36C25019B0050-028.pdf

PDF Posted

Attached to
Upgrade Fire Radio System 539-17-201 Federal contract opportunity
Solicitation number
36C25019B0050
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This notice announces an upcoming Invitation for Bid for an upgrade fire radio system project at the Veterans Affairs Cincinnati VAMC. The solicitation will have a total set-aside for Service-Disabled Veteran-Owned Small Businesses. Interested SDVOSBs must be registered in the Vendor Information Pages and SAM databases. The project involves upgrading the fire radio system across an existing 11-story medical facility housing clinical and administrative functions. The required work includes installation of a new distributed antenna system, equipment racks and cabling throughout multiple floors and mechanical spaces. The total project value is estimated between $500,000 to $1,000,000. The bid due date will be provided in the full solicitation package to be posted on August 14, 2019. The contract duration following notice to proceed cannot exceed 185 calendar days. The solicitation number is 36C25019B0050 and the NAICS code is 236220.

36C25019B0050 Attach 3 Drawings 02.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Fire Radio System 539-17-201, newest first.
File Type Posted
36C25019B0050-0003000.docx DOCX document
36C25019B0050-0003000.docx DOCX document
36C25019B0050-0002001.pdf PDF
36C25019B0050-0002002.pdf PDF
36C25019B0050-0002000.docx DOCX document
36C25019B0050-0002000.docx DOCX document
36C25019B0050-0002002.pdf PDF
36C25019B0050-0002001.pdf PDF
36C25019B0050-0001000.docx DOCX document
36C25019B0050-0001000.docx DOCX document
36C25019B0050-025.docx DOCX document
36C25019B0050-029.docx DOCX document
36C25019B0050-027.pdf PDF
36C25019B0050-030.docx DOCX document
36C25019B0050-026.docx DOCX document
36C25019B0050-029.docx DOCX document
36C25019B0050-026.docx DOCX document
36C25019B0050-028.pdf PDF
36C25019B0050-030.docx DOCX document
36C25019B0050-025.docx DOCX document
36C25019B0050-027.pdf PDF
36C25019B0050-000.docx DOCX document
36C25019B0050-000.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Department of Veterans Affairs Medical Center

LEVIN PORTER ASSOCIATES

ARCHITECTURE PLANNING INTERIOR DESIGN

3011 NEWMARK DRIVE

MIAMISBURG, OH 45342

937.224.1931 P

937.224.3091 F

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

HEAPY ENGINEERING

MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

937.224.5777 F

52109.00

3/

/2

2:

:2

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

COVER SHEET

G001

WSVP/BW

539-17-201

Cincinnati, Ohio

UPGRADE FIRE RADIO SYSTEM

3200 VINE STREET CINCINNATI, OHIO

SHEET

NO. SHEET NAME

GENERAL

G001 COVER SHEET

G002 STANDARDS INDEX

G003 CODE REVIEW

ARCHITECTURAL

A101 SIGNALS CLOSET DEMOLITION PLANS

A102 TENTH-ELEVENTH FLOOR PENTHOUSE DEMOLITION PLANS

A103 SIGNALS CLOSET NEW WORK PLANS

A104 TENTH-ELEVENTH FLOOR PENTHOUSE NEW WORK PLANS

TECHNOLOGY

ET-001 LEGENDS, SYMBOLS &INDEX OF DRAWINGS

ET-099 PIPE BASEMENT PLAN

ET-100 BASEMENT PLAN

ET-101 FIRST FLOOR PLAN

ET-102 SECOND FLOOR PLAN

ET-103 THIRD FLOOR PLAN

ET-104 FOURTH FLOOR PLAN

ET-105 FIFTH FLOOR PLAN

ET-106 SIXTH FLOOR PLAN

ET-107 SEVENTH FLOOR PLAN

ET-108 EIGHTH FLOOR PLAN

ET-109 NINTH FLOOR PLAN

ET-110 TENTH - ELEVENTH FLOOR PLAN

ET-501 DETAILS

VICINITY MAP

NORTH

GENERAL PROJECT NOTES

SHEET INDEX

A. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH SIGNAGE.

B. ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN

DISABILITIES ACT (ADA) AND THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) GUIDELINES.

C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY SERVICES, CAUSE

NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF THIS WORK.

D. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY

GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED.

E. DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL

COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH MATCH ADJACENT FINISHED COLORS UNLESS NOTED OTHERWISE.

F. ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED TO MATCH

EXISTING ADJACENT CONSTRUCTION.

G. ALL INTERIOR WOOD BLOCKING, MISC. FRAMING, PANELS, ETC. THAT ARE TO BE USED SHALL BE FIRE-RETARDANT TREATED. ALL EXTERIOR WOOD

BLOCKING SHALL BE PRESSURE TREATED.

H. ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-STRUCTURAL ITEM, COMPONENT OR SYSTEM.

I. ALL NEW PENETRATIONS IN ALL EXISTING, MODIFIED OR NEW CORRIDOR WALLS, SMOKE AND FIRE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED WITH

FIRE RESISTANT CAULKING OR SEALANT THAT PREVENTS THE PASSAGE OF SMOKE AND/OR FIRE ALL COMPLYING TO THE LIFE SAFETY AND FIRE CODE AND

MEETING EXISTING CONDITIONS.

J. NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE CONTRACTOR TO AVOID

DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.

K. NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE BUILDING PRIOR TO

BEGINNING CONSTRUCTION AND DELIVERY OF COMPONENTS TO THE SITE.

L. INTERIOR DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE

M. INTERIOR CONCRETE SLABS AND PATCHES, USE MIN. 10 MIL REINFORCED POLYETHYLENE VAPOR BARRIER UNDER CONCRETE SLAB. TROWEL SURFACE

SMOOTH AND FINISH FLUSH WITH EXISTING SLAB ELEVATION. SEAL VAPOR BARRIER WATERTIGHT.

N. CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR A COMPLETE AND FULLY OPERATIONAL

PROJECT IN ACCORDANCE WITH THE VETERAN ADMINISTRATION'S REQUIREMENTS

O. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVAL AND REPLACEMENT

WORK SPECIFIED AND REQUIRED TO ACCOMMODATE THE REQUIRED IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY REPLACEMENT, REPAIRING, AND PATCHING. WORK TO BE DONE BY WORKMAN SKILLED AND REGULARLY EMPLOYED IN THE TRADES INVOLVED.

P. CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE ALL WORK. NO EXTRA COSTS FOR LACK OF PROPER PLANNING AND EXECUTION SHALL BE

CONSIDERED.

Q. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR MATERIAL DIFFERENCES PRIOR TO PERFORMING ANY WORK AND SHALL NOTIFY THE COR OF ANY

DISCREPANCIES.

Revision s

Date

100% BID DOCUMENTS 03/13/2019

KEY PLAN

& AND

∠ ANGLE

@ AT

℄ CENTERLINE

DIAMETER OR ROUND

Ÿ SQUARE

# POUND OR NUMBER

A# AIR WITH NUMBER OF

VALVES INDICATED

A/C AIR CONDITIONING

ABI ADDITIONAL BID ITEM

ACOUS ACOUSTICAL

ACC ACCESSIBLE

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADD'L ADDITIONAL

AED AUTOMATED EXTERNAL

DEFIBRILLATOR

ADJ. ADJUSTABLE or ADJACENT

A.F.F. ABOVE FINISHED FLOOR

AGGR AGGREGATE

AL or ALUM ALUMINUM

ALT ALTERNATE

ANOD ANODIZED

APROX APPROXIMATE

ARCH ARCHITECT (URAL)

ASB ASBESTOS

ASC ACID STORAGE CABINET

ASPH ASPHALT

AUTO AUTOMATIC----------------------------------------

BBD BULLETIN BOARD

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLK'G BLOCKING

BM BEAM

BOT BOTTOM

BRG BEARING

BRZ BRONZE

BSMT BASEMENT

BSC BIOSAFETY CABINET----------------------------------------

C. COURSES

CAB CABINET

C.B. CATCH BASIN or CHALKBOARD

CEM CEMENT

CER CERAMIC

CG CORNER GUARD

CHAM CHAMFER

CHK. BD. CHALK BOARD

C.I. CAST IRON

C.J. CONTROL JOINT

C.L. CENTER LINE

CLG CEILING

CLKG CAULKING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CLEAN OUT

COL COLUMN

COMB COMBINATION

COMPT COMPARTMENT

CONC CONCRETE

CONF CONFERENCE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

CORR CORRIDOR

CP CLOSURE PANEL OR FINISHED PANEL

CS CUPSINK, SEE SPECIFICATIONS FOR SIZE

CSMT CASEMENT

CT CERAMIC TILE

CTR CENTER

CTSK COUNTERSUNK

CW COLD WATER

D DATA

D.A. DOOR ACTUATOR

DBL DOUBLE

DEPT DEPARTMENT

DEPART DEPARTURE

DET DETAIL

DF DRINKING FOUNTAIN

DI DIONIZED WATER

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DIV DIVISION

DN DOWN

D.O. DOOR OPENING

DR DRYING RACK or DOOR

DS DOWN SPOUT

DSP DRY STANDPIPE

DW DUMBWAITER

DWR DRAWER

DWG DRAWING (S)

E EAST OR ELECTRIC OUTLET, COORDINATE

WITH ELECTRICAL CONTRACTOR

EA EACH

E.C.C. ENVIRONMENTAL CONTROL CHAMBER

EJ EXPANSION JOINT

EL or ELEV ELEVATION or ELEVATOR

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENLRG'D ENLARGED

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP EQUIPMENT

ES EMERGENCY SHOWER STATION BY PLUMBING CONTRACTOR

EW EMERGENCY EYEWASH BY PLUMBING CONTRACTOR

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EX or EXIST EXISTING

EXPO EXPOSED

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAK FIRST AID KIT

FB FIRE BLANKET or FLAT BAR

FBD FIREBOARD

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FGL FIBERGLASS

FH FUME HOOD

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FHS FIRE HOSE STATION

FIN FINISH

FL or FLR FLOOR

FLASH FLASHING

FLEX FLEXIBLE

FLUOR FLUORESCENT

FO FACE OF

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY (CMU)

FOS FACE OF STUDS

FP FIREPOOF

FR(T) FIRE RETARDANT (TREATED)

FS FILLER STRIP or FULL SIZE

FSC FLAMMABLE STORAGE CABINET

FT FOOT OR FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

FV FIELD VERIFY

G# GAS COCK WITH NUMBER OF VALVES INDICATED

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GL GLASS or GRID LINE

GND GROUND

GR GUARD RAIL or GROUND

GT GROUT

GYP GYPSUM

HB HOSE BIBB

HBD HARDBOARD

HC HOLLOW CORE

HD HEAVY DUTY

HDR HEADER

HDWD HARDWOOD

HDWE HARDWARE

HEX HEXAGON

HGT HEIGHT

HM HOLLOW METAL

HORZ HORIZONTAL

HR HOUR

HTG HEATING

HVAC HEATING / VENTILATION / AIR CONDITIONING

HW HOT WATER

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER (DIM)

INSUL INSULATION

INT INTERIOR

ISO ISOMETRIC

JAN JANITOR

JC JANITOR'S CLOSET

JT JOINT

KIT KITCHEN

KPL KICKPLATE

KS KNEE SPACE

L LEFT

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LH LEFT HAND

LKR LOCKER

LOC LOCATION

LLD LEAD LINED DOOR

LT LIGHT

LTD LIMITED

LTL LINTEL

LVL LEVEL

LVR LOUVER

M METER

MACHINE

MAINT MAINTENANCE

MACH MACHINE

MAS MASONRY

MAX MAXIMUM

MM MILLIMETER

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MLD MOLDING

MO MASONRY OPENING

MOD MODIULAR or MODIFY (IED)

MOV MOVABLE

MT MOUNT

MTL or MET METAL

MTD MOUNTED

MUL MULLION

MWK MILLWORK

N NORTH

NAT NATURAL

NI NICKEL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NON COM NON-COMBUSTABLE

NTS NOT TO SCALE

O/ OVER

OA OVERALL

OC ON CENTER

OD OUSIDE DIAMETER (DIA)

OFF OFFICE

OH OVERHEAD

OPH OPPOSITE HAND

OPN'S OPENING

OPP OPOSITE

OPS OPPOSITE SURFACE

PRCST PRE CAST

PB PANIC BAR

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PERF PERFORATE (D)

PERI PERIMETER

PG PLATE GLASS

PL PLATE

PLF POUNDS PER LINEAL FOOT

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PNL PANEL

PORT PORTABLE

PPG POLISHED PLATE GLASS

PR PAIR

PS PULL SCREEN

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT or PRESSURE TREATED

PTD/PTR PAPER TOWEL

DISPENSER/RECEPTICAL

PTN PARTITION

R RIGHT

RA RETURN AIR

RAD RADIUS

RB RUBBER BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RECEP RECEPTACLE

RECEPT RECEPTIONIST

REF REFERENCE

REFL REFLECTED

REFR or REFRIG REFRIGERATOR

REV REVISION

REINF REINFORCED

REQ ('D) REQUIRE (MENT) (S) ('D)

RESIL RESILIENT

RFS ROOM FINISH SCHEDULE

RGTR REGISTER

RH RIGHT HAND

RM ROOM

R.O. ROUGH OPENING

RS REAGENT SHELF or ROUGH SAWN

RWC RAIN WATER CONDUCTOR

RWL RAIN WATER LEADER

S SOUTH

SB SMOKE BARRIER or SINK BASE

SC SOLID CORE

SCHED SCHEDULE

SD STORM DRAIN or SOAP DISPENSER

SECT SETION

SFRM SPRAY APPLIED FIRE

REISTIVE MATERIAL

SF GL SAFETY GLASS

SG SHEET GLASS

SH SHELF

SHR SHOWER

SHT SHEET

SIM SIMILAR

SKL SKYLIGHT

SL SLOPE

SND or SNR SANITARY NAPKIN

DISPENSER/RECEPTICAL

SP SOUND PROOF

SPEC SPECIFICATION

SPK SPEAKER

SPL SPECIAL

SQ SQUARE

SS STAINLESS STEEL

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STRL STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYN SYNTHETIC

SYS SYSTEM

TB TACK BOARD

TEL TELEPHONE

T&G TONGUE & GROOVE

THK THICK

TJ TOOLED JOINT

TO TOP OF

TV TELEVISION

TYP TYPICAL

UNF UNFINISHED

UON or UNO UNLESS

OTHERWISE NOTED

UR URNAL

V# VACUUM WITH NUMBER

OF VALVES INDICATED

VAR VARNISH

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VF VINYL FABRIC

VIF VERIFY IN FIELD

VNR VENEER

VT VINYL TILE

VWC VINYL WALL COVERING

W WEST

W/ WITH

WB WOOD BASE

WC WALL CABINET

WD WOOD

WG WIRED GLASS

WM WIRE MESH

W/O WITHOUT

WP WATER PROOF

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

XMFRTRANSFORMER

1.

MACH

(E) EXISTING

(N) NEW

CFMF COLD FORM METAL FRAMING

WRB WEATHER RESISTANT BARRIER

SURFACE MOUNTED

4' LIGHTING FIXTURE

2' x 4' RECESSED

LIGHTING

FIXTURE

RECESSED LIGHTING

FIXTURE (CENTER IN

CEILING

GRID SPACE)

DIR. LIGHTING FIXTURE

(CENTER IN CEILING

GRID

SPACE)

SUPPLY GRILLE

RETURN GRILLE

2' x 4' ACOUSTICAL CEILING

2' x 2' ACOUSTICAL CEILING

GYPSUM BOARD CEILING

EXPOSED STRUCTURE

FULL HEIGHT WALL

STRUCTURAL WOOD

FINISHED WOOD

PLYWOOD

STEEL OR METAL

CERAMIC TILE

CEMENT, STUCCO,

PLASTER, OR

STONE

RIGID INSULATION

BATT, BLANKET, OR

LOOSE

FILL INSULATION

SPRAY-

APPLIED

INSULATION

GRANULAR/GRAVEL FILL

FACE BRICK

ACOUSTICAL TILE

CARPET

METAL (GREATER

THAN

1" = 1'-0" SCALE)

METAL (LESS THAN

1"

= 1'-0" SCALE)

GLASS BLOCK

CONCRETE

MASONRY

UNIT (CMU)

EARTH

CONCRETE (SECTION)

CMU / BRICK

VENEER

STUD

PARTITION

CMU

STUD/ BRICK

VENEER

EXISTING

PARTITION

4"

1'-6"CLEAR

(MINIMUM)

1'-0" CLEAR

WITH

CLOSER AND

LATCH

6" M

A X

E Q

E

Q

D

IM

D

DOOR LOCATION DETAIL

DOOR FRAMING DETAIL

REF. USG GYPSUM

CONSTRUCTION

HANDBOOK

SCALE: N.T.S.

N.T.S.

20 GA. (MIN) DOUBLE

STUDS @ EACH

JAMB

METAL DOOR FRAME

CONTINUOUS BRACING

WHERE STUDS ARE

MORE THAN 12'-0" LONG

RUNNER

BETWEEN

JAMB STUDS

METAL STUDS @

16" O.C. MAX

3/4" HORIZ. BRACING WHEN

OPENING IS MORE THAN

3'-0"-OMIT BRACING WHEN DIM.

"D" IS 2'-0" OR LESS

STRUCTURAL

FLOOR /

ROOFRUNNER

JAMB ANCHOR - MIN. 4

ANCHORS PER JAMB-TYP.

RUNNER

FLOOR SLAB

WOMEN

2' -9

T

O

'-0

1' -5

T

O

'-7

(A D

A

3' -4

M

A X

2'-6"

3' -4

M

A X

8" MIN.

KNEE

CLR.

6" MAX.

TOE

CLR.

1' -5

M

A X

(A

D A

4' -0

M

A X

4' -0

M

A X

T

O D

IS

C

O N

N E

C

S

R

A P

3' -0

M

A X

(A

D A

9" M

IN

2' -3

M

IN

2' -5

M

A X

2' -3

M

IN

8" MIN. 6" MAX.

1'-5" TO 2'-0"

B O

T T

O M

O F

M

IR

R O

R S

U R

F A

C E

9" M

IN

. T

O E

C

LR

2' -1

0" M

A X

A

D A

K N

E E

C

LR

3' -4

M

A X

2' -6

M

A X

2' -8

M

A X

2' -9

T

O

'-0

9" MAX.

4'-6"

3'-6"12" MAX

1' -0

2'-0"

1'-6"

3'-0"

3' -6

M

A X

2'-6" MIN.

CLR. - TYP.

1' -0

T

Y P .

3' -6

T

Y P

2' -0

3' -0

(A

D A

2'-6" MIN.

(N O

N

A D

A

3" 1'-1"

MIN.

4"

6' -0

M

A X

1' -6

3'-4"

1'-7"

5' -0

SEAT

COVER

DISPENSER

S.N.R.

WATER CLOSET

CLEAR FLOOR

LAVATORYURINALS

SPACE - TYP.

MIRROR - SEE PLAN DISPENSER

DISPENSER

OPENING

DISPOSAL

OPENING

TOWEL DISP.

SOAP

DISP.

SAN.

NAP.

DISP.

SAN.

NAP.

REC

FIRE

EXT.

DRINKING FOUNTAINS

TISSUE

DISPENSER

GRAB

BAR

FULL

HEIGHT

MIRROR

DISPENSER

OPENING

SEAT

COVER

DISPENSER

SEAT COVER

DISP.

FIRE

EXTINGUISH

ER

CABINET

FLUSH

CONTROL

TO BE ON OPEN

SIDE - TYP.

ACCESSIBLE / NON-ACCESSIBLE

WALL OR

OBSTRUCTION

VERTICAL

GRAB

BAR

RR R

TYP.

CL

3"

3' -6

M

A X

ELEC.

HAND

DRYER

ELEC. HAND

DRYER

DETAIL NUMBER

DETAIL TITLE

DETAIL SCALE

SECTION I.D. NUMBER

DRAWING TITLE

SHEET WHERE

SECTION IS LOCATED

NOTE (IF

APPLICABLE)

SECTION

DETAIL (ENLARGED)

A101

SIM

AREA TO BE ENLARGED

DETAIL I.D. NUMBER

SHEET WHERE

DETAIL IS LOCATED

ELEVATION ELEVATION I.D.

NUMBER

SHEET WHERE

ELEVATION IS LOCATED

DOOR NUMBER

101 DOOR NUMBER

WINDOW

1t WINDOW

IDENTIFICATIO

N

FINISH

ACM-1 FINISH

IDENTIFICATIO

N

KEYED NOTES

KEYED NOTE

DESIGNATION

REVISIONS

REVISION AREA

REVISION DESIGNATION

ELEVATION HEIGHT

ELEVATION HEIGHT

100'-0"

T.O.S.

ELEVATION REFERENCE

SCALE |1/4" = 1'-0"

floor plan1

NOTE (IF

APPLICABLE)

ROOM

NAME

ROOM ROOM NAME

ROOM NUMBER

A101

SIM

COLUMN LINE

NEW DOOR

EXISTING DOOR

A101

SIM

P1

SET BOTTOM TRACK AND

GYP BD. IN (4) CONT.

BEADS OF ACOUSTICAL

SEALANT

METAL STUD RUNNER

TRACK.

3-5/8" MTL STUDS

SOUND BATT

INSUL.

SOUND BATT INSUL.

SET TOP TRACK AND GYP

BD. IN (4) CONT. BEADS OF

ACOUSTICAL SEALANT

TOP TRACK. FASTEN

GYPSUM BOARD TO

STUDS NOT TO TOP

TRACK

P2 SAME AS P1 BUT WITH 2 LAYERS OF

GYP (FOR RATING)

P3 6" FRAMING W/ 6" BATT INSUL

P4

METAL STUD RUNNER TRACK.

SOUND BATT INSUL.

SOUND BATT INSUL.

TOP TRACK. FASTEN

GYPSUM BOARD TO

STUDS NOT TO TOP

TRACK

METAL STUD

RUNNER TRACK.

STUDS SCREWED AT

BOTTOM

3-5/8" MTL STUDS

W/ 1 LAYER 5/8"

GYP BOARD THIS

SIDE - PAINT TO

MATCH ADJACENT

COLOR

TOP TRACK. FASTEN

GYPSUM BOARD TO

STUDS NOT TO TOP

TRACK

RUBBER BASE

P5

P6

METAL STUD RUNNER

TRACK. STUDS SCREWED

ON EA. SIDE AT TOP &

BOTTOM

METAL STUD

RUNNER TRACK.

STUDS

SCREWED ON

EA. SIDE AT TOP

& BOTTOM

3-5/8" MTL STUDS W/ 1

LAYER 5/8" GYP

BOARD EACH SIDE &

WRAP BOTTOM

3-5/8" MTL STUDS W/

1 LAYER 5/8" GYP

BOARD EACH SIDE

5/8" GYP. BOARD EA.

SIDE -TYPE "X"

3-5/8" MTL STUDS

5/8" GYP. BOARD EA. SIDE -

TYPE "X"

NOTE:

1. NOT ALL PARTITION TYPES USED.

2. ALL PARTITIONS ARE TO BE TYPE 'X' GYPSUM BOARD

TO 8'-0" A.F.F.

3. FIRE RATED CAULKING INSTEAD OF ACOUSTICAL SEALANT IN FIRE/SMOKE BARRIERS.

1" THICK WOOD

CAP - CLEAR

STAINED BIRCH

5' -0

HOLD P4 WALL TIGHT TO EXISTING WALL UNLESS

SHOWN OTHERWISE

P7

8" CMU WALL

CONTINUE GYP

BOARD TO 4" ABOVE

FINISH CEILING

U.N.O.

IF NO CEILING

RUN TO DECK

OR

STRUCTURE

ABOVE

WALL TYPE DESIGNATION

HOUR RATING

* ALL RATED METAL STUD PARTITIONS SHALL BE UL#U141

* ALL RATED CONCRETE BLOCK WALL SHALL BE UL #905

CEILING: SEE PLANS

TOTAL WALL

STC RATING: 52

TOTAL WALL

STC RATING: 52

SET TOP TRACK AND GYP

BD. IN (3) CONT. BEADS OF

ACOUSTICAL SEALANT

SET BOTTOM TRACK AND

GYP BD. IN (3) CONT.

BEADS OF ACOUSTICAL

SEALANT

SET BOTTOM TRACK IN (2)

CONT. BEADS OF

ACOUSTICAL SEALANT

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

52109.00

3/

/2

2:

:2

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

STANDARDS INDEX

G002

WSVP/BW

539-17-201

Cincinnati, Ohio symbols ceiling symbols material indications wall types typical plan and wall details abbreviations mounting heights - adultpartition types

Revision s

Date

UP

UP

UP

UP

UP

UP

DN

DN

Machine Room C121L

Machine Room C121M

Stair #1 C122L

EXIT

S1

SMOKE COMPARTMENT 3,647 SF.

SHAFT OPEN

TO BELOW

SHAFT

NINTH FLOOR ROOF

NINTH FLOOR ROOF

TENTH FLOOR ROOF

AHU

AHU

AHU

AHU

AHU

AHU

Machine & Tank Room

C121O

Hoist Machinery

EXIT S1

EXIT S2

SMOKE COMPARTMENT 1,958 SF.

ELEVENTH FLOOR

ROOF

ELEVENTH FLOOR ROOF

OPEN TO

BELOW

2 HOUR FIRE/SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

FIRE WALLS LEGEND

LIMITS OF SMOKE COMPARTMENT

EXISTING EQUIPMENT VERIFY

LOCATION IN FIELD

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

52109.00

3/

/2

2:

:3

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

CODE REVIEW

G003

WSVP/BW

539-17-201

Cincinnati, Ohio

Use and Occupancy Group Occupancy Group Health Care (NO CHANGE)

6.1.14.1.3 Where incidental to another occupancy areas used shall be permitted to be considered part of the predominant occupancy: (1) Mercantile, business, industrial or storage use.(NO CHANGE)

Construction Type II 222 (NO CHANGE) Total Building Height 112'-6", 11 Stories (NO CHANGE) Total Building Area NO CHANGE

Area Calculations Based on HC Use Allowable Building Area – Section 7.4.1Sprinklered Unlimited (NO CHANGE) Allowable Building Height 180 feet,12 stories (NO CHANGE)

TOTAL Allowable Building Height 112'-6" feet, 11 stories (NO CHANGE)

Accessible Means of Egress (Section 7.12.2) (NO CHANGE) Stories use exclusively for mechanical equipment, furnaces, or boilers shall be permitted to have a single means of egress.

Fire Resistance Rating Requirements (Table 7.2.2) –Type II222 Construction (NO CHANGE) Primary Structural Frame 2 Hours Bearing Walls Exterior 2 Hours Bearing Walls Interior 2 Hours Nonbearing Walls and Partitions Interior 0 Hours(Smoke Rated) Floor Construction 2 Hours Roof Construction and Secondary Members 1 Hours

Occupant Load (Table 7.4.1.2) (NO CHANGE) Floor SF OCC/SF OCC.

Tenth Floor Penthouse 3,642 100 36 Eleventh Floor Penthouse 1,958 100 20

Smoke Barriers (NO CHANGE)

8.5.1 Where required smoke barriers shall be provided to sub-divide the building spaces for the purpose of restricting the movement of smoke.

8.5.2.1 Smoke barriers shall be continuous from a floor to a floor.

8.5.3 A fire barrier shall be used as a smoke barrier.

Vertical Openings (NO CHANGE)

8.6.1 Every floor that separates stories in a building shall meet the following criteria:

(1) It shall be constructed as a smoke barrier in accordance with Section 8.5.

Automatic Sprinkler System (Section 9.7, and Section 18.3.5.4) (NO CHANGE) Required and provided

Fire Alarm System (Section 9.6 and Section 18.3.4.1 (NO CHANGE) Fire Alarm System required and provided

Health Care (Chapter 18) (NO CHANGE)

18.3.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6.

18.3.7 Buildings containing health care facilities shall be subdivided by smoke barriers, unless otherwise permitted.

18.3.7.3 The size of each smoke compartment will be limited to an area not exceeding 22,500 sf.

2009 NFPA 101 LIFE SAFETY CODE (WITH UPDATES)

SCALE | 1/8" = 1'-0"

TENTH FLOOR MECH. PENTHOUSE CODE PLAN1SCALE | 1/8" = 1'-0"

ELEVENTH FLOOR MECH. PENTHOUSE CODE PLAN2

Revision s

Date

100% BID DOCUMENTS 03/13/2019

N O

R T

H

N O

R

H

UP Corridor C-B-1

Corridor C-B-3

Canteen Stor.

A034

Non-Res.

Lounge A026

Stair 1 A024

Sig.

A025

Corridor C-B-1

Walk-In Freezer A0021a

Corridor A0010

Tele. Equip.

Rm.

A035

Dry Goods/Paper

Stor.

A0006

Supervisor A0012

Office A0013

3'

19' - 0" 8' - 5"

7'

Corridor C-1-1

Operator's Suite A175

Tlt.

A175A

Sig.

A141A

Stair 1 A141

Elec.

A143

Closet A141B

10 1

8' -4

V

IF

4'-9" VIF

2 HOUR FIRE/SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

LEGEND

AREA NOT IN CONTRACT

EXISTING EQUIPMENT VERIFY

LOCATION IN FIELD

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

52109.00

3/

/2

2:

:0

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

SIGNALS CLOSET DEMOLITION

PLANS

A101

WSVP/BW

539-17-201

Cincinnati, Ohio

SCALE | 1/8" = 1'-0"

BASEMENT PARTIAL DEMOLITION PLAN1SCALE | 1/8" = 1'-0"

TYPICAL SIGNALS CLOSET DEMOLITION2

General Demolition Notes

A. MAINTAIN ANY IN-PLACE FIREPROOFING.

B. REFER TO CODE SHEETS FOR FIRE-RATED ASSEMBLY TYPES AND

LOCATIONS.

C. PATCH/REPAIR SURFACES AS REQUIRED FOR ANY NEW FINISHES.

INCLUDING AREAS THAT WILL BE EXPOSED AS A RESULT OF THIS

PROJECT. MATCH ADJACENT FINISHES.

D. IN ANY AREAS OF PATCH/REPAIR, CONTRACTOR SHALL ASSUME

PAINT/FINISH WILL BE REQUIRED CORNER TO CORNER ONLY IN PUBLIC

SPACES SUCH AS CORRIDORS AND LOBBIES.

E. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION EFFORTS

BY ALL TRADES.

F. DEMO WORK FOR PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS

SHALL OCCUR BEYOND EXTENT OF WORK AS REQUIRED FOR

COMPLETION OF WORK. CONTRACTOR TO PREPARE ANY EXISTING AREA

BEYOND EXTENT OF WORK FOR INSTALLATION OF NEW SYSTEMS . SEE

PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS.

G. ALL DEMO TO BE BY ALL TRADES. SEE PME DRAWINGS FOR MORE

INFORMATION.

H. SEE FLOOR PLANS FOR NEW WORK TO BE DONE.

I. REMOVE ALL EXISTING WALLS AND FURRING TO EXPOSE AREAS TO

RECEIVE WORK, UNLESS NOTED OTHERWISE.

J. THERE ARE NO KNOWN ACM (ASBESTOS CONTAINING MATERIALS) IN THE

AREA OF WORK. IF ANY SUSPICIOUS OR POSITIVE ACM ARE

ENCOUNTERED NOTIFY THE COR IMMEDIATELY.

K. REMOVE ALL WALL HUNG ACCESSORIES AND OBJECTS PROTRUDING

FROM WALLS IN THE AREA OF REQUIRED DEMOLITION WORK. TURN ALL

EQUIPMENT OVER TO THE OWNER.

L. PROTECT ALL EXISTING DOORS, DOORFRAMES, WINDOWS, STAIRS,

CEILINGS, ETC. IN THE AREA OF WORK NOT SCHEDULED TO BE

DEMOLISHED. DOCUMENT EXISTING CONDITIONS WITH THE COR PRIOR TO

BEGINNING WORK.

M. CONTRACTOR IS RESPONSIBLE FOR CREATING A LEVEL FLOOR

FOLLOWING REMOVAL OF EXISTING CONSTRUCTION. CONTRACTOR TO

ASSUME NO SURFACE INSIDE SIGNALS CLOSETS OR TELEPHONE

EQUIPMENT ROOM WILL REQUIRE PATCHING AND LEVELING. ONLY

SURFACE WORK IN CORRIDORS OR LOBBIES WILL REQUIRE PATCHING

WITH FLOWABLE HIGH STRENGTH CEMENTITIOUS FILL UPON

COMPLETION OF WORK AS REQUIRED. FEATHER ALL EDGES TO MATCH

ALL EXISTING SLAB CONDITIONS AND ELEVATIONS REQUIRED TO INSTALL

NEW OR REPAIR EXISTING FLOOR FINISHES.

N. WORK IN ELEVATOR LOBBIES INCLUDING, BUT NOT LIMITED TO

OPERATING ROOM SUITES AND MAIN FIRST FLOOR CORRIDOR WILL BE

DONE BETWEEN THE HOURS OF 1800 AND 0600. COORDINATE TIMES OF

ACCESS WITH THE COR. THE AREA OF WORK WILL BE RETURNED TO A

CLEAN AND ORDERLY CONDITION MEETING ALL REQUIREMENTS AS SET

FORTH BY THE GENERAL CONDITIONS AND OPERATING RULES OF THE

VAMC, AT THE END OF EACH WORK DAY.

O. FLOOR SLABS ARE CONSIDERED TO BE CONCRETE WITH STEEL

REINFORCEMENT. ALL WALLS ARE CONSIDERED TO BE OF MASONRY

CONSTRUCTION EXCEPT THOSE INDICATED OTHERWISE.

P. SEE TECHNOLOGY DRAWINGS FOR EXTENT AND SCOPE OF CEILING TILE

REMOVAL, REPLACEMENT AND REINSTALLATION INCLUDING, BUT NOT

LIMITED TO CORRIDORS, EXAM ROOMS AND SUITES.

N O

R T

H

N O

R T

H

DEMOLITION PLAN NOTES

SCALE | 1" = 50'-0"

KEY PLAN4

SCALE | 1" = 50'-0"

KEY PLAN BASEMENT3

N O

R T

H

N O

R T

H

1. CONTRACTOR TO PREP ALL EXPOSED/PUBLIC AREAS OF CEILING, WALLS AND FLOOR FOR RE-PAINTING, RE-

FINISHING AS REQUIRED TO MATCH EXISTING CONDITIONS.

2. CORE DRILL SUSPENDED SLAB NO LESS THAN SIX INCHES FROM EDGE OF BEAM FOR NEW WIRING CONDUIT.

DO NOT DRILL THRU BEAM OR BEAM FLANGE. SEE TECHNOLOGY DRAWINGS FOR CONDUIT SIZE.

3. REMOVE AND DISPOSE OF ANY DISPLAY SURFACES PER THE DIRECTION OF THE COR.

4. CORE DRILL APPROXIMATELY 1'-0" THICK EXTERIOR MASONRY WALL WITH FILLED CORES BELOW

STRUCTURAL PERIMETER BEAM FOR NEW ANTENNA FEED. SEE TECHNOLOGY DRAWINGS FOR LOCATION OF

NEW ANTENNA MOUNT

5. AREAS OF THE FLOOR THAT ARE TO BE EXPOSED, SEALED CONCRETE THE CONTRACTOR SHALL PREP/OVERLAY AS REQUIRED WITH FLOWABLE HIGH STRENGTH CEMENTITIOUS FILL TO CREATE SMOOTH, EVEN SURFACE AS REQUIRED. MATCH EXISTING FINISHES.

6. REMOVE PORTION OF CEILING TILE AS REQUIRED TO INSTALL NEW BDA, ANTENNA AND CABLING. SEE

TECHNOLOGY DRAWINGS.

7. ON BASEMENT FLOOR CORE DRILL THROUGH WALL ABOVE CORRIDOR CEILING AND DOOR HEADER TO PROVIDE CONDUIT ACCESS TO TELEPHONE EQUIPMENT ROOM. SEE TECHNOLOGY DRAWINGS FOR CONDUIT

SIZE.

8. PROTECT EXISTING AIR HANDLING UNITS AND DUCTWORK IN AREA OF WORK.

9. REMOVE OR RELOCATE ALL EXISTING WALL HUNG EQUIPMENT, CONDUIT AND ACCESSORIES AS REQUIRED

TO CREATE AN UN-OBSTRUCTED PATH FOR NEW WIRING CONDUIT. SEE TECHNOLOGY DRAWINGS FOR EXACT

PATH.

10. COORDINATE EXACT LIMITS OF CONSTRUCTION IN THE FIELD WITH THE COR.

11. PROVIDE GROUNDING FOR LIGHTENING PROTECTION. SEE TECHNOLOGY DRAWINGS.

12. EXISTING PULLBOX.

13. CORE DRILL THROUGH WALL ABOVE CORRIDOR CEILING AND DOOR HEADER TO PROVIDE CONDUIT ACCESS

TO CORRIDOR. SEE TECHNOLOGY DRAWINGS FOR CONDUIT SIZE.

14. LINE OF SLAB EDGE/EXTERIOR WALL ABOVE.

Revision s

UP

U

PU

P

UP

DN

UP

DN

AHU

AHU

AHU

AHU

AHU

AHU

Machine Room C121L

NINTH FLOOR ROOF

NINTH FLOOR ROOF

TENTH FLOOR ROOF

Machine Room C121M

13' - 4" VIF 2' - 0"

4'

Machine & Tank Room

C121O 10

HOIST

MACHINERY

TENTH FLOOR ROOF

TENTH FLOOR

ROOF

V

IF

13'-4" VIF

OPEN TO

BELOW

2 HOUR FIRE/SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

LEGEND

AREA NOT IN CONTRACT

EXISTING EQUIPMENT VERIFY

LOCATION IN FIELD

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

52109.00

3/

/2

2:

:0

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

TENTH-ELEVENTH FLOOR

PENTHOUSE DEMOLITION PLANS

A102

WSVP/BW

539-17-201

Cincinnati, Ohio

SCALE | 1/8" = 1'-0"

DEMOLITION TENTH FLOOR PENTHOUSE1SCALE | 1/8" = 1'-0"

DEMOLITION ELEVENTH FLOOR PENTHOUSE2 N

O

R T

H

N O

R T

H

General Demolition NotesDEMOLITION PLAN NOTES

1. CONTRACTOR TO PREP ALL EXPOSED/PUBLIC AREAS OF CEILING, WALLS AND FLOOR FOR RE-

PAINTING, RE-FINISHING AS REQUIRED TO MATCH EXISTING CONDITIONS.

2. CORE DRILL SUSPENDED SLAB NO LESS THAN SIX INCHES FROM EDGE OF BEAM FOR NEW WIRING

CONDUIT. DO NOT DRILL THRU BEAM OR BEAM FLANGE. SEE TECHNOLOGY DRAWINGS FOR CONDUIT

SIZE.

3. REMOVE AND DISPOSE OF ANY DISPLAY SURFACES PER THE DIRECTION OF THE COR.

4. CORE DRILL APPROXIMATELY 1'-0" THICK FILLED CORES EXTERIOR MASONRY WALL BELOW

STRUCTURAL PERIMETER BEAM FOR NEW ANTENNA FEED. SEE TECHNOLOGY DRAWINGS FOR

LOCATION OF NEW ANTENNA MOUNT

5. AREAS OF THE FLOOR THAT ARE TO BE EXPOSED, SEALED CONCRETE THE CONTRACTOR SHALL

PREP/OVERLAY AS REQUIRED WITH FLOWABLE HIGH STRENGTH CEMENTITIOUS FILL TO CREATE

SMOOTH, EVEN SURFACE AS REQUIRED. MATCH EXISTING FINISHES.

6. REMOVE PORTION OF CEILING TILE AS REQUIRED TO INSTALL NEW BDA, ANTENNA AND CABLING. SEE

TECHNOLOGY DRAWINGS.

7. ON BASEMENT FLOOR CORE DRILL THROUGH WALL ABOVE CORRIDOR CEILING AND DOOR HEADER

TO PROVIDE CONDUIT ACCESS TO TELEPHONE EQUIPMENT ROOM. SEE TECHNOLOGY DRAWINGS

FOR CONDUIT SIZE.

8. PROTECT EXISTING AIR HANDLING UNITS AND DUCTWORK IN AREA OF WORK.

9. REMOVE OR RELOCATE ALL EXISTING WALL HUNG EQUIPMENT, CONDUIT AND ACCESSORIES AS

REQUIRED TO CREATE AN UN-OBSTRUCTED PATH FOR NEW WIRING CONDUIT. SEE TECHNOLOGY

DRAWINGS FOR EXACT PATH.

10. COORDINATE EXACT LIMITS OF CONSTRUCTION IN THE FIELD WITH THE COR.

11. PROVIDE GROUNDING FOR LIGHTENING PROTECTION. SEE TECHNOLOGY DRAWINGS.

12. EXISTING PULLBOX.

13. CORE DRILL THROUGH WALL ABOVE CORRIDOR CEILING AND DOOR HEADER TO PROVIDE CONDUIT

ACCESS TO CORRIDOR. SEE TECHNOLOGY DRAWINGS FOR CONDUIT SIZE.

14. LINE OF SLAB EDGE/EXTERIOR WALL ABOVE.

A. MAINTAIN ANY IN-PLACE FIREPROOFING.

B. REFER TO CODE SHEETS FOR FIRE-RATED ASSEMBLY TYPES AND

LOCATIONS.

C. PATCH/REPAIR SURFACES AS REQUIRED FOR ANY NEW FINISHES.

INCLUDING AREAS THAT WILL BE EXPOSED AS A RESULT OF THIS

PROJECT. MATCH ADJACENT FINISHES.

D. IN ANY AREAS OF PATCH/REPAIR, CONTRACTOR SHALL ASSUME

PAINT/FINISH WILL BE REQUIRED CORNER TO CORNER ONLY IN PUBLIC

SPACES SUCH AS CORRIDORS AND LOBBIES.

E. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION EFFORTS

BY ALL TRADES.

F. DEMO WORK FOR PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS

SHALL OCCUR BEYOND EXTENT OF WORK AS REQUIRED FOR

COMPLETION OF WORK. CONTRACTOR TO PREPARE ANY EXISTING AREA

BEYOND EXTENT OF WORK FOR INSTALLATION OF NEW SYSTEMS . SEE

PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS.

G. ALL DEMO TO BE BY ALL TRADES. SEE PME DRAWINGS FOR MORE

INFORMATION.

H. SEE FLOOR PLANS FOR NEW WORK TO BE DONE.

I. REMOVE ALL EXISTING WALLS AND FURRING TO EXPOSE AREAS TO

RECEIVE WORK, UNLESS NOTED OTHERWISE.

J. THERE ARE NO KNOWN ACM (ASBESTOS CONTAINING MATERIALS) IN THE

AREA OF WORK. IF ANY SUSPICIOUS OR POSITIVE ACM ARE

ENCOUNTERED NOTIFY THE COR IMMEDIATELY.

K. REMOVE ALL WALL HUNG ACCESSORIES AND OBJECTS PROTRUDING

FROM WALLS IN THE AREA OF REQUIRED DEMOLITION WORK. TURN ALL

EQUIPMENT OVER TO THE OWNER.

L. PROTECT ALL EXISTING DOORS, DOORFRAMES, WINDOWS, STAIRS,

CEILINGS, ETC. IN THE AREA OF WORK NOT SCHEDULED TO BE

DEMOLISHED. DOCUMENT EXISTING CONDITIONS WITH THE COR PRIOR TO

BEGINNING WORK.

M. CONTRACTOR IS RESPONSIBLE FOR CREATING A LEVEL FLOOR

FOLLOWING REMOVAL OF EXISTING CONSTRUCTION. CONTRACTOR TO

ASSUME NO SURFACE INSIDE SIGNALS CLOSETS OR TELEPHONE

EQUIPMENT ROOM WILL REQUIRE PATCHING AND LEVELING. ONLY

SURFACE WORK IN CORRIDORS OR LOBBIES WILL REQUIRE PATCHING

WITH FLOWABLE HIGH STRENGTH CEMENTITIOUS FILL UPON

COMPLETION OF WORK AS REQUIRED. FEATHER ALL EDGES TO MATCH

ALL EXISTING SLAB CONDITIONS AND ELEVATIONS REQUIRED TO INSTALL

NEW OR REPAIR EXISTING FLOOR FINISHES.

N. WORK IN ELEVATOR LOBBIES INCLUDING, BUT NOT LIMITED TO

OPERATING ROOM SUITES AND MAIN FIRST FLOOR CORRIDOR WILL BE

DONE BETWEEN THE HOURS OF 1800 AND 0600. COORDINATE TIMES OF

ACCESS WITH THE COR. THE AREA OF WORK WILL BE RETURNED TO A

CLEAN AND ORDERLY CONDITION MEETING ALL REQUIREMENTS AS SET

FORTH BY THE GENERAL CONDITIONS AND OPERATING RULES OF THE

VAMC, AT THE END OF EACH WORK DAY.

O. FLOOR SLABS ARE CONSIDERED TO BE CONCRETE WITH STEEL

REINFORCEMENT. ALL WALLS ARE CONSIDERED TO BE OF MASONRY

CONSTRUCTION EXCEPT THOSE INDICATED OTHERWISE.

P. SEE TECHNOLOGY DRAWINGS FOR EXTENT AND SCOPE OF CEILING TILE

REMOVAL, REPLACEMENT AND REINSTALLATION INCLUDING, BUT NOT

LIMITED TO CORRIDORS, EXAM ROOMS AND SUITES.

Revision s

UP

DN

Corridor C-B-1

Corridor C-B-3

Canteen Stor.

A034

Non-Res.

Lounge A026

Stair 1 A024

Sig.

A025

Corridor C-B-1

Walk-In Freezer A0021a

Corridor A0010

Tele. Equip.

Rm.

A035

Dry Goods/Paper

Stor.

A0006

Supervisor A0012

Office A0013

19' - 0" 8' - 5"

3'

7'

Tele.

A025A

Corridor C-1-1

Operator's Suite A175

Tlt.

A175A

Sig.

A141A

Stair 1 A141

Elec.

A143

Closet A141B

8' -4

V

IF

4'-9" VIF 9' - 11 3/8"

2 HOUR FIRE/SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

LEGEND

AREA NOT IN CONTRACT

EXISTING EQUIPMENT VERIFY

LOCATION IN FIELD

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

52109.00

3/

/2

2:

:2

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

SIGNALS CLOSET NEW WORK

PLANS

A103

WSVP/BW

539-17-201

Cincinnati, Ohio

SCALE | 1/8" = 1'-0"

BASEMENT NEW WORK1 N

O R

T H

SCALE | 1/8" = 1'-0"

TYPICAL SIGNALS CLOSET NEW WORK2 N

O R

T H

Floor Plan Notes General Notes A. PLUMBING, MECHANICAL, ELECTRICAL AND TECHNOLOGY SYSTEMS WORK SHALL OCCUR BEYOND THE

EXTENT OF WORK LINE AS REQUIRED. CONTRACTOR SHALL PATCH & REPAIR ANY EXISTING AREAS BEYOND EXTENT OF WORKLINE DAMAGED BY SUCH WORK. SEE MECHANICAL, ELECTRICAL, PLUMBING

AND TECHNOLOGY DRAWINGS.

B. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN INSPECTION, GENERAL

CONTRACTORS, ELECTRICAL/DATA CONTRACTORS, COR, AND CONSTRUCTION MANAGER SHALL

REVIEW IN-PLACE LOCATIONS OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE ALARM BOXES, ETC.

FINAL LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR COORDINATE WITH DESIGN INTENT.

C. ALL TWO-SIDED NEW INTERIOR PARTITIONS ARE P-1 UNLESS NOTED OTHERWISE.

D. ALL ONE-SIDED INTERIOR PARTITIONS ARE P-4 UNLESS NOTED OTHERWISE.

E. ALL WALLS ARE FULL HEIGHT TO DECK ABOVE, UNLESS NOTED OTHERWISE.

F. ALIGN ALL NEW WORK WITH EXISTING AS SHOWN, INDICATED OR ABUTTING

G. RUN ALL UTILITIES AS TIGHT TO STRUCTURE AS POSSIBLE. GENERAL CONTRACTOR TO COORDINATE

ALL TRADES AS REQUIRED TO AVOID CONFLICTS.

H. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING EXISTING CEILING TILE AND GRID UP TO THE

NEAREST TILE AS REQUIRED IN ORDER TO INSTALL NEW CABLE, HANGERS, JUNCTION BOXES,

ANTENNA, OUTLETS, ETC. CEILING TILE WILL BE CAREFULLY REMOVED AND STORED ON SITE OUT OF

THE IMMEDIATE CONSTRUCTION AREA. STORAGE AREA TO BE COORDINATED WITH THE COR. AT

THE END OF THE WORK DAY ALL TILE TEMPORARILY REMOVED TO COMATE WORK WILL BE RE-

INSTALLED UNLESS APPROVED OTHERWISE BY THE COR. AT THE BEGINNING OF WORK IN EACH

CORRIDOR THE CONTRACTOR WILL DOCUMENT ALONG WITH THE COR THE CONDITION OF THE

EXISTING CEILING TILE AND GRID, NOTING THOSE AREAS THAT BEGIN THE PROJECT AS DAMAGED, STAINED, MISSING, ETC. ANY TILE THAT APPEAR DAMAGED, LOST OR ALTERED BY THE CONTRACTOR AT THE CONCLUSION OF CONSTRUCTION WILL BE REPLACED ALONG WITH ANY AFFECTED GRID BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.

1. PROTECT EXISTING AIR HANDLERS, DUCTS AND EQUIPMENTS DURING CONSTRUCTION.

2. PROTECT EXISTING DOOR AND FRAME DURING CONSTRUCTION.

3. REPAIR PLYWOOD WALL SHEATHING IS IMMEDIATE AREA OF CONSTRUCTION INSIDE

SIGNALS/ELECTRIC CLOSETS AS REQUIRED IN ORDER TO RETURN SURFACES TO PER-CONSTRUCTION

LIKE CONDITION.

4. LINE OF ELEVENTH FLOOR SLAB EDGE/EXTERIOR WALL ABOVE

5. SEAL ALL FLOOR TO CEILING PENETRATIONS WITH TWO HOUR RATED FIRE CAULK/SEALANT.

6. TOUCH-UP WALLS AND REPAIR FLOOR IS IMMEDIATE AREA OF CONSTRUCTION AS REQUIRED IN ORDER

TO RETURN SURFACES TO PER-CONSTRUCTION LIKE CONDITION. CONFIRM WITH COR PRIOR TO

PERFORMING WORK THAT ANY VISIBLE SURFACE IN NON-PUBLIC SPACES REQUIRES A NEW FINISH.

7. SEAL ALL EXTERIOR WALL PENETRATION WITH WATERPROOF EXPANDABLE SEALANT TO MATCH THE

EXISTING MASONRY COLOR.

8. SEAL ALL VERTICAL INTERIOR PENETRATIONS FLUSH WITH THE EXISTING SURFACE. TOUCH-UP WALL

TO MATCH ALL EXISTING CONDITIONS.

9. SEAL ALL PENETRATION IN EXISTING VERTICAL PULLBOX/CLOSETS WITH TWO HOUR FIRE RESISTIVE

SEALANT.

10. SEE TECHNOLOGY PLANS FOR ANTENNA MOUNTING LOCATION AND DETAILS.

11. SEAL PENETRATIONS IN NON-RATED WALLS WITH APPROVED SEALANT TO RESIST THE PASSAGE OF

SMOKE.

12. COORDINATE EXACT LIMITS OF CONSTRUCTION IN THE FIELD WITH THE COR.

13. PROVIDE CLEAR UNOBSTRUCTED ROUTE FOR MOUNTING ANTENNA CONDUIT. SEE TECHNOLOGY

PLANS.

14. GROUT MASONRY CELLS FULL IF NOT ALREADY, DIRECTLY ADJACENT TO AND ABOVE AND BELOW

EXTERIOR WALL PENETRATION PROVIDING ACCESS FOR RADIO ANTENNA CABLING CONDUIT. SEE

TECHNOLOGY DRAWINGS.

SCALE | 1" = 50'-0"

KEY PLAN BASEMENT3SCALE | 1" = 50'-0"

KEY PLAN4 N

O

R T

H

N O

R T

H

Revision s

UP

UP

DN

UP

DN

AHU

AHU

AHU

AHU

AHU

AHU

Machine Room C121L

NINTH FLOOR ROOF

NINTH FLOOR ROOF

TENTH FLOOR ROOF

Machine Room C121M

13' - 4" VIF 2' - 0"

4'

Machine & Tank Room

C121O

HOIST

MACHINERY

TENTH FLOOR ROOF

TENTH FLOOR

ROOF

OPEN TO

BELOW

V

IF

13'-4" VIF

2 HOUR FIRE/SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

LEGEND

AREA NOT IN CONTRACT

EXISTING EQUIPMENT VERIFY

LOCATION IN FIELD

S

T A T E

OF OH

IO

R E G

IST ERED A RC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2019

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

HEAPY PROJECT No.: 2015-04002 FIRM LICENSE No.: 01528

52109.00

3/

/2

2:

:2

P

M

UPGRADE FIRE RADIO

SYSTEM

03/13/19

TENTH-ELEVENTH FLOOR

PENTHOUSE NEW WORK PLANS

A104

WSVP/BW

539-17-201

Cincinnati, Ohio

SCALE | 1/8" = 1'-0"

TENTH FLOOR PENTHOUSE NEW WORK1SCALE | 1/8" = 1'-0"

ELEVENTH FLOOR PENTHOUSE NEW WORK2

General NotesFloor Plan Notes

N O

R T

H

N O

R T

H

1. PROTECT EXISTING AIR HANDLERS, DUCTS AND EQUIPMENTS DURING CONSTRUCTION.

2. PROTECT EXISTING DOOR AND FRAME DURING CONSTRUCTION.

3. REPAIR PLYWOOD WALL SHEATHING IS IMMEDIATE AREA OF CONSTRUCTION INSIDE

SIGNALS/ELECTRIC CLOSETS AS REQUIRED IN ORDER TO RETURN SURFACES TO PER-CONSTRUCTION

LIKE CONDITION.

4. LINE OF ELEVENTH FLOOR SLAB EDGE/EXTERIOR WALL ABOVE

5. SEAL ALL FLOOR TO CEILING PENETRATIONS WITH TWO HOUR RATED FIRE CAULK/SEALANT.

6. TOUCH-UP WALLS AND REPAIR FLOOR IS IMMEDIATE AREA OF CONSTRUCTION AS REQUIRED IN ORDER

TO RETURN SURFACES TO PER-CONSTRUCTION LIKE CONDITION. CONFIRM WITH COR PRIOR TO

PERFORMING WORK THAT ANY VISIBLE SURFACE IN NON-PUBLIC SPACES REQUIRES A NEW FINISH.

7. SEAL ALL EXTERIOR WALL PENETRATION WITH WATERPROOF EXPANDABLE SEALANT TO MATCH THE

EXISTING MASONRY COLOR.

8. SEAL ALL VERTICAL INTERIOR PENETRATIONS FLUSH WITH THE EXISTING SURFACE. TOUCH-UP WALL

TO MATCH ALL EXISTING CONDITIONS.

9. SEAL ALL PENETRATION IN EXISTING VERTICAL PULLBOX/CLOSETS WITH TWO HOUR FIRE RESISTIVE

SEALANT.

10. SEE TECHNOLOGY PLANS FOR ANTENNA MOUNTING LOCATION AND DETAILS.

11. SEAL PENETRATIONS IN NON-RATED WALLS WITH APPROVED SEALANT TO RESIST THE PASSAGE OF

SMOKE.

12. COORDINATE EXACT LIMITS OF CONSTRUCTION IN THE FIELD WITH THE COR.

13. PROVIDE CLEAR UNOBSTRUCTED ROUTE FOR MOUNTING ANTENNA CONDUIT. SEE TECHNOLOGY

PLANS.

14. GROUT MASONRY CELLS FULL IF NOT ALREADY, DIRECTLY ADJACENT TO AND ABOVE AND BELOW

EXTERIOR WALL PENETRATION PROVIDING ACCESS FOR RADIO ANTENNA CABLING CONDUIT. SEE

TECHNOLOGY DRAWINGS.

A. PLUMBING, MECHANICAL, ELECTRICAL AND TECHNOLOGY SYSTEMS WORK SHALL OCCUR BEYOND THE EXTENT OF WORK LINE AS REQUIRED. CONTRACTOR SHALL PATCH & REPAIR ANY EXISTING AREAS BEYOND EXTENT OF WORKLINE DAMAGED BY SUCH WORK. SEE MECHANICAL, ELECTRICAL, PLUMBING

AND TECHNOLOGY DRAWINGS.

B. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN INSPECTION, GENERAL

CONTRACTORS, ELECTRICAL/DATA CONTRACTORS, COR, AND CONSTRUCTION MANAGER SHALL

REVIEW IN-PLACE LOCATIONS OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE ALARM BOXES, ETC.

FINAL LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR COORDINATE WITH DESIGN INTENT.

C. ALL TWO-SIDED NEW INTERIOR PARTITIONS ARE P-1 UNLESS NOTED OTHERWISE.

D. ALL ONE-SIDED INTERIOR PARTITIONS ARE P-4 UNLESS NOTED OTHERWISE.

E. ALL WALLS ARE FULL HEIGHT TO DECK ABOVE, UNLESS NOTED OTHERWISE.

F. ALIGN ALL NEW WORK WITH EXISTING AS SHOWN, INDICATED OR ABUTTING

G. RUN ALL UTILITIES AS TIGHT TO STRUCTURE AS POSSIBLE. GENERAL CONTRACTOR TO COORDINATE

ALL TRADES AS REQUIRED TO AVOID CONFLICTS.

H. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING EXISTING CEILING TILE AND GRID UP TO THE

NEAREST TILE AS REQUIRED IN ORDER TO INSTALL NEW CABLE, HANGERS, JUNCTION BOXES,

ANTENNA, OUTLETS, ETC. CEILING TILE WILL BE CAREFULLY REMOVED AND STORED ON SITE OUT OF THEIMMEDIATE CONSTRUCTION AREA. STORAGE AREA TO BE COORDINATED WITH THE COR. AT THE END OF THE WORK DAY ALL TILE TEMPORARILY REMOVED TO COMATE WORK WILL BE RE-INSTALLED UNLESS APPROVED OTHERWISE BY THE COR. AT THE BEGINNING OF WORK IN EACH CORRIDOR THE CONTRACTOR WILL DOCUMENT ALONG WITH THE COR THE CONDITION OF THE EXISTING CEILING TILE AND GRID, NOTING THOSE AREAS THAT BEGIN THE PROJECT AS DAMAGED, STAINED, MISSING, ETC.

ANY TILE THAT APPEAR DAMAGED, LOST OR ALTERED BY THE CONTRACTOR AT THE CONCLUSION OF CONSTRUCTION WILL BE REPLACED ALONG WITH ANY AFFECTED GRID BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE GOVERNMENT.

Revision s

A. ALL ELECTRICAL SPLICES FOR W IRE SIZES 6 AW G AND LARGER SHALL BE HYDRAULIC CRIM P TYPE.

B. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUM ENTS.

C. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.

D. ANY ASBESTOS W ORK PERFORMED AS PART OF THIS PROJECT SHALL BE COM PLETED PRIOR TO STARTING ANY

OTHER PROJECT SITE W ORK.

E. THE NOTES AND SYM BOLS SET DOW N ON THESE DRAW INGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED

IN THE PROJECT AND M UST BE FOLLOW ED TO EXECUTE THE W ORK AS INTENDED.

F. THE CONTRACTORS SHALL REFER TO ALL SPECIFICATION SECTIONS, AND ELECTRICAL DRAW INGS FOR DETAILS

OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEM ENT FOR THEIR W ORK. THE VARIOUS DRAW INGS COMPRISING THE SET ARE INTERDEPENDENT AND M UST BE USED JOINTLY AT ALL TIMES.

EACH CONTRACTOR SHOULD REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THESE NOTES AND SYM BOLS SET DOW N ON THE DRAW INGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOW ED TO EXECUTE THE W ORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE COR THRU

THE CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.

G . IN ACCORDANCE W ITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR W ILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORM ANCE OF THE W ORK. THIS W ILL APPLY CONTINUOUSLY AND NOT BE LIM ITED TO NORM AL W ORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.

H. ALL W ORK M UST BE COORDINATED W ITH THE COR TO M AINTAIN OPERATION OF THE EXISTING FACILITY.

I. FIELD VERIFY DIM ENSIONAL INFORMATION PRIOR TO ORDERING EQUIPMENT. DO NOT SCALE DRAW INGS.

J. DIM ENSIONS ARE TYPICALLY INDICATED TO THE FINISHED FACE OF W ALLS OR PARTITIONS AND CENTER LINES OF

COLUM NS UNLESS OTHERW ISE INDICATED.

K. TITLES, CAPTIONS, HEADINGS, ETC. ARE INTENDED FOR GENERAL REFERENCE AND ARE NOT INTENDED TO LIMIT

THE W ORK REQUIRED IN ANY W AY.

L. EACH CONTRACTOR SHALL COORDINATE HIS W ORK W ITH THE W ORK OF OTHERS. HE SHALL KEEP HIM SELF

INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE W ORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS W ORK W ITH OTHERS SO THAT THE PROGRESS OF THE

TOTAL W ORK SHALL BE KEPT ON SCHEDULE.

M . ALL W ORK SHALL BE PERFORM ED IN COMPLETE COM PLIANCE W ITH ALL GOVERNING CODES AND STANDARDS.

N. EXISTING CONDITIONS SHOW N HAVE BEEN BASED UPON AVAILABLE DRAW ING INFORM ATION, LIM ITED SITE

INVESTIGATIONS AND MAY BE AT VARIANCE W ITH ACTUAL W ORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE W ORK. ANY DISCREPANCIES BETW EEN EXISTING CONDITIONS AND THE W ORK SHOW N ON THE CONTRACT DOCUM ENTS W HICH M AY IMPACT THE PROGRESS OF THE W ORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN W RITING FOR RESOLUTION BEFORE PROCEEDING W ITH THE W ORK.

O . EACH CONTRACTOR AND/OR TRADE FITTING OR PLACING HIS W ORK INTO OR ON THE W ORK OF OTHERS DOES SO W ITH THE UNDERSTANDING THAT THE INSTALLATION OF HIS W ORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE W ORK IN PLACE. IF THE W ORK OF OTHERS IS NOT ACCEPTABLE, HE SHALL NOTIFY THE COR AND SUCH W ORK SHALL BE CORRECTED. ANY NEW W ORK INSTALLED IN UNSUITABLE EXISTING W ORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW W ORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING W ORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS W ILL BE

CONSIDERED.

P. ANY STRUCTURAL, M ECHANICAL, ELECTRICAL, FIRE PROTECTION, OR PLUM BING INFORM ATION INDICATED ON THE ARCHITECTURAL DRAW INGS IS FOR REFERENCE PURPOSES ONLY UNLESS OTHERW ISE INDICATED.

Q . IF, IN THE PERFORM ANCE OF THE ELECTRICAL W ORK, MATERIALS ARE OBSERVED W HICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE ELECTRICAL CONTRACTOR SHALL IM MEDIATELY INFORM THE COR. W ORK THAT W OULD EXPOSE W ORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERM INATED. W ORK MAY BE RESUM ED ONLY AFTER A DETERMINATION HAS BEEN M ADE AND UNSAFE MATERIALS HAVE BEEN REM OVED OR

ENCAPSULATED AND THE AREA DECLARED SAFE.

R. PROPER PERSONNEL PROTECTION EQUIPMENT SHALL BE W ORN PER OSHA AND VA REQUIREM ENTS W ITH VAMC

COR AND SAFETY OFFICER.

S. FIRESTOPPING ASSEM BLIES SHALL BE PROVIDED AT PENETRATIONS OF CONDUITS AND OTHER ELECTRICAL ITEMS THRU FIRE RATED FLOORS, FIRE RATED W ALLS AND PARTITIONS AND FIRE RATED SHAFT W ALLS AND PARTITIONS.

ALL PENETRATIONS THROUGH 0-HOUR RATED W ALLS SHALL BE CAULKED SM OKE-TIGHT. REFER TO

SPECIFICATION SECTION 07 84 00.

T. REMOVE EXISTING ELECTRICAL SYSTEM S W HICH ARE M ADE SUPERFLUOUS W HEN NEW SYSTEM S ARE INSTALLED INCLUDING ALL ASSOCIATED W IRING AND DEVICES. PROVIDE BLANK STAINLESS STEEL COVERPLATES PROPERLY SIZED FOR EXISTING BACKBOX AND W ALL OPENING FOR ALL RECESSED W ALL MOUNTED DEVICES REM OVED. ALL

ABANDON RACEW AY, CONDUIT AND BOXES SHALL BE REM OVED.

U. REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREM ENTS FOR STATEM ENT OF BID ITEM (S) AND

DEDUCTIVE ALTERNATES.

V. CONTRACTOR IS REQUIRED TO PROVIDE FLOOR AND W ALL PROTECTION (AS NEEDED) AND REPLACE ANY DAMAGED CEILING TILES W ITH NEW . RETURN AREA BACK TO ORIGINAL CONDITIONS UPON COM PLETION OF

W ORK.

W . THE CONTRACTOR IS RESPONSIBLE FOR REM OVING EXISTING CEILING TILE AND GRID UP TO THE NEAREST TILE AS REQUIRED IN ORDER TO INSTALL NEW CABLE, CABLE M ANAGEMENT, JUNCTION BOXES, ANTENNA, OUTLETS, ETC.

CEILING TILE W ILL BE CAREFULLY REMOVED AND STORED ON SITE OUT OF THE IM M EDIATE CONSTRUCTION AREA.

STORAGE AREA TO BE COORDINATED W ITH THE COR. AT THE END OF THE W ORK DAY ALL TILE TEMPORARILY REMOVED TO ACCOMODATE W ORK W ILL BE RE-INSTALLED UNLESS APPROVED OTHERW ISE BY THE COR. AT THE BEGINNING OF W ORK IN EACH CORRIDOR THE CONTRACTOR W ILL DOCUYM ENT ALONG W ITH THE COR THE CONDITION OF THE EXISTING CEILING TILE AND GRID, NOTING THOSE AREAS THAT BEGIN THE PROJECT AS DAMAGED, STAINED, M NISSING, ETC. ANY ADDITIONAL TILE NOT IDENTIFIED INITIALLY THAT ARE SUBSEQUENTLY DAMAGED, LOST, OR ALTERED BY THE CONTRACTOR W ILL BE REPLACED ALONG W ITH ANY AFFECTED GRID BY

THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNM ENT.

X. REFER TO PLANS FOR AREAS W HICH REQUIRE ADDITIONAL RESTRICTIONS ON LABOR HOURS AND PROCEEDURES

(3RD SHIFT, STERILE CORRIDOR, ETC.).

GENERAL NOTES

NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT

TO MODIFICATIONS ON OTHER DRAW INGS.

ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT

NECESSARILY BE USED ON THIS PROJECT.

ABBREVIATIONS

AAP - AREA ALARM PANEL - M EDICAL GAS

CC - ACCESS

ADJ - ADJUSTABLE

AF - ARC FAULT CIRCUIT INTERUPTER

AFCI - ARC FAULT CIRCUIT INTERUPTER

AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM

AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIM ATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEM BLY

ATS - AUTOM ATIC TRANSFER SW ITCH

BLDG - BUILDING

BOE - BOTTOM OF EQUIPM ENT

BOT - BOTTOM

BTW N - BETW EEN

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CKT - CIRCUIT

CLG - CEILING

CMU - CONCRETE M ASONRY UNIT

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CORR - CORRIDOR

CTR - CENTER

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIM ENSION

DIV - DIVISION

DN - DOW N

DW G - DRAW ING

EA - EACH

EC - ELECTRICAL CONTRACTOR (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATION OR ELEVATOR

EM - EMERGENCY

EQ - EQUAL

EQS - EQUIPMENT SUPPLIER

EQUIP - EQUIPM ENT

EX/R - EXISTING DEVICE TO BE REM OVED, CLEANED,

STORED, AND RELOCATED UNDER NEW W ORK PHASE.

ETR - EXISTING TO REMAIN

EW C - ELECTRIC W ATER COOLER

EX - EXISTING

EXP - EXPANSION

EXT - EXTERIOR

FCE - FIRE CONTROL EQUIPMENT

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)

FT - FEET

FTG - FOOTING

GC - GENERAL CONTRACTOR

GF - GROUND FAULT CIRCUIT INTERRUPTER

GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GFFT - GROUND FAULT FEED THRU

HC - HVAC CONTRACTOR (DIVISION 23)

HP - HORSE POW ER OR HIGH POINT

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

IN - INCHES

KEC - KITCHEN EQUIPM ENT CONTRACTOR

L - LENGTH

LBS - POUNDS

M AP - MASTER ALARM PANEL (M EDICAL GAS)

M AX - MAXIMUM

M EZZ - M EZZANINE

M FR - MANUFACTURER

M H - M ANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM

M IN - M INIMUM OR M INUTE

M ISC - M ISCELLANEOUS

M TD - MOUNTED

M TG - MOUNTING

NIC - NOT IN CONTRACT

NOM - NOM INAL

NTS - NOT TO SCALE

OD - OUTSIDE DIAM ETER

OFCI - OW NER FURNISHED CONTRACTOR INSTALLED

OFOI - OW NER FURNISHED OW NER INSTALLED

PC - PLUMBING CONTRACTOR (DIVISION 22)

PLBG - PLUMBING

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH-IN

S - SURFACE MOUNTED

SC - SECURITY CONTRACTOR

SCH - SCHEDULE

SHT - SHEET

SMS - SECURITY M ANAGEMENT SYSTEM

SPEC - SPECIFICATIONS

SQ - SQUARE

SS - STAINLESS STEEL

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TC - TECHNOLOGY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .