36C25019B0023-0001003.pdf

PDF 172 KB Posted

Attached to
Remove Sterile Steam Humidifiers Federal contract opportunity
Solicitation number
36C25019B0023
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0023 0001 1-M0.0 - MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES_AD01.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Remove Sterile Steam Humidifiers, newest first.
File Type Posted
36C25019B0023-0001001.docx DOCX document
36C25019B0023-0001002.docx DOCX document
36C25019B0023-0001004.pdf PDF
36C25019B0023-0001000.docx DOCX document
36C25019B0023-003.pdf PDF
36C25019B0023-004.pdf PDF
36C25019B0023-002.pdf PDF
36C25019B0023-005.pdf PDF
36C25019B0023-001.docx DOCX document
36C25019B0023-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE CONTRACTOR SHALL PROVIDE PRICING FOR THE FOLLOWING DEDUCT ALTERNATES AND THE WORK DESCRIBED THEREIN

MAY BE ELIMINATED FROM THE PROJECT AT THE DISCRETION OF THE VA.

DEDUCT ALTERNATE #1

ELIMINATE ALL WORK DESCRIBED BELOW FROM PROJECT SCOPE (TO BE COMPLETED BY VA FACILITIES):

AC-6 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD AND

DOWNSTREAM OF THE NEW F&T STEAM TRAP.

AC-28 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-57 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF NEW STEAM DISPERSION MANIFOLD.

AC-61 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

AC-62 - OMIT ALL NEW CONDENSATE PIPING WORK DOWNSTREAM OF STEAM DISPERSION MANIFOLD.

*CONTRACTOR SHALL STILL PROVIDE NEW CONDENSATE PUMP*

DEDUCT ALTERNATE #2

ELIMINATE ALL WORK ASSOCIATED WITH AC-26 FROM PROJECT SCOPE.

DEDUCT ALTERNATE #3

ELIMINATE ALL WORK ASSOCIATED WITH AC-28 FROM PROJECT SCOPE.

DEDUCT ALTERNATE NOTES

S

E-65042

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

DAVID A.

DEMAGALL

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2013.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

Bid Issue 03/21/2019

FULLY SPRINKLERED

03/21/2019

541-18-502

A B

C D

E F

Addenum #01 04/22/2019

REMOVE STERILE STEAM

HUMIDIFIERS

JMCDAD

MECHANICAL LEGEND, GENERAL

NOTES AND SCHEDULES

2 9

1-M0.0

MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.

COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH COR A MINIMUM OF TEN WORKING DAYS IN ADVANCE.

PROVIDE MANUFACTURER RECOMMENDED SERVICE CLEARANCE FOR ALL NEW MECHANICAL EQUIPMENT.

NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF PANELS.

PITCH ALL NEW PRESSURIZED STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW AT A MINIMUM OF 1/4" PER 10-FT.

ALL REDUCERS USED IN NEW STEAM PIPING SHALL BE ECCENTRIC.

ALL NEW CONNECTIONS TO HORIZONTAL STEAM MAINS SHALL BE MADE AT AN UPWARD 45° ANGLE.

CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING, FIREPROOFING AND REPAIRING ALL EXISTING FINISHES, FLOORS, WALLS AND CEILINGS AFFECTED BY THE SELECTIVE DEMOLITION AND NEW WORK DESCRIBED IN THE DESIGN DOCUMENTS. SEE

SPECIFICATIONS.

CONTRACTOR SHALL PROTECT EXISTING FINISHES DURING CONSTRUCTION AND REPAIR OR REPLACE ANY ITEMS DAMAGED AS A

RESULT OF WORK DESCRIBED IN THE DESIGN DOCUMENTS.

DEMOLITION SYMBOLS:

HVAC PIPING:CALL OUTS:

ABBREVIATIONS:

HVAC CONTROLS:

AD ACCESS DOOR

ELECTRICAL CONTRACTOR

GENERAL TRADES CONTRACTOR

TEMPERATURE CONTROL CONTRACTOR

HVAC CONTRACTOR

CONNECT TO EXISTING

EC

GC

TC

HC

REFERENCE TO CODED NOTE

TO OPENING IN TOP OF DUCT. SHALL BE A MINIMUM 1.5 TIMES

GREATER THAN THE CROSS-SECTIONAL AREA OF DUCT.

ABOVE FINISHED FLOORAFF

@ MANUAL OVERRIDE

ROOF OPENINGRO

TEMPERATURE CONTROL PANELTCP

CURRENT TRANSFORMER ON MOTOR WIRING WITH TRANSDUCER

AIR CONDITIONING CONDENSATE

LOW PRESSURE STEAM CONDENSATELPC

LPS

ACC

LOW PRESSURE STEAM

PRESSURE GAUGE

LOW LIMIT THERMOSTATL

HUMIDITY SENSOR WITH SETPOINT ADJUSTMENT

COMBINATION FIRE/SMOKE DAMPER IN DUCT

MEDIUM PRESSURE STEAM CONDENSATE

MPS

MPC

MEDIUM PRESSURE STEAM

HUMIDITY SENSOR

MOTORIZED 2-WAY CONTROL VALVE

STATIC PRESSURE SENSOR

H

H

S

MOD

FSD

STRAINER

FLEXIBLE PIPE CONNECTOR

THERMOMETER IN PIPE WELL

BALANCING VALVE

HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"

ISOLATION VALVE

REDUCER

UNION

(SHUTOFF, BALANCE, CHECK)

TRIPLE DUTY VALVE

CHECK VALVE

MOTORIZED 3-WAY CONTROL VALVE

GAUGE PORT (PETE'S PLUG)

DRAIN VALVE WITH HOSE FITTING

MOTORIZED 2-WAY CONTROL VALVE

LOCAL DRAIN, VALVED WITH 3/4"

THREADED CONNECTOR

MANUAL AIR VENTMAV

PRESSURE RELIEF VALVE

KITCHEN HOOD EXHAUSTKHE

CD CONDENSATE PIPING

EXISTING TO REMAIN

EXISTING TO BE REMOVED

X

XR

EXISTING TO BE RELOCATEDXRL

EQUIPMENT OR FIXTURE MARK

UNIT NUMBER

EQUIPMENT

TYPE

BRANCH PIPE CONNECTION

EQ-#

FIRE DAMPER IN DUCTFDD

TWO POSITION VALVE

PRESSURE REDUCING VALVE

LIMIT OF DEMOLITION

EXISTING NEW LOCATIONXNL

THERMOSTATT

NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS.

IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF WORK, FOR DETAILED SCOPE OF WORK PLEASE REFER TO THE SUBSEQUENT DRAWINGS.

A.

B.

C.

D.

E.

F.

G.

H.

THIS PROJECT CONSISTS OF WORK IN MULTIPLE SPACES LOCATED IN DIFFERENT BUILDINGS. WORK SHALL BE COMPLETED IN A MANNER THAT MINIMIZES SHUTDOWNS TO NO MORE THAN ONE

AIR HANDLING UNIT AT A TIME.

THE FOLLOWING PHASES SHALL BE COMPLETED IN THE ORDER BELOW. DURATIONS LISTED SHALL BE FROM VA'S NOTICE TO PROCEED TO SUBSTANTIAL COMPLETION:

PHASE 1 - SUBMISSION OF EQUIPMENT AND CONTROLS FOR REVIEW AND APPROVAL. CONTRACTOR SCHEDULING AND REVIEW WITH VA (SEE NOTES BELOW) - 28 DAYS.

PHASE 2 - ALL WORK ASSOCIATED WITH AC-6. DURATION - 21 DAYS.

PHASE 3 - ALL WORK ASSOCIATED WITH AC-57. DURATION - 30 DAYS.

PHASE 4 - ALL WORK ASSOCIATED WITH AC-26. DURATION - 28 DAYS.

PHASE 5 - ALL WORK ASSOCIATED WITH AC-28. DURATION - 21 DAYS.

PHASE 6 - ALL WORK ASSOCIATED WITH AC-61 & AC-62. DURATION - 60 DAYS.

ESTIMATED PROJECT DURATION IS 224 DAYS.

CONTRACTOR SHALL USE THE PHASING OUTLINED ABOVE AND DEVELOP A SCHEDULE FOR REVIEW AND APPROVAL BY THE COR. CONTRACTOR PHASING PLAN SHALL DETAIL THE SEQUENCE OF WORK TO BE COMPLETED TO COMPLY WITH ITEM "A" ABOVE. THE PHASING AND SCHEDULE SUBMITTED BY THE CONTRACTOR IS SUBJECT TO CHANGE AT THE DISCRETION OF THE VA.

CONTRACTOR SCHEDULE REQUIREMENTS ARE OUTLINED IN THE SPECIFICATIONS AND SHALL INCLUDE THE FOLLOWING:

1. BROKEN DOWN BY MECHANICAL ROOM AND AIR HANDLING UNIT.

2. INCLUDE START DATES AND END DATES FOR EACH TASK.

3. TASKS FOR EACH TRADE; DEMOLITION, NEW PIPING, INDSULATION, CONTROLS, ELECTRICAL, ETC.

4. DURATIONS FOR EACH TASK.

5. INCLUDE AIR HANDLING UNIT SHUTDOWN DATES AND DURATIONS.

ALL WORK INSIDE OF THE AIR HANDLING UNITS THAT REQUIRE A SHUTDOWN SHALL BE COMPLETED ON 3RD SHIFT ON A WEEKEND. CONTRACTOR SHALL SUBMIT A SHUTDOWN PLAN TO THE VA WITH SPECIFIC START AND END DATES AND TIMES. AIR HANDLING UNIT SHUTDOWN TIMES WILL NEED TO BE SCHEDULED WITH EACH DEPARTMENT AFFECTED AND WILL LIKELY BE LIMITED TO A FEW HOURS (THIS MAY CHANGE AT THE DISCRETION OF THE VA). CONTRACTORS MAY HAVE TO COMPLETE THEIR WORK OVER MULTIPLE SHUTDOWNS IF THE AVAILABLE TIMES ARE NOT

SUFFICIENT TO COMPLETE ALL WORK NECESSARY.

CONTRACTOR SHALL FIELD VERIFY ALL WORK SHOWN ON THESE DRAWINGS AND NOTIFY THE COR AND DESIGN TEAM OF ANY CONDITIONS THAT PREVENT THE INTENDED DESIGN FROM BEING

CONSTRUCTED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE

OF CONSTRUCTION.

THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO

ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.

PROJECT PHASING AND COORDINATION NOTES

GENERAL MECHANICAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

MECHANICAL LEGEND

NOTES:

1.

2.

CONTRACTOR SHALL PROVIDE ALL TRANSITIONS, FITTINGS AND ACCESSORIES REQUIRED TO CONNECT STEAM SUPPLY PIPING TO

THE NEW DISPERSION MANIFOLD SEE DETAILS.

CONTRACTOR SHALL SUPPLY ALL HARDWARE, BRACKETS AND FLASHING REQUIRED TO MOUNT MANIFOLDS IN EXISTING AIR

HANDLING UNITS.

FACTORY INSULATED DISPERSION TUBES

ACCESSORIES

HUMIDIFIER PERFORMANCE

STEAM DISPERSION MANIFOLD MARK HUM-6

SPACE SERVED

DESIRED AIR DRY BULB TEMPERATURE (F)

DESIRED CONDITIONS IN SPACE (RH)

DESIGN LOAD (LBS/HR) 180

DESIGN AIR FLOW (CFM)

MAXIMUM ABSORPTION DISTANCE (INCHES)

MAX AIR PRESSURE DROP (INCHES W.C.)

STEAM DISPERSION MANIFOLD

DISPERSION MANIFOLD FACE WIDTH (INCHES)

DISPERSION MANIFOLD FACE HEIGHT (INCHES)

HEADER AND TUBE MATERIAL

FIRST FLOOR

MRI SUITE

HUMIDIFIER DISPERSION MANIFOLD SCHEDULE

MOUNTING LOCATION

AIR HANDLING UNIT SERVED AC-6

10000

65°

40%

AIR HANDLING UNIT

0.1

STAINLESS STEEL

YES

HUM-57

AC-57

23300

72°

30%

FIRST FLOOR

PALMS LAB

STAINLESS STEEL

YES

AIR HANDLING UNIT

DIRECT STEAM PRESSURE AVAILABLE 10 PSI 15 PSI

0.1

HUMIDIFIER CONTROL NOTES

HUMIDIFIER CONTROL SEQUENCE

THE CONTROLLER SHALL MEASURE THE RETURN AIR HUMIDITY AND MODULATE THE STEAM CONTROL VALVE TO MAINTAIN A MINIMUM SETPOINT OF:

AC-6 - 40% RH(ADJ.)

AC-26 - 45% RH(ADJ.)

AC-28 - 45% RH(ADJ.)

AC-57 - 30% RH(ADJ.)

AC-61 - 30% RH(ADJ.)

AC-62 - 30% RH(ADJ.)

THE HUMIDIFIER SHALL BE ENABLED WHENEVER THE SUPPLY FAN STATUS IS ON AND THE RETURN AIR RELATIVE HUMIDITY IS BELOW THE SETPOINT LISTED IN ITEM 1.

THE HUMIDIFIER SHALL TURN OFF WHENEVER: RETURN AIR HUMIDITY MEASURES MORE THAN 10% OF THE SETPOINT LISTED IN ITEM 1 OR ON A LOSS OF SUPPLY FAN STATUS.

ALARMS:

A. HIGH SUPPLY AIR HUMIDITY +15%(ADJ) OF SETPOINT IN ITEM 1 (MEASURED IN RETURN AIR DUCT).

B. LOW SUPPLY AIR HUMIDITY -5%(ADJ) OF SETPOINT IN ITEM 1 (MEASURED IN RETURN AIR DUCT).

1.

2.

3.

CONTRACTOR SHALL PROVIDE THE FOLLOWING NEW CONTROL DEVICES FOR EACH HUMIDIFIER:

A. SUPPLY AIR HIGH LIMIT HUMIDITY SENSOR (LOCATED IN SUPPLY AIR DUCT DOWNSTREAM OF AIR HANDLING UNIT, IN MECHANICAL SPACE) B. RETURN AIR HUMIDITY SENSOR (LOCATED IN RETURN AIR DUCT UPSTREAM OF AIR HANDLING UNIT, IN MECHANICAL SPACE)

C. CONTROL VALVE (SEE SCHEDULE AND DETAILS)

AT THE COMPLETION OF EACH PHASE THE CONTRACTOR SHALL TEST THE AIR HANDLING UNIT TO VERIFY THE HUMIDIFICATION SEQUENCE DETAILED BELOW IS MET. CONTRACTOR SHALL PROVIDE A REPORT THAT DETAILS EXACT LOCATIONS OF NEW CONTROL DEVICES LISTED IN ITEM 1 ABOVE AND WRITTEN VERIFICATION THAT THE HUMIDIFICATION CONTROL SEQUENCE

BELOW IS OPERATIONAL.

STEAM CONDENSATE PUMP SCHEDULE

PUMP

NUMBER

LOCATION /

SERVICE

TYPE

CONDENSATE

RATE

DISCHARGE

PRESSURE

RECEIVER

CAPACITY

MOTOR

NOM. HP VOLT/PHASE/HZ

CP-1

CARES 7TH

AC-61

DUPLEX 5 GPM 10 PSI 15 GALLONS 1/4 480/3/60

CP-2

CARES 7TH

AC-62

DUPLEX 10 GPM 15 PSI 15 GALLONS 1/2 480/3/60

OVERALL DIMENSIONS W x H x L (INCHES) 71 x 43.25 x 7.25 86 x 87.25 x 7.25

STEAM CONTROL VALVE SCHEDULE

UNIT SERVED AC-6 AC-57 AC-26 AC-28 AC-61

CAPACITY

AC-62 (a)

VALVE SIZE

NOTE: ALL VALVES SHALL BE BRONZE BODY, ELECTRONICALLY ACTUATED (24V) AND RATED FOR LISTED CAPACITY ABOVE.

510 LBS/HR

1-1/4"

180 LBS/HR

3/4"

510 LBS/HR

1-1/4"

HUM-26

AC-26

33000

72°

45%

0.1

BASEMENT

ANIMAL RESEARCH

STAINLESS STEEL

YES

AIR HANDLING UNIT

10 PSI

71 x 55.25 x 7.25

82 LBS/HR

1/2"

VALVE Cv 14.05.5 16.0 2.5

2-1/2"

2-1/2"

44.3

1730 LBS/HR 1475 LBS/HR

AC-62 (b)

2-1/2"

44.3

1475 LBS/HR

1.

2.

EXISTING CONTROLS ARE BY ANDOVER.

ADDENDUM #1 04/022/2019

Sheets
1-M0.0 - MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES

File details come from the government source that posted it.