36C25019B0023-003.pdf

PDF 4 MB Posted

Attached to
Remove Sterile Steam Humidifiers Federal contract opportunity
Solicitation number
36C25019B0023
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0023 P01. VA Remove Humidifiers 100 Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Remove Sterile Steam Humidifiers, newest first.
File Type Posted
36C25019B0023-0001004.pdf PDF
36C25019B0023-0001000.docx DOCX document
36C25019B0023-0001003.pdf PDF
36C25019B0023-0001001.docx DOCX document
36C25019B0023-0001002.docx DOCX document
36C25019B0023-004.pdf PDF
36C25019B0023-002.pdf PDF
36C25019B0023-005.pdf PDF
36C25019B0023-001.docx DOCX document
36C25019B0023-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

E-65042

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TE

A

H

F OO

IO

DAVID A.

DEMAGALL

EAST BLVD.

E

S

T

E A

S T

B L V

D

MAGNOLIA DR.

H A

Z E

L D

R

E . 1

S T

MT. SINAI DR.

M

AR

TIN

LU

TH

ER

K

IN

G D

R

Drawing Title

Approved: Division Chief

Location

Project Title Date

Checked Drawn DRAWING NO.Building Number

Project No.

Office of

Facilities

Management

Dwg. of o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

VA FORM 08-6231, OCT 1978 1

2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A B

C D

E F

FACILITY MANAGER

DATE

SHOP FOREMAN 138

APPROVALS

CHIEF Planning and Construction

DATE

CHIEF, Occupational Health & Safety

APPROVALS

DIRECTOR 00

DATE

ASSOCIATE DIRECTOR 00A (B)

APPROVALS

Approved: Service Director

CHIEF, IRMCHIEF, ENGINEERING 138

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

10701 EAST BLVD. CLEVELAND, OH. 44106

PROJECT NO.

Veterans Administration Medical Center

Perspectus Architecture LLC

Fredrick, Fredrick & Heller Engineers, Inc.

672 East Royalton Road Broadview Heights, Ohio 44147

Architect 13212 Shaker Square Cleveland, Ohio 44120

PROJECT DESCRIPTION:

REMOVE STERILE STEAM HUMIDIFIERS AND REPLACE

WITH DIRECT STEAM. 11 TOTAL UNITS LOCATED IN 5

DIFFERENT MECHANICAL SPACES.

PROJECT AREA: 6,600 SQFT (5 SPACES COMBINED)

DESIGN CODES:

2018 NFPA 101 Life Safety Code

2018 IBC

2017 VA HVAC Design Manual

TYPE OF CONSTRUCTION: (LSC A.8.2.1.2)

Type II (222)

FIRE SUPPRESSION:

Fully Sprinklered, Existing to Remain

FIRE ALARM SYSTEM:

Existing to Remain

EXTERIOR BEARING WALLS: (LSC A.8.2.1.2)

2 Hours

INTERIOR BEARING WALLS: (LSC A.8.2.1.2)

2 Hours

STRUCTURAL FRAME / COLUMNS: (LSC A.8.2.1.2)

2 Hours (Supporting more than 1 floor)

FLOOR - CEILING ASSEMBLIES: (LSC A.8.2.1.2)

2 Hours

ROOF - CEILING ASSEMBLIES: (LSC A.8.2.1.2)

1 Hour

INTERIOR NON-BEARING WALLS: (LSC A.8.2.1.2)

0 Hour

EXTERIOR NON-BEARING WALLS: (LSC A.8.2.1.2)

0 Hour

EXIT ENCLOSURES (LSC 7.1.3.2.1)

Existing: 1 Hour

SMOKE BARRIERS: (LSC 18.3.7.3)

1 Hour

EXIT ACCESS CORRIDORS: (LSC 18.3.6.2)

0 Hour, Smoke Partitions (Healthcare)

CODE INFORMATIONDRAWING INDEX

1-X1 COVER SHEET

MECHANICAL

1-M0.0 MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES

1-M0.1 MECHANICAL DETAILS AND CONTROLS

1-M1.0 PHASE 2 - PARTIAL SECOND FLOOR PENTHOUSE MECHANICAL PLANS (AC-6)

1-M2.0 PHASE 3 - PARTIAL SECOND FLOOR MECHANICAL PLANS (AC-57)

1-M3.0 PHASE 4 - PARTIAL BASEMENT MECHANICAL PLANS (AC-26)

1-M4.0 PHASE 5 - PARTIAL BASEMENT MECHANICAL PLANS (AC-28)

1-M5.0 PHASE 6 - PARTIAL SEVENTH FLOOR PENTHOUSE MECHANICAL DEMOLITION PLAN (AC-61 & AC-62)

1-M5.1 PHASE 6 - PARTIAL SEVENTH FLOOR PENTHOUSE MECHANICAL PLAN (AC-61 & AC-62)

U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285

VICINITY PLAN

Arch. job no. 18-063

REMOVE STERILE STEAM

HUMIDIFIERS

541-18-502

JMCDAD

COVER SHEET

1 9

1-X1

541-18-502

100% CONSTRUCTION DOCUMENTS

AUGUST 10, 2018

AUGUST 10, 2018

REMOVE STERILE STEAM HUMIDIFIERS

VAMC - WADE PARK CAMPUS

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

MECHANICAL LEGEND, GENERAL

NOTES AND SCHEDULES

2 9

1-M0.0

MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.

COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH COR A MINIMUM OF TEN WORKING DAYS IN ADVANCE.

PROVIDE MANUFACTURER RECOMMENDED SERVICE CLEARANCE FOR ALL NEW MECHANICAL EQUIPMENT.

NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF PANELS.

PITCH ALL NEW PRESSURIZED STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW AT A MINIMUM OF 1/4" PER 10-FT.

ALL REDUCERS USED IN NEW STEAM PIPING SHALL BE ECCENTRIC.

ALL NEW CONNECTIONS TO HORIZONTAL STEAM MAINS SHALL BE MADE AT AN UPWARD 45° ANGLE.

CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING, FIREPROOFING AND REPAIRING ALL EXISTING FINISHES, FLOORS, WALLS AND CEILINGS AFFECTED BY THE SELECTIVE DEMOLITION AND NEW WORK DESCRIBED IN THE DESIGN DOCUMENTS. SEE

SPECIFICATIONS.

CONTRACTOR SHALL PROTECT EXISTING FINISHES DURING CONSTRUCTION AND REPAIR OR REPLACE ANY ITEMS DAMAGED AS A

RESULT OF WORK DESCRIBED IN THE DESIGN DOCUMENTS.

DEMOLITION SYMBOLS:

HVAC PIPING:CALL OUTS:

ABBREVIATIONS:

HVAC CONTROLS:

AD ACCESS DOOR

ELECTRICAL CONTRACTOR

GENERAL TRADES CONTRACTOR

TEMPERATURE CONTROL CONTRACTOR

HVAC CONTRACTOR

CONNECT TO EXISTING

EC

GC

TC

HC

REFERENCE TO CODED NOTE

TO OPENING IN TOP OF DUCT. SHALL BE A MINIMUM 1.5 TIMES

GREATER THAN THE CROSS-SECTIONAL AREA OF DUCT.

ABOVE FINISHED FLOORAFF

@ MANUAL OVERRIDE

ROOF OPENINGRO

TEMPERATURE CONTROL PANELTCP

CURRENT TRANSFORMER ON MOTOR WIRING WITH TRANSDUCER

AIR CONDITIONING CONDENSATE

LOW PRESSURE STEAM CONDENSATELPC

LPS

ACC

LOW PRESSURE STEAM

PRESSURE GAUGE

LOW LIMIT THERMOSTATL

HUMIDITY SENSOR WITH SETPOINT ADJUSTMENT

COMBINATION FIRE/SMOKE DAMPER IN DUCT

MEDIUM PRESSURE STEAM CONDENSATE

MPS

MPC

MEDIUM PRESSURE STEAM

HUMIDITY SENSOR

MOTORIZED 2-WAY CONTROL VALVE

STATIC PRESSURE SENSOR

H

H

S

MOD

FSD

STRAINER

FLEXIBLE PIPE CONNECTOR

THERMOMETER IN PIPE WELL

BALANCING VALVE

HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"

ISOLATION VALVE

REDUCER

UNION

(SHUTOFF, BALANCE, CHECK)

TRIPLE DUTY VALVE

CHECK VALVE

MOTORIZED 3-WAY CONTROL VALVE

GAUGE PORT (PETE'S PLUG)

DRAIN VALVE WITH HOSE FITTING

MOTORIZED 2-WAY CONTROL VALVE

LOCAL DRAIN, VALVED WITH 3/4"

THREADED CONNECTOR

MANUAL AIR VENTMAV

PRESSURE RELIEF VALVE

KITCHEN HOOD EXHAUSTKHE

CD CONDENSATE PIPING

EXISTING TO REMAIN

EXISTING TO BE REMOVED

X

XR

EXISTING TO BE RELOCATEDXRL

EQUIPMENT OR FIXTURE MARK

UNIT NUMBER

EQUIPMENT

TYPE

BRANCH PIPE CONNECTION

EQ-#

FIRE DAMPER IN DUCTFDD

TWO POSITION VALVE

PRESSURE REDUCING VALVE

LIMIT OF DEMOLITION

EXISTING NEW LOCATIONXNL

THERMOSTATT

NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS.

IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF WORK, FOR DETAILED SCOPE OF WORK PLEASE REFER TO THE SUBSEQUENT DRAWINGS.

A.

B.

C.

D.

E.

F.

G.

H.

THIS PROJECT CONSISTS OF WORK IN MULTIPLE SPACES LOCATED IN DIFFERENT BUILDINGS. WORK SHALL BE COMPLETED IN A MANNER THAT MINIMIZES SHUTDOWNS TO NO MORE THAN ONE

AIR HANDLING UNIT AT A TIME.

THE FOLLOWING PHASES SHALL BE COMPLETED IN THE ORDER BELOW. DURATIONS LISTED SHALL BE FROM VA'S NOTICE TO PROCEED TO SUBSTANTIAL COMPLETION:

PHASE 1 - HUMIDIFIER CONTROL VERIFICATION AND REVIEW, SEE NOTES ON THIS SHEET. DURATION - 28 DAYS.

PHASE 2 - ALL WORK ASSOCIATED WITH AC-6. DURATION - 21 DAYS.

PHASE 3 - ALL WORK ASSOCIATED WITH AC-57. DURATION - 30 DAYS.

PHASE 4 - ALL WORK ASSOCIATED WITH AC-26. DURATION - 28 DAYS.

PHASE 5 - ALL WORK ASSOCIATED WITH AC-28. DURATION - 21 DAYS.

PHASE 6 - ALL WORK ASSOCIATED WITH AC-61 & AC-62. DURATION - 60 DAYS.

CONTRACTOR SHALL USE THE PHASING OUTLINED ABOVE AND DEVELOP A SCHEDULE FOR REVIEW AND APPROVAL BY THE COR. CONTRACTOR PHASING PLAN SHALL DETAIL THE SEQUENCE OF WORK TO BE COMPLETED TO COMPLY WITH ITEM "A" ABOVE. THE PHASING AND SCHEDULE SUBMITTED BY THE CONTRACTOR IS SUBJECT TO CHANGE AT THE DISCRETION OF THE VA.

CONTRACTOR SCHEDULE REQUIREMENTS ARE OUTLINED IN THE SPECIFICATIONS AND SHALL INCLUDE THE FOLLOWING:

1. BROKEN DOWN BY MECHANICAL ROOM AND AIR HANDLING UNIT.

2. INCLUDE START DATES AND END DATES FOR EACH TASK.

3. TASKS FOR EACH TRADE; DEMOLITION, NEW PIPING, INDSULATION, CONTROLS, ELECTRICAL, ETC.

4. DURATIONS FOR EACH TASK.

5. INCLUDE AIR HANDLING UNIT SHUTDOWN DATES AND DURATIONS.

ALL WORK INSIDE OF THE AIR HANDLING UNITS THAT REQUIRE A SHUTDOWN SHALL BE COMPLETED ON 3RD SHIFT ON A WEEKEND. CONTRACTOR SHALL SUBMIT A SHUTDOWN PLAN TO THE VA WITH SPECIFIC START AND END DATES AND TIMES. AIR HANDLING UNIT SHUTDOWN TIMES WILL NEED TO BE SCHEDULED WITH EACH DEPARTMENT AFFECTED AND WILL LIKELY BE LIMITED TO A FEW HOURS (THIS MAY CHANGE AT THE DISCRETION OF THE VA). CONTRACTORS MAY HAVE TO COMPLETE THEIR WORK OVER MULTIPLE SHUTDOWNS IF THE AVAILABLE TIMES ARE NOT

SUFFICIENT TO COMPLETE ALL WORK NECESSARY.

CONTRACTOR SHALL FIELD VERIFY ALL WORK SHOWN ON THESE DRAWINGS AND NOTIFY THE COR AND DESIGN TEAM OF ANY CONDITIONS THAT PREVENT THE INTENDED DESIGN FROM BEING

CONSTRUCTED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE

OF CONSTRUCTION.

THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO

ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.

PROJECT PHASING AND COORDINATION NOTES

GENERAL MECHANICAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

MECHANICAL LEGEND

NOTES:

1.

2.

CONTRACTOR SHALL PROVIDE ALL TRANSITIONS, FITTINGS AND ACCESSORIES REQUIRED TO CONNECT STEAM SUPPLY PIPING TO

THE NEW DISPERSION MANIFOLD SEE DETAILS.

CONTRACTOR SHALL SUPPLY ALL HARDWARE, BRACKETS AND FLASHING REQUIRED TO MOUNT MANIFOLDS IN EXISTING AIR

HANDLING UNITS.

FACTORY INSULATED DISPERSION TUBES

ACCESSORIES

HUMIDIFIER PERFORMANCE

STEAM DISPERSION MANIFOLD MARK HUM-6

SPACE SERVED

DESIRED AIR DRY BULB TEMPERATURE (F)

DESIRED CONDITIONS IN SPACE (RH)

DESIGN LOAD (LBS/HR) 180

DESIGN AIR FLOW (CFM)

MAXIMUM ABSORPTION DISTANCE (INCHES)

MAX AIR PRESSURE DROP (INCHES W.C.)

STEAM DISPERSION MANIFOLD

DISPERSION MANIFOLD FACE WIDTH (INCHES)

DISPERSION MANIFOLD FACE HEIGHT (INCHES)

HEADER AND TUBE MATERIAL

FIRST FLOOR

MRI SUITE

HUMIDIFIER DISPERSION MANIFOLD SCHEDULE

MOUNTING LOCATION

AIR HANDLING UNIT SERVED AC-6

10000

65°

40%

AIR HANDLING UNIT

0.1

STAINLESS STEEL

YES

HUM-57

AC-57

23300

72°

30%

FIRST FLOOR

PALMS LAB

STAINLESS STEEL

YES

AIR HANDLING UNIT

DIRECT STEAM PRESSURE AVAILABLE 10 PSI 15 PSI

0.1

PHASE 1 - HUMIDIFIER CONTROL VERIFICATION

HUMIDIFIER CONTROL SEQUENCE

THE CONTROLLER SHALL MEASURE THE RETURN AIR HUMIDITY AND MODULATE THE STEAM CONTROL VALVE TO MAINTAIN A MINIMUM SETPOINT OF:

AC-6 - 40% RH(ADJ.)

AC-26 - 45% RH(ADJ.)

AC-28 - 45% RH(ADJ.)

AC-57 - 30% RH(ADJ.)

AC-61 - 30% RH(ADJ.)

AC-62 - 30% RH(ADJ.)

THE HUMIDIFIER SHALL BE ENABLED WHENEVER THE SUPPLY FAN STATUS IS ON AND THE RETURN AIR RELATIVE HUMIDITY IS BELOW THE SETPOINT LISTED IN ITEM 1.

THE HUMIDIFIER SHALL TURN OFF WHENEVER: RETURN AIR HUMIDITY MEASURES MORE THAN 10% OF THE SETPOINT LISTED IN ITEM 1 OR ON A LOSS OF SUPPLY FAN STATUS.

ALARMS:

A. HIGH SUPPLY AIR HUMIDITY +15%(ADJ) OF SETPOINT IN ITEM 1 (MEASEURED IN RETURN AIR DUCT).

B. LOW SUPPLY AIR HUMIDITY -5%(ADJ) OF SETPOINT IN ITEM 1 (MEASEURED IN RETURN AIR DUCT).

1.

2.

3.

PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL INSPECT THE EXISTING CONTROL SYSTEM(S) FOR EACH AIR HANDLING UNIT WITHIN THE PROJECT SCOPE AND VERIFY THAT THEY ARE PROPERLY EQUIPPED TO COMPLY WITH THE SEQUENCE LISTED BELOW. CONTRACTOR SHALL PROVIDE A REPORT CONTAINING THE FOLLOWING INFORMATION:

A. EXISTING SUPPLY AIR HUMIDITY SENSOR LOCATION

B. EXISTING RETURN AIR HUMIDITY SENSOR LOCATION

C. PROPOSED NEW CONTROL VALVE LOCATION

D. EXISTING HUMIDIFICATION SETPOINT

E. EXISTING HUMIDIFICATION SEQUENCE

CONTRACTOR SHALL SUBMIT REPORT FOR REVIEW BY DESIGN TEAM AND VA COR. AFTER REVIEW, ADJUSTMENTS MAY BE MADE TO EXISTING SYSTEMS TO ENSURE PROPER HUMIDIFIER OPERATION. SCOPE OF WORK MAY CHANGE FOR EACH AIR HANDLING UNIT BASED ON THE CONTENTS OF THE REPORT.

AT THE COMPLETION OF EACH PHASE THE CONTRACTOR SHALL TEST EACH STEAM CONTROL VALVE AND HUMIDIFIER TO VERIFY THAT THE EXISTING AND NEW EQUIPMENT IS OPERATING PROPERLY AND IS CAPABLE OF MEETING THE SET POINTS AND SEQUENCES SPECIFIED BELOW. CONTRACTOR SHALL SUBMIT TEST REPORTS FOR EACH AIR HANDLING UNIT TO BE REVIEWED BY THE DESIGN TEAM AND THE VA COR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY CHANGES REQUIRED TO PROVIDE A PROPERLY OPERATING SYSTEM TO THE SATISFACTION OF THE VA.

STEAM CONDENSATE PUMP SCHEDULE

PUMP

NUMBER

LOCATION /

SERVICE

TYPE

CONDENSATE

RATE

DISCHARGE

PRESSURE

RECEIVER

CAPACITY

MOTOR

NOM. HP VOLT/PHASE/HZ

CP-1

CARES 7TH

AC-61

DUPLEX 5 GPM 10 PSI 15 GALLONS 1/4 480/3/60

CP-2

CARES 7TH

AC-62

DUPLEX 10 GPM 15 PSI 15 GALLONS 1/2 480/3/60

OVERALL DIMENSIONS W x H x L (INCHES) 71 x 43.25 x 7.25 86 x 87.25 x 7.25

STEAM CONTROL VALVE SCHEDULE

UNIT SERVED AC-6 AC-57 AC-26 AC-28 AC-61

CAPACITY

AC-62 (a)

VALVE SIZE

NOTE: ALL VALVES SHALL BE BRONZE BODY, ELECTRONICALLY ACTUATED (24V) AND RATED FOR LISTED CAPACITY ABOVE.

510 LBS/HR

1-1/4"

180 LBS/HR

3/4"

510 LBS/HR

1-1/4"

HUM-26

AC-26

33000

72°

45%

0.1

BASEMENT

ANIMAL RESEARCH

STAINLESS STEEL

YES

AIR HANDLING UNIT

10 PSI

71 x 55.25 x 7.25

82 LBS/HR

1/2"

VALVE Cv 14.05.5 16.0 2.5

2-1/2"

2-1/2"

44.3

1730 LBS/HR 1475 LBS/HR

AC-62 (b)

2-1/2"

44.3

1475 LBS/HR

1.

2.

3.

EXISTING CONTROLS ARE BY ANDOVER.

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

MECHANICAL DETAILS AND

CONTROLS

3 9

1-M0.1

NOT TO SCALE

AC-62 HUMIDIFIER CONNECTION DETAIL

AC-26 HUMIDIFIER CONNECTION DETAIL

AC-28 HUMIDIFIER CONNECTION DETAIL

AC-6 HUMIDIFIER CONNECTION DETAIL

CONDENSATE PUMP DETAILHUMIDIFIER CONDENSATE TRAP DETAIL

5 6

1 3

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALENOT TO SCALE

NOT TO SCALE

NEW Y-STRAINER WITH

BLOW DOWN VALVE

NEW STEAM CONTROL VALVE

NEW GATE VALVE (TYPICAL)

NEW 2"Ø LOW PRESSURE STEAM.

TAP INTO TOP OF MAIN AT 45° ANGLE.

NEW UNION (TYPICAL)

NEW FLOAT AND

THERMOSTATIC

STEAM TRAP

NEW CHECK VALVE

NOT TO SCALE

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

SADDLE

WELD

TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD

PROVIDE INSULATION SHIELD (8"

MIN.) AND INSERT FOR ALL PIPING

SIDE VIEW

1-5/8" 12 GAGE CHANNEL

OR 2"x2"x1/4" ANGLE

1" MAX.

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION UNDER

INSULATION SHIELD

(9 PCF MIN. DENSITY)

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

HANGER ROD

INSULATION SHIELD

AT HANGER

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

BAND

1/2" DIA. HANGER RODS WITH 36"

MAX. SPACING ON EACH CHANNEL

ROLLER

NEW 3/4"Ø LOW

PRESSURE

CONDENSATE

X-3"Ø LPS (10 PSI)

3/4"Ø LOW PRESSURE CONDENSATE

NEW 2"Ø LOW PRESSURE STEAM

3/4"Ø BYPASS

X- CONDENSATE

PUMP PACKAGE

NEW UNION (TYPICAL)

NEW 2-1/2"Ø LOW PRESSURE STEAM

X-2"Ø LOW PRESSURE CONDENSATE

X-1"Ø PUMPED

CONDENSATE

X-3/4"Ø LOW PRESSURE

CONDENSATE

X-4"Ø LPS TO

HEATING COIL

X-4"Ø LOW

PRESSURE STEAM

X-3/4"Ø LOW PRESSURE CONDENSATE

X-2"Ø LOW

PRESSURE

CONDENSATE

NEW UNION (TYPICAL)

EXISTING FLOAT AND

THERMOSTATIC STEAM

TRAP ASSEMBLY

X-3"Ø LPS (5 PSI)

NEW 1-1/2"Ø LOW PRESSURE STEAM

X-BYPASS

X-2"Ø LOW

PRESSURE

CONDENSATE

X-CONDENSATE

PUMP PACKAGE

X-2"Ø PUMPED

CONDENSATE

X-2"Ø LOW

PRESSURE

CONDENSATE

X-1-1/2"Ø LPS (5 PSI)

NEW CONDENSATE TRAP (SEE DETAIL)

NEW 3/4"Ø CONDENSATE TRAP

X-LPC

RECEIVER

NEW 3/4"Ø LOW PRESSURE

HUMIDIFIER CONDENSATE

NEW DISPERSION MANIFOLD IN EXISTING AIR

HANDLING UNIT (AC-6) SEE SCHEDULE.

X-6"Ø LPS (15 PSI)

NEW 3"Ø LOW PRESSURE STEAM

X-BYPASS

X-CONDENSATE

PUMP PACKAGE

X-2"Ø PUMPED

CONDENSATE

X-1"Ø LOW PRESSURE CONDENSATE

X-1"Ø LOW PRESSURE

CONDENSATE FROM

FLASH TANK

X-1"Ø LOW PRESSURE

CONDENSATE FROM

HEATING COIL

EXISTING FLOAT AND

THERMOSTATIC STEAM

TRAP ASSEMBLY

NEW 3"Ø LOW PRESSURE STEAM.

TAP INTO TOP OF MAIN AT 45° ANGLE.

X-6"Ø LPS (6 PSI)

EXISTING 6"Ø LOW PRESSURE STEAM

X-BYPASS

X-2"Ø LOW PRESSURE

CONDENSATE

EXISTING FLOAT AND

THERMOSTATIC STEAM

TRAP ASSEMBLY

TO BOILER PLANT

X-6"Ø LPS (6 PSI)

EXISTING 6"Ø LOW PRESSURE STEAM

X-2"Ø LOW PRESSURE CONDENSATE

EXISTING FLOAT AND

THERMOSTATIC STEAM

TRAP ASSEMBLY

TO BOILER PLANT

NEW Y-STRAINER WITH BLOW DOWN VALVE (TYPICAL)

NEW STEAM CONTROL VALVE (TYPICAL)

NEW GATE VALVE (TYPICAL)

X-4"Ø LPS (10 PSI)

NEW 6"Ø LOW

PRESSURE STEAM

NEW 6"Ø LOW

PRESSURE STEAM

NEW DISPERSION MANIFOLD IN EXISTING AIR

HANDLING UNIT (AC-26) SEE SCHEDULE.

NEW DISPERSION MANIFOLD IN EXISTING AIR

HANDLING UNIT (AC-57) SEE SCHEDULE.

EXISTING DISPERSION MANIFOLD IN

EXISTING AIR HANDLING UNIT (AC-61)

EXISTING DISPERSION MANIFOLD IN

EXISTING AIR HANDLING UNIT (AC-62)

EXISTING DISPERSION MANIFOLD IN

EXISTING AIR HANDLING UNIT (AC-28)

AI R CO NDI TI O NING CO NDENSTATE TRAP DETAI L

N O T TO SC ALE

A IR H AN DL ER

P LU G T EE

FO RC LE ANI NG

( TY PIC AL)

B A SE

R AILO F

A IR

H AN DL ER

1 -1 /2"

S UP PO R T B EAM9"

4 -1 /2"

F LO O R O F

M EC HA NIC ALRO O M

A IR G AP

F LO O R DR AIN

6" MIN.

NOTE 1

DISPERSION MANIFOLD

CONNECTION POINT

SEE DETAILS 1-6 FOR PIPE SIZES

AND TERMINATION INFORMATION

NOTES:

1.

AIR HANDLING UNIT

HUMIDIFIER SECTION

TYPICAL PIPE HANGER DETAIL

EXISTING HEATING COIL

CONDENSATE AND TRAP

EXISTING 1"Ø LOW

PRESSURE CONDENSATE

DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES) DOWNSTREAM

OF NEW STEAM DISPERSION MANIFOLD AND DOWNSTREAM OF THE NEW F&T STEAM TRAP.

*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*

D1

D1

D1D1

NEW 1-1/4"Ø LOW

PRESSURE CONDENSATE

EXISTING 2"Ø LOW

PRESSURE CONDENSATE

DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)

DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*

D1

D1

NEW CONDENSATE TRAP (SEE DETAIL)

D3

DEDUCT ALTERNATE 2 - OMIT ALL NEW WORK ASSOCIATED WITH AC-26.

*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*

D2

D3

D2

DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)

DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

DEDUCT ALTERNATE 3 - OMIT ALL NEW WORK ASSOCIATED WITH AC-28.

*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL FOR BASE BID*

D1

D1

AC-61 HUMIDIFIER CONNECTION DETAIL

NEW

CONDENSATE

PUMP PACKAGE

(CP-1)

1-1/4"Ø PUMPED

CONDENSATE

1"Ø LOW PRESSURE

CONDENSATE (QTY 2)

NEW CONDENSATE TRAP (SEE DETAIL)

CONNECT TO EXISTING 3"Ø LPC

LOCATED NORTH OF AC-61.

SEE FLOOR PLANS FOR CONTINUATION DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)

DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*

D1

D1 D1

NEW

CONDENSATE

PUMP PACKAGE

(CP-2)

1-1/2"Ø PUMPED

CONDENSATE

1-1/4"Ø LOW PRESSURE

CONDENSATE (QTY 2)

CONNECT TO NEW 2"Ø PUMPED

CONDENSATE ABOVE CP-1.

SEE FLOOR PLANS FOR CONTINUATION

DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)

DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*

D1

D1

1-1/4"Ø LOW PRESSURE

CONDENSATE (QTY 2)

NEW CONDENSATE TRAP (SEE DETAIL)

TO CONDENSATE MAIN

SEE FLOOR PLANS

FULL SIZE VENT UP

THROUGH ROOF,

SEE DETAIL.

CONDENSATE FROM SYSTEM.

PROVIDE INLET-SIZED HEADER

FOR MULTIPLE RETURNS.

PUMP

UNION (TYP)

3-1/2" CONCRETE PAD

PROVIDE WITH PUMP

CONTROL PACKAGE.

SEE SCHEDULE.

STEAM CO NDENSATE PUM P DETAI L

N O T TO S CALE

C O N DEN SAT E M AIN

V ENT TO RO O M

C O N DE NSA TE

F RO M S YSTEM( PR O V IDE H EAD ER

FO R

M ULT IPLE

R ET UR NS ).

4 " CO NCR ET E P AD

U NIO N(T YP)

P UM P

F UL L SI ZE

V EN T UPT HRO UG H

RO O F

FLO O R

P RO V IDE

W ITH PUM PC O NTRO L

P AC KAG E.

S EE

S CH ED UL E.

R E CE IV ER

CONDENSATE

PUMP PACKAGE

(CP-1 & CP-2)

CHECK VALVE

GLOBE VALVE (TYP)

STRAINER (TYP)

CONTRACTOR SHALL SIZE WATER SEAL AT A MINIMUM OF 8" OR 2" LARGER THAN THE ABSOLUTE STATIC PRESSURE OF THE HUMIDIFIER SECTION IN THE AIR HANDLING UNIT, WHICH EVER IS LARGER.

FROM CONDENSATE

PRODUCING EQUIPMENT

NEW DIRT LEG WITH CAP

TIE IN AT HIGH POINT

OF EXISTING

CONDENSATE PIPING

NEW CHECK VALVE

AND GATE VALVE

NEW CHECK

VALVE AND GATE

VALVE (QTY 2)

ECCENTRIC REDUCER (TYPICAL)

NEW Y-STRAINER WITH

BLOW DOWN VALVE

NEW STEAM CONTROL VALVE

NEW GATE VALVE (TYPICAL)

ECCENTRIC REDUCER (TYPICAL)

NEW Y-STRAINER WITH

BLOW DOWN VALVE

NEW STEAM CONTROL VALVE

NEW GATE VALVE (TYPICAL)

ECCENTRIC REDUCER (TYPICAL)

AC-57 HUMIDIFIER CONNECTION DETAIL

NEW Y-STRAINER WITH

BLOW DOWN VALVE

NEW STEAM CONTROL VALVE

NEW GATE VALVE (TYPICAL)

ECCENTRIC REDUCER (TYPICAL)

NEW Y-STRAINER WITH

BLOW DOWN VALVE

NEW STEAM CONTROL VALVE

NEW GATE VALVE (TYPICAL)

ECCENTRIC REDUCER (TYPICAL)

UNION (TYPICAL)

45° TAP

45° TAP

45° TAP

UNION (TYPICAL)

ECCENTRIC REDUCER (TYPICAL)

NEW CHECK

VALVE AND

GATE VALVE

D1

M

IN

IM

U

M

INSULATION ROOFING

VENT (SEE PLANS

FOR SIZES, MINIMUM

3-INCHES)

FLASH VENT WITH 6 LB.

LEAD CAP AND BASE. ROLL

CAP 1" INTO TOP OF VENT

BASE TO BE 2'-0" SQUARE.

VENT THROUGH ROOF DETAIL7

NOT TO SCALE

DN

UP

UP

DN

DN

UP

O V

O V

O V

O V OV

OV OV

S

W

V

U

T

S

X X

X X

X

X

X

X X

X

X

X

X X

X X

X

X

X X

X X

X

X

X X

X

X X

X

X X

X X

X

X

X X

X X

X

X

X

X X

X X

X

X X

X X

X

X

X X

X X

X

X

X

X X

X X

X

X

X X

X X

X

X

X X

X

X

X

X X

X X

X

X

X

X X

X X

X

X X

X X

X

X

X

X X

X X

X

X

X X

X

X X

X

X X

X X

X

X X

X X

X X

X

X

X X

X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X X

X

X

X X

X X

X X

X

X X

X X

X

X

X X

X X

X X

XX

X X

X

X X

X

X X

X

X X

X

X X

X X

X X

X X

X X

X X X

X X

X

X

X X

X

X X

X

X X

X

X X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X

C R A S H C R A S H

NI C NI C

FEC

FEC

FEC

FEC

PROJECT AREA

(AC-6)

SECOND FLOOR KEY PLAN

NO SCALE

30.1

30.1

32.2

32.2

CC.1 CC.1

34.6

34.6

35.3

35.3

CC.5 CC.5

D1

X-AC-6

X - 3/4" CW

X - 3/4" CW

X - 1" CW

X - 3/4" CW

X - 3" HPS

X - 2" LPC

X - 3" CHWR

X - 3" CHWS

X - 3" V

X - 3" LPS

X

L P

S

X - 3/4" CW

X - 1 1/2" HHWS

X - 1 1/2" HHWR

X-UH

D2

D3

XR - 1 1/4"

D4

EXISTING MPS (45 PSI) TO LPS (10 PSI)

PRESSURE REDUCING STATION

D5

XR - 2"

30.1

30.1

32.2

32.2

CC.1 CC.1

34.6

34.6

35.3

35.3

CC.5 CC.5

X-AC-6

X - 3/4" CW

X - 3/4" CW

X - 1" CW

X - 3/4" CW

X - 3" HPS

X - 2" LPC

X - 3" CHWR

X - 3" CHWS

X - 3" V

X - 3" LPS

X

L P

S

X - 3/4" CW

1EXISTING MPS (45 PSI) TO LPS (10 PSI)

PRESSURE REDUCING STATION

2" LPS

4HUM-6

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

PHASE 2 - PARTIAL SECOND

FLOOR PENTHOUSE MECHANICAL

PLANS (AC-6)

4 9

1-M1.0

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL SECOND FLOOR PENTHOUSE

MECHANICAL DEMOLITION PLAN (AC-6) 1

GENERAL NOTES

# DEMOLITION CODED NOTES

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL SECOND FLOOR PENTHOUSE

MECHANICAL PLAN (AC-6) 2

# CODED NOTES

D1 REMOVE EXISTING DRISTEEM HUMIDIFIER AND DRANE COOLER COMPLETE. REMOVE ALL ASSOCIATED EQUIPMENT MOUNTS, PIPES, HANGERS AND ACCESSORIES COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".

REMOVE EXISTING 2"Ø STEAM SUPPLY BACK TO DISPERSION MANIFOLD CONNECTION POINT.

REMOVE EXISTING 3/4"Ø DOMESTIC WATER BACK TO ISOLATION VALVE ON WALL AND CAP.

REMOVE EXISTING HUMIDIFIER DRAIN PIPING BACK TO DISPERSION MANIFOLD CONNECTION POINT.

REMOVE EXISTING DISPERSION MANIFOLD FROM AC-6 COMPLETE. UNIT SHUTDOWN WILL BE REQUIRED, SEE

GENERAL NOTES.

1 EXTEND NEW 2"Ø LPS FROM EXISTING 3"Ø LPS AND CONNECT TO NEW DISPERSION MANIFOLD COMPLETE. SEE

DETAIL.

CONNECT NEW 3/4"Ø LOW PRESSURE CONDENSATE TO DISPERSION MANIFOLD OUTLET AND PROVIDE

CONDENSATE TRAP PER DETAIL.

EXTEND NEW 3/4"Ø LOW PRESSURE CONDENSATE AND TIE INTO EXISTING 2"Ø LOW PRESSURE CONDENSATE

PER DETAIL.

PROVIDE NEW STEAM DISPERSION MANIFOLD. CONNECT NEW 2"Ø LPS AND 3/4"Ø LPC TO UNIT. SEE SCHEDULE.

UNIT SHUTDOWN WILL BE REQUIRED. SEE GENERAL NOTES.

AC-6 HUMIDIFICATION DESIGN CRITERIA: 70°F @ 40% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 180 LBS/HR.

EXISTING MEDIUM PRESSURE STEAM SUPPLY INTO SPACE IS 45 PSI.

EXISTING LOW PRESSURE STEAM DOWNSTREAM OF PRV IS 10 PSI.

ANY SHUTDOWNS ASSOCIATED WITH AC-6 SHALL BE BETWEEN 8PM AND 6AM, MONDAY THROUGH SATURDAY OR ON SUNDAYS. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE BASED ON MRI SUITE SCHEDULE.

ALL SHUTDOWNS SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE.

CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING FINISHES AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO; WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.

CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF

CONSTRUCTION UNDER THIS CONTRACT.

MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACCOMPLISH THIS.

PENTHOUSE ACCESS FROM ROOF.

INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.

A.

B.

C.

D.

E.

F.

G.

H.

I.

D2

D3

D4

D5

DN

UP

DN

DN

UP

O V

O V

O V

OV OV

OV OV

S

W

V

U

T

S

X X

X X

X

X

X X

X X

X

X

X

X X

X X

X

X X

X X

X

X

X

X X

X X

X

X

X X

X X

X

X X

X

X X

X

X

X X

X

X

X

X X

X X

X

X

X X

X X

X

X

X

X X

X

X

X

X

X X

X

X

X

X X

X X

X

X

X

X X

X X

X

X X

X X

X

X

X X

X

X X

X

X

X X

X

X

X

X

X

X X

X X

X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X

X

X X

X X

X

X X

X X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X

X

X

X X

X

X X

X

X X

X X

X

X

XX

X

X X

X

X X

X

X X

X X

X X

X X

X X

X

X X

X

X X X

X X

X X

X

X

X X

X X

X

X

X X

X X

X

X

X X

X

X X

X

X

X

X

X

X

X X

X

X

X

X X

X X

X

X X

X

C R A S H C R A S H

NI C NI C

FEC

FEC

FEC

FEC

PROJECT AREA

(AC-57)

SECOND FLOOR KEY PLAN

NO SCALE

B.1 B.1

D.1 D.1

7.1

7.1

8.1

8.1

9.1

9.1

X - 12" CHWS

X - 12" CHWR

X - 2 1/2" LPC

X - 4" CHWR

X - 4" CHWS

D1

D2

D5

D4

XR - 1"

XR - 3"

XR - 3/4"

XR - 2"

XR - 1 1/4"

X-CONDENSATE

PUMP PACKAGE

D3

X-FLASH TANK

X - 6" LPS

X - 2" LPC

X - 2" HPC

X-HPS-TO-LPS PRESSURE

REDUCING STATION

X - 2" HPC

X - 4" HPS

X - 3" V

X - 2" LPC

X-VTR

X-AC-57

D4 D5D3

D6

D7

D8

B.1 B.1

D.1 D.1

7.1

7.1

8.1

8.1

9.1

9.1

X - 12" CHWS

X - 12" CHWR

X - 2 1/2" LPC

X - 4" CHWR

X - 4" CHWS

X-CONDENSATE

PUMP PACKAGE

X-FLASH TANK

X - 6" LPS

X - 2" LPC

X - 2" HPC

X-HPS-TO-LPS PRESSURE

REDUCING STATION

X - 2" HPC

X - 4" HPS

X - 3" V

X - 2" LPC

X-VTR

X-AC-57

3" LPS

HUM-572

1 1/4" LPC

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

PHASE 3 - PARTIAL SECOND

FLOOR MECHANICAL PLANS

(AC-57)

5 9

1-M2.0

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL SECOND FLOOR MECHANICAL

DEMOLITION PLAN (AC-57) 1

# DEMOLITION CODED NOTES # CODED NOTES

D1 REMOVE EXISTING STEAM-TO-STEAM HEAT EXCHANGER HUMIDIFIER COMPLETE. DISCONNECT ALL PIPING AND REMOVE EXISTING EQUIPMENT SUPPORTS COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".

REMOVE EXISTING DOMESTIC WATER BRANCH LINE BACK TO MAIN AND CAP WITHIN TWO PIPE DIAMETERS OF THE MAIN. MAIN IS LOCATED ALONG THE WEST WALL OF THE MECHANICAL ROOM, APPROXIMATELY 20' ABOVE THE

FLOOR.

REMOVE 3"Ø STEAM SUPPLY LINE FROM HUMIDIFIER TO DISPERSION MANIFOLD COMPLETE.

REMOVE 1"Ø LPC BACK TO CONDENSATE MANIFOLD.

REMOVE EXISTING 2"Ø LPS BACK TO LOCATION SHOWN.

REMOVE EXISTING STEAM DISPERSION MANIFOLD AND ALL ASSOCIATED PIPNG COMPLETE. AIR HANDLING UNIT

SHUTDOWN WILL BE REQUIRED, SEE GENERAL NOTES.

REMOVE EXISTING DRAIN COOLER AND ALL ASSOCIATED PIPING COMPLETE.

REMOVE EXISTING 3/4"Ø COLD WATER PIPING BACK TO LOCATION SHOWN AND CAP.

1 PROVIDE NEW 3"Ø LOW PRESSURE STEAM PIPING TO HUMIDIFIER AS SHOWN. TAP NEW LINE OFF TOP OF EXISTING

6"Ø MAIN AT A 45° ANGLE. SEE DETAIL.

PROVIDE NEW STEAM DISPERSION MANIFOLD, SEE SCHEDULE. EXTEND NEW 3"Ø LOW PRESSURE STEAM AND 1"Ø LOW PRESSURE CONDENSATE PIPING TO MANIFOLD AND CONNECT COMPLETE. AIR HANDLING UNIT SHUTDOWN

WILL BE REQUIRED, SEE GENERAL NOTES.

EXTEND NEW 1-1/4"Ø LOW PRESSURE CONDENSATE PIPING OVER TO CONDENSATE PUMP PACKAGE INLET HEADER AND CONNECT COMPLETE. PROVIDE CONDENSATE TRAP PER DETAIL. CONNECT NEW CONDENSATE LINE

TO TOP OF HEADER PER DETAIL.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/4" = 1'-0"

PARTIAL SECOND FLOOR MECHANICAL

PLAN (AC-57) 2

GENERAL NOTES

AC-57 HUMIDIFICATION DESIGN CRITERIA: 72°F @ 30% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 510 LBS/HR.

EXISTING HIGH PRESSURE STEAM SUPPLY INTO SPACE IS 90 PSI.

EXISTING LOW PRESSURE STEAM DOWNSTREAM OF PRV IS 15 PSI.

ANY SHUTDOWNS ASSOCIATED WITH AC-57 SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE AT ANY TIME AT THE DISCRETION OF THE VA.

CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING SURFACES OR STRUCTURE AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO;

WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.

CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF

CONSTRUCTION UNDER THIS CONTRACT.

MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACCOMPLISH THIS.

INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.

A.

B.

C.

D.

E.

F.

G.

H.

D2

D3

D4

D5

D6

D7

D8

653'-0"

W10X49

W10X49W10X49

W10X49

W10X72

W12X106W12X106

W10X72W10X49

W12X106

DN

UP

UP

DN

DN

UP

FEC

FEC

FEC

FEC

FEC

FEC

PROJECT AREA

(AC-26)

BASEMENT KEY PLAN

NO SCALE

H

H

HVAC

BF467 X-AC-26

D2

D2D1

D3

X - 2" ACC

X - 1 1/4" HW

X - 3/4" HWR

X - 1 1/2" CW

XR - 2"

XR - 4"

XR - 3/4"

XR - 3/4"

XR - 3/4"

X - 4" LPS

X - 2" LPC

X - 4" CHWR

X - 4" CHWS

D4

X-CONDENSATE

PUMP PACKAGE

D5

H

H

HVAC

BF467

X - 1 1/2" CW

X - 3/4" HWR

X - 1 1/4" HW

X - 2" ACC

X - 4" LPS

X - 2" LPC

X - 4" CHWR

X - 4" CHWS

X-AC-26

2 1/2" LPS1

HUM-26

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

PHASE 4 - PARTIAL BASEMENT

MECHANICAL PLANS (AC-26)

6 9

1-M3.0

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL BASEMENT MECHANICAL DEMOLITION

PLAN (AC-26) 1

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/4" = 1'-0"

PARTIAL BASEMENT MECHANICAL PLAN (AC-26) 2

GENERAL NOTES

# DEMOLITION CODED NOTES

# CODED NOTES

D1 REMOVE EXISTING STEAM-TO-STEAM HEAT EXCHANGER HUMIDIFIERS COMPLETE. REMOVE EXISTING CONTROL PANELS AND EQUIPMENT SUPPORTS COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL

DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".

REMOVE EXISTING DOMESTIC WATER BRANCH LINE BACK TO MAIN AND CAP WITHIN TWO PIPE DIAMETERS OF

MAIN TO AVOID LEAVING A DEAD-LEG.

CAP BACKFLOW PREVENTER DRAINS. MAINTAIN EXISTING 2"Ø HORIZONTAL DRAIN ALONG FLOOR AS IT SERVES

UNITS OUTSIDE OF THE PROJECT AREA.

REMOVE 4"Ø STEAM SUPPLY LINE FROM HUMIDIFIER TO DISPERSION MANIFOLD. DISCONNECT 3/4"Ø LPC FROM

MANIFOLD AND PRESERVE FOR RECONNECTION IN NEW PHASE.

REMOVE EXISTING STEAM DISPERSION MANIFOLD COMPLETE. AIR HANDLING UNIT SHUTDOWN WILL BE

REQUIRED, SEE GENERAL NOTES.

1 CONNECT NEW 2-1/2"Ø LOW PRESSURE STEAM TO EXISTING 4"Ø LOW PRESSURE STEAM. CONNECT BRANCH

INTO VERTICAL SECTION OF PIPING, ABOVE THE HEATING COIL CONNECTION. SEE DETAIL.

NEW STEAM DISPERSION MANIFOLD IN AC-26. CONNECT NEW 2-1/2"Ø LPS AND 3/4"Ø LPC COMPLETE. SEE SCHEDULE AND DETAIL. AIR HANDLING UNIT SHUTDOWN WILL BE REQUIRED, SEE GENERAL NOTES.

AC-26 HUMIDIFICATION DESIGN CRITERIA: 72°F @ 45% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 500 LBS/HR.

EXISTING LOW PRESSURE STEAM IN SPACE IS 10 PSI.

ANY SHUTDOWNS ASSOCIATED WITH AC-26 SHALL BE BETWEEN 6PM AND 7AM, MONDAY THROUGH FRIDAY OR ON WEEKENDS. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE BASED ON ANIMAL RESEARCH SCHEDULE.

ALL SHUTDOWNS SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE.

CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING SURFACES OR STRUCTURE AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO;

WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.

CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF

CONSTRUCTION UNDER THIS CONTRACT.

MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACCOMPLISH THIS.

INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.

A.

B.

C.

D.

E.

F.

G.

D2

D3

D4

D5

653'-0"

W10X49

W10X49W10X49

W10X49

W10X72

W12X106W12X106

W10X72W10X49

W12X106

DN

UP

UP

DN

DN

UP

FEC

FEC

FEC

FEC

FEC

FEC

PROJECT AREA

(AC-28)

BASEMENT KEY PLAN

NO SCALE

16.1 16.1

6.2 6.2

D.2

D.2

C.2

C.2

B.2

B.2

A.2

A.2

X-AC-28

X-AC-32

D2

D1

D3

X - 4" CHWS

X - 4" CHWR

X - 4" CHWS

X - 4" CHWR

X - 5" LPSX - 4" CHWS

X - 4" CHWR

X - 1" LPC

X - 2" LPS

X - 1" LPC

X - 2" CW

X - 3" LPS

X - 4" HPS

D4

XR - 1/2"

X - 3" LPS

X-CONDENSATE

PUMP PACKAGE

X - 3/4" HPC

X - 1/2" LPC

X - 3/4" LPC

X - 1/2" LPC

X - 4" V

X-HPS-TO-LPS PRESSURE

REDUCING STATION

Mechanical

BE260

XR - 2"

X - 1 1/2" LPS

X - 2" ACC

D5 D6

X-DISPERSION

MANIFOLD

16.1 16.1

6.2 6.2

D.2

D.2

C.2

C.2

B.2

B.2

A.2

A.2

X-AC-28

X - 4" CHWS

X - 4" CHWR

X - 4" CHWS

X - 4" CHWR

X - 5" LPSX - 4" CHWS

X - 4" CHWR

X - 1" LPC

X - 2" LPS

X - 1" LPC

X - 2" CW

X - 3" LPS

X - 4" HPS

X - 3" LPS

X-CONDENSATE

PUMP PACKAGE

X - 3/4" HPC

X - 1/2" LPC

X - 3/4" LPC

X - 1/2" LPC

X - 4" V

X-HPS-TO-LPS PRESSURE

REDUCING STATION

Mechanical

BE260

X - 2" ACC

1 1/2" LPS

3/4" LPC

2"Ø PUMPED CONDENSATE

X-DISPERSION

MANIFOLD

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

PHASE 5 - PARTIAL BASEMENT

MECHANICAL PLANS (AC-28)

7 9

1-M4.0

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL BASEMENT MECHANICAL DEMOLITION

PLAN (AC-28) 1

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/4" = 1'-0"

PARTIAL BASEMENT MECHANICAL PLAN (AC-28) 2

GENERAL NOTES

# DEMOLITION CODED NOTES

# CODED NOTES

D1 REMOVE EXISTING STEAM-TO-STEAM HEAT EXCHANGER HUMIDIFIER COMPLETE. REMOVE EXISTING

EQUIPMENT SUPPORTS COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL

DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".

REMOVE EXISTING DOMESTIC WATER BRANCH LINE BACK TO VALVE AND CAP.

REMOVE 2"Ø STEAM SUPPLY LINE FROM STEAM GENERATOR TO DISPERSION MANIFOLD COMPLETE.

REMOVE 1-1/2"Ø LOW PRESSURE STEAM FROM EXISTING STEAM GENERATOR BACK TO TEE AND CAP.

REMOVE EXISTING CONDENSATE COOLER AND ALL ASSOCIATED PIPING AND SUPPORTS COMPLETE.

REMOVE 3/4"Ø HUMIDIFIER CONDENSATE PIPING COMPLETE.

1 PROVIDE NEW 1-1/2"Ø LOW PRESSURE STEAM PIPING TO DISPERSION MANIFOLD AND CONNECT COMPLETE.

PROVIDE NEW 3/4"Ø LOW PRESSURE CONDENSATE PIPING AND TO TIE INTO EXISTING 1"Ø LOW PRESSURE CONDENSATE PIPING UPSTREAM OF CONDENSATE RECEIVER. SEE HUMIDIFIER CONDENSATE TRAP DETAIL.

AC-28 HUMIDIFICATION DESIGN CRITERIA: 65°F @ 45% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 82 LBS/HR.

EXISTING HIGH PRESSURE STEAM SUPPLY INTO SPACE IS 100 PSI.

EXISTING LOW PRESSURE STEAM DOWNSTREAM OF PRV IS 17 PSI.

ANY SHUTDOWNS ASSOCIATED WITH AC-28 SHALL BE BETWEEN 6PM AND 7AM, MONDAY THROUGH FRIDAY OR ON WEEKENDS. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE BASED ON ANIMAL OPERATION SCHEDULE.

ALL SHUTDOWNS SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE.

CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING SURFACES OR STRUCTURE AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO;

WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.

CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF

CONSTRUCTION UNDER THIS CONTRACT.

MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO ACCOMPLISH THIS.

INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.

A.

B.

C.

D.

E.

F.

G.

H.

D2

D3

D4

D5

D6

CAP

F.E.

FEC

FEC

P106

UP

UP

DNUP

PROJECT AREA

(AC-61 & AC-62)

SEVENTH FLOOR KEY PLAN

NO SCALE

ELECTRICAL ROOM PF-105

K

K

M

M

N

N

O

O

P

P

S

SR

R

17 17

15 15

12 12

Mechanical

Penthouse

PF104

X - 3/4" CW

X - 3/4" CW

15.1 15.1

16.1 16.1

D1

D1

D1

X - 6" MPSX - 3/4" CW

X - 6" LPS

X - 6" LPS

X - 3" MPC

X - 3" LPC

X - 3" MPC

X - 1 1/4" CW

X - 1" LPC

XR - 4"

XR - 1 1/4"

XR - 3/4"

XR - 4"

XR - 6"

XR - 6"

X - 3" LPC

X - 6" LPS

X - 1" CW

X-SINK

D2

EXISTING MPS (35 PSI) TO LPS (6 PSI)

PRESSURE REDUCING STATION

X - 6" LPS X - 6" LPS

X - 6" LPS

D3

D3

D3

X-AC-61

X-AC-62

EXISTING DRAIN COOLER

EXISTING DRAIN COOLER

D3D3

D3

D4

D4

D4

D5

X - 3" MPC

X - 6" MPS

X - 6" LPS

D6

D7

D6 D7

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

100% Construction Documents 08/10/2018

FULLY SPRINKLERED

08/10/2018

541-18-502

A B

C D

E F

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

PHASE 6 - PARTIAL SEVENTH

FLOOR PENTHOUSE MECHANICAL

DEMOLITION PLAN (AC-61 & AC-62)

8 9

1-M5.0

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL SEVENTH FLOOR PENTHOUSE

MECHANICAL DEMOLITION PLAN (AC-61 & AC-62) 1

GENERAL NOTES

# DEMOLITION CODED NOTES

D1 REMOVE EXISTING STEAM-TO-STEAM HUMIDIFIER COMPLETE. REMOVE ALL ASSOCIATED DOMESTIC WATER, LOW PRESSURE STEAM, LOW PRESSURE CONDENSATE AND DRAIN PIPING BACK TO ACTIVE MAINS AND CAP. REMOVE ALL EQUIPMENT PADS FOR LOWER UNITS AND STEEL SUPPORTS FOR UPPER UNITS AND PATCH ANY FLOOR AND WALL HOLES LEFT OVER. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE". TYPICAL FOR SIX (6) UNITS.

REMOVE EXISTING CONDENSATE PUMP PACKAGE COMPLETE. REMOVE ALL ASSOCIATED PIPING BACK TO ACTIVE

MAINS AND CAP.

MAINTAIN EXISTING 6"Ø LOW PRESSURE STEAM PIPING FOR RECONNECTION IN NEW PHASE.

REMOVE EXISTING CONDENSATE TRAPS AND PIPING BACK TO ACTIVE MAIN AND CAP.

REMOVE EXISTING DOMESTIC COLD WATER LINE BACK TO ACTIVE MAIN AND CAP.

REMOVE EXISTING CONDENSATE TRAPS AND PIPING FROM AIR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.