36C25019B0023 P01. VA Remove Humidifiers 100 Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019B0023-0001004.pdf | ||
| 36C25019B0023-0001000.docx | DOCX document | |
| 36C25019B0023-0001003.pdf | ||
| 36C25019B0023-0001001.docx | DOCX document | |
| 36C25019B0023-0001002.docx | DOCX document | |
| 36C25019B0023-004.pdf | ||
| 36C25019B0023-002.pdf | ||
| 36C25019B0023-005.pdf | ||
| 36C25019B0023-001.docx | DOCX document | |
| 36C25019B0023-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
E-65042
R
E
S
O F
I
R
G E
NO
I
S
P
E
N
E
D
ERT
L EA
E I N
G
R
T
S
TE
A
H
F OO
IO
DAVID A.
DEMAGALL
EAST BLVD.
E
S
T
E A
S T
B L V
D
MAGNOLIA DR.
H A
Z E
L D
R
E . 1
S T
MT. SINAI DR.
M
AR
TIN
LU
TH
ER
K
IN
G D
R
Drawing Title
Approved: Division Chief
Location
Project Title Date
Checked Drawn DRAWING NO.Building Number
Project No.
Office of
Facilities
Management
Dwg. of o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978 1
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
FACILITY MANAGER
DATE
SHOP FOREMAN 138
APPROVALS
CHIEF Planning and Construction
DATE
CHIEF, Occupational Health & Safety
APPROVALS
DIRECTOR 00
DATE
ASSOCIATE DIRECTOR 00A (B)
APPROVALS
Approved: Service Director
CHIEF, IRMCHIEF, ENGINEERING 138
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
Veterans Administration Medical Center
Perspectus Architecture LLC
Fredrick, Fredrick & Heller Engineers, Inc.
672 East Royalton Road Broadview Heights, Ohio 44147
Architect 13212 Shaker Square Cleveland, Ohio 44120
PROJECT DESCRIPTION:
REMOVE STERILE STEAM HUMIDIFIERS AND REPLACE
WITH DIRECT STEAM. 11 TOTAL UNITS LOCATED IN 5
DIFFERENT MECHANICAL SPACES.
PROJECT AREA: 6,600 SQFT (5 SPACES COMBINED)
DESIGN CODES:
2018 NFPA 101 Life Safety Code
2018 IBC
2017 VA HVAC Design Manual
TYPE OF CONSTRUCTION: (LSC A.8.2.1.2)
Type II (222)
FIRE SUPPRESSION:
Fully Sprinklered, Existing to Remain
FIRE ALARM SYSTEM:
Existing to Remain
EXTERIOR BEARING WALLS: (LSC A.8.2.1.2)
2 Hours
INTERIOR BEARING WALLS: (LSC A.8.2.1.2)
2 Hours
STRUCTURAL FRAME / COLUMNS: (LSC A.8.2.1.2)
2 Hours (Supporting more than 1 floor)
FLOOR - CEILING ASSEMBLIES: (LSC A.8.2.1.2)
2 Hours
ROOF - CEILING ASSEMBLIES: (LSC A.8.2.1.2)
1 Hour
INTERIOR NON-BEARING WALLS: (LSC A.8.2.1.2)
0 Hour
EXTERIOR NON-BEARING WALLS: (LSC A.8.2.1.2)
0 Hour
EXIT ENCLOSURES (LSC 7.1.3.2.1)
Existing: 1 Hour
SMOKE BARRIERS: (LSC 18.3.7.3)
1 Hour
EXIT ACCESS CORRIDORS: (LSC 18.3.6.2)
0 Hour, Smoke Partitions (Healthcare)
CODE INFORMATIONDRAWING INDEX
1-X1 COVER SHEET
MECHANICAL
1-M0.0 MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES
1-M0.1 MECHANICAL DETAILS AND CONTROLS
1-M1.0 PHASE 2 - PARTIAL SECOND FLOOR PENTHOUSE MECHANICAL PLANS (AC-6)
1-M2.0 PHASE 3 - PARTIAL SECOND FLOOR MECHANICAL PLANS (AC-57)
1-M3.0 PHASE 4 - PARTIAL BASEMENT MECHANICAL PLANS (AC-26)
1-M4.0 PHASE 5 - PARTIAL BASEMENT MECHANICAL PLANS (AC-28)
1-M5.0 PHASE 6 - PARTIAL SEVENTH FLOOR PENTHOUSE MECHANICAL DEMOLITION PLAN (AC-61 & AC-62)
1-M5.1 PHASE 6 - PARTIAL SEVENTH FLOOR PENTHOUSE MECHANICAL PLAN (AC-61 & AC-62)
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
VICINITY PLAN
Arch. job no. 18-063
REMOVE STERILE STEAM
HUMIDIFIERS
541-18-502
JMCDAD
COVER SHEET
1 9
1-X1
541-18-502
100% CONSTRUCTION DOCUMENTS
AUGUST 10, 2018
AUGUST 10, 2018
REMOVE STERILE STEAM HUMIDIFIERS
VAMC - WADE PARK CAMPUS
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
MECHANICAL LEGEND, GENERAL
NOTES AND SCHEDULES
2 9
1-M0.0
MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH COR A MINIMUM OF TEN WORKING DAYS IN ADVANCE.
PROVIDE MANUFACTURER RECOMMENDED SERVICE CLEARANCE FOR ALL NEW MECHANICAL EQUIPMENT.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF PANELS.
PITCH ALL NEW PRESSURIZED STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW AT A MINIMUM OF 1/4" PER 10-FT.
ALL REDUCERS USED IN NEW STEAM PIPING SHALL BE ECCENTRIC.
ALL NEW CONNECTIONS TO HORIZONTAL STEAM MAINS SHALL BE MADE AT AN UPWARD 45° ANGLE.
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING, FIREPROOFING AND REPAIRING ALL EXISTING FINISHES, FLOORS, WALLS AND CEILINGS AFFECTED BY THE SELECTIVE DEMOLITION AND NEW WORK DESCRIBED IN THE DESIGN DOCUMENTS. SEE
SPECIFICATIONS.
CONTRACTOR SHALL PROTECT EXISTING FINISHES DURING CONSTRUCTION AND REPAIR OR REPLACE ANY ITEMS DAMAGED AS A
RESULT OF WORK DESCRIBED IN THE DESIGN DOCUMENTS.
DEMOLITION SYMBOLS:
HVAC PIPING:CALL OUTS:
ABBREVIATIONS:
HVAC CONTROLS:
AD ACCESS DOOR
ELECTRICAL CONTRACTOR
GENERAL TRADES CONTRACTOR
TEMPERATURE CONTROL CONTRACTOR
HVAC CONTRACTOR
CONNECT TO EXISTING
EC
GC
TC
HC
REFERENCE TO CODED NOTE
TO OPENING IN TOP OF DUCT. SHALL BE A MINIMUM 1.5 TIMES
GREATER THAN THE CROSS-SECTIONAL AREA OF DUCT.
ABOVE FINISHED FLOORAFF
@ MANUAL OVERRIDE
ROOF OPENINGRO
TEMPERATURE CONTROL PANELTCP
CURRENT TRANSFORMER ON MOTOR WIRING WITH TRANSDUCER
AIR CONDITIONING CONDENSATE
LOW PRESSURE STEAM CONDENSATELPC
LPS
ACC
LOW PRESSURE STEAM
PRESSURE GAUGE
LOW LIMIT THERMOSTATL
HUMIDITY SENSOR WITH SETPOINT ADJUSTMENT
COMBINATION FIRE/SMOKE DAMPER IN DUCT
MEDIUM PRESSURE STEAM CONDENSATE
MPS
MPC
MEDIUM PRESSURE STEAM
HUMIDITY SENSOR
MOTORIZED 2-WAY CONTROL VALVE
STATIC PRESSURE SENSOR
H
H
S
MOD
FSD
STRAINER
FLEXIBLE PIPE CONNECTOR
THERMOMETER IN PIPE WELL
BALANCING VALVE
HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"
ISOLATION VALVE
REDUCER
UNION
(SHUTOFF, BALANCE, CHECK)
TRIPLE DUTY VALVE
CHECK VALVE
MOTORIZED 3-WAY CONTROL VALVE
GAUGE PORT (PETE'S PLUG)
DRAIN VALVE WITH HOSE FITTING
MOTORIZED 2-WAY CONTROL VALVE
LOCAL DRAIN, VALVED WITH 3/4"
THREADED CONNECTOR
MANUAL AIR VENTMAV
PRESSURE RELIEF VALVE
KITCHEN HOOD EXHAUSTKHE
CD CONDENSATE PIPING
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
EXISTING TO BE RELOCATEDXRL
EQUIPMENT OR FIXTURE MARK
UNIT NUMBER
EQUIPMENT
TYPE
BRANCH PIPE CONNECTION
EQ-#
FIRE DAMPER IN DUCTFDD
TWO POSITION VALVE
PRESSURE REDUCING VALVE
LIMIT OF DEMOLITION
EXISTING NEW LOCATIONXNL
THERMOSTATT
NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS.
IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF WORK, FOR DETAILED SCOPE OF WORK PLEASE REFER TO THE SUBSEQUENT DRAWINGS.
A.
B.
C.
D.
E.
F.
G.
H.
THIS PROJECT CONSISTS OF WORK IN MULTIPLE SPACES LOCATED IN DIFFERENT BUILDINGS. WORK SHALL BE COMPLETED IN A MANNER THAT MINIMIZES SHUTDOWNS TO NO MORE THAN ONE
AIR HANDLING UNIT AT A TIME.
THE FOLLOWING PHASES SHALL BE COMPLETED IN THE ORDER BELOW. DURATIONS LISTED SHALL BE FROM VA'S NOTICE TO PROCEED TO SUBSTANTIAL COMPLETION:
PHASE 1 - HUMIDIFIER CONTROL VERIFICATION AND REVIEW, SEE NOTES ON THIS SHEET. DURATION - 28 DAYS.
PHASE 2 - ALL WORK ASSOCIATED WITH AC-6. DURATION - 21 DAYS.
PHASE 3 - ALL WORK ASSOCIATED WITH AC-57. DURATION - 30 DAYS.
PHASE 4 - ALL WORK ASSOCIATED WITH AC-26. DURATION - 28 DAYS.
PHASE 5 - ALL WORK ASSOCIATED WITH AC-28. DURATION - 21 DAYS.
PHASE 6 - ALL WORK ASSOCIATED WITH AC-61 & AC-62. DURATION - 60 DAYS.
CONTRACTOR SHALL USE THE PHASING OUTLINED ABOVE AND DEVELOP A SCHEDULE FOR REVIEW AND APPROVAL BY THE COR. CONTRACTOR PHASING PLAN SHALL DETAIL THE SEQUENCE OF WORK TO BE COMPLETED TO COMPLY WITH ITEM "A" ABOVE. THE PHASING AND SCHEDULE SUBMITTED BY THE CONTRACTOR IS SUBJECT TO CHANGE AT THE DISCRETION OF THE VA.
CONTRACTOR SCHEDULE REQUIREMENTS ARE OUTLINED IN THE SPECIFICATIONS AND SHALL INCLUDE THE FOLLOWING:
1. BROKEN DOWN BY MECHANICAL ROOM AND AIR HANDLING UNIT.
2. INCLUDE START DATES AND END DATES FOR EACH TASK.
3. TASKS FOR EACH TRADE; DEMOLITION, NEW PIPING, INDSULATION, CONTROLS, ELECTRICAL, ETC.
4. DURATIONS FOR EACH TASK.
5. INCLUDE AIR HANDLING UNIT SHUTDOWN DATES AND DURATIONS.
ALL WORK INSIDE OF THE AIR HANDLING UNITS THAT REQUIRE A SHUTDOWN SHALL BE COMPLETED ON 3RD SHIFT ON A WEEKEND. CONTRACTOR SHALL SUBMIT A SHUTDOWN PLAN TO THE VA WITH SPECIFIC START AND END DATES AND TIMES. AIR HANDLING UNIT SHUTDOWN TIMES WILL NEED TO BE SCHEDULED WITH EACH DEPARTMENT AFFECTED AND WILL LIKELY BE LIMITED TO A FEW HOURS (THIS MAY CHANGE AT THE DISCRETION OF THE VA). CONTRACTORS MAY HAVE TO COMPLETE THEIR WORK OVER MULTIPLE SHUTDOWNS IF THE AVAILABLE TIMES ARE NOT
SUFFICIENT TO COMPLETE ALL WORK NECESSARY.
CONTRACTOR SHALL FIELD VERIFY ALL WORK SHOWN ON THESE DRAWINGS AND NOTIFY THE COR AND DESIGN TEAM OF ANY CONDITIONS THAT PREVENT THE INTENDED DESIGN FROM BEING
CONSTRUCTED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO
ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
PROJECT PHASING AND COORDINATION NOTES
GENERAL MECHANICAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
MECHANICAL LEGEND
NOTES:
1.
2.
CONTRACTOR SHALL PROVIDE ALL TRANSITIONS, FITTINGS AND ACCESSORIES REQUIRED TO CONNECT STEAM SUPPLY PIPING TO
THE NEW DISPERSION MANIFOLD SEE DETAILS.
CONTRACTOR SHALL SUPPLY ALL HARDWARE, BRACKETS AND FLASHING REQUIRED TO MOUNT MANIFOLDS IN EXISTING AIR
HANDLING UNITS.
FACTORY INSULATED DISPERSION TUBES
ACCESSORIES
HUMIDIFIER PERFORMANCE
STEAM DISPERSION MANIFOLD MARK HUM-6
SPACE SERVED
DESIRED AIR DRY BULB TEMPERATURE (F)
DESIRED CONDITIONS IN SPACE (RH)
DESIGN LOAD (LBS/HR) 180
DESIGN AIR FLOW (CFM)
MAXIMUM ABSORPTION DISTANCE (INCHES)
MAX AIR PRESSURE DROP (INCHES W.C.)
STEAM DISPERSION MANIFOLD
DISPERSION MANIFOLD FACE WIDTH (INCHES)
DISPERSION MANIFOLD FACE HEIGHT (INCHES)
HEADER AND TUBE MATERIAL
FIRST FLOOR
MRI SUITE
HUMIDIFIER DISPERSION MANIFOLD SCHEDULE
MOUNTING LOCATION
AIR HANDLING UNIT SERVED AC-6
10000
65°
40%
AIR HANDLING UNIT
0.1
STAINLESS STEEL
YES
HUM-57
AC-57
23300
72°
30%
FIRST FLOOR
PALMS LAB
STAINLESS STEEL
YES
AIR HANDLING UNIT
DIRECT STEAM PRESSURE AVAILABLE 10 PSI 15 PSI
0.1
PHASE 1 - HUMIDIFIER CONTROL VERIFICATION
HUMIDIFIER CONTROL SEQUENCE
THE CONTROLLER SHALL MEASURE THE RETURN AIR HUMIDITY AND MODULATE THE STEAM CONTROL VALVE TO MAINTAIN A MINIMUM SETPOINT OF:
AC-6 - 40% RH(ADJ.)
AC-26 - 45% RH(ADJ.)
AC-28 - 45% RH(ADJ.)
AC-57 - 30% RH(ADJ.)
AC-61 - 30% RH(ADJ.)
AC-62 - 30% RH(ADJ.)
THE HUMIDIFIER SHALL BE ENABLED WHENEVER THE SUPPLY FAN STATUS IS ON AND THE RETURN AIR RELATIVE HUMIDITY IS BELOW THE SETPOINT LISTED IN ITEM 1.
THE HUMIDIFIER SHALL TURN OFF WHENEVER: RETURN AIR HUMIDITY MEASURES MORE THAN 10% OF THE SETPOINT LISTED IN ITEM 1 OR ON A LOSS OF SUPPLY FAN STATUS.
ALARMS:
A. HIGH SUPPLY AIR HUMIDITY +15%(ADJ) OF SETPOINT IN ITEM 1 (MEASEURED IN RETURN AIR DUCT).
B. LOW SUPPLY AIR HUMIDITY -5%(ADJ) OF SETPOINT IN ITEM 1 (MEASEURED IN RETURN AIR DUCT).
1.
2.
3.
PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL INSPECT THE EXISTING CONTROL SYSTEM(S) FOR EACH AIR HANDLING UNIT WITHIN THE PROJECT SCOPE AND VERIFY THAT THEY ARE PROPERLY EQUIPPED TO COMPLY WITH THE SEQUENCE LISTED BELOW. CONTRACTOR SHALL PROVIDE A REPORT CONTAINING THE FOLLOWING INFORMATION:
A. EXISTING SUPPLY AIR HUMIDITY SENSOR LOCATION
B. EXISTING RETURN AIR HUMIDITY SENSOR LOCATION
C. PROPOSED NEW CONTROL VALVE LOCATION
D. EXISTING HUMIDIFICATION SETPOINT
E. EXISTING HUMIDIFICATION SEQUENCE
CONTRACTOR SHALL SUBMIT REPORT FOR REVIEW BY DESIGN TEAM AND VA COR. AFTER REVIEW, ADJUSTMENTS MAY BE MADE TO EXISTING SYSTEMS TO ENSURE PROPER HUMIDIFIER OPERATION. SCOPE OF WORK MAY CHANGE FOR EACH AIR HANDLING UNIT BASED ON THE CONTENTS OF THE REPORT.
AT THE COMPLETION OF EACH PHASE THE CONTRACTOR SHALL TEST EACH STEAM CONTROL VALVE AND HUMIDIFIER TO VERIFY THAT THE EXISTING AND NEW EQUIPMENT IS OPERATING PROPERLY AND IS CAPABLE OF MEETING THE SET POINTS AND SEQUENCES SPECIFIED BELOW. CONTRACTOR SHALL SUBMIT TEST REPORTS FOR EACH AIR HANDLING UNIT TO BE REVIEWED BY THE DESIGN TEAM AND THE VA COR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY CHANGES REQUIRED TO PROVIDE A PROPERLY OPERATING SYSTEM TO THE SATISFACTION OF THE VA.
STEAM CONDENSATE PUMP SCHEDULE
PUMP
NUMBER
LOCATION /
SERVICE
TYPE
CONDENSATE
RATE
DISCHARGE
PRESSURE
RECEIVER
CAPACITY
MOTOR
NOM. HP VOLT/PHASE/HZ
CP-1
CARES 7TH
AC-61
DUPLEX 5 GPM 10 PSI 15 GALLONS 1/4 480/3/60
CP-2
CARES 7TH
AC-62
DUPLEX 10 GPM 15 PSI 15 GALLONS 1/2 480/3/60
OVERALL DIMENSIONS W x H x L (INCHES) 71 x 43.25 x 7.25 86 x 87.25 x 7.25
STEAM CONTROL VALVE SCHEDULE
UNIT SERVED AC-6 AC-57 AC-26 AC-28 AC-61
CAPACITY
AC-62 (a)
VALVE SIZE
NOTE: ALL VALVES SHALL BE BRONZE BODY, ELECTRONICALLY ACTUATED (24V) AND RATED FOR LISTED CAPACITY ABOVE.
510 LBS/HR
1-1/4"
180 LBS/HR
3/4"
510 LBS/HR
1-1/4"
HUM-26
AC-26
33000
72°
45%
0.1
BASEMENT
ANIMAL RESEARCH
STAINLESS STEEL
YES
AIR HANDLING UNIT
10 PSI
71 x 55.25 x 7.25
82 LBS/HR
1/2"
VALVE Cv 14.05.5 16.0 2.5
2-1/2"
2-1/2"
44.3
1730 LBS/HR 1475 LBS/HR
AC-62 (b)
2-1/2"
44.3
1475 LBS/HR
1.
2.
3.
EXISTING CONTROLS ARE BY ANDOVER.
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
MECHANICAL DETAILS AND
CONTROLS
3 9
1-M0.1
NOT TO SCALE
AC-62 HUMIDIFIER CONNECTION DETAIL
AC-26 HUMIDIFIER CONNECTION DETAIL
AC-28 HUMIDIFIER CONNECTION DETAIL
AC-6 HUMIDIFIER CONNECTION DETAIL
CONDENSATE PUMP DETAILHUMIDIFIER CONDENSATE TRAP DETAIL
5 6
1 3
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALENOT TO SCALE
NOT TO SCALE
NEW Y-STRAINER WITH
BLOW DOWN VALVE
NEW STEAM CONTROL VALVE
NEW GATE VALVE (TYPICAL)
NEW 2"Ø LOW PRESSURE STEAM.
TAP INTO TOP OF MAIN AT 45° ANGLE.
NEW UNION (TYPICAL)
NEW FLOAT AND
THERMOSTATIC
STEAM TRAP
NEW CHECK VALVE
NOT TO SCALE
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
SADDLE
WELD
TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD
PROVIDE INSULATION SHIELD (8"
MIN.) AND INSERT FOR ALL PIPING
SIDE VIEW
1-5/8" 12 GAGE CHANNEL
OR 2"x2"x1/4" ANGLE
1" MAX.
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION UNDER
INSULATION SHIELD
(9 PCF MIN. DENSITY)
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
HANGER ROD
INSULATION SHIELD
AT HANGER
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
BAND
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH CHANNEL
ROLLER
NEW 3/4"Ø LOW
PRESSURE
CONDENSATE
X-3"Ø LPS (10 PSI)
3/4"Ø LOW PRESSURE CONDENSATE
NEW 2"Ø LOW PRESSURE STEAM
3/4"Ø BYPASS
X- CONDENSATE
PUMP PACKAGE
NEW UNION (TYPICAL)
NEW 2-1/2"Ø LOW PRESSURE STEAM
X-2"Ø LOW PRESSURE CONDENSATE
X-1"Ø PUMPED
CONDENSATE
X-3/4"Ø LOW PRESSURE
CONDENSATE
X-4"Ø LPS TO
HEATING COIL
X-4"Ø LOW
PRESSURE STEAM
X-3/4"Ø LOW PRESSURE CONDENSATE
X-2"Ø LOW
PRESSURE
CONDENSATE
NEW UNION (TYPICAL)
EXISTING FLOAT AND
THERMOSTATIC STEAM
TRAP ASSEMBLY
X-3"Ø LPS (5 PSI)
NEW 1-1/2"Ø LOW PRESSURE STEAM
X-BYPASS
X-2"Ø LOW
PRESSURE
CONDENSATE
X-CONDENSATE
PUMP PACKAGE
X-2"Ø PUMPED
CONDENSATE
X-2"Ø LOW
PRESSURE
CONDENSATE
X-1-1/2"Ø LPS (5 PSI)
NEW CONDENSATE TRAP (SEE DETAIL)
NEW 3/4"Ø CONDENSATE TRAP
X-LPC
RECEIVER
NEW 3/4"Ø LOW PRESSURE
HUMIDIFIER CONDENSATE
NEW DISPERSION MANIFOLD IN EXISTING AIR
HANDLING UNIT (AC-6) SEE SCHEDULE.
X-6"Ø LPS (15 PSI)
NEW 3"Ø LOW PRESSURE STEAM
X-BYPASS
X-CONDENSATE
PUMP PACKAGE
X-2"Ø PUMPED
CONDENSATE
X-1"Ø LOW PRESSURE CONDENSATE
X-1"Ø LOW PRESSURE
CONDENSATE FROM
FLASH TANK
X-1"Ø LOW PRESSURE
CONDENSATE FROM
HEATING COIL
EXISTING FLOAT AND
THERMOSTATIC STEAM
TRAP ASSEMBLY
NEW 3"Ø LOW PRESSURE STEAM.
TAP INTO TOP OF MAIN AT 45° ANGLE.
X-6"Ø LPS (6 PSI)
EXISTING 6"Ø LOW PRESSURE STEAM
X-BYPASS
X-2"Ø LOW PRESSURE
CONDENSATE
EXISTING FLOAT AND
THERMOSTATIC STEAM
TRAP ASSEMBLY
TO BOILER PLANT
X-6"Ø LPS (6 PSI)
EXISTING 6"Ø LOW PRESSURE STEAM
X-2"Ø LOW PRESSURE CONDENSATE
EXISTING FLOAT AND
THERMOSTATIC STEAM
TRAP ASSEMBLY
TO BOILER PLANT
NEW Y-STRAINER WITH BLOW DOWN VALVE (TYPICAL)
NEW STEAM CONTROL VALVE (TYPICAL)
NEW GATE VALVE (TYPICAL)
X-4"Ø LPS (10 PSI)
NEW 6"Ø LOW
PRESSURE STEAM
NEW 6"Ø LOW
PRESSURE STEAM
NEW DISPERSION MANIFOLD IN EXISTING AIR
HANDLING UNIT (AC-26) SEE SCHEDULE.
NEW DISPERSION MANIFOLD IN EXISTING AIR
HANDLING UNIT (AC-57) SEE SCHEDULE.
EXISTING DISPERSION MANIFOLD IN
EXISTING AIR HANDLING UNIT (AC-61)
EXISTING DISPERSION MANIFOLD IN
EXISTING AIR HANDLING UNIT (AC-62)
EXISTING DISPERSION MANIFOLD IN
EXISTING AIR HANDLING UNIT (AC-28)
AI R CO NDI TI O NING CO NDENSTATE TRAP DETAI L
N O T TO SC ALE
A IR H AN DL ER
P LU G T EE
FO RC LE ANI NG
( TY PIC AL)
B A SE
R AILO F
A IR
H AN DL ER
1 -1 /2"
S UP PO R T B EAM9"
4 -1 /2"
F LO O R O F
M EC HA NIC ALRO O M
A IR G AP
F LO O R DR AIN
6" MIN.
NOTE 1
DISPERSION MANIFOLD
CONNECTION POINT
SEE DETAILS 1-6 FOR PIPE SIZES
AND TERMINATION INFORMATION
NOTES:
1.
AIR HANDLING UNIT
HUMIDIFIER SECTION
TYPICAL PIPE HANGER DETAIL
EXISTING HEATING COIL
CONDENSATE AND TRAP
EXISTING 1"Ø LOW
PRESSURE CONDENSATE
DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES) DOWNSTREAM
OF NEW STEAM DISPERSION MANIFOLD AND DOWNSTREAM OF THE NEW F&T STEAM TRAP.
*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*
D1
D1
D1D1
NEW 1-1/4"Ø LOW
PRESSURE CONDENSATE
EXISTING 2"Ø LOW
PRESSURE CONDENSATE
DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)
DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*
D1
D1
NEW CONDENSATE TRAP (SEE DETAIL)
D3
DEDUCT ALTERNATE 2 - OMIT ALL NEW WORK ASSOCIATED WITH AC-26.
*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*
D2
D3
D2
DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)
DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
DEDUCT ALTERNATE 3 - OMIT ALL NEW WORK ASSOCIATED WITH AC-28.
*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL FOR BASE BID*
D1
D1
AC-61 HUMIDIFIER CONNECTION DETAIL
NEW
CONDENSATE
PUMP PACKAGE
(CP-1)
1-1/4"Ø PUMPED
CONDENSATE
1"Ø LOW PRESSURE
CONDENSATE (QTY 2)
NEW CONDENSATE TRAP (SEE DETAIL)
CONNECT TO EXISTING 3"Ø LPC
LOCATED NORTH OF AC-61.
SEE FLOOR PLANS FOR CONTINUATION DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)
DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*
D1
D1 D1
NEW
CONDENSATE
PUMP PACKAGE
(CP-2)
1-1/2"Ø PUMPED
CONDENSATE
1-1/4"Ø LOW PRESSURE
CONDENSATE (QTY 2)
CONNECT TO NEW 2"Ø PUMPED
CONDENSATE ABOVE CP-1.
SEE FLOOR PLANS FOR CONTINUATION
DEDUCT ALTERNATE 1 - OMIT ALL NEW CONDENSATE PIPING WORK (DASHED LINES)
DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THIS DETAIL UNDER BASE BID*
D1
D1
1-1/4"Ø LOW PRESSURE
CONDENSATE (QTY 2)
NEW CONDENSATE TRAP (SEE DETAIL)
TO CONDENSATE MAIN
SEE FLOOR PLANS
FULL SIZE VENT UP
THROUGH ROOF,
SEE DETAIL.
CONDENSATE FROM SYSTEM.
PROVIDE INLET-SIZED HEADER
FOR MULTIPLE RETURNS.
PUMP
UNION (TYP)
3-1/2" CONCRETE PAD
PROVIDE WITH PUMP
CONTROL PACKAGE.
SEE SCHEDULE.
STEAM CO NDENSATE PUM P DETAI L
N O T TO S CALE
C O N DEN SAT E M AIN
V ENT TO RO O M
C O N DE NSA TE
F RO M S YSTEM( PR O V IDE H EAD ER
FO R
M ULT IPLE
R ET UR NS ).
4 " CO NCR ET E P AD
U NIO N(T YP)
P UM P
F UL L SI ZE
V EN T UPT HRO UG H
RO O F
FLO O R
P RO V IDE
W ITH PUM PC O NTRO L
P AC KAG E.
S EE
S CH ED UL E.
R E CE IV ER
CONDENSATE
PUMP PACKAGE
(CP-1 & CP-2)
CHECK VALVE
GLOBE VALVE (TYP)
STRAINER (TYP)
CONTRACTOR SHALL SIZE WATER SEAL AT A MINIMUM OF 8" OR 2" LARGER THAN THE ABSOLUTE STATIC PRESSURE OF THE HUMIDIFIER SECTION IN THE AIR HANDLING UNIT, WHICH EVER IS LARGER.
FROM CONDENSATE
PRODUCING EQUIPMENT
NEW DIRT LEG WITH CAP
TIE IN AT HIGH POINT
OF EXISTING
CONDENSATE PIPING
NEW CHECK VALVE
AND GATE VALVE
NEW CHECK
VALVE AND GATE
VALVE (QTY 2)
ECCENTRIC REDUCER (TYPICAL)
NEW Y-STRAINER WITH
BLOW DOWN VALVE
NEW STEAM CONTROL VALVE
NEW GATE VALVE (TYPICAL)
ECCENTRIC REDUCER (TYPICAL)
NEW Y-STRAINER WITH
BLOW DOWN VALVE
NEW STEAM CONTROL VALVE
NEW GATE VALVE (TYPICAL)
ECCENTRIC REDUCER (TYPICAL)
AC-57 HUMIDIFIER CONNECTION DETAIL
NEW Y-STRAINER WITH
BLOW DOWN VALVE
NEW STEAM CONTROL VALVE
NEW GATE VALVE (TYPICAL)
ECCENTRIC REDUCER (TYPICAL)
NEW Y-STRAINER WITH
BLOW DOWN VALVE
NEW STEAM CONTROL VALVE
NEW GATE VALVE (TYPICAL)
ECCENTRIC REDUCER (TYPICAL)
UNION (TYPICAL)
45° TAP
45° TAP
45° TAP
UNION (TYPICAL)
ECCENTRIC REDUCER (TYPICAL)
NEW CHECK
VALVE AND
GATE VALVE
D1
M
IN
IM
U
M
INSULATION ROOFING
VENT (SEE PLANS
FOR SIZES, MINIMUM
3-INCHES)
FLASH VENT WITH 6 LB.
LEAD CAP AND BASE. ROLL
CAP 1" INTO TOP OF VENT
BASE TO BE 2'-0" SQUARE.
VENT THROUGH ROOF DETAIL7
NOT TO SCALE
DN
UP
UP
DN
DN
UP
O V
O V
O V
O V OV
OV OV
S
W
V
U
T
S
X X
X X
X
X
X
X X
X
X
X
X X
X X
X
X
X X
X X
X
X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X X
X X
X
X
X
X X
X X
X
X
X X
X X
X
X
X X
X
X
X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X
X X
X X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X X
X
X
X X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X
X X
X X
X
X
X X
X X
X X
XX
X X
X
X X
X
X X
X
X X
X
X X
X X
X X
X X
X X
X X X
X X
X
X
X X
X
X X
X
X X
X
X X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X
C R A S H C R A S H
NI C NI C
FEC
FEC
FEC
FEC
PROJECT AREA
(AC-6)
SECOND FLOOR KEY PLAN
NO SCALE
30.1
30.1
32.2
32.2
CC.1 CC.1
34.6
34.6
35.3
35.3
CC.5 CC.5
D1
X-AC-6
X - 3/4" CW
X - 3/4" CW
X - 1" CW
X - 3/4" CW
X - 3" HPS
X - 2" LPC
X - 3" CHWR
X - 3" CHWS
X - 3" V
X - 3" LPS
X
L P
S
X - 3/4" CW
X - 1 1/2" HHWS
X - 1 1/2" HHWR
X-UH
D2
D3
XR - 1 1/4"
D4
EXISTING MPS (45 PSI) TO LPS (10 PSI)
PRESSURE REDUCING STATION
D5
XR - 2"
30.1
30.1
32.2
32.2
CC.1 CC.1
34.6
34.6
35.3
35.3
CC.5 CC.5
X-AC-6
X - 3/4" CW
X - 3/4" CW
X - 1" CW
X - 3/4" CW
X - 3" HPS
X - 2" LPC
X - 3" CHWR
X - 3" CHWS
X - 3" V
X - 3" LPS
X
L P
S
X - 3/4" CW
1EXISTING MPS (45 PSI) TO LPS (10 PSI)
PRESSURE REDUCING STATION
2" LPS
4HUM-6
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
PHASE 2 - PARTIAL SECOND
FLOOR PENTHOUSE MECHANICAL
PLANS (AC-6)
4 9
1-M1.0
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL SECOND FLOOR PENTHOUSE
MECHANICAL DEMOLITION PLAN (AC-6) 1
GENERAL NOTES
# DEMOLITION CODED NOTES
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL SECOND FLOOR PENTHOUSE
MECHANICAL PLAN (AC-6) 2
# CODED NOTES
D1 REMOVE EXISTING DRISTEEM HUMIDIFIER AND DRANE COOLER COMPLETE. REMOVE ALL ASSOCIATED EQUIPMENT MOUNTS, PIPES, HANGERS AND ACCESSORIES COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".
REMOVE EXISTING 2"Ø STEAM SUPPLY BACK TO DISPERSION MANIFOLD CONNECTION POINT.
REMOVE EXISTING 3/4"Ø DOMESTIC WATER BACK TO ISOLATION VALVE ON WALL AND CAP.
REMOVE EXISTING HUMIDIFIER DRAIN PIPING BACK TO DISPERSION MANIFOLD CONNECTION POINT.
REMOVE EXISTING DISPERSION MANIFOLD FROM AC-6 COMPLETE. UNIT SHUTDOWN WILL BE REQUIRED, SEE
GENERAL NOTES.
1 EXTEND NEW 2"Ø LPS FROM EXISTING 3"Ø LPS AND CONNECT TO NEW DISPERSION MANIFOLD COMPLETE. SEE
DETAIL.
CONNECT NEW 3/4"Ø LOW PRESSURE CONDENSATE TO DISPERSION MANIFOLD OUTLET AND PROVIDE
CONDENSATE TRAP PER DETAIL.
EXTEND NEW 3/4"Ø LOW PRESSURE CONDENSATE AND TIE INTO EXISTING 2"Ø LOW PRESSURE CONDENSATE
PER DETAIL.
PROVIDE NEW STEAM DISPERSION MANIFOLD. CONNECT NEW 2"Ø LPS AND 3/4"Ø LPC TO UNIT. SEE SCHEDULE.
UNIT SHUTDOWN WILL BE REQUIRED. SEE GENERAL NOTES.
AC-6 HUMIDIFICATION DESIGN CRITERIA: 70°F @ 40% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 180 LBS/HR.
EXISTING MEDIUM PRESSURE STEAM SUPPLY INTO SPACE IS 45 PSI.
EXISTING LOW PRESSURE STEAM DOWNSTREAM OF PRV IS 10 PSI.
ANY SHUTDOWNS ASSOCIATED WITH AC-6 SHALL BE BETWEEN 8PM AND 6AM, MONDAY THROUGH SATURDAY OR ON SUNDAYS. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE BASED ON MRI SUITE SCHEDULE.
ALL SHUTDOWNS SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE.
CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING FINISHES AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO; WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.
CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF
CONSTRUCTION UNDER THIS CONTRACT.
MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO
ACCOMPLISH THIS.
PENTHOUSE ACCESS FROM ROOF.
INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.
A.
B.
C.
D.
E.
F.
G.
H.
I.
D2
D3
D4
D5
DN
UP
DN
DN
UP
O V
O V
O V
OV OV
OV OV
S
W
V
U
T
S
X X
X X
X
X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X
X
X X
X
X
X
X X
X X
X
X
X X
X X
X
X
X
X X
X
X
X
X
X X
X
X
X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X X
X
X X
X
X
X X
X
X
X
X
X
X X
X X
X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X
X
X X
X
X X
X
X X
X X
X
X
XX
X
X X
X
X X
X
X X
X X
X X
X X
X X
X
X X
X
X X X
X X
X X
X
X
X X
X X
X
X
X X
X X
X
X
X X
X
X X
X
X
X
X
X
X
X X
X
X
X
X X
X X
X
X X
X
C R A S H C R A S H
NI C NI C
FEC
FEC
FEC
FEC
PROJECT AREA
(AC-57)
SECOND FLOOR KEY PLAN
NO SCALE
B.1 B.1
D.1 D.1
7.1
7.1
8.1
8.1
9.1
9.1
X - 12" CHWS
X - 12" CHWR
X - 2 1/2" LPC
X - 4" CHWR
X - 4" CHWS
D1
D2
D5
D4
XR - 1"
XR - 3"
XR - 3/4"
XR - 2"
XR - 1 1/4"
X-CONDENSATE
PUMP PACKAGE
D3
X-FLASH TANK
X - 6" LPS
X - 2" LPC
X - 2" HPC
X-HPS-TO-LPS PRESSURE
REDUCING STATION
X - 2" HPC
X - 4" HPS
X - 3" V
X - 2" LPC
X-VTR
X-AC-57
D4 D5D3
D6
D7
D8
B.1 B.1
D.1 D.1
7.1
7.1
8.1
8.1
9.1
9.1
X - 12" CHWS
X - 12" CHWR
X - 2 1/2" LPC
X - 4" CHWR
X - 4" CHWS
X-CONDENSATE
PUMP PACKAGE
X-FLASH TANK
X - 6" LPS
X - 2" LPC
X - 2" HPC
X-HPS-TO-LPS PRESSURE
REDUCING STATION
X - 2" HPC
X - 4" HPS
X - 3" V
X - 2" LPC
X-VTR
X-AC-57
3" LPS
HUM-572
1 1/4" LPC
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
PHASE 3 - PARTIAL SECOND
FLOOR MECHANICAL PLANS
(AC-57)
5 9
1-M2.0
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL SECOND FLOOR MECHANICAL
DEMOLITION PLAN (AC-57) 1
# DEMOLITION CODED NOTES # CODED NOTES
D1 REMOVE EXISTING STEAM-TO-STEAM HEAT EXCHANGER HUMIDIFIER COMPLETE. DISCONNECT ALL PIPING AND REMOVE EXISTING EQUIPMENT SUPPORTS COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".
REMOVE EXISTING DOMESTIC WATER BRANCH LINE BACK TO MAIN AND CAP WITHIN TWO PIPE DIAMETERS OF THE MAIN. MAIN IS LOCATED ALONG THE WEST WALL OF THE MECHANICAL ROOM, APPROXIMATELY 20' ABOVE THE
FLOOR.
REMOVE 3"Ø STEAM SUPPLY LINE FROM HUMIDIFIER TO DISPERSION MANIFOLD COMPLETE.
REMOVE 1"Ø LPC BACK TO CONDENSATE MANIFOLD.
REMOVE EXISTING 2"Ø LPS BACK TO LOCATION SHOWN.
REMOVE EXISTING STEAM DISPERSION MANIFOLD AND ALL ASSOCIATED PIPNG COMPLETE. AIR HANDLING UNIT
SHUTDOWN WILL BE REQUIRED, SEE GENERAL NOTES.
REMOVE EXISTING DRAIN COOLER AND ALL ASSOCIATED PIPING COMPLETE.
REMOVE EXISTING 3/4"Ø COLD WATER PIPING BACK TO LOCATION SHOWN AND CAP.
1 PROVIDE NEW 3"Ø LOW PRESSURE STEAM PIPING TO HUMIDIFIER AS SHOWN. TAP NEW LINE OFF TOP OF EXISTING
6"Ø MAIN AT A 45° ANGLE. SEE DETAIL.
PROVIDE NEW STEAM DISPERSION MANIFOLD, SEE SCHEDULE. EXTEND NEW 3"Ø LOW PRESSURE STEAM AND 1"Ø LOW PRESSURE CONDENSATE PIPING TO MANIFOLD AND CONNECT COMPLETE. AIR HANDLING UNIT SHUTDOWN
WILL BE REQUIRED, SEE GENERAL NOTES.
EXTEND NEW 1-1/4"Ø LOW PRESSURE CONDENSATE PIPING OVER TO CONDENSATE PUMP PACKAGE INLET HEADER AND CONNECT COMPLETE. PROVIDE CONDENSATE TRAP PER DETAIL. CONNECT NEW CONDENSATE LINE
TO TOP OF HEADER PER DETAIL.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/4" = 1'-0"
PARTIAL SECOND FLOOR MECHANICAL
PLAN (AC-57) 2
GENERAL NOTES
AC-57 HUMIDIFICATION DESIGN CRITERIA: 72°F @ 30% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 510 LBS/HR.
EXISTING HIGH PRESSURE STEAM SUPPLY INTO SPACE IS 90 PSI.
EXISTING LOW PRESSURE STEAM DOWNSTREAM OF PRV IS 15 PSI.
ANY SHUTDOWNS ASSOCIATED WITH AC-57 SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE AT ANY TIME AT THE DISCRETION OF THE VA.
CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING SURFACES OR STRUCTURE AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO;
WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.
CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF
CONSTRUCTION UNDER THIS CONTRACT.
MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO
ACCOMPLISH THIS.
INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.
A.
B.
C.
D.
E.
F.
G.
H.
D2
D3
D4
D5
D6
D7
D8
653'-0"
W10X49
W10X49W10X49
W10X49
W10X72
W12X106W12X106
W10X72W10X49
W12X106
DN
UP
UP
DN
DN
UP
FEC
FEC
FEC
FEC
FEC
FEC
PROJECT AREA
(AC-26)
BASEMENT KEY PLAN
NO SCALE
H
H
HVAC
BF467 X-AC-26
D2
D2D1
D3
X - 2" ACC
X - 1 1/4" HW
X - 3/4" HWR
X - 1 1/2" CW
XR - 2"
XR - 4"
XR - 3/4"
XR - 3/4"
XR - 3/4"
X - 4" LPS
X - 2" LPC
X - 4" CHWR
X - 4" CHWS
D4
X-CONDENSATE
PUMP PACKAGE
D5
H
H
HVAC
BF467
X - 1 1/2" CW
X - 3/4" HWR
X - 1 1/4" HW
X - 2" ACC
X - 4" LPS
X - 2" LPC
X - 4" CHWR
X - 4" CHWS
X-AC-26
2 1/2" LPS1
HUM-26
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
PHASE 4 - PARTIAL BASEMENT
MECHANICAL PLANS (AC-26)
6 9
1-M3.0
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL BASEMENT MECHANICAL DEMOLITION
PLAN (AC-26) 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/4" = 1'-0"
PARTIAL BASEMENT MECHANICAL PLAN (AC-26) 2
GENERAL NOTES
# DEMOLITION CODED NOTES
# CODED NOTES
D1 REMOVE EXISTING STEAM-TO-STEAM HEAT EXCHANGER HUMIDIFIERS COMPLETE. REMOVE EXISTING CONTROL PANELS AND EQUIPMENT SUPPORTS COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL
DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".
REMOVE EXISTING DOMESTIC WATER BRANCH LINE BACK TO MAIN AND CAP WITHIN TWO PIPE DIAMETERS OF
MAIN TO AVOID LEAVING A DEAD-LEG.
CAP BACKFLOW PREVENTER DRAINS. MAINTAIN EXISTING 2"Ø HORIZONTAL DRAIN ALONG FLOOR AS IT SERVES
UNITS OUTSIDE OF THE PROJECT AREA.
REMOVE 4"Ø STEAM SUPPLY LINE FROM HUMIDIFIER TO DISPERSION MANIFOLD. DISCONNECT 3/4"Ø LPC FROM
MANIFOLD AND PRESERVE FOR RECONNECTION IN NEW PHASE.
REMOVE EXISTING STEAM DISPERSION MANIFOLD COMPLETE. AIR HANDLING UNIT SHUTDOWN WILL BE
REQUIRED, SEE GENERAL NOTES.
1 CONNECT NEW 2-1/2"Ø LOW PRESSURE STEAM TO EXISTING 4"Ø LOW PRESSURE STEAM. CONNECT BRANCH
INTO VERTICAL SECTION OF PIPING, ABOVE THE HEATING COIL CONNECTION. SEE DETAIL.
NEW STEAM DISPERSION MANIFOLD IN AC-26. CONNECT NEW 2-1/2"Ø LPS AND 3/4"Ø LPC COMPLETE. SEE SCHEDULE AND DETAIL. AIR HANDLING UNIT SHUTDOWN WILL BE REQUIRED, SEE GENERAL NOTES.
AC-26 HUMIDIFICATION DESIGN CRITERIA: 72°F @ 45% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 500 LBS/HR.
EXISTING LOW PRESSURE STEAM IN SPACE IS 10 PSI.
ANY SHUTDOWNS ASSOCIATED WITH AC-26 SHALL BE BETWEEN 6PM AND 7AM, MONDAY THROUGH FRIDAY OR ON WEEKENDS. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE BASED ON ANIMAL RESEARCH SCHEDULE.
ALL SHUTDOWNS SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE.
CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING SURFACES OR STRUCTURE AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO;
WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.
CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF
CONSTRUCTION UNDER THIS CONTRACT.
MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO
ACCOMPLISH THIS.
INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.
A.
B.
C.
D.
E.
F.
G.
D2
D3
D4
D5
653'-0"
W10X49
W10X49W10X49
W10X49
W10X72
W12X106W12X106
W10X72W10X49
W12X106
DN
UP
UP
DN
DN
UP
FEC
FEC
FEC
FEC
FEC
FEC
PROJECT AREA
(AC-28)
BASEMENT KEY PLAN
NO SCALE
16.1 16.1
6.2 6.2
D.2
D.2
C.2
C.2
B.2
B.2
A.2
A.2
X-AC-28
X-AC-32
D2
D1
D3
X - 4" CHWS
X - 4" CHWR
X - 4" CHWS
X - 4" CHWR
X - 5" LPSX - 4" CHWS
X - 4" CHWR
X - 1" LPC
X - 2" LPS
X - 1" LPC
X - 2" CW
X - 3" LPS
X - 4" HPS
D4
XR - 1/2"
X - 3" LPS
X-CONDENSATE
PUMP PACKAGE
X - 3/4" HPC
X - 1/2" LPC
X - 3/4" LPC
X - 1/2" LPC
X - 4" V
X-HPS-TO-LPS PRESSURE
REDUCING STATION
Mechanical
BE260
XR - 2"
X - 1 1/2" LPS
X - 2" ACC
D5 D6
X-DISPERSION
MANIFOLD
16.1 16.1
6.2 6.2
D.2
D.2
C.2
C.2
B.2
B.2
A.2
A.2
X-AC-28
X - 4" CHWS
X - 4" CHWR
X - 4" CHWS
X - 4" CHWR
X - 5" LPSX - 4" CHWS
X - 4" CHWR
X - 1" LPC
X - 2" LPS
X - 1" LPC
X - 2" CW
X - 3" LPS
X - 4" HPS
X - 3" LPS
X-CONDENSATE
PUMP PACKAGE
X - 3/4" HPC
X - 1/2" LPC
X - 3/4" LPC
X - 1/2" LPC
X - 4" V
X-HPS-TO-LPS PRESSURE
REDUCING STATION
Mechanical
BE260
X - 2" ACC
1 1/2" LPS
3/4" LPC
2"Ø PUMPED CONDENSATE
X-DISPERSION
MANIFOLD
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
PHASE 5 - PARTIAL BASEMENT
MECHANICAL PLANS (AC-28)
7 9
1-M4.0
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL BASEMENT MECHANICAL DEMOLITION
PLAN (AC-28) 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/4" = 1'-0"
PARTIAL BASEMENT MECHANICAL PLAN (AC-28) 2
GENERAL NOTES
# DEMOLITION CODED NOTES
# CODED NOTES
D1 REMOVE EXISTING STEAM-TO-STEAM HEAT EXCHANGER HUMIDIFIER COMPLETE. REMOVE EXISTING
EQUIPMENT SUPPORTS COMPLETE. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL
DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE".
REMOVE EXISTING DOMESTIC WATER BRANCH LINE BACK TO VALVE AND CAP.
REMOVE 2"Ø STEAM SUPPLY LINE FROM STEAM GENERATOR TO DISPERSION MANIFOLD COMPLETE.
REMOVE 1-1/2"Ø LOW PRESSURE STEAM FROM EXISTING STEAM GENERATOR BACK TO TEE AND CAP.
REMOVE EXISTING CONDENSATE COOLER AND ALL ASSOCIATED PIPING AND SUPPORTS COMPLETE.
REMOVE 3/4"Ø HUMIDIFIER CONDENSATE PIPING COMPLETE.
1 PROVIDE NEW 1-1/2"Ø LOW PRESSURE STEAM PIPING TO DISPERSION MANIFOLD AND CONNECT COMPLETE.
PROVIDE NEW 3/4"Ø LOW PRESSURE CONDENSATE PIPING AND TO TIE INTO EXISTING 1"Ø LOW PRESSURE CONDENSATE PIPING UPSTREAM OF CONDENSATE RECEIVER. SEE HUMIDIFIER CONDENSATE TRAP DETAIL.
AC-28 HUMIDIFICATION DESIGN CRITERIA: 65°F @ 45% R.H. - ESTIMATED LOAD IS A MAXIMUM OF 82 LBS/HR.
EXISTING HIGH PRESSURE STEAM SUPPLY INTO SPACE IS 100 PSI.
EXISTING LOW PRESSURE STEAM DOWNSTREAM OF PRV IS 17 PSI.
ANY SHUTDOWNS ASSOCIATED WITH AC-28 SHALL BE BETWEEN 6PM AND 7AM, MONDAY THROUGH FRIDAY OR ON WEEKENDS. AVAILABLE SHUTDOWN TIMES ARE SUBJECT TO CHANGE BASED ON ANIMAL OPERATION SCHEDULE.
ALL SHUTDOWNS SHALL BE SCHEDULED WITH COR A MINIMUM OF TEN DAYS IN ADVANCE.
CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING SURFACES OR STRUCTURE AFFECTED BY THE DEMOLITION OR INSTALLATION OF THE ITEMS SHOWN ON THIS SHEET. THIS INCLUDES, BUT IS NOT LIMITED TO;
WALLS, FLOORS, STRUCTURE, FIREPROOFING, PAINT, HANGERS & WALL-BRACKETS.
CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT NOT AFFECTED BY THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT OF ANY EXISTING EQUIPMENT DAMAGED AS A RESULT OF
CONSTRUCTION UNDER THIS CONTRACT.
MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS OUTSIDE OF PROJECT SCOPE UNLESS NOTED OTHERWISE. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO ACCOMPLISH THIS.
INSULATE ALL STEAM, STEAM CONDENSATE AND PUMPED CONDENSATE PIPING.
A.
B.
C.
D.
E.
F.
G.
H.
D2
D3
D4
D5
D6
CAP
F.E.
FEC
FEC
P106
UP
UP
DNUP
PROJECT AREA
(AC-61 & AC-62)
SEVENTH FLOOR KEY PLAN
NO SCALE
ELECTRICAL ROOM PF-105
K
K
M
M
N
N
O
O
P
P
S
SR
R
17 17
15 15
12 12
Mechanical
Penthouse
PF104
X - 3/4" CW
X - 3/4" CW
15.1 15.1
16.1 16.1
D1
D1
D1
X - 6" MPSX - 3/4" CW
X - 6" LPS
X - 6" LPS
X - 3" MPC
X - 3" LPC
X - 3" MPC
X - 1 1/4" CW
X - 1" LPC
XR - 4"
XR - 1 1/4"
XR - 3/4"
XR - 4"
XR - 6"
XR - 6"
X - 3" LPC
X - 6" LPS
X - 1" CW
X-SINK
D2
EXISTING MPS (35 PSI) TO LPS (6 PSI)
PRESSURE REDUCING STATION
X - 6" LPS X - 6" LPS
X - 6" LPS
D3
D3
D3
X-AC-61
X-AC-62
EXISTING DRAIN COOLER
EXISTING DRAIN COOLER
D3D3
D3
D4
D4
D4
D5
X - 3" MPC
X - 6" MPS
X - 6" LPS
D6
D7
D6 D7
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
100% Construction Documents 08/10/2018
FULLY SPRINKLERED
08/10/2018
541-18-502
A B
C D
E F
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
PHASE 6 - PARTIAL SEVENTH
FLOOR PENTHOUSE MECHANICAL
DEMOLITION PLAN (AC-61 & AC-62)
8 9
1-M5.0
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PENTHOUSE
MECHANICAL DEMOLITION PLAN (AC-61 & AC-62) 1
GENERAL NOTES
# DEMOLITION CODED NOTES
D1 REMOVE EXISTING STEAM-TO-STEAM HUMIDIFIER COMPLETE. REMOVE ALL ASSOCIATED DOMESTIC WATER, LOW PRESSURE STEAM, LOW PRESSURE CONDENSATE AND DRAIN PIPING BACK TO ACTIVE MAINS AND CAP. REMOVE ALL EQUIPMENT PADS FOR LOWER UNITS AND STEEL SUPPORTS FOR UPPER UNITS AND PATCH ANY FLOOR AND WALL HOLES LEFT OVER. DISCONNECT POWER AT THE BREAKER, REMOVE ELECTRICAL DISCONNECT, CONDUIT AND WIRING BACK TO BREAKER AND RE-LABEL BREAKER AS "SPARE". TYPICAL FOR SIX (6) UNITS.
REMOVE EXISTING CONDENSATE PUMP PACKAGE COMPLETE. REMOVE ALL ASSOCIATED PIPING BACK TO ACTIVE
MAINS AND CAP.
MAINTAIN EXISTING 6"Ø LOW PRESSURE STEAM PIPING FOR RECONNECTION IN NEW PHASE.
REMOVE EXISTING CONDENSATE TRAPS AND PIPING BACK TO ACTIVE MAIN AND CAP.
REMOVE EXISTING DOMESTIC COLD WATER LINE BACK TO ACTIVE MAIN AND CAP.
REMOVE EXISTING CONDENSATE TRAPS AND PIPING FROM AIR…