATE: 5/18/20
Drawing #2
REPLY NEEDED BY: &22 0
INFORMATION NEEDED: It says to protect bottom 7' of paneling on Gym wall but that paneling is buckled from moisture. How do we address that issue?
See Reply to RFI #18.
REQUEST FOR INFORMATION {RFI)
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 18 DATE: 5/18/20
Drawing #2 General note 11
INFORMATION NEEDED: Because the bottom 7' of Gym wall is buckled from moisture, there is almost certainly mold behind the walls. How do we address remediating all the mold?
REPLY:
RFl's will be answered by amendment(s) posted to Contract Opportunities (FBO).
Carefully remove and protect existing paneling, remediate mold and reinstall paneling.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 19 DATE: 5/18/20
SPEC/DWG. REFERENCE(s}:
Drawing #2
INFORMATION NEEDED: Is there any wall tile or flooring to be replaced in the basement other than the carpet specified in the drawing. Including the bathrooms?
No.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 20 DATE: 5/18/20
SPEC/DWG. REFERENCE{s):
Drawing #2 General note 14
INFORMATION NEEDED: Is there an R-value that needs to be met with foam in Gym ceiling?
RFl's will be answered by amendment(s} posted to Contract Opportunities (FBO}.
See Reply to RFI # 10.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from resoondina in a timely manner.
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 21 DATE: 5/18/20
Drawing #2 General note 18
INFORMATION NEEDED: Is there a specific spec regarding the polyurethane coating on Gym floor?
RFl's will be answered by amendment(s) posted to Contract Opportunities (FBO).
099100 Painting the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 22 DATE: 5/18/20
Drawing #2 General note 11
INFORMATION NEEDED: There is significant water intrusion that enters the basement after it rains.
How do we go about certifying that all the mold is remediated if it appears after the water comes in? How to warranty flooring if the water consistently comes in?
Water Intrusion will be address by the VA before start of work.
the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from respondinq in a timely manner.
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFINO.: 23 DATE: 5/18/20
Drawing #2 General note 14
INFORMATION NEEDED: Is there a spec on the layer between the tongue & groove ceiling board
& the foam insulation?
No.
REPLY FROM : Zach McDaniel DATE: 5/21/2020 the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the
Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100
RFI NO.: 24 DATE: 5/22/2020
REPLY NEEDED BY:
Is the concrete underneath the gym floor level or is the sleeper system installed level?
This will affect demolition costs as well as the type of system to go back in.
REPLY:
RFI’s will be answered by amendment(s) posted to Contract Opportunities (FBO).
The concrete floor as a slight slope. The sleeper system will need to be installed level.
REPLY FROM:
Zach McDaniel
DATE:
5/26/2020
File details come from the government source that posted it. Updated .