Write-Up 1.pdf
PDF 34 KB Posted
- Attached to
- Z1DA--Project# 626-21-202 Upgrade Elevator & Main Facility Access Federal contract opportunity
- Solicitation number
- 36C24922B0021
About this file
This addendum pertains to a federal construction contract opportunity with the Department of Veterans Affairs to upgrade elevators and main facility access at a medical center campus in Nashville, Tennessee. Key details include revisions to drawings and specifications for demolition and construction work involving elevator mechanical rooms, lobbies, corridors and stairwells. Product and service requirements encompass cold formed metal framing, metal stairs, open cell spray foam insulation, fluid applied membrane, and metal wall panel rainscreen assembly. The solicitation number is 36C24922B0021 for Project 626-21-202. The response due date and award date are not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Write-Up 2.pdf | ||
| 36C24922B0021 0004.docx | DOCX document | |
| Structural Addendum 1 S-101 and S-201.pdf | ||
| Compiled A _ G Sheets.pdf | ||
| 36C24922B0021 0003.docx | DOCX document | |
| C27_Drawings 20-383 Structural Addendum 1.pdf | ||
| Updated Drawings_20-383 Structural Addendum 1.pdf | ||
| Bid Questions - Upgrade Elevator Main Facility Access.pdf | ||
| 36C24922B0021 0002.docx | DOCX document | |
| Write-Up.pdf | ||
| Updated Combined Specs.pdf | ||
| 36C24922B0021 0001.docx | DOCX document | |
| Wage Rate TVHS-02-25-2022.docx | DOCX document | |
| 36C24922B0021_1.docx | DOCX document | |
| DUNS _ TAX ID 02.docx | DOCX document | |
| C28_Specs - 626-21-202 Elevator and Main Facility Access.pdf | ||
| Contractor EMR Certification Form 02.docx | DOCX document | |
| C27_Drawings - 626-21-202 Elevator and Main Facility Access.pdf | ||
| RFI Form 02.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Raleigh | Indianapolis | Fort Collins | Las Vegas | Charlotte | Minneapolis | Virginia Beach | Cincinnati |Wilmington | Nashville www.acg-pa.com
Addendum No. 1
Date: May 24, 2022
RE: Department of Veteran Affairs Project 626-21-202
Upgrade Elevator & Main Facility Access TVHS Medical Center Nashville Campus Contract: 36C24921R0035
From: Apogee Consulting Group, Inc.
Addendum No. 1 are revisions made to the Contract Documents. The following revisions include, but are not limited to, the following items.
Attached are revised drawings, specifications and documents:
Drawings
General
None.
Structural
S-101
1. At 1-Plan, delete H1 as shown.
S-201
1. At 7-Detail, revise as shown.
Architecture
AD-101
1. At 1-Elevator Mechanical Room Stair Demo Plan-Phase 1, revise stair plan as shown.
2. At 2-Second Floor Demolition Plan, revise area at Corridor C1-21A.
AD-102
1. At 2-Second Floor Demolition Plan, revise area at Corridor C1-21A.
AD-103
1. At 4-Demolition Stair Section, revise Mechanical Room stair as shown.
Addendum No. 01 2
AD-104
1. At Key Plan, revise plan as shown.
2 At 2-First Floor DW#7, 8, 9 Demo RCP-Phase 1, revise Security Equipment, B-123 as shown.
3 At 5-Second Floor DW#7, 8, 9 Demo RCP-Phase 1, revise Electrical Room, B-218 as shown.
4 At 8-Third Floor DW#7, 8, 9 Demo RCP-Phase 1, revise Electrical Room , B-319 as shown.
5 At 11-Fourth Floor DW#7, 8, 9 Demo RCP-Phase 1, revise Storage, B-420 as shown.
A-101
1. At 1- Elevator Mechanical Room Plan-Phase 1, revise plan as shown.
2. At 2-Second Floor Plan -Phase 1, revise Elevator Lobby 201 as shown.
A-103
1. At Key Plan, revise plan as shown.
2. At 1-First Floor DW#7, 8, 9 Plan-Phase 1, revise Security Equipment, B-123 as shown.
3. At 4-Second Floor DW#7, 8, 9 Plan-Phase 1, revise Electrical Room, B-218 as shown.
5. At 7-Third Floor DW#7, 8, 9 Plan-Phase 1, revise Electrical Room , B-319 as shown.
6. At 10-Fourth Floor DW#7, 8, 9 Plan-Phase 1, revise Storage, B-420 as shown.
A-104
1. At 1-Elevators P10 & P11 Elevation, add Fifth Floor elevations.
2. At 2-Section Thru Existing Elevator Shaft, add Fifth Floor section.
A-301
1. At 1-Section Thru Elevator Lobby title, revise to read “TYPICAL ELEVATION AT
ELEVATOR LOBBY”.
2. At 2-Entrance and Ramp Elevation, add door tag no. 204 to the main entrance door.
3. At 2-Entrance and Ramp Elevation, note top of window elevation to be El. 18’-3”.
4. At 5-Bridge Section, revise as shown with 4” C-Stud braces above ceiling at 4’-0” O.C.
5. At Key Notes, revise note 10 to read “TPO ROOF SYSTEM”.
A-302
1. At 1-Section At Bridge, revise window head detail.
2. At 1-Section At Bridge, revise top of wall detail.
3. At 2-Section At Bridge, revise window head detail.
4. At 2-Section At Bridge, revise top of wall detail.
A-401
1. Add Sections and Details :
11-Ships Ladder Tread Enlarged Detail, At Bridge, revise window head detail.
12-Stair Section (Ships Ladder) 13-Ships Ladder-Bottom Landing Connection Detail 14- Ships Ladder-Top Landing Connection Detail
Addendum No. 01 3
A-501
1. At Door Types, revise D2, D3 and D4 as shown.
2. At Door Schedule, revise as shown.
3. At H2-Head Detail-Storefront, revise as shown.
A-502
1. At 3-Section Detail At Storefront -Window Head, revise as shown.
2. At 4-Section Detail At Roof- West Wall, revise as shown.
3. At 5-Section Detail At Roof-East Wall, revise as shown.
A-503
1. At 1-Detail Plan At Accordian Fire Rated Door/Partition, revise as shown, added Elevation 5/A-503.
2. Add ELEVATION 5/A-503.
3. Add 6-TYPICAL BOLLARD DETAIL.
A-601
1. At 3-Window Elevaton-W4, revise door number.
2. At 4-Window Elevation-W5, revise as shown.
3. At 6-Window Elevation-W8, revise as shown.
4. At H1-Storefront Head @ New Metal Panel, revise as shown.
Addendum No. 01 4
Specifications
000110 Table of Contents
1. Replace with updated Table of Contents.
010000 General Requirements
1. Replace specification with updated specification.
013526 Safety Requirements
1. Replace specification with updated specification.
054000 Cold Form Metal Framing
1. Add this new specification.
055100 Metal Stairs
1.Add this new specification.
072119 Open Cell Spray Foam Thermal Insulation
1. Add this new specification.
072726 Fluid Applied Membrane
1.Add this new specification.
074216 Metal Wall Panel Rainscreen Assembly
1. Add this new specification. –
End of Document
File details come from the government source that posted it. Updated .