36C25019B0012-004.pdf

PDF 7 MB Posted

Attached to
Provide Waste Anesthesia Gas for ASC 541-18-603
Solicitation number
36C25019B0012
Issued by

About this file

36C25019B0012 Attachment - Drawings.pdf

View the file

Other files

File Type Posted
36C25019B0012-0002007.pdf PDF
36C25019B0012-0002005.pdf PDF
36C25019B0012-0002006.pdf PDF
36C25019B0012-0002003.docx DOCX document
36C25019B0012-0002004.pdf PDF
36C25019B0012-0001005.docx DOCX document
36C25019B0012-001.docx DOCX document
36C25019B0012-006.docx DOCX document
36C25019B0012-002.pdf PDF
36C25019B0012-003.pdf PDF
36C25019B0012-005.pdf PDF
36C25019B0012-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GI-1

TITLE SHEET & DRAWING

INDEX

8901 SUPERIOR AVE. CLEVELAND, OH. 44106

DEPARTMENT OF VETERANS AFFAIRS OUTPATIENT SURGERY CENTER

Cleveland Veterans Affairs

Medical Center

PROVIDE WASTE ANESTHESIA GAS (WAG) FOR ASC PROJECT

DRAWING INDEX

PROJECT NO. 541-18-603

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

AS-0.0 FIRST FLOOR OVERALL PHASING PLAN

AS-0.1 ENLARGED CONSTRUCTION PHASING/INFECTION CONTROL PLANS

AS-1.0 FIRST FLOOR EXISTING CONDITIONS & LIFE SAFETY PLAN

AS-1.1 FIRST FLOOR DEMOLITION PLANS

AS-1.2 FIRST FLOOR IMPROVEMENT PLANS

AS-1.3 FIRST FLOOR REFLECTED CEILING PLANS

AS-2.0 DOOR SCHEDULE & DETAILS

100% CD'S SUBMISSION

11.9.18

BUILDING MASTER KEY PLAN

GROUND FLOORNORTH

PROJECT

WORK AREA

1262 SF

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS OUTPATIENT

SURGERY CENTER

8901 SUPERIOR AVE.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BLDG

NATURE OF PROJECT: INSTALLATION OF NEW WASTE ANESTHESIA GAS IN

THREE (3) OPERATING ROOMS & CONSTRUCTION OF

ASSOCIATED MEDICAL EQUIPMENT ROOM IN EXISTING

ONE-STORY OUTPATIENT SURGERY CENTER

A. DESIGN CODES: 2015 NPFA LIFE SAFETY CODE 101

2017 OHIO BUILDING CODE

2017 OHIO MECHANICAL/PLUMBING CODES

NFPA 70 / 2017 NATIONAL ELECTRICAL CODE

2009 ICC ANSI A117.1 GUIDELINES

C. USE GROUP: B - AMBULATORY CARE FACILITY - EXISTING, NO

CHANGE PROPOSED

D. CONSTRUCTION TYPE: TYPE VB - COMBUSTIBLE, UNPROTECTED - EXISTING,

NO CHANGE PROPOSED

E. PROJECT AREA: 1,262 SF

F. PROJECT AREA OCCUPANT LOAD: 13 OCCUPANTS

G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS

REQUIRED PER NEW IMPROVEMENTS TO BE PREPARED BY

A LICENSED FIRE PROTECTION SYSTEM DESIGNER AND

SUBMITTED UNDER SEPARATE COVER FOR PERMIT

CODE INFORMATION

Revisions: Date

1ST SUBMISSION 8.28.18

DAKCJK11.9.18

PLUMBING

P-0.1 PLUMBING LEGENDS, SCHEDULES, & DETAILS

P-1.1 DEMOLITION AND NEW WORK - FIRST FLOOR PLAN - PLUMBING

ELECTRICAL

E-0.1 ELECTRICAL SYMBOL LEGEND, GENERAL NOTES, & DETAILS

E-1.0 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL

E-2.0 LIGHTING - FIRST FLOOR PLAN - ELECTRICAL

E-2.1 POWER/SYSTEMS - FIRST FLOOR PLAN - ELECTRICAL

E-3.0 ELECTRICAL PANELBOARD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

1468 WEST 9TH STREET #400 CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

Stanley J. Kaczmar, License #4988

Expiration Date: 12/31/2019

N

O

T

F

R

C

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS AMBULATORY

SURGERY CENTER

PROVIDE WASTE ANESTHESIA GAS

(WAG) FOR ASC

8901 SUPERIOR AVE. CLEVELAND, OHIO

541-18-603

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

1/16" = 1'-0"

100% CD'S SUBMISSION 11.9.18

AS-0.0

FIRST FLOOR OVERALL

CONSTRUCTION PHASING PLAN

Revisions: Date

1st SUBMISSION 8.28.18

DAKCJK11.9.18

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS AMBULATORY

SURGERY CENTER

PROVIDE WASTE ANESTHESIA GAS

(WAG) FOR ASC

8901 SUPERIOR AVE. CLEVELAND, OHIO

541-18-603

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

WAITING

PATIENT ENTRY

VESTIBULE

MEN'S

WOMEN'S

IRM (IT)

ENTRY

MECHANICAL

ROOM

STAFF LOUNGE

GAS CYL.

STOR.

NURSE

MANAGER

EXAM/

CONSULTATION

RECEPTION/

WORKROOM

PATIENT

DRESSING

PATIENT

RESTROOM

PATIENT

RESTROOM

PATIENT

DRESSING

NURSE

STATION

MEDICATION

ROOM

PATIENT

RESTROOM

PACU AREA

EMS CLOSET

STAFF AREA

CORRIDOR

STAFF

RESTROOM

STAFF

RESTROOM

MEN'S LOCKER

ROOM

WOMEN'S

LOCKER ROOM

SOILED

UTILITY

SOILED

CART

HOLDING

PHYSICIAN

OFFICE

CLEAN

CART

HOLDING

SURGICAL AND

ANESTHESIA

EQUIPMENT

G.I. PROCESS

GENERAL O.R. #3

GENERAL O.R. #2

SUB-STERILE

SCRUB

SUB-STERILE

SCRUB

GENERAL O.R. #1

STERILE SUPPLIES

BREAK

OUT AREA

STAFF ENTRY

VESTIBULE

CLEAN

UTILITY

PACU

CORRIDOR

CORRIDOR

O.R.

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

PATIENT

CUBICLE #1

PATIENT

CUBICLE #2

PATIENT

CUBICLE #3

PATIENT

CUBICLE #4

PATIENT

CUBICLE #5

PATIENT

CUBICLE #6

PATIENT

CUBICLE #7

PATIENT

CUBICLE #8

3/16" = 1'-0"

OVERALL PHASING PLAN

FIRST FLOOR

SHOWER

ROOM

P H

A S

E

I I

S

C O

P E

W

O R

K

PATIENT

CUBICLE #9

SEMI-RESTRICTED

ACCESS (NON-STERILE)

RESTRICTED ACCESS

(STERILE)

S

E

M

I

R

E

S

T

R

I

C

T

E

D

A

C

C

E

S

S

N

O

N

S

T

E

R

I

L

E

R

E

S

T

R

I

C

T

E

D

A

C

C

E

S

S

S

T

E

R

I

L

E

UNRESTRICTED

ACCESS

(NON-STERILE)

SEMI-RESTRICTED

ACCESS (NON-STERILE)

U N

R E

S T

R I C

T E

D

A

C C

E S

S

N

O N

S

T E

R I L

E

S E

M I R

E S

T R

I C

T E

D

A C

C E

S

N

O N

S

T E

R I L

E

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS

SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH

AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM

BOARD TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE

WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,

AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF

ASSEMBLY AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION

SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY

CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING

NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE

STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT

UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR

TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING

ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND

LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO

REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT

CONSTRUCTION.

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL

CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED

TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE

SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK

SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE

LOCATION OF BARRIERS WITH OWNER.

12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN

THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.

DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.

16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR

DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35

26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF

DEBRIS FROM THE PROJECT AREA.

17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE

OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS

SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.

CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.

CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING

AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF

CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.

EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND

ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM

THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN

EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC

SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.

18.

CONSTRUCTION TIMEFRAME REQUIREMENT:

ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE

COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT

SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT

CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:

PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS

EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL

ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.

PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30

PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.

WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE

FACILITY IS CLOSED DURING THIS TIME.

WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE

FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.

CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,

SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT

TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC

ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID

CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE

GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE

FOLLOWED

GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL

BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION

WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS

SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW

SYSTEM IS ACTIVATED

CITY OF CLEVELAND REQUIREMENTS:

1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF

CLEVELAND, AND AS SUCH, THE CITY OF CLEVELAND'S PERMITTING AND INSPECTION

PROCESS MUST BE FOLLOWED. THE VA IS A TENANT IN THIS BUILDING AND THE FACILITY IS

NOT OWNED BY THE FEDERAL GOVERNMENT.

2. ALL CONTRACTORS - GENERAL AND SUBS - ARE REQUIRED TO BE REGISTERED WITH THE CITY

OF CLEVELAND IN ORDER TO PERFORM CONSTRUCTION OPERATIONS AND PULL PERMITS.

3. IT WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO BOTH PULL AND COVER

THE COST OF THE GENERAL BUILDING PERMIT FOR THIS PROJECT, AND ALL FEES

ASSOCIATED WITH SAME SHALL BE INCLUDED IN THE BID PRICE. ALL SUB-CONTRACTORS

WILL ALSO BE RESPONSIBLE FOR BOTH PULLING AND COVERING THE COST OF THEIR

INDIVIDUAL TRADE PERMITS.

4. THE GC SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ALL FIRE ALARM AND FIRE

SUPPRESSION SYSTEM DRAWINGS - TO THE EXTENT THAT MODIFICATIONS TO SAME ARE

REQUIRED FOR THIS PROJECT - TO THE CITY OF CLEVELAND FOR REVIEW AND APPROVAL.

5. THE GC SHALL BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS REQUIRED FOR THE

PROJECT WITH THE CITY OF CLEVELAND AND ENSURING THAT ALL INSPECTIONS ARE

COMPLETED AND PASSED. THIS INSPECTION PROCESS SHALL BE CONSIDERED IN ADDITION

TO THOSE REQUIRED INTERNALLY BY THE VA.

6. THE GC SHALL BE RESPONSIBLE FOR OBTAINING A CERTIFICATE OF OCCUPANCY THROUGH

THE CITY OF CLEVELAND AND OBTAINING ALL FINAL SIGN-OFFS FROM BUILDING OFFICIALS

7. ARCHITECT WILL SUBMIT DRAWINGS FOR BUILDING PERMIT REVIEW/APPROVAL. GC SHALL BE

RESPONSIBLE FOR PERMIT PICK-UP/PAYMENT. IT IS THE INTENT THAT THE PERMIT WILL BE

READY FOR PICK-UP AHEAD OF PRECONSTRUCTION

EXISTING WALLS TO REMAIN

INDICATES EXISTING DOORS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND

DOOR TO BE REMOVED UPON COMPLETION OF WORK

U.N.O. PATCH REPAIR EXISTING CONDITIONS AS

REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO TYPICAL TEMPORARY

PARTITION DETAIL. SCHEDULE NOTE: CONSTRUCTION

OF TEMPORARY BARRIERS SHALL BE PERFORMED

AFTER NORMAL BUSINESS HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

PHASING DURATION:

REFER TO "CONSTRUCTION TIMEFRAME REQUIREMENT" FOR

PERMITTED SCHEDULING OF ON-SITE CONSTRUCTION

ACTIVITIES. PHASING DURATION DURING THE CONSTRUCTION

PERIOD SHALL BE AS FOLLOWS:

PRECONSTRUCTION:

SUBMITTALS/PERMIT PICK-UP: 45 DAYS

--> ORDER LONG LEAD TIME EQUIPMENT

(APPROX. 8-12 WEEKS)

DURING THE 8-12 WEEK EQUIPMENT LEAD TIME, PHASES I, II, AND

III SHALL BE COMPLETED BY THE GC, SCHEDULED AS FOLLOWS:

PHASE I: O.R. #1: 8 DAYS

O.R. #1 AND SUB-STERILE 139 WILL NOT

BE USED BY VA STAFF DURING THIS TIME

VA PHASE I ACTIVATION: 10 DAYS*

PHASE II: O.R. #2: 8 DAYS

O.R. #2 WILL NOT BE USED BY VA STAFF

DURING THIS TIME.

SUB-STERILE 139 WILL BE USED BY VA STAFF.

PIPING FOR O.R. #2 SHALL BE STUBBED INTO

O.R. #2 DURING PHASE I TO AVOID GC ACCESS

VA PHASE II ACTIVATION: 10 DAYS*

PHASE III: O.R. #3: 8 DAYS

O.R. #1 AND SUB-STERILE 144 WILL NOT BE

USED BY VA STAFF DURING THIS TIME

*ACTIVATION TIMES BETWEEN PHASES ARE INCLUDED TO ALLOW

VA STAFF TO COORDINATE THEIR PROCEDURE SCHEDULE WITH

THE NEXT PHASE'S O.R. SHUTDOWN, AS IT IS UNLIKELY THAT THE

EACH PHASE WILL RUN CONCURRENTLY WITHOUT LAG TIME.

NEW MED. GAS SYSTEMS ARE NOT "ACTIVATED" DURING THIS

TIME

--> EQUIPMENT ARRIVES ON SITE TO BE INSTALLED IN PHASE IV:

PHASE IV: NEW MECH. ROOM: 31 DAYS

NOTE: PHASE IV TIMEFRAME SHALL ALSO

INCLUDE ACTIVATION AND CERTIFICATION OF

NEW MED. GAS SYSTEMS AND EQUIPMENT

TOTAL PROJECT TIMEFRAME: 120 DAYS

SYMBOL LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED

AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS

UNRESTRICTED ACCESS AREAS - NON-STERILE

SEMI-RESTRICTED ACCESS AREAS - NON-STERILE

RESTRICTED ACCESS AREAS - STERILE. ALL

CONTRACTORS ARE REQUIRED TO WEAR GOWNS,

SHOE COVERS, HEAD COVERS, AND FACE MASKS AT

ALL TIMES WHEN IN THESE AREAS

INFECTION CONTROL CLASS:

ALL CONSTRUCTION TO BE PERFORMED UNDER THIS CONTRACT

SHALL BE CLASSIFIED AS CLASS IV. GC SHALL REFER TO AND

FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"

01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT

100% CD'S SUBMISSION 11.9.18

P H

A S

E

I

S

C O

W

O R

K P

H A

I I I

S

C O

W

O R

K

PHASE IV SCOPE OF WORK

6'-0"

4'-4" +/-3'-8"

6'-0"

4'-4" +/-

3'-11"

4'-0"

6'-0"

4'-4" +/-

5'-0"

8'-3"

AS-0.1

ENLARGED CONSTRUCTION

PHASING/INFECTION CONTROL PLANS

Revisions: Date

1st SUBMISSION 8.28.18

DAKCJK11.9.18

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS AMBULATORY

SURGERY CENTER

PROVIDE WASTE ANESTHESIA GAS

(WAG) FOR ASC

8901 SUPERIOR AVE. CLEVELAND, OHIO

541-18-603

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

GENERAL O.R. #2

SUB-STERILE

SCRUB

GENERAL O.R. #1

O.R.

CORRIDOR

1/4" = 1'-0"

INFECTION CONTROL PLAN

ENLARGED PHASE I: O.R. #1

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS

SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH

AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM

BOARD TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE

WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,

AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF

ASSEMBLY AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION

SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY

CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING

NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE

STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT

UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR

TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING

ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND

LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO

REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT

CONSTRUCTION.

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL

CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED

TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE

SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK

SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE

LOCATION OF BARRIERS WITH OWNER.

12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN

THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.

DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.

16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR

DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35

26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF

DEBRIS FROM THE PROJECT AREA.

17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE

OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS

SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.

CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.

CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING

AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF

CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.

EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND

ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM

THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN

EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC

SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.

18.

CONSTRUCTION TIMEFRAME REQUIREMENT:

ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE

COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT

SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT

CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:

PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS

EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL

ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.

PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30

PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.

WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE

FACILITY IS CLOSED DURING THIS TIME.

WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE

FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.

CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,

SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT

TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC

ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID

CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE

GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE

FOLLOWED

GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL

BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION

WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS

SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW

SYSTEM IS ACTIVATED

CITY OF CLEVELAND REQUIREMENTS:

1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF

CLEVELAND, AND AS SUCH, THE CITY OF CLEVELAND'S PERMITTING AND INSPECTION

PROCESS MUST BE FOLLOWED. THE VA IS A TENANT IN THIS BUILDING AND THE FACILITY IS

NOT OWNED BY THE FEDERAL GOVERNMENT.

2. ALL CONTRACTORS - GENERAL AND SUBS - ARE REQUIRED TO BE REGISTERED WITH THE CITY

OF CLEVELAND IN ORDER TO PERFORM CONSTRUCTION OPERATIONS AND PULL PERMITS.

3. IT WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO BOTH PULL AND COVER

THE COST OF THE GENERAL BUILDING PERMIT FOR THIS PROJECT, AND ALL FEES

ASSOCIATED WITH SAME SHALL BE INCLUDED IN THE BID PRICE. ALL SUB-CONTRACTORS

WILL ALSO BE RESPONSIBLE FOR BOTH PULLING AND COVERING THE COST OF THEIR

INDIVIDUAL TRADE PERMITS.

4. THE GC SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ALL FIRE ALARM AND FIRE

SUPPRESSION SYSTEM DRAWINGS - TO THE EXTENT THAT MODIFICATIONS TO SAME ARE

REQUIRED FOR THIS PROJECT - TO THE CITY OF CLEVELAND FOR REVIEW AND APPROVAL.

5. THE GC SHALL BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS REQUIRED FOR THE

PROJECT WITH THE CITY OF CLEVELAND AND ENSURING THAT ALL INSPECTIONS ARE

COMPLETED AND PASSED. THIS INSPECTION PROCESS SHALL BE CONSIDERED IN ADDITION

TO THOSE REQUIRED INTERNALLY BY THE VA.

6. THE GC SHALL BE RESPONSIBLE FOR OBTAINING A CERTIFICATE OF OCCUPANCY THROUGH

THE CITY OF CLEVELAND AND OBTAINING ALL FINAL SIGN-OFFS FROM BUILDING OFFICIALS

7. ARCHITECT WILL SUBMIT DRAWINGS FOR BUILDING PERMIT REVIEW/APPROVAL. GC SHALL BE

RESPONSIBLE FOR PERMIT PICK-UP/PAYMENT. IT IS THE INTENT THAT THE PERMIT WILL BE

READY FOR PICK-UP AHEAD OF PRECONSTRUCTION

EXISTING WALLS TO REMAIN

INDICATES EXISTING DOORS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND

DOOR TO BE REMOVED UPON COMPLETION OF WORK

U.N.O. PATCH REPAIR EXISTING CONDITIONS AS

REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO TYPICAL TEMPORARY

PARTITION DETAIL. SCHEDULE NOTE: CONSTRUCTION

OF TEMPORARY BARRIERS SHALL BE PERFORMED

AFTER NORMAL BUSINESS HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

PHASING DURATION:

REFER TO "CONSTRUCTION TIMEFRAME REQUIREMENT" FOR

PERMITTED SCHEDULING OF ON-SITE CONSTRUCTION

ACTIVITIES. PHASING DURATION DURING THE CONSTRUCTION

PERIOD SHALL BE AS FOLLOWS:

PRECONSTRUCTION:

SUBMITTALS/PERMIT PICK-UP: 45 DAYS

--> ORDER LONG LEAD TIME EQUIPMENT

(APPROX. 8-12 WEEKS)

DURING THE 8-12 WEEK EQUIPMENT LEAD TIME, PHASES I, II, AND

III SHALL BE COMPLETED BY THE GC, SCHEDULED AS FOLLOWS:

PHASE I: O.R. #1: 8 DAYS

O.R. #1 AND SUB-STERILE 139 WILL NOT

BE USED BY VA STAFF DURING THIS TIME

VA PHASE I ACTIVATION: 10 DAYS*

PHASE II: O.R. #2: 8 DAYS

O.R. #2 WILL NOT BE USED BY VA STAFF

DURING THIS TIME.

SUB-STERILE 139 WILL BE USED BY VA STAFF.

PIPING FOR O.R. #2 SHALL BE STUBBED INTO

O.R. #2 DURING PHASE I TO AVOID GC ACCESS

VA PHASE II ACTIVATION: 10 DAYS*

PHASE III: O.R. #3: 8 DAYS

O.R. #1 AND SUB-STERILE 144 WILL NOT BE

USED BY VA STAFF DURING THIS TIME

*ACTIVATION TIMES BETWEEN PHASES ARE INCLUDED TO ALLOW

VA STAFF TO COORDINATE THEIR PROCEDURE SCHEDULE WITH

THE NEXT PHASE'S O.R. SHUTDOWN, AS IT IS UNLIKELY THAT THE

EACH PHASE WILL RUN CONCURRENTLY WITHOUT LAG TIME.

NEW MED. GAS SYSTEMS ARE NOT "ACTIVATED" DURING THIS

TIME

--> EQUIPMENT ARRIVES ON SITE TO BE INSTALLED IN PHASE IV:

PHASE IV: NEW MECH. ROOM: 31 DAYS

NOTE: PHASE IV TIMEFRAME SHALL ALSO

INCLUDE ACTIVATION AND CERTIFICATION OF

NEW MED. GAS SYSTEMS AND EQUIPMENT

TOTAL PROJECT TIMEFRAME: 120 DAYS

SYMBOL LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED

AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS

UNRESTRICTED ACCESS AREAS - NON-STERILE

SEMI-RESTRICTED ACCESS AREAS - NON-STERILE

RESTRICTED ACCESS AREAS - STERILE. ALL

CONTRACTORS ARE REQUIRED TO WEAR GOWNS,

SHOE COVERS, HEAD COVERS, AND FACE MASKS AT

ALL TIMES WHEN IN THESE AREAS

INFECTION CONTROL CLASS:

ALL CONSTRUCTION TO BE PERFORMED UNDER THIS CONTRACT

SHALL BE CLASSIFIED AS CLASS IV. GC SHALL REFER TO AND

FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"

01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT

100% CD'S SUBMISSION 11.9.18

LOCATION OF

NEW MED.

GAS/AIR OUTLET

BOX

LOCATE TEMP.

PARTITION JUST SOUTH

OF EXISTING

OVERHEAD BOOM ARM.

GC SHALL FULLY SEAL

OFF ENTIRETY OF

BOOM ARM FROM

CONSTRUCTION AREAS

ALIGN W/EXISTING

WINDOW JAMB

FULLY SEAL EXISTING

LIGHT/HVAC FIXTURES

IN ALL CONSTRUCTION

AREAS, TYP.

CONSTRUCTION AREA

CONSTRUCTION AREA

EXISTING O.R.

AREA - NO GC

ACCESS

LOCATE TEMP.

PARTITION JUST EAST

OF EXISTING

OVERHEAD BOOM ARM

C O

N S

T R

U C

T I O

N

A N

T E

R O

O M

ALIGN W/EXISTING

DOOR JAMB

LOCATE ZIP WALL

NORTH OF SUPPLY

DIFFUSER

INTENT OF ZIPWALL

INCLUSION IS SOLELY

FOR WORK

ASSOCIATED WITH NEW

ZONE VALVE BOX.

ZIPWALL SHALL BE

REMOVED UPON

COMPLETION OF

INSTALLATION

ALIGN W/EXISTING

DOOR JAMB

FULLY SEAL EXISTING

LIGHT FIXTURES, HVAC

DIFFUSERS, AND HOOD

IN SUB-STERILE ROOM.

COVER ALL SINKS

EXISTING DOOR SHALL

BE FULLY SEALED

DURING

CONSTRUCTION AND

WILL REMAIN CLOSED

1/4" = 1'-0"

INFECTION CONTROL PLAN

ENLARGED PHASE II: O.R. #2

SUB-STERILE

EXISTING DOOR SHALL

BE FULLY SEALED

DURING

CONSTRUCTION AND

WILL REMAIN CLOSED

C O

N S

T R

U C

T I O

N

A N

T E

R O

O M

CONSTRUCTION AREA

LOCATE TEMP. PARTITION

JUST WEST OF EXISTING

OVERHEAD BOOM ARM

LOCATION OF NEW MED.

GAS/AIR OUTLET BOX

GENERAL O.R. #2

EXISTING O.R.

AREA - NO GC

ACCESS

LOCATE TEMP.

PARTITION JUST SOUTH

OF EXISTING

OVERHEAD BOOM ARM.

GC SHALL FULLY SEAL

OFF ENTIRETY OF

BOOM ARM FROM

CONSTRUCTION AREAS

FULLY SEAL EXISTING

LIGHT/HVAC FIXTURES

IN ALL CONSTRUCTION

AREAS, TYP.

O.R.

CORRIDOR

SCRUB

SUB-STERILE

SCRUB

ALIGN W/EXISTING

WINDOW JAMB

INTENT OF ZIPWALL

INCLUSION IS SOLELY

FOR WORK

ASSOCIATED WITH NEW

ZONE VALVE BOX.

ZIPWALL SHALL BE

REMOVED UPON

COMPLETION OF

INSTALLATION

LOCATE ZIP WALL

NORTH OF SUPPLY

DIFFUSER

ALIGN W/EXISTING

DOOR JAMB

1/4" = 1'-0"

INFECTION CONTROL PLAN

ENLARGED PHASE III: O.R. #3

LOCATE TEMP. PARTITION

JUST WEST OF EXISTING

OVERHEAD BOOM ARM

LOCATION OF NEW MED.

GAS/AIR OUTLET BOX

LOCATE TEMP.

PARTITION JUST SOUTH

OF EXISTING

OVERHEAD BOOM ARM.

GC SHALL FULLY SEAL

OFF ENTIRETY OF

BOOM ARM FROM

CONSTRUCTION AREAS

FULLY SEAL EXISTING

LIGHT/HVAC FIXTURES

IN ALL CONSTRUCTION

AREAS, TYP.

ALIGN W/EXISTING

WINDOW JAMB

INTENT OF ZIPWALL

INCLUSION IS SOLELY FOR

WORK ASSOCIATED WITH

NEW ZONE VALVE BOX.

ZIPWALL SHALL BE

REMOVED UPON

COMPLETION OF

INSTALLATION

ALIGN W/EXISTING

DOOR JAMB

CONSTRUCTION AREA

EXISTING O.R.

AREA - NO GC

ACCESS

SUB-STERILE

SCRUB

CONSTRUCTION AREA

EXISTING DOOR SHALL

BE FULLY SEALED

DURING

CONSTRUCTION AND

WILL REMAIN CLOSED

FULLY SEAL EXISTING

LIGHT FIXTURES AND

HVAC DIFFUSERS IN

SUB-STERILE ROOM.

COVER ALL SINKS

O.R.

CORRIDOR

GENERAL O.R. #3

1/4" = 1'-0"

INFECTION CONTROL PLAN

ENLARGED PHASE IV: NEW MECH. ROOM

STAFF AREA

CORRIDOR

SHOWER

ROOM

VA MEDICAL STAFF MUST

BE PERMITTED ACCESS

THROUGH CORRIDOR AT

ALL TIMES

FOR ALL NEW PIPING TO BE RUN

ABOVE EXISTING TILE CEILING, GC

SHALL UTILIZE VISQUEEN OR

SIMILAR BARRIER AROUND WORK

AREA & SPECIAL HEPA CART FOR

REMOVAL AND REPLACEMENT OF

TILES AT ALL TIMES, TYP.

CONSTRUCTION

AREA

STAFF AREA

CORRIDOR

NEW MED.

GAS ZONE

VALVE BOX

ABOVE

EXISTING

NEW MED. GAS ZONE

VALVE BOX ABOVE

EXISTING

NEW MED. GAS ZONE

VALVE BOX ABOVE

EXISTING

NEW MED. GAS PIPING

FROM ZONE VALVE BOX

TO BE RUN ABOVE

EXISTING TILE CEILING AS

A PART OF THIS PHASE

TO A PHASE II

CONNECTION POINT

ABOVE O.R. CORRIDOR

137. GC SHALL UTILIZE

VISQUEEN OR SIMILAR

BARRIER AROUND WORK

AREA & SPECIAL HEPA

CART FOR REMOVAL AND

REPLACEMENT OF TILES

AT ALL TIMES, TYP.

NEW MED. GAS PIPING FROM ZONE

VALVE BOX TO BE RUN ABOVE

EXISTING TILE CEILING AS A PART

OF THIS PHASE TO A PHASE III

CONNECTION POINT ABOVE O.R.

CORRIDOR 137. GC SHALL UTILIZE

VISQUEEN OR SIMILAR BARRIER

AROUND WORK AREA & SPECIAL

HEPA CART FOR REMOVAL AND

REPLACEMENT OF TILES AT ALL

TIMES, TYP.

NEW MED. GAS PIPING FROM ZONE

VALVE BOX TO BE RUN ABOVE

EXISTING TILE CEILING AS A PART

OF THIS PHASE TO A PHASE IV

CONNECTION POINT ABOVE O.R.

CORRIDOR 137. GC SHALL UTILIZE

VISQUEEN OR SIMILAR BARRIER

AROUND WORK AREA & SPECIAL

HEPA CART FOR REMOVAL AND

REPLACEMENT OF TILES AT ALL

TIMES, TYP.

C O

N S

T R

U C

T I O

N

A N

T E

R O

O M

NOTE: TEMPORARY

BARRIERS OCCUR IN A

CEILING TILE AREA, AND

MUST EXTEND THROUGH

CEILING TILE TO EX. GYP. BD.

@ UNDERSIDE OF ROOF

TRUSSES (APPROX. 11'-4"

HIGH). GC SHALL REPLACE

REMOVED CEILING TILES

UPON REMOVAL OF TEMP.

CONST. BARRIERS

GC SHALL

PROTECT/COVER

SCRUB SINK WHEN

REMOVING CEILING

TILES IN SCRUB

AREA

GC SHALL

PROTECT/COVER

SCRUB SINK WHEN

REMOVING CEILING

TILES IN SCRUB AREA

THE INTENT OF

PROVIDING THIS

TEMPORARY DOOR IS TO

MAINTAIN ACCESS INTO

O.R. AREA IN AN

EMERGENCY ONLY.

DOOR SHALL BE KEYED

SEPARATELY FROM

OTHER CONSTRUCTION

DOORS, WITH KEYS

ISSUED TO VA STAFF

ONLY

EX. HOOD

ABOVE

V A

C

E S

S

O

N L

Y

C

E S

S

O

N L

Y

NO GC ACCESS

C

E S

S

O

N L

Y

AS-1.0

FIRST FLOOR EXISTING

CONDITIONS & LIFE SAFETY PLAN

Revisions: Date

1st SUBMISSION 8.28.18

DAKCJK11.9.18

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS AMBULATORY

SURGERY CENTER

PROVIDE WASTE ANESTHESIA GAS

(WAG) FOR ASC

8901 SUPERIOR AVE. CLEVELAND, OHIO

541-18-603

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

WAITING

PATIENT ENTRY

VESTIBULE

MEN'S

WOMEN'S

IRM (IT)

ENTRY

MECHANICAL

ROOM

STAFF LOUNGE

GAS CYL.

STOR.

NURSE

MANAGER

EXAM/

CONSULTATION

RECEPTION/

WORKROOM

PATIENT

DRESSING

PATIENT

RESTROOM

PATIENT

RESTROOM

PATIENT

DRESSING

NURSE

STATION

MEDICATION

ROOM

PATIENT

RESTROOM

PACU AREA

EMS CLOSET

STAFF AREA

CORRIDOR

STAFF

RESTROOM

STAFF

RESTROOM

MEN'S LOCKER

ROOM

WOMEN'S

LOCKER ROOM

SOILED

UTILITY

SOILED

CART

HOLDING

PHYSICIAN

OFFICE

CLEAN

CART

HOLDING

SURGICAL AND

ANESTHESIA

EQUIPMENT

G.I. PROCESS

GENERAL O.R. #3

GENERAL O.R. #2

SCRUB

SCRUB

GENERAL O.R. #1

STERILE SUPPLIES

BREAK

OUT AREA

STAFF ENTRY

VESTIBULE

CLEAN

UTILITY

PACU

CORRIDOR

CORRIDOR

O.R.

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

PATIENT

CUBICLE #1

PATIENT

CUBICLE #2

PATIENT

CUBICLE #3

PATIENT

CUBICLE #4

PATIENT

CUBICLE #5

PATIENT

CUBICLE #6

PATIENT

CUBICLE #7

PATIENT

CUBICLE #8

3/16" = 1'-0"

EXISTING CONDITIONS PLAN

FIRST FLOOR

SHOWER

ROOM

EX. MED. GAS

CONTROL

PANEL

EX. MED. GAS

CONTROL

PANEL

EX. MED. GAS

CONTROL

PANEL

EX. MED.

GAS ZONE

VALVES

(2)

EX. MED. GAS

ZONE VALVES

(2)

EX. O.R.

#1 ELEC.

PANEL

EX. O.R.

#2 ELEC.

PANEL

EX. O.R. #3

ELEC. PANEL

EX. MASTER

MED. GAS

ALARM PANEL

PHASE IV: NEW

MECH. ROOM

SCOPE OF WORK

PHASE III: MEDICAL

GAS UPGRADE

SCOPE OF WORK

PATIENT

CUBICLE #9

SEMI-RESTRICTED

ACCESS (NON-STERILE)

RESTRICTED ACCESS

(STERILE)

S

E

M

I

R

E

S

T

R

I

C

T

E

D

A

C

C

E

S

S

N

O

N

S

T

E

R

I

L

E

R

E

S

T

R

I

C

T

E

D

A

C

C

E

S

S

S

T

E

R

I

L

E

UNRESTRICTED

ACCESS

(NON-STERILE)

SEMI-RESTRICTED

ACCESS (NON-STERILE)

U N

R E

S T

R I C

T E

D

A

C C

E S

S

N

O N

S

T E

R I L

E

S E

M I R

E S

T R

I C

T E

D

A C

C E

N

O N

S

T E

R I L

E

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS

SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH

AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM

BOARD TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE

WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,

AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF

ASSEMBLY AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION

SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY

CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING

NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE

STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT

UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR

TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING

ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND

LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO

REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT

CONSTRUCTION.

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL

CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED

TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE

SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK

SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE

LOCATION OF BARRIERS WITH OWNER.

12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN

THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.

DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.

16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR

DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35

26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF

DEBRIS FROM THE PROJECT AREA.

17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE

OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS

SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.

CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.

CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING

AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF

CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.

EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND

ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM

THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN

EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC

SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.

18.

CONSTRUCTION TIMEFRAME REQUIREMENT:

ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE

COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT

SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT

CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:

PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS

EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL

ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.

PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30

PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.

WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE

FACILITY IS CLOSED DURING THIS TIME.

WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE

FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.

CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,

SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT

TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC

ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID

CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE

GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE

FOLLOWED

GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL

BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION

WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS

SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW

SYSTEM IS ACTIVATED

CITY OF CLEVELAND REQUIREMENTS:

1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF

CLEVELAND, AND AS SUCH, THE CITY OF CLEVELAND'S PERMITTING AND INSPECTION

PROCESS MUST BE FOLLOWED. THE VA IS A TENANT IN THIS BUILDING AND THE FACILITY IS

NOT OWNED BY THE FEDERAL GOVERNMENT.

2. ALL CONTRACTORS - GENERAL AND SUBS - ARE REQUIRED TO BE REGISTERED WITH THE CITY

OF CLEVELAND IN ORDER TO PERFORM CONSTRUCTION OPERATIONS AND PULL PERMITS.

3. IT WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO BOTH PULL AND COVER

THE COST OF THE GENERAL BUILDING PERMIT FOR THIS PROJECT, AND ALL FEES

ASSOCIATED WITH SAME SHALL BE INCLUDED IN THE BID PRICE. ALL SUB-CONTRACTORS

WILL ALSO BE RESPONSIBLE FOR BOTH PULLING AND COVERING THE COST OF THEIR

INDIVIDUAL TRADE PERMITS.

4. THE GC SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ALL FIRE ALARM AND FIRE

SUPPRESSION SYSTEM DRAWINGS - TO THE EXTENT THAT MODIFICATIONS TO SAME ARE

REQUIRED FOR THIS PROJECT - TO THE CITY OF CLEVELAND FOR REVIEW AND APPROVAL.

5. THE GC SHALL BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS REQUIRED FOR THE

PROJECT WITH THE CITY OF CLEVELAND AND ENSURING THAT ALL INSPECTIONS ARE

COMPLETED AND PASSED. THIS INSPECTION PROCESS SHALL BE CONSIDERED IN ADDITION

TO THOSE REQUIRED INTERNALLY BY THE VA.

6. THE GC SHALL BE RESPONSIBLE FOR OBTAINING A CERTIFICATE OF OCCUPANCY THROUGH

THE CITY OF CLEVELAND AND OBTAINING ALL FINAL SIGN-OFFS FROM BUILDING OFFICIALS

7. ARCHITECT WILL SUBMIT DRAWINGS FOR BUILDING PERMIT REVIEW/APPROVAL. GC SHALL BE

RESPONSIBLE FOR PERMIT PICK-UP/PAYMENT. IT IS THE INTENT THAT THE PERMIT WILL BE

READY FOR PICK-UP AHEAD OF PRECONSTRUCTION

EXISTING WALLS TO REMAIN

INDICATES EXISTING DOORS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND

DOOR TO BE REMOVED UPON COMPLETION OF WORK

U.N.O. PATCH REPAIR EXISTING CONDITIONS AS

REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO TYPICAL TEMPORARY

PARTITION DETAIL. SCHEDULE NOTE: CONSTRUCTION

OF TEMPORARY BARRIERS SHALL BE PERFORMED

AFTER NORMAL BUSINESS HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

PHASING DURATION:

REFER TO "CONSTRUCTION TIMEFRAME REQUIREMENT" FOR

PERMITTED SCHEDULING OF ON-SITE CONSTRUCTION

ACTIVITIES. PHASING DURATION DURING THE CONSTRUCTION

PERIOD SHALL BE AS FOLLOWS:

PRECONSTRUCTION:

SUBMITTALS/PERMIT PICK-UP: 45 DAYS

--> ORDER LONG LEAD TIME EQUIPMENT

(APPROX. 8-12 WEEKS)

DURING THE 8-12 WEEK EQUIPMENT LEAD TIME, PHASES I, II, AND

III SHALL BE COMPLETED BY THE GC, SCHEDULED AS FOLLOWS:

PHASE I: O.R. #1: 8 DAYS

O.R. #1 AND SUB-STERILE 139 WILL NOT

BE USED BY VA STAFF DURING THIS TIME

VA PHASE I ACTIVATION: 10 DAYS*

PHASE II: O.R. #2: 8 DAYS

O.R. #2 WILL NOT BE USED BY VA STAFF

DURING THIS TIME.

SUB-STERILE 139 WILL BE USED BY VA STAFF.

PIPING FOR O.R. #2 SHALL BE STUBBED INTO

O.R. #2 DURING PHASE I TO AVOID GC ACCESS

VA PHASE II ACTIVATION: 10 DAYS*

PHASE III: O.R. #3: 8 DAYS

O.R. #1 AND SUB-STERILE 144 WILL NOT BE

USED BY VA STAFF DURING THIS TIME

*ACTIVATION TIMES BETWEEN PHASES ARE INCLUDED TO ALLOW

VA STAFF TO COORDINATE THEIR PROCEDURE SCHEDULE WITH

THE NEXT PHASE'S O.R. SHUTDOWN, AS IT IS UNLIKELY THAT THE

EACH PHASE WILL RUN CONCURRENTLY WITHOUT LAG TIME.

NEW MED. GAS SYSTEMS ARE NOT "ACTIVATED" DURING THIS

TIME

--> EQUIPMENT ARRIVES ON SITE TO BE INSTALLED IN PHASE IV:

PHASE IV: NEW MECH. ROOM: 31 DAYS

NOTE: PHASE IV TIMEFRAME SHALL ALSO

INCLUDE ACTIVATION AND CERTIFICATION OF

NEW MED. GAS SYSTEMS AND EQUIPMENT

TOTAL PROJECT TIMEFRAME: 120 DAYS

SYMBOL LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED

AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS

UNRESTRICTED ACCESS AREAS - NON-STERILE

SEMI-RESTRICTED ACCESS AREAS - NON-STERILE

RESTRICTED ACCESS AREAS - STERILE. ALL

CONTRACTORS ARE REQUIRED TO WEAR GOWNS,

SHOE COVERS, HEAD COVERS, AND FACE MASKS AT

ALL TIMES WHEN IN THESE AREAS

INFECTION CONTROL CLASS:

ALL CONSTRUCTION TO BE PERFORMED UNDER THIS CONTRACT

SHALL BE CLASSIFIED AS CLASS IV. GC SHALL REFER TO AND

FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"

01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT

EX. MED.

GAS ZONE

VALVES (2)

SUB-STERILE

PHASE II: MEDICAL

GAS UPGRADE

SCOPE OF WORK

PHASE I: MEDICAL

GAS UPGRADE

SCOPE OF WORK

100% CD'S SUBMISSION 11.9.18

SUB-STERILE

REFER TO

IMPROVEMENT PLAN

FOR SMOKE

PARTITION

ASSOCIATED WITH

NEW MECH. ROOM

E

E

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

LIFE SAFETY NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION

2. PROJECT SCOPE LINES ARE INDICATED FOR GENERAL

INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK

REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE

AREA AS INDICATED ON ANY DRAWINGS.

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE

TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT

PATHS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT

AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE

SAFETY MEASURES. COORDINATE W/VA.

EXISTING EXIT SIGNAGE

F.E.C.

EXISTING FIRE EXTINGUISHER CABINET

EXIT

A

F F

AS-1.1

FIRST FLOOR DEMOLITION PLANS

Revisions: Date

1st SUBMISSION 8.28.18

DAKCJK11.9.18

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS AMBULATORY

SURGERY CENTER

PROVIDE WASTE ANESTHESIA GAS

(WAG) FOR ASC

8901 SUPERIOR AVE. CLEVELAND, OHIO

541-18-603

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

GENERAL O.R. #2

SUB-STERILE

SCRUB

GENERAL O.R. #1

O.R.

CORRIDOR

1/4" = 1'-0"

DEMOLITION PLAN

ENLARGED PHASE I: O.R. #1

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS

SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH

AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM

BOARD TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE

WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED BY CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING,

AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF

ASSEMBLY AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION

SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY

CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING

NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE

STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT

UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVE, PRIOR

TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING

ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND

LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO

REMAIN IN SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT

CONSTRUCTION.

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL

CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED

TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE

SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK

SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE

LOCATION OF BARRIERS WITH OWNER.

12. THE FACILITY'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN

THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.

DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.

16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR

DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35

26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF

DEBRIS FROM THE PROJECT AREA.

17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE

OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS

SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.

CONSTRUCTION ACTIVITIES FOR THIS PROJECT OCCUR WITHIN A STERILE ENVIRONMENT.

CONSTRUCTION AREAS MUST BE PROPERLY SCREENED OFF FROM ALL SURROUNDING

AREAS, AS THE FACILITY WILL BE OCCUPIED AND IN USE THROUGHOUT THE ENTIRETY OF

CONSTRUCTION. COORDINATE ALL REQUIRED SCREENING AND ISOLATION WITH COR.

EXISTING EQUIPMENT IN ROOMS MUST BE PROTECTED THROUGHOUT CONSTRUCTION, AND

ALL CONSTRUCTION ACTIVITIES IN "CLEAN" SPACES MUST BE PROPERLY ISOLATED FROM

THE SURROUNDING SPACES THROUGHOUT THEIR ENTIRETY. GC SHALL PREPARE AN

EQUIPMENT PROTECTION PLAN AND SUBMIT TO THE COR FOR REVIEW AND APPROVAL. GC

SHALL COORDINATE WITH THE COR TO DETERMINE ALL PROTECTION REQUIREMENTS.

18.

CONSTRUCTION TIMEFRAME REQUIREMENT:

ALL CONSTRUCTION WORK IDENTIFIED IN THE CONTRACT DOCUMENTS MUST BE

COORDINATED WITH THE COR TO BE PERFORMED AROUND A WORKING OUTPATIENT

SURGERY CENTER THAT IS TO REMAIN OCCUPIED AND IN USE THROUGHOUT

CONSTRUCTION. CONSTRUCTION OPERATIONS SHALL BE DELINEATED AS FOLLOWS:

PHASES I, II,& III: EACH O.R. WILL BE INDIVIDUALLY SHUT DOWN FOR EIGHT (8) DAYS

EACH (FRIDAY @ 5:30 PM TO FOLLOWING SUNDAY) TO ALLOW CONTRACTORS FULL

ACCESS TO THE ROOMS DURING EVENING HOURS (AFTER 5:30 PM) EACH DAY.

PHASE IV: CONTRACTOR TO PERFORM WORK DURING EVENING HOURS (AFTER 5:30

PM) UNLESS DAYTIME WORK IS APPROVED BY COR/VA STAFF.

WEEKEND WORK SHALL BE PERMITTED FOR ALL PHASES AT ALL HOURS SINCE THE

FACILITY IS CLOSED DURING THIS TIME.

WORK SHALL NOT BE PERMITTED ON WEEKDAYS DURING HOURS WHEN THE

FACILITY IS IN OPERATION UNLESS APPROVED BY COR/VA STAFF.

CITY OF CLEVELAND BUILDING INSPECTIONS, WHICH MUST OCCUR DURING THE DAY,

SHALL BE SCHEDULED BY THE GC AND MUST BE APPROVED BY THE VA SO AS NOT

TO CAUSE DISRUPTION TO PROCEDURES. IT IS RECOMMENDED THAT THE GC

ENDEAVOR TO SCHEDULE SUCH INSPECTIONS WELL IN ADVANCE TO AVOID

CONFLICTS WITH MEDICAL SCHEDULING. INSPECTORS SHALL BE INFORMED BY THE

GC WITH REGARDS TO SPECIAL GOWNING/GARBING PROCEDURES THAT MUST BE

FOLLOWED

GC SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INFECTION CONTROL

BARRIERS AROUND WORK AREAS TO ALLOW THE FACILITY TO CONTINUE OPERATION

WITHOUT INTERRUPTION THROUGHOUT THE ENTIRE PROJECT. EXISTING MEDICAL GAS

SYSTEMS SHALL REMAIN IN FULL OPERATION THROUGHOUT CONSTRUCTION UNTIL NEW

SYSTEM IS ACTIVATED

CITY OF CLEVELAND REQUIREMENTS:

1. THIS PROJECT AND THE FACILITY IN GENERAL FALL UNDER THE JURISDICTION OF THE CITY OF

CLEVELAND, AND AS SUCH, THE CITY OF…