36C25018B0197-002.doc
DOC document 29 KB Posted
- Attached to
- Install PA Systems in Trailers 539-18-201 Federal contract opportunity
- Solicitation number
- 36C25018B0197
About this file
36C25018B0197 S02 - Statement of Work.doc
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0197-00002000.docx | DOCX document | |
| 36C25018B0197-00002001.pdf | ||
| 36C25018B0197-00001002.pdf | ||
| 36C25018B0197-00001000.docx | DOCX document | |
| 36C25018B0197-00001001.pdf | ||
| 36C25018B0197-008.pdf | ||
| 36C25018B0197-001.docx | DOCX document | |
| 36C25018B0197-004.pdf | ||
| 36C25018B0197-005.docx | DOCX document | |
| 36C25018B0197-003.pdf | ||
| 36C25018B0197-007.docx | DOCX document | |
| 36C25018B0197-006.docx | DOCX document | |
| 36C25018B0197-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Date: December 7, 2017 Project No. 539-18-201 Install PA Systems in Trailers The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for Project 539-18-201, “Install PA Systems in Trailers”, including prepare site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
Work includes general construction, alterations, mechanical and electrical work, and certain other items shown and specified in project drawings and specifications. This construction project will correct emergency prepardendess issues at the Veterans Affairs Cincinnati Campus. Corrective work includes the installation of fire alarm and public address speakers in the office trailers on the Cincinnati Campus, which includes the Education Trailer (TB), IH&S Trailer (Trailer TD), Research Trailer (Trailer “TE”) and the Operating Enduring Freedom (OEF)/Operation Iraqi Freedom (OIF) Trailer (Trailer “TF”). In addition, this project will provide a complete and integrated campus-wide notification system. As the aforementioned trailers are occupied space, phasing the construction work is required.
The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project.
Period of Performance: All phases of work completed within 270 calendar days after issuance of the Notice to Proceed.