36C25019B0012-004.pdf
PDF 7 MB Posted
- Attached to
- Provide Waste Anesthesia Gas for ASC 541-18-603
- Solicitation number
- 36C25019B0012
About this file
36C25019B0012 Attachment - Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019B0012-0002007.pdf | ||
| 36C25019B0012-0002005.pdf | ||
| 36C25019B0012-0002006.pdf | ||
| 36C25019B0012-0002003.docx | DOCX document | |
| 36C25019B0012-0002004.pdf | ||
| 36C25019B0012-0001005.docx | DOCX document | |
| 36C25019B0012-001.docx | DOCX document | |
| 36C25019B0012-006.docx | DOCX document | |
| 36C25019B0012-002.pdf | ||
| 36C25019B0012-003.pdf | ||
| 36C25019B0012-005.pdf | ||
| 36C25019B0012-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GI-1
TITLE SHEET & DRAWING
INDEX
8901 SUPERIOR AVE. CLEVELAND, OH. 44106
DEPARTMENT OF VETERANS AFFAIRS OUTPATIENT SURGERY CENTER
Cleveland Veterans Affairs
Medical Center
PROVIDE WASTE ANESTHESIA GAS (WAG) FOR ASC PROJECT
DRAWING INDEX
PROJECT NO. 541-18-603
GI-1 TITLE SHEET & DRAWING INDEX
ARCHITECTURAL
AS-0.0 FIRST FLOOR OVERALL PHASING PLAN
AS-0.1 ENLARGED CONSTRUCTION PHASING/INFECTION CONTROL PLANS
AS-1.0 FIRST FLOOR EXISTING CONDITIONS & LIFE SAFETY PLAN
AS-1.1 FIRST FLOOR DEMOLITION PLANS
AS-1.2 FIRST FLOOR IMPROVEMENT PLANS
AS-1.3 FIRST FLOOR REFLECTED CEILING PLANS
AS-2.0 DOOR SCHEDULE & DETAILS
100% CD'S SUBMISSION
11.9.18
BUILDING MASTER KEY PLAN
GROUND FLOORNORTH
PROJECT
WORK AREA
1262 SF
I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS OUTPATIENT
SURGERY CENTER
8901 SUPERIOR AVE.
CLEVELAND, OHIO
II. DESCRIPTION & USER GROUP CLASSIFICATION OF BLDG
NATURE OF PROJECT: INSTALLATION OF NEW WASTE ANESTHESIA GAS IN
THREE (3) OPERATING ROOMS & CONSTRUCTION OF
ASSOCIATED MEDICAL EQUIPMENT ROOM IN EXISTING
ONE-STORY OUTPATIENT SURGERY CENTER
A. DESIGN CODES: 2015 NPFA LIFE SAFETY CODE 101
2017 OHIO BUILDING CODE
2017 OHIO MECHANICAL/PLUMBING CODES
NFPA 70 / 2017 NATIONAL ELECTRICAL CODE
2009 ICC ANSI A117.1 GUIDELINES
C. USE GROUP: B - AMBULATORY CARE FACILITY - EXISTING, NO
CHANGE PROPOSED
D. CONSTRUCTION TYPE: TYPE VB - COMBUSTIBLE, UNPROTECTED - EXISTING,
NO CHANGE PROPOSED
E. PROJECT AREA: 1,262 SF
F. PROJECT AREA OCCUPANT LOAD: 13 OCCUPANTS
G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS
REQUIRED PER NEW IMPROVEMENTS TO BE PREPARED BY
A LICENSED FIRE PROTECTION SYSTEM DESIGNER AND
SUBMITTED UNDER SEPARATE COVER FOR PERMIT
CODE INFORMATION
Revisions: Date
1ST SUBMISSION 8.28.18
DAKCJK11.9.18
PLUMBING
P-0.1 PLUMBING LEGENDS, SCHEDULES, & DETAILS
P-1.1 DEMOLITION AND NEW WORK - FIRST FLOOR PLAN - PLUMBING
ELECTRICAL
E-0.1 ELECTRICAL SYMBOL LEGEND, GENERAL NOTES, & DETAILS
E-1.0 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL
E-2.0 LIGHTING - FIRST FLOOR PLAN - ELECTRICAL
E-2.1 POWER/SYSTEMS - FIRST FLOOR PLAN - ELECTRICAL
E-3.0 ELECTRICAL PANELBOARD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
1468 WEST 9TH STREET #400 CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
Stanley J. Kaczmar, License #4988
Expiration Date: 12/31/2019
N
O
T
F
R
C
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS AMBULATORY
SURGERY CENTER
PROVIDE WASTE ANESTHESIA GAS
(WAG) FOR ASC
8901 SUPERIOR AVE. CLEVELAND, OHIO
541-18-603
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
1/16" = 1'-0"
100% CD'S SUBMISSION 11.9.18
AS-0.0
FIRST FLOOR OVERALL
CONSTRUCTION PHASING PLAN
Revisions: Date
1st SUBMISSION 8.28.18
DAKCJK11.9.18
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS AMBULATORY
SURGERY CENTER
PROVIDE WASTE ANESTHESIA GAS
(WAG) FOR ASC
8901 SUPERIOR AVE. CLEVELAND, OHIO
541-18-603
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
WAITING
PATIENT ENTRY
VESTIBULE
MEN'S
WOMEN'S
IRM (IT)
ENTRY
MECHANICAL
ROOM
STAFF LOUNGE
GAS CYL.
STOR.
NURSE
MANAGER
EXAM/
CONSULTATION
RECEPTION/
WORKROOM
PATIENT
DRESSING
PATIENT
RESTROOM
PATIENT
RESTROOM
PATIENT
DRESSING
NURSE
STATION
MEDICATION
ROOM
PATIENT
RESTROOM
PACU AREA
EMS CLOSET
STAFF AREA
CORRIDOR
STAFF
RESTROOM
STAFF
RESTROOM
MEN'S LOCKER
ROOM
WOMEN'S
LOCKER ROOM
SOILED
UTILITY
SOILED
CART
HOLDING
PHYSICIAN
OFFICE
CLEAN
CART
HOLDING
SURGICAL AND
ANESTHESIA
EQUIPMENT
G.I. PROCESS
GENERAL O.R. #3
GENERAL O.R. #2
SUB-STERILE
SCRUB
SUB-STERILE
SCRUB
GENERAL O.R. #1
STERILE SUPPLIES
BREAK
OUT AREA
STAFF ENTRY
VESTIBULE
CLEAN
UTILITY
PACU
CORRIDOR
CORRIDOR
O.R.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PATIENT
CUBICLE #1
PATIENT
CUBICLE #2
PATIENT
CUBICLE #3
PATIENT
CUBICLE #4
PATIENT
CUBICLE #5
PATIENT
CUBICLE #6
PATIENT
CUBICLE #7
PATIENT
CUBICLE #8
3/16" = 1'-0"
OVERALL PHASING PLAN
FIRST FLOOR
SHOWER
ROOM
P H
A S
E
I I
S
C O
P E
W
O R
K
PATIENT
CUBICLE #9
SEMI-RESTRICTED
ACCESS (NON-STERILE)
RESTRICTED ACCESS
(STERILE)
S
E
M
I
R
E
S
T
R
I
C
T
E
D
A
C
C
E
S
S
N
O
N
S
T
E
R
I
L
E
R
E
S
T
R
I
C
T
E
D
A
C
C
E
S
S
S
T
E
R
I
L
E
UNRESTRICTED
ACCESS
(NON-STERILE)
SEMI-RESTRICTED
ACCESS (NON-STERILE)
U N
R E
S T
R I C
T E
D
A
C C
E S
S
N
O N
S
T E
R I L
E
S E
M I R
E S
T R
I C
T E
D
A C
C E
S
N
O N
S
T E
R I L
E
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS
SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH
AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM
BOARD TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE
WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,
AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF
ASSEMBLY AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION
SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY
CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING
NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE
STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT
UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR
TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING
ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND
LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO
REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT
CONSTRUCTION.
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL
CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED
TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF
BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE
SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY
REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK
SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE
LOCATION OF BARRIERS WITH OWNER.
12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN
THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.
DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.
16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR
DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35
26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF
DEBRIS FROM THE PROJECT AREA.
17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE
OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS
SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.
CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.
CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING
AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF
CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.
EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND
ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM
THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN
EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC
SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.
18.
CONSTRUCTION TIMEFRAME REQUIREMENT:
ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE
COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT
SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT
CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:
PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS
EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL
ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.
PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30
PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.
WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE
FACILITY IS CLOSED DURING THIS TIME.
WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE
FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.
CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,
SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT
TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC
ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID
CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE
GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE
FOLLOWED
GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL
BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION
WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS
SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW
SYSTEM IS ACTIVATED
CITY OF CLEVELAND REQUIREMENTS:
1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF
CLEVELAND, AND AS SUCH, THE CITY OF CLEVELAND'S PERMITTING AND INSPECTION
PROCESS MUST BE FOLLOWED. THE VA IS A TENANT IN THIS BUILDING AND THE FACILITY IS
NOT OWNED BY THE FEDERAL GOVERNMENT.
2. ALL CONTRACTORS - GENERAL AND SUBS - ARE REQUIRED TO BE REGISTERED WITH THE CITY
OF CLEVELAND IN ORDER TO PERFORM CONSTRUCTION OPERATIONS AND PULL PERMITS.
3. IT WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO BOTH PULL AND COVER
THE COST OF THE GENERAL BUILDING PERMIT FOR THIS PROJECT, AND ALL FEES
ASSOCIATED WITH SAME SHALL BE INCLUDED IN THE BID PRICE. ALL SUB-CONTRACTORS
WILL ALSO BE RESPONSIBLE FOR BOTH PULLING AND COVERING THE COST OF THEIR
INDIVIDUAL TRADE PERMITS.
4. THE GC SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ALL FIRE ALARM AND FIRE
SUPPRESSION SYSTEM DRAWINGS - TO THE EXTENT THAT MODIFICATIONS TO SAME ARE
REQUIRED FOR THIS PROJECT - TO THE CITY OF CLEVELAND FOR REVIEW AND APPROVAL.
5. THE GC SHALL BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS REQUIRED FOR THE
PROJECT WITH THE CITY OF CLEVELAND AND ENSURING THAT ALL INSPECTIONS ARE
COMPLETED AND PASSED. THIS INSPECTION PROCESS SHALL BE CONSIDERED IN ADDITION
TO THOSE REQUIRED INTERNALLY BY THE VA.
6. THE GC SHALL BE RESPONSIBLE FOR OBTAINING A CERTIFICATE OF OCCUPANCY THROUGH
THE CITY OF CLEVELAND AND OBTAINING ALL FINAL SIGN-OFFS FROM BUILDING OFFICIALS
7. ARCHITECT WILL SUBMIT DRAWINGS FOR BUILDING PERMIT REVIEW/APPROVAL. GC SHALL BE
RESPONSIBLE FOR PERMIT PICK-UP/PAYMENT. IT IS THE INTENT THAT THE PERMIT WILL BE
READY FOR PICK-UP AHEAD OF PRECONSTRUCTION
EXISTING WALLS TO REMAIN
INDICATES EXISTING DOORS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND
DOOR TO BE REMOVED UPON COMPLETION OF WORK
U.N.O. PATCH REPAIR EXISTING CONDITIONS AS
REQUIRED UPON REMOVAL OF ALL TEMPORARY
CONSTRUCTION. REFER TO TYPICAL TEMPORARY
PARTITION DETAIL. SCHEDULE NOTE: CONSTRUCTION
OF TEMPORARY BARRIERS SHALL BE PERFORMED
AFTER NORMAL BUSINESS HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
PHASING DURATION:
REFER TO "CONSTRUCTION TIMEFRAME REQUIREMENT" FOR
PERMITTED SCHEDULING OF ON-SITE CONSTRUCTION
ACTIVITIES. PHASING DURATION DURING THE CONSTRUCTION
PERIOD SHALL BE AS FOLLOWS:
PRECONSTRUCTION:
SUBMITTALS/PERMIT PICK-UP: 45 DAYS
--> ORDER LONG LEAD TIME EQUIPMENT
(APPROX. 8-12 WEEKS)
DURING THE 8-12 WEEK EQUIPMENT LEAD TIME, PHASES I, II, AND
III SHALL BE COMPLETED BY THE GC, SCHEDULED AS FOLLOWS:
PHASE I: O.R. #1: 8 DAYS
O.R. #1 AND SUB-STERILE 139 WILL NOT
BE USED BY VA STAFF DURING THIS TIME
VA PHASE I ACTIVATION: 10 DAYS*
PHASE II: O.R. #2: 8 DAYS
O.R. #2 WILL NOT BE USED BY VA STAFF
DURING THIS TIME.
SUB-STERILE 139 WILL BE USED BY VA STAFF.
PIPING FOR O.R. #2 SHALL BE STUBBED INTO
O.R. #2 DURING PHASE I TO AVOID GC ACCESS
VA PHASE II ACTIVATION: 10 DAYS*
PHASE III: O.R. #3: 8 DAYS
O.R. #1 AND SUB-STERILE 144 WILL NOT BE
USED BY VA STAFF DURING THIS TIME
*ACTIVATION TIMES BETWEEN PHASES ARE INCLUDED TO ALLOW
VA STAFF TO COORDINATE THEIR PROCEDURE SCHEDULE WITH
THE NEXT PHASE'S O.R. SHUTDOWN, AS IT IS UNLIKELY THAT THE
EACH PHASE WILL RUN CONCURRENTLY WITHOUT LAG TIME.
NEW MED. GAS SYSTEMS ARE NOT "ACTIVATED" DURING THIS
TIME
--> EQUIPMENT ARRIVES ON SITE TO BE INSTALLED IN PHASE IV:
PHASE IV: NEW MECH. ROOM: 31 DAYS
NOTE: PHASE IV TIMEFRAME SHALL ALSO
INCLUDE ACTIVATION AND CERTIFICATION OF
NEW MED. GAS SYSTEMS AND EQUIPMENT
TOTAL PROJECT TIMEFRAME: 120 DAYS
SYMBOL LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED
AROUND CONSTRUCTION AREA PER VA SAFETY
STANDARDS
UNRESTRICTED ACCESS AREAS - NON-STERILE
SEMI-RESTRICTED ACCESS AREAS - NON-STERILE
RESTRICTED ACCESS AREAS - STERILE. ALL
CONTRACTORS ARE REQUIRED TO WEAR GOWNS,
SHOE COVERS, HEAD COVERS, AND FACE MASKS AT
ALL TIMES WHEN IN THESE AREAS
INFECTION CONTROL CLASS:
ALL CONSTRUCTION TO BE PERFORMED UNDER THIS CONTRACT
SHALL BE CLASSIFIED AS CLASS IV. GC SHALL REFER TO AND
FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"
01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT
100% CD'S SUBMISSION 11.9.18
P H
A S
E
I
S
C O
W
O R
K P
H A
I I I
S
C O
W
O R
K
PHASE IV SCOPE OF WORK
6'-0"
4'-4" +/-3'-8"
6'-0"
4'-4" +/-
3'-11"
4'-0"
6'-0"
4'-4" +/-
5'-0"
8'-3"
AS-0.1
ENLARGED CONSTRUCTION
PHASING/INFECTION CONTROL PLANS
Revisions: Date
1st SUBMISSION 8.28.18
DAKCJK11.9.18
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS AMBULATORY
SURGERY CENTER
PROVIDE WASTE ANESTHESIA GAS
(WAG) FOR ASC
8901 SUPERIOR AVE. CLEVELAND, OHIO
541-18-603
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
GENERAL O.R. #2
SUB-STERILE
SCRUB
GENERAL O.R. #1
O.R.
CORRIDOR
1/4" = 1'-0"
INFECTION CONTROL PLAN
ENLARGED PHASE I: O.R. #1
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS
SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH
AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM
BOARD TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE
WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,
AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF
ASSEMBLY AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION
SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY
CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING
NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE
STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT
UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR
TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING
ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND
LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO
REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT
CONSTRUCTION.
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL
CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED
TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF
BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE
SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY
REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK
SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE
LOCATION OF BARRIERS WITH OWNER.
12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN
THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.
DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.
16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR
DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35
26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF
DEBRIS FROM THE PROJECT AREA.
17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE
OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS
SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.
CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.
CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING
AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF
CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.
EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND
ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM
THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN
EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC
SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.
18.
CONSTRUCTION TIMEFRAME REQUIREMENT:
ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE
COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT
SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT
CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:
PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS
EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL
ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.
PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30
PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.
WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE
FACILITY IS CLOSED DURING THIS TIME.
WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE
FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.
CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,
SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT
TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC
ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID
CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE
GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE
FOLLOWED
GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL
BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION
WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS
SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW
SYSTEM IS ACTIVATED
CITY OF CLEVELAND REQUIREMENTS:
1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF
CLEVELAND, AND AS SUCH, THE CITY OF CLEVELAND'S PERMITTING AND INSPECTION
PROCESS MUST BE FOLLOWED. THE VA IS A TENANT IN THIS BUILDING AND THE FACILITY IS
NOT OWNED BY THE FEDERAL GOVERNMENT.
2. ALL CONTRACTORS - GENERAL AND SUBS - ARE REQUIRED TO BE REGISTERED WITH THE CITY
OF CLEVELAND IN ORDER TO PERFORM CONSTRUCTION OPERATIONS AND PULL PERMITS.
3. IT WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO BOTH PULL AND COVER
THE COST OF THE GENERAL BUILDING PERMIT FOR THIS PROJECT, AND ALL FEES
ASSOCIATED WITH SAME SHALL BE INCLUDED IN THE BID PRICE. ALL SUB-CONTRACTORS
WILL ALSO BE RESPONSIBLE FOR BOTH PULLING AND COVERING THE COST OF THEIR
INDIVIDUAL TRADE PERMITS.
4. THE GC SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ALL FIRE ALARM AND FIRE
SUPPRESSION SYSTEM DRAWINGS - TO THE EXTENT THAT MODIFICATIONS TO SAME ARE
REQUIRED FOR THIS PROJECT - TO THE CITY OF CLEVELAND FOR REVIEW AND APPROVAL.
5. THE GC SHALL BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS REQUIRED FOR THE
PROJECT WITH THE CITY OF CLEVELAND AND ENSURING THAT ALL INSPECTIONS ARE
COMPLETED AND PASSED. THIS INSPECTION PROCESS SHALL BE CONSIDERED IN ADDITION
TO THOSE REQUIRED INTERNALLY BY THE VA.
6. THE GC SHALL BE RESPONSIBLE FOR OBTAINING A CERTIFICATE OF OCCUPANCY THROUGH
THE CITY OF CLEVELAND AND OBTAINING ALL FINAL SIGN-OFFS FROM BUILDING OFFICIALS
7. ARCHITECT WILL SUBMIT DRAWINGS FOR BUILDING PERMIT REVIEW/APPROVAL. GC SHALL BE
RESPONSIBLE FOR PERMIT PICK-UP/PAYMENT. IT IS THE INTENT THAT THE PERMIT WILL BE
READY FOR PICK-UP AHEAD OF PRECONSTRUCTION
EXISTING WALLS TO REMAIN
INDICATES EXISTING DOORS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND
DOOR TO BE REMOVED UPON COMPLETION OF WORK
U.N.O. PATCH REPAIR EXISTING CONDITIONS AS
REQUIRED UPON REMOVAL OF ALL TEMPORARY
CONSTRUCTION. REFER TO TYPICAL TEMPORARY
PARTITION DETAIL. SCHEDULE NOTE: CONSTRUCTION
OF TEMPORARY BARRIERS SHALL BE PERFORMED
AFTER NORMAL BUSINESS HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
PHASING DURATION:
REFER TO "CONSTRUCTION TIMEFRAME REQUIREMENT" FOR
PERMITTED SCHEDULING OF ON-SITE CONSTRUCTION
ACTIVITIES. PHASING DURATION DURING THE CONSTRUCTION
PERIOD SHALL BE AS FOLLOWS:
PRECONSTRUCTION:
SUBMITTALS/PERMIT PICK-UP: 45 DAYS
--> ORDER LONG LEAD TIME EQUIPMENT
(APPROX. 8-12 WEEKS)
DURING THE 8-12 WEEK EQUIPMENT LEAD TIME, PHASES I, II, AND
III SHALL BE COMPLETED BY THE GC, SCHEDULED AS FOLLOWS:
PHASE I: O.R. #1: 8 DAYS
O.R. #1 AND SUB-STERILE 139 WILL NOT
BE USED BY VA STAFF DURING THIS TIME
VA PHASE I ACTIVATION: 10 DAYS*
PHASE II: O.R. #2: 8 DAYS
O.R. #2 WILL NOT BE USED BY VA STAFF
DURING THIS TIME.
SUB-STERILE 139 WILL BE USED BY VA STAFF.
PIPING FOR O.R. #2 SHALL BE STUBBED INTO
O.R. #2 DURING PHASE I TO AVOID GC ACCESS
VA PHASE II ACTIVATION: 10 DAYS*
PHASE III: O.R. #3: 8 DAYS
O.R. #1 AND SUB-STERILE 144 WILL NOT BE
USED BY VA STAFF DURING THIS TIME
*ACTIVATION TIMES BETWEEN PHASES ARE INCLUDED TO ALLOW
VA STAFF TO COORDINATE THEIR PROCEDURE SCHEDULE WITH
THE NEXT PHASE'S O.R. SHUTDOWN, AS IT IS UNLIKELY THAT THE
EACH PHASE WILL RUN CONCURRENTLY WITHOUT LAG TIME.
NEW MED. GAS SYSTEMS ARE NOT "ACTIVATED" DURING THIS
TIME
--> EQUIPMENT ARRIVES ON SITE TO BE INSTALLED IN PHASE IV:
PHASE IV: NEW MECH. ROOM: 31 DAYS
NOTE: PHASE IV TIMEFRAME SHALL ALSO
INCLUDE ACTIVATION AND CERTIFICATION OF
NEW MED. GAS SYSTEMS AND EQUIPMENT
TOTAL PROJECT TIMEFRAME: 120 DAYS
SYMBOL LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED
AROUND CONSTRUCTION AREA PER VA SAFETY
STANDARDS
UNRESTRICTED ACCESS AREAS - NON-STERILE
SEMI-RESTRICTED ACCESS AREAS - NON-STERILE
RESTRICTED ACCESS AREAS - STERILE. ALL
CONTRACTORS ARE REQUIRED TO WEAR GOWNS,
SHOE COVERS, HEAD COVERS, AND FACE MASKS AT
ALL TIMES WHEN IN THESE AREAS
INFECTION CONTROL CLASS:
ALL CONSTRUCTION TO BE PERFORMED UNDER THIS CONTRACT
SHALL BE CLASSIFIED AS CLASS IV. GC SHALL REFER TO AND
FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"
01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT
100% CD'S SUBMISSION 11.9.18
LOCATION OF
NEW MED.
GAS/AIR OUTLET
BOX
LOCATE TEMP.
PARTITION JUST SOUTH
OF EXISTING
OVERHEAD BOOM ARM.
GC SHALL FULLY SEAL
OFF ENTIRETY OF
BOOM ARM FROM
CONSTRUCTION AREAS
ALIGN W/EXISTING
WINDOW JAMB
FULLY SEAL EXISTING
LIGHT/HVAC FIXTURES
IN ALL CONSTRUCTION
AREAS, TYP.
CONSTRUCTION AREA
CONSTRUCTION AREA
EXISTING O.R.
AREA - NO GC
ACCESS
LOCATE TEMP.
PARTITION JUST EAST
OF EXISTING
OVERHEAD BOOM ARM
C O
N S
T R
U C
T I O
N
A N
T E
R O
O M
ALIGN W/EXISTING
DOOR JAMB
LOCATE ZIP WALL
NORTH OF SUPPLY
DIFFUSER
INTENT OF ZIPWALL
INCLUSION IS SOLELY
FOR WORK
ASSOCIATED WITH NEW
ZONE VALVE BOX.
ZIPWALL SHALL BE
REMOVED UPON
COMPLETION OF
INSTALLATION
ALIGN W/EXISTING
DOOR JAMB
FULLY SEAL EXISTING
LIGHT FIXTURES, HVAC
DIFFUSERS, AND HOOD
IN SUB-STERILE ROOM.
COVER ALL SINKS
EXISTING DOOR SHALL
BE FULLY SEALED
DURING
CONSTRUCTION AND
WILL REMAIN CLOSED
1/4" = 1'-0"
INFECTION CONTROL PLAN
ENLARGED PHASE II: O.R. #2
SUB-STERILE
EXISTING DOOR SHALL
BE FULLY SEALED
DURING
CONSTRUCTION AND
WILL REMAIN CLOSED
C O
N S
T R
U C
T I O
N
A N
T E
R O
O M
CONSTRUCTION AREA
LOCATE TEMP. PARTITION
JUST WEST OF EXISTING
OVERHEAD BOOM ARM
LOCATION OF NEW MED.
GAS/AIR OUTLET BOX
GENERAL O.R. #2
EXISTING O.R.
AREA - NO GC
ACCESS
LOCATE TEMP.
PARTITION JUST SOUTH
OF EXISTING
OVERHEAD BOOM ARM.
GC SHALL FULLY SEAL
OFF ENTIRETY OF
BOOM ARM FROM
CONSTRUCTION AREAS
FULLY SEAL EXISTING
LIGHT/HVAC FIXTURES
IN ALL CONSTRUCTION
AREAS, TYP.
O.R.
CORRIDOR
SCRUB
SUB-STERILE
SCRUB
ALIGN W/EXISTING
WINDOW JAMB
INTENT OF ZIPWALL
INCLUSION IS SOLELY
FOR WORK
ASSOCIATED WITH NEW
ZONE VALVE BOX.
ZIPWALL SHALL BE
REMOVED UPON
COMPLETION OF
INSTALLATION
LOCATE ZIP WALL
NORTH OF SUPPLY
DIFFUSER
ALIGN W/EXISTING
DOOR JAMB
1/4" = 1'-0"
INFECTION CONTROL PLAN
ENLARGED PHASE III: O.R. #3
LOCATE TEMP. PARTITION
JUST WEST OF EXISTING
OVERHEAD BOOM ARM
LOCATION OF NEW MED.
GAS/AIR OUTLET BOX
LOCATE TEMP.
PARTITION JUST SOUTH
OF EXISTING
OVERHEAD BOOM ARM.
GC SHALL FULLY SEAL
OFF ENTIRETY OF
BOOM ARM FROM
CONSTRUCTION AREAS
FULLY SEAL EXISTING
LIGHT/HVAC FIXTURES
IN ALL CONSTRUCTION
AREAS, TYP.
ALIGN W/EXISTING
WINDOW JAMB
INTENT OF ZIPWALL
INCLUSION IS SOLELY FOR
WORK ASSOCIATED WITH
NEW ZONE VALVE BOX.
ZIPWALL SHALL BE
REMOVED UPON
COMPLETION OF
INSTALLATION
ALIGN W/EXISTING
DOOR JAMB
CONSTRUCTION AREA
EXISTING O.R.
AREA - NO GC
ACCESS
SUB-STERILE
SCRUB
CONSTRUCTION AREA
EXISTING DOOR SHALL
BE FULLY SEALED
DURING
CONSTRUCTION AND
WILL REMAIN CLOSED
FULLY SEAL EXISTING
LIGHT FIXTURES AND
HVAC DIFFUSERS IN
SUB-STERILE ROOM.
COVER ALL SINKS
O.R.
CORRIDOR
GENERAL O.R. #3
1/4" = 1'-0"
INFECTION CONTROL PLAN
ENLARGED PHASE IV: NEW MECH. ROOM
STAFF AREA
CORRIDOR
SHOWER
ROOM
VA MEDICAL STAFF MUST
BE PERMITTED ACCESS
THROUGH CORRIDOR AT
ALL TIMES
FOR ALL NEW PIPING TO BE RUN
ABOVE EXISTING TILE CEILING, GC
SHALL UTILIZE VISQUEEN OR
SIMILAR BARRIER AROUND WORK
AREA & SPECIAL HEPA CART FOR
REMOVAL AND REPLACEMENT OF
TILES AT ALL TIMES, TYP.
CONSTRUCTION
AREA
STAFF AREA
CORRIDOR
NEW MED.
GAS ZONE
VALVE BOX
ABOVE
EXISTING
NEW MED. GAS ZONE
VALVE BOX ABOVE
EXISTING
NEW MED. GAS ZONE
VALVE BOX ABOVE
EXISTING
NEW MED. GAS PIPING
FROM ZONE VALVE BOX
TO BE RUN ABOVE
EXISTING TILE CEILING AS
A PART OF THIS PHASE
TO A PHASE II
CONNECTION POINT
ABOVE O.R. CORRIDOR
137. GC SHALL UTILIZE
VISQUEEN OR SIMILAR
BARRIER AROUND WORK
AREA & SPECIAL HEPA
CART FOR REMOVAL AND
REPLACEMENT OF TILES
AT ALL TIMES, TYP.
NEW MED. GAS PIPING FROM ZONE
VALVE BOX TO BE RUN ABOVE
EXISTING TILE CEILING AS A PART
OF THIS PHASE TO A PHASE III
CONNECTION POINT ABOVE O.R.
CORRIDOR 137. GC SHALL UTILIZE
VISQUEEN OR SIMILAR BARRIER
AROUND WORK AREA & SPECIAL
HEPA CART FOR REMOVAL AND
REPLACEMENT OF TILES AT ALL
TIMES, TYP.
NEW MED. GAS PIPING FROM ZONE
VALVE BOX TO BE RUN ABOVE
EXISTING TILE CEILING AS A PART
OF THIS PHASE TO A PHASE IV
CONNECTION POINT ABOVE O.R.
CORRIDOR 137. GC SHALL UTILIZE
VISQUEEN OR SIMILAR BARRIER
AROUND WORK AREA & SPECIAL
HEPA CART FOR REMOVAL AND
REPLACEMENT OF TILES AT ALL
TIMES, TYP.
C O
N S
T R
U C
T I O
N
A N
T E
R O
O M
NOTE: TEMPORARY
BARRIERS OCCUR IN A
CEILING TILE AREA, AND
MUST EXTEND THROUGH
CEILING TILE TO EX. GYP. BD.
@ UNDERSIDE OF ROOF
TRUSSES (APPROX. 11'-4"
HIGH). GC SHALL REPLACE
REMOVED CEILING TILES
UPON REMOVAL OF TEMP.
CONST. BARRIERS
GC SHALL
PROTECT/COVER
SCRUB SINK WHEN
REMOVING CEILING
TILES IN SCRUB
AREA
GC SHALL
PROTECT/COVER
SCRUB SINK WHEN
REMOVING CEILING
TILES IN SCRUB AREA
THE INTENT OF
PROVIDING THIS
TEMPORARY DOOR IS TO
MAINTAIN ACCESS INTO
O.R. AREA IN AN
EMERGENCY ONLY.
DOOR SHALL BE KEYED
SEPARATELY FROM
OTHER CONSTRUCTION
DOORS, WITH KEYS
ISSUED TO VA STAFF
ONLY
EX. HOOD
ABOVE
V A
C
E S
S
O
N L
Y
C
E S
S
O
N L
Y
NO GC ACCESS
C
E S
S
O
N L
Y
AS-1.0
FIRST FLOOR EXISTING
CONDITIONS & LIFE SAFETY PLAN
Revisions: Date
1st SUBMISSION 8.28.18
DAKCJK11.9.18
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS AMBULATORY
SURGERY CENTER
PROVIDE WASTE ANESTHESIA GAS
(WAG) FOR ASC
8901 SUPERIOR AVE. CLEVELAND, OHIO
541-18-603
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
WAITING
PATIENT ENTRY
VESTIBULE
MEN'S
WOMEN'S
IRM (IT)
ENTRY
MECHANICAL
ROOM
STAFF LOUNGE
GAS CYL.
STOR.
NURSE
MANAGER
EXAM/
CONSULTATION
RECEPTION/
WORKROOM
PATIENT
DRESSING
PATIENT
RESTROOM
PATIENT
RESTROOM
PATIENT
DRESSING
NURSE
STATION
MEDICATION
ROOM
PATIENT
RESTROOM
PACU AREA
EMS CLOSET
STAFF AREA
CORRIDOR
STAFF
RESTROOM
STAFF
RESTROOM
MEN'S LOCKER
ROOM
WOMEN'S
LOCKER ROOM
SOILED
UTILITY
SOILED
CART
HOLDING
PHYSICIAN
OFFICE
CLEAN
CART
HOLDING
SURGICAL AND
ANESTHESIA
EQUIPMENT
G.I. PROCESS
GENERAL O.R. #3
GENERAL O.R. #2
SCRUB
SCRUB
GENERAL O.R. #1
STERILE SUPPLIES
BREAK
OUT AREA
STAFF ENTRY
VESTIBULE
CLEAN
UTILITY
PACU
CORRIDOR
CORRIDOR
O.R.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PATIENT
CUBICLE #1
PATIENT
CUBICLE #2
PATIENT
CUBICLE #3
PATIENT
CUBICLE #4
PATIENT
CUBICLE #5
PATIENT
CUBICLE #6
PATIENT
CUBICLE #7
PATIENT
CUBICLE #8
3/16" = 1'-0"
EXISTING CONDITIONS PLAN
FIRST FLOOR
SHOWER
ROOM
EX. MED. GAS
CONTROL
PANEL
EX. MED. GAS
CONTROL
PANEL
EX. MED. GAS
CONTROL
PANEL
EX. MED.
GAS ZONE
VALVES
(2)
EX. MED. GAS
ZONE VALVES
(2)
EX. O.R.
#1 ELEC.
PANEL
EX. O.R.
#2 ELEC.
PANEL
EX. O.R. #3
ELEC. PANEL
EX. MASTER
MED. GAS
ALARM PANEL
PHASE IV: NEW
MECH. ROOM
SCOPE OF WORK
PHASE III: MEDICAL
GAS UPGRADE
SCOPE OF WORK
PATIENT
CUBICLE #9
SEMI-RESTRICTED
ACCESS (NON-STERILE)
RESTRICTED ACCESS
(STERILE)
S
E
M
I
R
E
S
T
R
I
C
T
E
D
A
C
C
E
S
S
N
O
N
S
T
E
R
I
L
E
R
E
S
T
R
I
C
T
E
D
A
C
C
E
S
S
S
T
E
R
I
L
E
UNRESTRICTED
ACCESS
(NON-STERILE)
SEMI-RESTRICTED
ACCESS (NON-STERILE)
U N
R E
S T
R I C
T E
D
A
C C
E S
S
N
O N
S
T E
R I L
E
S E
M I R
E S
T R
I C
T E
D
A C
C E
N
O N
S
T E
R I L
E
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS
SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH
AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM
BOARD TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE
WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,
AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF
ASSEMBLY AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION
SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY
CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING
NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE
STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT
UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR
TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING
ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND
LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO
REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT
CONSTRUCTION.
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL
CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED
TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF
BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE
SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY
REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK
SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE
LOCATION OF BARRIERS WITH OWNER.
12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN
THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.
DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.
16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR
DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35
26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF
DEBRIS FROM THE PROJECT AREA.
17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE
OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS
SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.
CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.
CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING
AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF
CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.
EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND
ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM
THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN
EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC
SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.
18.
CONSTRUCTION TIMEFRAME REQUIREMENT:
ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE
COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT
SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT
CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:
PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS
EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL
ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.
PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30
PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.
WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE
FACILITY IS CLOSED DURING THIS TIME.
WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE
FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.
CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,
SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT
TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC
ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID
CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE
GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE
FOLLOWED
GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL
BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION
WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS
SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW
SYSTEM IS ACTIVATED
CITY OF CLEVELAND REQUIREMENTS:
1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF
CLEVELAND, AND AS SUCH, THE CITY OF CLEVELAND'S PERMITTING AND INSPECTION
PROCESS MUST BE FOLLOWED. THE VA IS A TENANT IN THIS BUILDING AND THE FACILITY IS
NOT OWNED BY THE FEDERAL GOVERNMENT.
2. ALL CONTRACTORS - GENERAL AND SUBS - ARE REQUIRED TO BE REGISTERED WITH THE CITY
OF CLEVELAND IN ORDER TO PERFORM CONSTRUCTION OPERATIONS AND PULL PERMITS.
3. IT WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO BOTH PULL AND COVER
THE COST OF THE GENERAL BUILDING PERMIT FOR THIS PROJECT, AND ALL FEES
ASSOCIATED WITH SAME SHALL BE INCLUDED IN THE BID PRICE. ALL SUB-CONTRACTORS
WILL ALSO BE RESPONSIBLE FOR BOTH PULLING AND COVERING THE COST OF THEIR
INDIVIDUAL TRADE PERMITS.
4. THE GC SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ALL FIRE ALARM AND FIRE
SUPPRESSION SYSTEM DRAWINGS - TO THE EXTENT THAT MODIFICATIONS TO SAME ARE
REQUIRED FOR THIS PROJECT - TO THE CITY OF CLEVELAND FOR REVIEW AND APPROVAL.
5. THE GC SHALL BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS REQUIRED FOR THE
PROJECT WITH THE CITY OF CLEVELAND AND ENSURING THAT ALL INSPECTIONS ARE
COMPLETED AND PASSED. THIS INSPECTION PROCESS SHALL BE CONSIDERED IN ADDITION
TO THOSE REQUIRED INTERNALLY BY THE VA.
6. THE GC SHALL BE RESPONSIBLE FOR OBTAINING A CERTIFICATE OF OCCUPANCY THROUGH
THE CITY OF CLEVELAND AND OBTAINING ALL FINAL SIGN-OFFS FROM BUILDING OFFICIALS
7. ARCHITECT WILL SUBMIT DRAWINGS FOR BUILDING PERMIT REVIEW/APPROVAL. GC SHALL BE
RESPONSIBLE FOR PERMIT PICK-UP/PAYMENT. IT IS THE INTENT THAT THE PERMIT WILL BE
READY FOR PICK-UP AHEAD OF PRECONSTRUCTION
EXISTING WALLS TO REMAIN
INDICATES EXISTING DOORS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND
DOOR TO BE REMOVED UPON COMPLETION OF WORK
U.N.O. PATCH REPAIR EXISTING CONDITIONS AS
REQUIRED UPON REMOVAL OF ALL TEMPORARY
CONSTRUCTION. REFER TO TYPICAL TEMPORARY
PARTITION DETAIL. SCHEDULE NOTE: CONSTRUCTION
OF TEMPORARY BARRIERS SHALL BE PERFORMED
AFTER NORMAL BUSINESS HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
PHASING DURATION:
REFER TO "CONSTRUCTION TIMEFRAME REQUIREMENT" FOR
PERMITTED SCHEDULING OF ON-SITE CONSTRUCTION
ACTIVITIES. PHASING DURATION DURING THE CONSTRUCTION
PERIOD SHALL BE AS FOLLOWS:
PRECONSTRUCTION:
SUBMITTALS/PERMIT PICK-UP: 45 DAYS
--> ORDER LONG LEAD TIME EQUIPMENT
(APPROX. 8-12 WEEKS)
DURING THE 8-12 WEEK EQUIPMENT LEAD TIME, PHASES I, II, AND
III SHALL BE COMPLETED BY THE GC, SCHEDULED AS FOLLOWS:
PHASE I: O.R. #1: 8 DAYS
O.R. #1 AND SUB-STERILE 139 WILL NOT
BE USED BY VA STAFF DURING THIS TIME
VA PHASE I ACTIVATION: 10 DAYS*
PHASE II: O.R. #2: 8 DAYS
O.R. #2 WILL NOT BE USED BY VA STAFF
DURING THIS TIME.
SUB-STERILE 139 WILL BE USED BY VA STAFF.
PIPING FOR O.R. #2 SHALL BE STUBBED INTO
O.R. #2 DURING PHASE I TO AVOID GC ACCESS
VA PHASE II ACTIVATION: 10 DAYS*
PHASE III: O.R. #3: 8 DAYS
O.R. #1 AND SUB-STERILE 144 WILL NOT BE
USED BY VA STAFF DURING THIS TIME
*ACTIVATION TIMES BETWEEN PHASES ARE INCLUDED TO ALLOW
VA STAFF TO COORDINATE THEIR PROCEDURE SCHEDULE WITH
THE NEXT PHASE'S O.R. SHUTDOWN, AS IT IS UNLIKELY THAT THE
EACH PHASE WILL RUN CONCURRENTLY WITHOUT LAG TIME.
NEW MED. GAS SYSTEMS ARE NOT "ACTIVATED" DURING THIS
TIME
--> EQUIPMENT ARRIVES ON SITE TO BE INSTALLED IN PHASE IV:
PHASE IV: NEW MECH. ROOM: 31 DAYS
NOTE: PHASE IV TIMEFRAME SHALL ALSO
INCLUDE ACTIVATION AND CERTIFICATION OF
NEW MED. GAS SYSTEMS AND EQUIPMENT
TOTAL PROJECT TIMEFRAME: 120 DAYS
SYMBOL LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED
AROUND CONSTRUCTION AREA PER VA SAFETY
STANDARDS
UNRESTRICTED ACCESS AREAS - NON-STERILE
SEMI-RESTRICTED ACCESS AREAS - NON-STERILE
RESTRICTED ACCESS AREAS - STERILE. ALL
CONTRACTORS ARE REQUIRED TO WEAR GOWNS,
SHOE COVERS, HEAD COVERS, AND FACE MASKS AT
ALL TIMES WHEN IN THESE AREAS
INFECTION CONTROL CLASS:
ALL CONSTRUCTION TO BE PERFORMED UNDER THIS CONTRACT
SHALL BE CLASSIFIED AS CLASS IV. GC SHALL REFER TO AND
FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"
01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT
EX. MED.
GAS ZONE
VALVES (2)
SUB-STERILE
PHASE II: MEDICAL
GAS UPGRADE
SCOPE OF WORK
PHASE I: MEDICAL
GAS UPGRADE
SCOPE OF WORK
100% CD'S SUBMISSION 11.9.18
SUB-STERILE
REFER TO
IMPROVEMENT PLAN
FOR SMOKE
PARTITION
ASSOCIATED WITH
NEW MECH. ROOM
E
E
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
LIFE SAFETY NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION
2. PROJECT SCOPE LINES ARE INDICATED FOR GENERAL
INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK
REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE
AREA AS INDICATED ON ANY DRAWINGS.
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE
TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT
PATHS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT
AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE
SAFETY MEASURES. COORDINATE W/VA.
EXISTING EXIT SIGNAGE
F.E.C.
EXISTING FIRE EXTINGUISHER CABINET
EXIT
A
F F
AS-1.1
FIRST FLOOR DEMOLITION PLANS
Revisions: Date
1st SUBMISSION 8.28.18
DAKCJK11.9.18
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS AMBULATORY
SURGERY CENTER
PROVIDE WASTE ANESTHESIA GAS
(WAG) FOR ASC
8901 SUPERIOR AVE. CLEVELAND, OHIO
541-18-603
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
GENERAL O.R. #2
SUB-STERILE
SCRUB
GENERAL O.R. #1
O.R.
CORRIDOR
1/4" = 1'-0"
DEMOLITION PLAN
ENLARGED PHASE I: O.R. #1
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS
SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH
AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM
BOARD TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE
WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,
AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF
ASSEMBLY AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION
SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY
CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING
NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE
STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT
UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR
TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING
ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND
LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO
REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT
CONSTRUCTION.
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL
CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED
TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF
BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE
SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY
REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK
SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE
LOCATION OF BARRIERS WITH OWNER.
12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN
THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.
DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.
16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR
DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35
26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF
DEBRIS FROM THE PROJECT AREA.
17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE
OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS
SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.
CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.
CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING
AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF
CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.
EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND
ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM
THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN
EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC
SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.
18.
CONSTRUCTION TIMEFRAME REQUIREMENT:
ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE
COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT
SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT
CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:
PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS
EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL
ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.
PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30
PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.
WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE
FACILITY IS CLOSED DURING THIS TIME.
WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE
FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.
CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,
SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT
TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC
ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID
CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE
GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE
FOLLOWED
GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL
BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION
WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS
SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW
SYSTEM IS ACTIVATED
CITY OF CLEVELAND REQUIREMENTS:
1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF
CLEVELAND, AND AS SUCH, THE CITY OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.