36C25018Q0079-007.docx

DOCX document 30 KB Posted

Attached to
Indianapolis Medical Center Shuttle Services Federal contract opportunity
Solicitation number
36C25018Q0079
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018Q0079 S02- Attachment D.4- Quality Assurance Surveillance Plan.docx

View the file

Other files for this federal contract opportunity

Other files attached to Indianapolis Medical Center Shuttle Services, newest first.
File Type Posted
36C25018Q0079-0001000.docx DOCX document
36C25018Q0079-0001001.pdf PDF
36C25018Q0079-006.docx DOCX document
36C25018Q0079-005.docx DOCX document
36C25018Q0079-003.docx DOCX document
36C25018Q0079-004.docx DOCX document
36C25018Q0079-002.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indianapolis VA Medical Center Passenger Shuttle Services

QUALITY ASSURANCE SURVEILLANCE PLAN

QUALITY CONTROL PROGRAM — The Contractor is responsible for establishing a quality control program that at a minimum encompasses an inspection system that identifies, documents and remedies all deficiencies. All quality control records will be made available to the Government upon request.

QUALITY ASSURANCE PLAN - The Government will monitor the Contractor’s performance under this contract using the following. See Service Delivery Summary and the Quality Assurance Plan Worksheet.

Periodic and Unscheduled Inspections - The Contractor’s vehicles, facilities, or any other physical property tied to the performance of this contract may be inspected by the Contracting Officer, designated representative or a state inspector. After each inspection, the Contractor will be advised of any unsatisfactory conditions for which the Contractor is responsible. The Contractor shall promptly correct such deficiencies and communicate to the COR, by the following work day, the solution to each problem, when it will be corrected and what will be done to prevent recurrence of the problem.

Government Option. When inspection indicates that service is deficient, the Government may notify the Contractor in a timely manner that it may be held liable for any damages sustained by the Government including costs associated with re-evaluation. Meeting industry standards does not relieve the Contractor from responsibility to perform all other work IAW the terms of this Performance Work Statement.

Acceptable Performance. The Contractor shall be paid the full contract price if no repeat deficiencies are noted during a scheduled or special evaluation.

Unacceptable Performance - The Government Point of Contact (POC) may submit a Quality Assurance Worksheet at any time and as often as necessary to document quality levels. If Contractor response to an identified quality deficiency is unsatisfactory, the Contracting Officer or COR will contact the appropriate Contractor representative to implement a plan of action to remedy the identified deficiency.

Evaluation - The Contracting Officer’s designated representative will conduct at a minimum a semi-annual evaluation. If a deficiency is noted during one of these evaluations, a special evaluation will be scheduled to ensure the problem is corrected. Additionally, a cure notice will be sent to the Contractor in the event of repeat deficiencies.

Quality Assurance Plan Indianapolis VA Medical Center Passenger Shuttle Services Summary Worksheet Objective: To transport VA patients, guest, and staff to and from the Medical Center in a safe, timely, and efficient manner.

Task
Reference
Standards
Acceptable Quality Level (AQL)
Method of Surveillance /

Frequency

Transport passengers comfortably and safely between locations identified in “Locations” section.
PWS- Section titled “Tasks and Requirements”
Shuttles will be:

a) Handicap accessible

b) Air conditioned and heated

c) Adequate ease of passenger boarding and disembarking

d) With seating capacity for 75% of the passengers with room for additional standing passengers.

e) Good, working condition with minimal age, mileage, and wear.

Contractor must utilize vehicles that meet all these criteria 100% of the time.
Periodic and Unscheduled Inspections
Hire and Maintain Qualified and Licensed Drivers
PWS- Section titled “Tasks and Requirements”
Drivers Will:

a) Possess valid licenses for class of vehicle operated

b) Pass all required screening

c) Meet Federal and State requirements for commercial vehicle operators

Must maintain 95% compliance with timeframes listed in PWS.
Periodic and Unscheduled Inspections
Maintain Standard Hours of Operation
PWS- Section titled “Tasks and Requirements”
The service will be operated between the hours of 5:00 a.m. and 9:00 p.m. Monday through Friday EXCEPT federal holidays (See Section Standard Business Hours & Federal Holidays)
Must maintain 95% compliance with timeframes listed in PWS..
Periodic Inspections/

Customer Complaints

Maintain Minimal Wait Times
PWS- Section titled “Tasks and Requirements”
1. Shuttle passenger waiting time shall be less than seven (7) minutes between 6:00 a.m. and 8:59 a.m. as well as between 2:30 p.m. and 5:59 p.m.

1. Shuttle passenger waiting time shall be less than ten (10) minutes between 5:00 a.m. and 5:59 a.m., between 9:00 a.m. and 2:29 p.m., and between 6:00 p.m. and 9:59 p.m.

Must maintain 90% compliance
Periodic and Unscheduled Inspections/

Customer Complaints

Quality Assurance Plan:

The COR will monitor Contractor performance and complete the Quality Assurance Worksheet provided, quarterly, at a minimum. The Quality Assurance Worksheet will be submitted directly to the Contracting Officer with a copy to the Contractor and the COR following the first quarter of performance, not later than the 5th day of the month following the evaluation. Future quarters will be submitted to the Contractor, and the COR. All quality performance ratings other than “Green” will be addressed and circumstances surrounding the rating will be documented for the contract file. The Contacting Officer will assume a quality performance rating of “Green” on all measured deliverables unless otherwise notified.

The quality rating may change from “Green” to “Red” without notice. We anticipate the Government POC utilizing the “Yellow” quality rating to alert the contracting office and the COR of quality issues that have the potential for a “Red” quality rating if corrective action is not taken.

The Government POC may submit a Quality Assurance Worksheet at anytime and as often as necessary to document quality levels. If Contractor response to an identified quality deficiency is unsatisfactory, the Contracting Officer or COR will contact the appropriate Contractor representative to implement a plan of action to remedy the identified deficiency.

COR must be formally trained which requires two (2) courses (proof of training certificates are required). New certificates required every two (2) years.

The COR referred to in this QASP is Ronald Scanland

Rating
Description
Green
Yes, performance and technical specifications are being met at AQL.

Yellow Yes, performance and technical specifications are currently being met at the minimum AQL, but the following service / deliverable needs Contractor attention.

The Customer must identify what component of the deliverable and/or service requires attention.

Red No, performance and technical specifications are not being met at AQL and the following service / deliverable needs immediate Contractor resolution.

The Customer must identify what component of the deliverable and/or service is below the minimum AQL.

QUALITY ASSURANCE PLAN WORKSHEET PASSENGER SHUTTLE SERVICES

Performance Rating

Deliverable/Service

Quality Rating
Causative Factors
Effect on Mission
Action Required / Date

Transport passengers comfortably and safely between locations identified in “Locations” section.

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Hire and Maintain Qualified and Licensed Drivers

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Maintain Standard Hours of Operation

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Maintain Minimal Wait Times

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Yellow

Red

Period of Performance: From _________________to___________________

Approved by: Date: ___________________ (Contracting Officer Representative)

File details come from the government source that posted it.