36C25019B0023 0001 1-M0.0 - MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES_AD01.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019B0023-0001001.docx | DOCX document | |
| 36C25019B0023-0001002.docx | DOCX document | |
| 36C25019B0023-0001004.pdf | ||
| 36C25019B0023-0001000.docx | DOCX document | |
| 36C25019B0023-003.pdf | ||
| 36C25019B0023-004.pdf | ||
| 36C25019B0023-002.pdf | ||
| 36C25019B0023-005.pdf | ||
| 36C25019B0023-001.docx | DOCX document | |
| 36C25019B0023-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN
MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.
DEDUCT ALTERNATE #1
ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):
AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND
DOWNSTREAM OF THE NEW F&T STEAM TRAP.
AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.
AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.
*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*
DEDUCT ALTERNATE #2
ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.
DEDUCT ALTERNATE #3
ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.
DEDUCT ALTERNATE NOTES
S
E-65042
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
DAVID A.
DEMAGALL
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2013.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Bid Issue 03/21/2019
FULLY SPRINKLERED
03/21/2019
541-18-502
A B
C D
E F
Addenum #01 04/22/2019
REMOVE STERILE STEAM
HUMIDIFIERS
JMCDAD
MECHANICAL LEGEND, GENERAL
NOTES AND SCHEDULES
2 9
1-M0.0
MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH COR A MINIMUM OF TEN WORKING DAYS IN ADVANCE.
PROVIDE MANUFACTURER RECOMMENDED SERVICE CLEARANCE FOR ALL NEW MECHANICAL EQUIPMENT.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF PANELS.
PITCH ALL NEW PRESSURIZED STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW AT A MINIMUM OF 1/4" PER 10-FT.
ALL REDUCERS USED IN NEW STEAM PIPING SHALL BE ECCENTRIC.
ALL NEW CONNECTIONS TO HORIZONTAL STEAM MAINS SHALL BE MADE AT AN UPWARD 45° ANGLE.
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING, FIREPROOFING AND REPAIRING ALL EXISTING FINISHES, FLOORS, WALLS AND CEILINGS AFFECTED BY THE SELECTIVE DEMOLITION AND NEW WORK DESCRIBED IN THE DESIGN DOCUMENTS. SEE
SPECIFICATIONS.
CONTRACTOR SHALL PROTECT EXISTING FINISHES DURING CONSTRUCTION AND REPAIR OR REPLACE ANY ITEMS DAMAGED AS A
RESULT OF WORK DESCRIBED IN THE DESIGN DOCUMENTS.
DEMOLITION SYMBOLS:
HVAC PIPING:CALL OUTS:
ABBREVIATIONS:
HVAC CONTROLS:
AD ACCESS DOOR
ELECTRICAL CONTRACTOR
GENERAL TRADES CONTRACTOR
TEMPERATURE CONTROL CONTRACTOR
HVAC CONTRACTOR
CONNECT TO EXISTING
EC
GC
TC
HC
REFERENCE TO CODED NOTE
TO OPENING IN TOP OF DUCT. SHALL BE A MINIMUM 1.5 TIMES
GREATER THAN THE CROSS-SECTIONAL AREA OF DUCT.
ABOVE FINISHED FLOORAFF
@ MANUAL OVERRIDE
ROOF OPENINGRO
TEMPERATURE CONTROL PANELTCP
CURRENT TRANSFORMER ON MOTOR WIRING WITH TRANSDUCER
AIR CONDITIONING CONDENSATE
LOW PRESSURE STEAM CONDENSATELPC
LPS
ACC
LOW PRESSURE STEAM
PRESSURE GAUGE
LOW LIMIT THERMOSTATL
HUMIDITY SENSOR WITH SETPOINT ADJUSTMENT
COMBINATION FIRE/SMOKE DAMPER IN DUCT
MEDIUM PRESSURE STEAM CONDENSATE
MPS
MPC
MEDIUM PRESSURE STEAM
HUMIDITY SENSOR
MOTORIZED 2-WAY CONTROL VALVE
STATIC PRESSURE SENSOR
H
H
S
MOD
FSD
STRAINER
FLEXIBLE PIPE CONNECTOR
THERMOMETER IN PIPE WELL
BALANCING VALVE
HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"
ISOLATION VALVE
REDUCER
UNION
(SHUTOFF, BALANCE, CHECK)
TRIPLE DUTY VALVE
CHECK VALVE
MOTORIZED 3-WAY CONTROL VALVE
GAUGE PORT (PETE'S PLUG)
DRAIN VALVE WITH HOSE FITTING
MOTORIZED 2-WAY CONTROL VALVE
LOCAL DRAIN, VALVED WITH 3/4"
THREADED CONNECTOR
MANUAL AIR VENTMAV
PRESSURE RELIEF VALVE
KITCHEN HOOD EXHAUSTKHE
CD CONDENSATE PIPING
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
EXISTING TO BE RELOCATEDXRL
EQUIPMENT OR FIXTURE MARK
UNIT NUMBER
EQUIPMENT
TYPE
BRANCH PIPE CONNECTION
EQ-#
FIRE DAMPER IN DUCTFDD
TWO POSITION VALVE
PRESSURE REDUCING VALVE
LIMIT OF DEMOLITION
EXISTING NEW LOCATIONXNL
THERMOSTATT
NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS.
IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF WORK, FOR DETAILED SCOPE OF WORK PLEASE REFER TO THE SUBSEQUENT DRAWINGS.
A.
B.
C.
D.
E.
F.
G.
H.
THIS PROJECT CONSISTS OF WORK IN MULTIPLE SPACES LOCATED IN DIFFERENT BUILDINGS. WORK SHALL BE COMPLETED IN A MANNER THAT MINIMIZES SHUTDOWNS TO NO MORE THAN ONE
AIR HANDLING UNIT AT A TIME.
THE FOLLOWING PHASES SHALL BE COMPLETED IN THE ORDER BELOW. DURATIONS LISTED SHALL BE FROM VA'S NOTICE TO PROCEED TO SUBSTANTIAL COMPLETION:
PHASE 1 - SUBMISSION OF EQUIPMENT AND CONTROLS FOR REVIEW AND APPROVAL. CONTRACTOR SCHEDULING AND REVIEW WITH VA (SEE NOTES BELOW) - 28 DAYS.
PHASE 2 - ALL WORK ASSOCIATED WITH AC-6. DURATION - 21 DAYS.
PHASE 3 - ALL WORK ASSOCIATED WITH AC-57. DURATION - 30 DAYS.
PHASE 4 - ALL WORK ASSOCIATED WITH AC-26. DURATION - 28 DAYS.
PHASE 5 - ALL WORK ASSOCIATED WITH AC-28. DURATION - 21 DAYS.
PHASE 6 - ALL WORK ASSOCIATED WITH AC-61 & AC-62. DURATION - 60 DAYS.
ESTIMATED PROJECT DURATION IS 224 DAYS.
CONTRACTOR SHALL USE THE PHASING OUTLINED ABOVE AND DEVELOP A SCHEDULE FOR REVIEW AND APPROVAL BY THE COR. CONTRACTOR PHASING PLAN SHALL DETAIL THE SEQUENCE OF WORK TO BE COMPLETED TO COMPLY WITH ITEM "A" ABOVE. THE PHASING AND SCHEDULE SUBMITTED BY THE CONTRACTOR IS SUBJECT TO CHANGE AT THE DISCRETION OF THE VA.
CONTRACTOR SCHEDULE REQUIREMENTS ARE OUTLINED IN THE SPECIFICATIONS AND SHALL INCLUDE THE FOLLOWING:
1. BROKEN DOWN BY MECHANICAL ROOM AND AIR HANDLING UNIT.
2. INCLUDE START DATES AND END DATES FOR EACH TASK.
3. TASKS FOR EACH TRADE; DEMOLITION, NEW PIPING, INDSULATION, CONTROLS, ELECTRICAL, ETC.
4. DURATIONS FOR EACH TASK.
5. INCLUDE AIR HANDLING UNIT SHUTDOWN DATES AND DURATIONS.
ALL WORK INSIDE OF THE AIR HANDLING UNITS THAT REQUIRE A SHUTDOWN SHALL BE COMPLETED ON 3RD SHIFT ON A WEEKEND. CONTRACTOR SHALL SUBMIT A SHUTDOWN PLAN TO THE VA WITH SPECIFIC START AND END DATES AND TIMES. AIR HANDLING UNIT SHUTDOWN TIMES WILL NEED TO BE SCHEDULED WITH EACH DEPARTMENT AFFECTED AND WILL LIKELY BE LIMITED TO A FEW HOURS (THIS MAY CHANGE AT THE DISCRETION OF THE VA). CONTRACTORS MAY HAVE TO COMPLETE THEIR WORK OVER MULTIPLE SHUTDOWNS IF THE AVAILABLE TIMES ARE NOT
SUFFICIENT TO COMPLETE ALL WORK NECESSARY.
CONTRACTOR SHALL FIELD VERIFY ALL WORK SHOWN ON THESE DRAWINGS AND NOTIFY THE COR AND DESIGN TEAM OF ANY CONDITIONS THAT PREVENT THE INTENDED DESIGN FROM BEING
CONSTRUCTED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO
ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
PROJECT PHASING AND COORDINATION NOTES
GENERAL MECHANICAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
MECHANICAL LEGEND
NOTES:
1.
2.
CONTRACTOR SHALL PROVIDE ALL TRANSITIONS, FITTINGS AND ACCESSORIES REQUIRED TO CONNECT STEAM SUPPLY PIPING TO
THE NEW DISPERSION MANIFOLD SEE DETAILS.
CONTRACTOR SHALL SUPPLY ALL HARDWARE, BRACKETS AND FLASHING REQUIRED TO MOUNT MANIFOLDS IN EXISTING AIR
HANDLING UNITS.
FACTORY INSULATED DISPERSION TUBES
ACCESSORIES
HUMIDIFIER PERFORMANCE
STEAM DISPERSION MANIFOLD MARK HUM-6
SPACE SERVED
DESIRED AIR DRY BULB TEMPERATURE (F)
DESIRED CONDITIONS IN SPACE (RH)
DESIGN LOAD (LBS/HR) 180
DESIGN AIR FLOW (CFM)
MAXIMUM ABSORPTION DISTANCE (INCHES)
MAX AIR PRESSURE DROP (INCHES W.C.)
STEAM DISPERSION MANIFOLD
DISPERSION MANIFOLD FACE WIDTH (INCHES)
DISPERSION MANIFOLD FACE HEIGHT (INCHES)
HEADER AND TUBE MATERIAL
FIRST FLOOR
MRI SUITE
HUMIDIFIER DISPERSION MANIFOLD SCHEDULE
MOUNTING LOCATION
AIR HANDLING UNIT SERVED AC-6
10000
65°
40%
AIR HANDLING UNIT
0.1
STAINLESS STEEL
YES
HUM-57
AC-57
23300
72°
30%
FIRST FLOOR
PALMS LAB
STAINLESS STEEL
YES
AIR HANDLING UNIT
DIRECT STEAM PRESSURE AVAILABLE 10 PSI 15 PSI
0.1
HUMIDIFIER CONTROL NOTES
HUMIDIFIER CONTROL SEQUENCE
THE CONTROLLER SHALL MEASURE THE RETURN AIR HUMIDITY AND MODULATE THE STEAM CONTROL VALVE TO MAINTAIN A MINIMUM SETPOINT OF:
AC-6 - 40% RH(ADJ.)
AC-26 - 45% RH(ADJ.)
AC-28 - 45% RH(ADJ.)
AC-57 - 30% RH(ADJ.)
AC-61 - 30% RH(ADJ.)
AC-62 - 30% RH(ADJ.)
THE HUMIDIFIER SHALL BE ENABLED WHENEVER THE SUPPLY FAN STATUS IS ON AND THE RETURN AIR RELATIVE HUMIDITY IS BELOW THE SETPOINT LISTED IN ITEM 1.
THE HUMIDIFIER SHALL TURN OFF WHENEVER: RETURN AIR HUMIDITY MEASURES MORE THAN 10% OF THE SETPOINT LISTED IN ITEM 1 OR ON A LOSS OF SUPPLY FAN STATUS.
ALARMS:
A. HIGH SUPPLY AIR HUMIDITY +15%(ADJ) OF SETPOINT IN ITEM 1 (MEASURED IN RETURN AIR DUCT).
B. LOW SUPPLY AIR HUMIDITY -5%(ADJ) OF SETPOINT IN ITEM 1 (MEASURED IN RETURN AIR DUCT).
1.
2.
3.
CONTRACTOR SHALL PROVIDE THE FOLLOWING NEW CONTROL DEVICES FOR EACH HUMIDIFIER:
A. SUPPLY AIR HIGH LIMIT HUMIDITY SENSOR (LOCATED IN SUPPLY AIR DUCT DOWNSTREAM OF AIR HANDLING UNIT, IN MECHANICAL SPACE) B. RETURN AIR HUMIDITY SENSOR (LOCATED IN RETURN AIR DUCT UPSTREAM OF AIR HANDLING UNIT, IN MECHANICAL SPACE)
C. CONTROL VALVE (SEE SCHEDULE AND DETAILS)
AT THE COMPLETION OF EACH PHASE THE CONTRACTOR SHALL TEST THE AIR HANDLING UNIT TO VERIFY THE HUMIDIFICATION SEQUENCE DETAILED BELOW IS MET. CONTRACTOR SHALL PROVIDE A REPORT THAT DETAILS EXACT LOCATIONS OF NEW CONTROL DEVICES LISTED IN ITEM 1 ABOVE AND WRITTEN VERIFICATION THAT THE HUMIDIFICATION CONTROL SEQUENCE
BELOW IS OPERATIONAL.
STEAM CONDENSATE PUMP SCHEDULE
PUMP
NUMBER
LOCATION /
SERVICE
TYPE
CONDENSATE
RATE
DISCHARGE
PRESSURE
RECEIVER
CAPACITY
MOTOR
NOM. HP VOLT/PHASE/HZ
CP-1
CARES 7TH
AC-61
DUPLEX 5 GPM 10 PSI 15 GALLONS 1/4 480/3/60
CP-2
CARES 7TH
AC-62
DUPLEX 10 GPM 15 PSI 15 GALLONS 1/2 480/3/60
OVERALL DIMENSIONS W x H x L (INCHES) 71 x 43.25 x 7.25 86 x 87.25 x 7.25
STEAM CONTROL VALVE SCHEDULE
UNIT SERVED AC-6 AC-57 AC-26 AC-28 AC-61
CAPACITY
AC-62 (a)
VALVE SIZE
NOTE: ALL VALVES SHALL BE BRONZE BODY, ELECTRONICALLY ACTUATED (24V) AND RATED FOR LISTED CAPACITY ABOVE.
510 LBS/HR
1-1/4"
180 LBS/HR
3/4"
510 LBS/HR
1-1/4"
HUM-26
AC-26
33000
72°
45%
0.1
BASEMENT
ANIMAL RESEARCH
STAINLESS STEEL
YES
AIR HANDLING UNIT
10 PSI
71 x 55.25 x 7.25
82 LBS/HR
1/2"
VALVE Cv 14.05.5 16.0 2.5
2-1/2"
2-1/2"
44.3
1730 LBS/HR 1475 LBS/HR
AC-62 (b)
2-1/2"
44.3
1475 LBS/HR
1.
2.
EXISTING CONTROLS ARE BY ANDOVER.
ADDENDUM #1 04/022/2019