About this file
This document package includes construction drawings and specifications for a Department of Veterans Affairs sitework and accessibility project. The drawings show demolition plans, site plans, and grading/drainage plans for locations 1 through 3 at a VA medical center campus. The specifications include construction and paving details, pipe bedding requirements, and standard installation types. The solicitation is for sitework and accessibility improvements including sidewalk, pavement, and drainage work. The contracting agency is the VA Veterans Health Administration VISN 9. The incumbent contractor will be responsible for demolition, concrete, asphalt, drainage and related site construction in accordance with the drawings and specifications provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24923B0005 0004.docx | DOCX document | |
| Header - List of Attachments.txt | TXT text file | |
| 36C24923B0005 0003.docx | DOCX document | |
| 36C24923B0005 0002.docx | DOCX document | |
| 36C24923B0005 0001.docx | DOCX document | |
| 36C24923B0005_1.pdf | ||
| 626A4-21-501 Combined Specs Sitework and Acc.pdf | ||
| 626A4-21-501 Sitework and Acc Signed Drawings.pdf | ||
| WD TN20230147 01062023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAS
GAS
W W W
W
B R
IC
K
C O
LU
M
N
B R
IC
K
C O
LU
M
N
G A
TE
588 588
C O
N C
R
ETE SID
EW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
LOD
LOD
LODLODLODLODLODLOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
EX. BC
PR. TC586.51
586.01
TC
BC
586.42 585.92
586.09
586.07
585.88
TC
BC
586.43 586.01
586.06
586.19 586.13
585.89
585.96 585.88
585.88
TC
BC
585.99 585.99
TC
BC
585.92 585.92
TC
BC
586.24 585.74
EX. BC
PR. TC586.29
585.79
TC
BC
586.30 585.87
585.70
TC
BC
586.25 585.83
585.99
585.94
585.98
586.23
586.32 586.37
586.31 586.45
586.47
PR FGH INLET
PR GRATE EL = 585.88
PR INV EL = 581.96PR FGH INLET
PR GRATE EL = 585.70
PR INV EL = 581.89
PR DOGHOUSE MANHOLE
PR RIM = 585.50
PR INV IN = 581.65
EX INV OUT = 581.40
© 2021 Microsoft Corporation © 2021 TomTom
GAS
GAS
B R
IC
K
C O
LU
M
N
B R
IC
K
C O
LU
M
N
G A
TE
C O
N C
R
ETE SID
EW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
LOD
LOD
LODLODLODLODLODLOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
19.93'
4'
RAMP
8.74'
GAS
GAS
W W W
W
B R
IC
K
C O
LU
M
N
B R
IC
K
C O
LU
M
N
G A
TE
588 588
C O
N C
R
ETE SID
EW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
LOD
LOD
LODLODLODLODLODLOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
22.73'
4.72'
4.67'8.09'
8.53'
4.89'
11.23'
18.28'
1.34'
57.45'
18.51'
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# JUNE 3, 2021
AE SITEWORK &
ACCESSIBLITY
626A4-21-501
3400 LEBANON RD,
MURFREESBORO, TN 37129
20-325
4NRS ZLR
100% BID DOCUMENTS
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
8, 106, 107
01 ADDENDUM 02/15/22
SCALE: 1" = 30'
SCALE: 1" = 30'
SCALE: 1" = 30'
SITE AND PAVING KEY NOTES:
DEMOLITION KEY NOTES:LEGEND
CONCRETE AND/OR CURB GUTTER TO BE
REMOVED
ASPHALT TO BE SAWCUT AND REMOVED
EXISTING STRIPING TO BE REMOVED
LIMITS OF DISTURBANCE
EXISTING CONTOURSXXXX
LOD LOD LOD
LEGEND
CONCRETE SIDEWALK PAVING
ASPHALT PAVING
PROPOSED CURB AND GUTTER
GRADING AND DRAINAGE KEY NOTES:LEGEND
EXISTING CONTOURS
PROPOSED CONTOURS
EXISTING STORM PIPE
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
PROPOSED TOP OF CURB / BOTTOM OF
CURB SPOT ELEVATION
XXXX.XX
XXXX.XX
XXXX
XXXX
TC
BC
XXXX.XX
XXXX.XX
KEY PLAN
LOCATION 3
LOCATION 1
LOCATION 2
1" = 30'
SCALE IN FEET
30 15 30 60
1) SAWCUT AND REMOVE EXISTING CONCRETE SIDEWALK AT
NEAREST JOINT.
2) SAWCUT AND REMOVE EXISTING 24" CONCRETE CURB AND
GUTTER.
3) EXISTING LIGHT POLE TO REMAIN.
4) EXISTING ASPHALT PAVING TO REMAIN.
5) EXISTING TREE TO REMAIN.
6) EXISTING CONCRETE SIDEWALK TO REMAIN.
7) EXISTING CURB AND GUTTER (TO REMAIN)
8) EXISTING CURB (TO REMAIN)
9) EXISTING STORMWATER INLET (TO REMAIN)
10) EXISTING STORMWATER PIPE (TO REMAIN)
11) EXISTING ASPHALT PAVING TO BE SAWCUT, REMOVED, AND
REPLACED. IN ADDITION TO ASPHALT REMOVAL, CONTRACTOR SHALL
REMOVE AND REPLACE TOP 3" OF AGGREGATE BASE. A TOTAL DEPTH
OF REMOVAL AND REPLACEMENT SHALL BE 6.5" (ASPHALT AND GAB,
SEE DETAIL ON SHEET CS-501) EXISTING SUB BASE TO REMAIN.
12) EXISTING INLET TO BE RESET FOR NEW PAVEMENT.
13) EXISTING GATE (TO REMAIN)
14) EXISTING CURB RAMP (TO REMAIN)
1) PROPOSED ASPHALT PAVEMENT SEE DETAIL 8 ON SHEET CS501.
2) PROPOSED CROSSWALK STRIPING. SEE DETAIL ON SHEET CS501.
3) PROPOSED CONCRETE SIDEWALK. CONCRETE SIDEWALK TO TIE
INTO EXISTING WITH FLUSH AND LEVEL CONNECTION. SEE DETAIL ON
SHEET CS501.
4) EXISTING LIGHT POLE (TYP.)
5) PROPOSED CURB RAMP WITH RETURN CURBS.
SEE DETAIL CS501.
6) PROPOSED 5'X5' MINIMUM FLAT LANDING.
7) PROPOSED CENTER LINE PAVEMENT STRIPING.
8) PROPOSED SLOPE SIDEWALK WITH RETURN CURBS.
9) PROPOSED CURB AND GUTTER (TO MATCH EXISTING)
10) PROPOSED MOUNTABLE CURB (SEE DETAIL ON SHEET CS501)
11) TRANSITION CURB FROM FULL 6" TO MOUNTABLE CURB.
1) TOP OF PROPOSED ASPHALT PAVING TO TIE INTO EXISTING
ASPHALT PAVEMENT GRADE.
2) PROPOSED FRAME, GRATE, AND HOOD INLET (TYP.) (SEE DETAIL
10 ON SHEET CS501).
3) PROPOSED 15" HDPE PIPE. SEE BEDDING DETAIL 6 ON CS-502.
4) PROPOSED CURB RAMP. 1:13 (7.7%) MAXIMUM SLOPE IN THE
DIRECTION OF TRAVEL AND 1:67 (1.5%) MAXIMUM CROSS SLOPE.
5) PROPOSED 5' DEEP X WIDTH OF RAMP MINIMUM FLAT LANDING
ALONG AT THE TOP/BOTTOM OF RAMP. 1:67 (1.5%) MAXIMUM SLOPE IN
ALL DIRECTIONS.
6) EXISTING INLET TO BE RESET FOR NEW PAVEMENT.
7) PROPOSED SLOPED SIDEWALK. 1:22 (4.5%) MAXIMUM SLOPE IN
THE DIRECTION OF TRAVEL AND 1:67 (1.5%) MAXIMUM CROSS SLOPE.
8) PROPOSED 15" RCP. USE TYPE 2 INSTALLATION. SEE DETAIL 1 ON
CS-502.
C-101
(LOCATION 3) DEMOLITION PLAN
C-101
(LOCATION 3) SITE AND PAVING PLAN
C-101
(LOCATION 3) GRADING AND DRAINAGE PLAN
(LOCATION 3) SITEWORK
C-101
02/16/2022
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# JUNE 3, 2021
AE SITEWORK &
ACCESSIBLITY
626A4-21-501
3400 LEBANON RD,
MURFREESBORO, TN 37129
20-325
4NRS ZLR
100% BID DOCUMENTS
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
8, 106, 107
01 ADDENDUM 02/15/22
CONSTRUCTION AND PAVING DETAILS
CS-502
60"
30"
54"
48"
42"
36"
18"
24"
15"
12"
96"
56"
88"
80"
72"
64"
39"
48"
34"
30"
PIPE DIAM. MIN. TRENCH WIDTH
8"
10"
6"
4"
26"
28"
23"
21"
RECOMMENDED MINIMUM TRENCH WIDTHS
HEAVY CONSTRUCTION
(75T AXLE LOAD) *
48"
60"
12"
24"54" - 60"
12" - 48"
PIPE DIAM.
SURFACE LIVE LOADING CONDITION
MINIMUM RECOMMENDED COVER BASED ON LOADING CONDITIONS
H-25
* VEHICLES IN EXCESS OF 75T MAY REQUIRE ADDITIONAL COVER
NOTES:
1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION
2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED.
3. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN
ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL.
4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" (100mm) FOR 4"-24" (100mm-600mm); 6" (150mm) FOR 30"-60" (750mm-900mm).
5. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF PIPE.
THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS
REQUIRED IN ASTM D2321, LATEST EDITION.
6. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 54"-60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT
OR TO TOP OF RIGID PAVEMENT.
CS-502
CS-502
CS-502
CS-502
CS-502
RCP BEDDING, TRENCHING, AND BACKFILL
NTS
NOTES:
1. COMPACTION AND SOIL SYMBOLS - I.E. “95% CATEGORY I”- REFERS TO CATEGORY I SOIL MATERIAL WITH
MINIMUM STANDARD PROCTOR COMPACTION OF 95%. SEE TABLE FOR EQUIVALENT MODIFIED PROCTOR
VALUES.
2. SOIL IN THE OUTER BEDDING, HAUNCH, AND LOWER SIDE ZONES, EXCEPT UNDER THE MIDDLE 1/3 OF THE PIPE, SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS THE MAJORITY OF SOIL IN THE OVERFILL ZONE.
3. FOR TRENCHES, TOP ELEVATION SHALL BE NO LOWER THAN 0.1 H BELOW FINISHED GRADE OR, FOR ROADWAYS, ITS TOP SHALL BE NO LOWER THAN AN ELEVATION OF 1 FOOT BELOW THE BOTTOM OF THE PAVEMENT BASE
MATERIAL.
4. FOR TRENCHES, WIDTH SHALL BE WIDER THAN SHOWN IF REQUIRED FOR ADEQUATE SPACE TO ATTAIN THE
SPECIFIED COMPACTION IN THE HAUNCH AND BEDDING ZONES.
5. FOR TRENCH WALLS THAT ARE WITHIN 10 DEGREES OF VERTICAL, THE COMPACTION OR FIRMNESS OF THE SOIL
IN THE TRENCH WALLS AND LOWER SIDE ZONE NEED NOT BE CONSIDERED.
6. FOR TRENCH WALLS WITH GREATER THAN 10 DEGREE SLOPES THAT CONSIST OF EMBANKMENT, THE LOWER SIDE SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS SPECIFIED FOR THE SOIL IN THE BACKFILL
ZONE.
7. SUBTRENCHES
7.1. A SUBTRENCH IS DEFINED AS A TRENCH WITH ITS TOP BELOW FINISHED GRADE BY MORE THAN 0.1 H OR, FOR ROADWAYS, ITS TOP IS AT AN ELEVATION LOWER THAN 1FT. BELOW THE BOTTOM OF THE PAVEMENT
BASE MATERIAL.
7.2. THE MINIMUM WIDTH OF A SUBTRENCH SHALL BE 1.33 OUTSIDE Ø OR WIDER IF REQUIRED FOR ADEQUATE
SPACE TO ATTAIN THE SPECIFIED COMPACTION IN THE HAUNCH AND BEDDING ZONES.
7.3. FOR SUBTRENCHES WITH WALLS OF NATURAL SOIL, ANY PORTION OF THE LOWER SIDE ZONE IN THE SUBTRENCH WALL SHALL BE AT LEAST AS FIRM AS AN EQUIVALENT SOIL PLACED TO THE COMPACTION REQUIREMENTS SPECIFIED FOR THE LOWER SIDE ZONE AND AS FIRM AS THE MAJORITY OF SOIL IN THE OVERFILL ZONE, OR SHALL BE REMOVED AND REPLACED WITH SOIL COMPACTED TO THE SPECIFIED LEVEL.
SIDD SOIL
GRAVELLY
SAND
(CATEGORY I)
MODIFIED
PROCTOR
STANDARD
PROCTOR
STANDARD
AASHTO
A1, A3
PERCENT COMPACTION
GM, SM, ML,
ALSO GC, SC
WITH LESS
THAN 20%
PASSING
#200 SIEVE
SANDY
SILT
(CATEGORY II)
USCS,
SW, SP,
GW, GP
A2, A4 95
REPRESENTATIVE SOIL TYPES
CL, MH,
GC, SC
SILTY
CLAY
(CATEGORY III)
A5, A6 90
CS-502
THE SELECTION OF STANDARD INSTALLATION:
SELECTION SHOULD BE BASED ON AN EVALUATION OF THE QUALITY OF CONSTRUCTION AND INSPECTION ANTICIPATED. A TYPE 1 STANDARD INSTALLATION REQUIRES THE HIGHEST CONSTRUCTION QUALITY AND DEGREE OF INSPECTION. REQUIRED CONSTRUCTION QUALITY IS REDUCED FOR A TYPE 2 STANDARD INSTALLATION, AND REDUCED FURTHER FOR A TYPE 3 STANDARD INSTALLATION. A TYPE 4 STANDARD INSTALLATION REQUIRES VIRTUALLY NO CONSTRUCTION OR QUALITY INSPECTION. CONSEQUENTLY, A TYPE 4 STANDARD INSTALLATION WILL REQUIRE A HIGHER STRENGTH PIPE, AND A TYPE I STANDARD INSTALLATION WILL REQUIRE A LOWER STRENGTH PIPE FOR THE SAME DEPTH OF INSTALLATION.
O.D. (OUTSIDE
DIAMETER)
I.D. IN
SIDE
DIAMETER
SUITABLE
FOUNDATION
INSTALLATION
TYPE
O.D./24 MIN., NOT LESS THAN
75 MM (3"). IF ROCK
FOUNDATION, O.D./12 MIN.,
NOT LESS THAN 150 MM (6").
BEDDING THICKNESS HAUNCH AND
OUTER BEDDING
95% CATEGORY I 90% CATEGORY I,
95% CATEGORY II,
OR
100% CATEGORY III
TYPE 1
LOWER SIDE
90% CATEGORY I,
OR
95% CATEGORY II
85% CATEGORY I,
90% CATEGORY II,
OR
95% CATEGORY III
TYPE 2
85% CATEGORY I,
90% CATEGORY II,
OR
95% CATEGORY III
TYPE 3 85% CATEGORY I,
90% CATEGORY II,
OR
95% CATEGORY III
NO BEDDING REQUIRED,
EXCEPT IF ROCK
FOUNDATION, USE O.D./12
MIN., NOT LESS THAN 150
MM (6").
NO COMPACTION
REQUIRED, EXCEPT
IF CATEGORY III,
THEN USE 85%
TYPE 4
O.D./24 MIN., NOT LESS THAN
75 MM (3"). IF ROCK
FOUNDATION, O.D./12 MIN.,
NOT LESS THAN 150 MM (6").
O.D./24 MIN., NOT LESS
THAN 75 MM (3"). IF ROCK
FOUNDATION, O.D./12 MIN.,
NOT LESS THAN 150 MM (6").
NO COMPACTION
REQUIRED, EXCEPT
IF CATEGORY III,
THEN USE 85%
STANDARD INSTALLATIONS SOIL AND MINIMUM COMPACTION REQUIREMENTS
SPRINGLINE
O.D./6
(MIN.) O.D. (MIN.)
O.D./3 OUTER BEDDING MATERIALS
H
BEDDING
MIDDLE BEDDING LOOSELY
PLACED UNCOMPACTED
BEDDING EXCEPT TYPE 4
LOWER
SIDE
HAUNCH
OVERFILL SOIL
CATEGORY I, II, III
02/16/2022
| Sheets and Views |
| C-101 (LOCATION 3) SITEWORK |
| CS-502 CONSTRUCTION AND PAVING DETAILS |
File details come from the government source that posted it. Updated .