C27_Drawings 20-383 Structural Addendum 1.pdf
PDF 11 MB Posted
- Attached to
- Z1DA--Project# 626-21-202 Upgrade Elevator & Main Facility Access Federal contract opportunity
- Solicitation number
- 36C24922B0021
About this file
This document provides details on a federal contract opportunity for upgrading an elevator and main facility access. The solicitation number is 36C24922B0021 for Project 626-21-202 to upgrade the elevator and main facility access at the Veterans Health Administration Veterans Integrated Service Network 9 facility. The agency listed is the Department of Veterans Affairs. The opportunity type is a solicitation for upgrading the elevator and main access at the specified VHA facility. No pricing terms, response dates, set asides, or other contract details are provided in this document beyond the project name and number and involved agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Write-Up 2.pdf | ||
| 36C24922B0021 0004.docx | DOCX document | |
| Structural Addendum 1 S-101 and S-201.pdf | ||
| Write-Up 1.pdf | ||
| Compiled A _ G Sheets.pdf | ||
| 36C24922B0021 0003.docx | DOCX document | |
| Updated Drawings_20-383 Structural Addendum 1.pdf | ||
| Bid Questions - Upgrade Elevator Main Facility Access.pdf | ||
| 36C24922B0021 0002.docx | DOCX document | |
| Write-Up.pdf | ||
| Updated Combined Specs.pdf | ||
| 36C24922B0021 0001.docx | DOCX document | |
| Wage Rate TVHS-02-25-2022.docx | DOCX document | |
| 36C24922B0021_1.docx | DOCX document | |
| DUNS _ TAX ID 02.docx | DOCX document | |
| C28_Specs - 626-21-202 Elevator and Main Facility Access.pdf | ||
| Contractor EMR Certification Form 02.docx | DOCX document | |
| C27_Drawings - 626-21-202 Elevator and Main Facility Access.pdf | ||
| RFI Form 02.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE SECTION 01 00 00 OF THE SPECIFICATION. THE SCHEDULE OF BID ALTERNATES TO BE INCLUDED WITH THE BID PACKAGE
IS AS FOLLOWS:
BID ITEM I:
A. WORK INCLUDES GENERAL CONSTRUCTION, ALTERNATES, NECESSARY REMOVAL OF EXISTING STRUCTURES, AND CERTAIN
OTHER ITEMS.
BID ITEM II:
B. ALL WORK IN BID ITEM I EXCEPT FINISHING THE BRIDGE UNDERSIDE SOFFIT IN STUCCO IN LIEU OF METAL PANELS AND METAL
COLUMN COVERS AT EXISTING CONCRETE COLUMNS IN LIEU OF MAINTAINING EXISTING FINISHES.
BID ITEM III:
C. ALL WORK IN BID ITEM II EXCEPT ELEVATOR MACHINE ROOM UPGRADES NOT RELATED TO MINOR REPAIRS AND FINISHES.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:0
:1
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
G-001
COVER
1 5RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
UPGRADE ELEVATOR & MAIN FACILITY ACCESS
TVHS VA MEDICAL CENTER NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212
VA PROJECT #: 626-21-202
KK
DRAWING LIST
GENERAL
G-001 COVER 1 5
G-100 GENERAL INFORMATION 2 5
G-101 SITE LOGISTICS PLAN 3 5
G-102 ICRA DETAILS 4 5
G-103 OVERALL PHASING PLAN 5 5
STRUCTURAL
S-101 FLOOR PLANS - PHASE 1 1 1
S-201 FLOOR PLANS - PHASE 1 2 2
ABATEMENT
HA101 ABATEMENT PLAN - DUMBWAITERS PHASE 1 1 1
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 24
AD101 SECOND FLOOR DEMOLITION FLOOR PLANS - PHASE 1 2 24
AD102 SECOND FLOOR DEMOLITION FLOOR PLANS - PHASES 2, 2A, 2B AND 3 3 24
AD103 DEMOLITION PLANS AND SECTION - BRIDGE SOFFIT PLAN AND ELEVATOR MECHANICAL ROOM STAIRWELL 4 24
AD104 DEMOLITION PLANS - DUMBWAITERS #7,8,9,14 PHASE 1 5 24
AD110 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN - PHASE 1 6 24
AD111 SECOND FLOOR DEMOLITION REFLECTED CEILING PLANS - PHASE 2 AND 3 7 24
A-101 SECOND FLOOR PLAN - PHASE 1 8 24
A-102 FLOOR PLANS - PHASES 2, 2A, 2B AND 3 9 24
A-103 NEW WORK PLANS - DUMBWAITERS PHASE 1 10 24
A-104 TYPICAL ELEVATOR CAR PLANS, INTERIOR ELEVATIONS AND DETAILS 11 24
A-105 BRIDGE ROOF AND SOFFIT PLANS 12 24
A-110 REFLECTED CEILING PLANS - PHASE 1 13 24
A-111 REFLECTED CEILING PLANS - PHASE 2 AND 3 14 24
A-201 EXTERIOR ELEVATIONS 15 24
A-301 BUILDING SECTIONS 16 24
A-302 WALL SECTIONS 17 24
A-303 WALL SECTIONS 18 24
A-401 INTERIOR DETAILS 19 24
A-501 PARTITION TYPES, DOOR SCHEDULE, ELEVATIONS AND DETAILS 20 24
A-502 SECTION DETAILS 21 24
A-503 PLAN DETAILS 22 24
A-601 WINDOW AND LOUVER ELEVATIONS AND DETAILS 23 24
A-901 RENDERINGS 24 24
INTERIORS
I-001 PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS 1 6
I-101 SECOND FLOOR FINISH AND WALL PROTECTION PLAN & ELEVATIONS 2 6
I-141 FIRST FLOOR SIGNAGE PLAN 3 6
I-411 SECOND FLOOR OVERALL EQUIPMENT PLAN 4 6
I-431 ENLARGED TOILET PLANS AND ELEVATIONS 5 6
I-441 INTERIOR DETAILS 6 6
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 4
FK101 SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1 2 4
FX101 SECOND FLOOR FIRE SUPPRESSION PLAN PHASE 1 3 4
FX102 SECOND FLOOR FIRE SUPPRESSION PLAN PHASE 2 4 4
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 5
P-100 BASEMENT & FIRST FLOOR DRAIN, WASTE, AND VENT PLAN 2 5
P-101 SECOND FLOOR PLUMBING PLAN 3 5
P-501 PLUMBING DETAILS 4 5
P-901 WASTE & WATER PIPE RISERS 5 5
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 8
MD101 SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 2 8
MD102 SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2 3 8
MH101 SECOND FLOOR HVAC PLAN - PHASE 1 4 8
MH102 SECOND FLOOR HVAC PLAN - PHASE 2 5 8
MP101 SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 1 & 2 6 8
M-501 MECHANICAL DETAILS & SCHEDULES 7 8
M-502 MECHANICAL CONTROLS 8 8
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 12
E-002 ELECTRICAL GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 12
ED101 ELECTRICAL DEMOLITION PLANS 3 12
ED102 ELECTRICAL DEMOLITION PLANS 4 12
E-101 ELECTRICAL PLANS 5 12
E-102 ELECTRICAL PLANS 6 12
E-103 ELECTRICAL PLANS 7 12
E-104 ELECTRICAL PLANS 8 12
EL101 ELECTRICAL LIGHTING PLANS 9 12
E-501 ELECTRICAL DETAILS 10 12
E-601 SINGLE LINE DIAGRAM AND SCHEDULES 11 12
E-602 ELECTRICAL SCHEDULES 12 12
AREA OF WORK AREA OF WORK
NORTH NORTH
BID ALTERNATES
DocuSign Envelope ID: F367A384-6B7D-42A0-B197-538A80688D8E
5/26/2022
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
FINISH ELEVATION
SYMBOL
FLOOR SLOPE
SYMBOL
X 0" = 10'-3" AFF
1-1/2"
DIAMETER
GRAB BAR
TOILET
TISSUE
DISPENSER
SANITARY
NAPKIN
DISPOSAL
TOILET
FIXTURE
TOILET
FIXTURE
TOILET TISSUE
DISPENSER
1-1/2"
DIAMETER
GRAB BAR
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
ACCESSIBLE TOILET
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
5'-0" CLEAR
3'-0" 6"
3'-0"
" 3
1'-0" 3'-6"
2'-4"
5'-0" CLEAR
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
TYPICAL URINAL
MOUNTING
CLEAR
15"
CLEAR
15"
"3
M
A X
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
DIAPER CHANGING
STATION
M
IN
M A
X
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
S
U R
F A
C E
O F
M
IR
R
O R
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
WALL PROTECTION
BUMPERGUARD
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
CLOCKCLOCK OUTLET
TELEVISION
OUTLET
WALL MOUNTED TV
CLOCK
F O
R S
T A
N D
IN
G
O
.C
TELEVISION
OUTLET
F O
R S
E A
T E
D
O
.C
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
TOILET ACCESSORIES
6"
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
O .C
O.C.
39" - 41"
3'-6" 1'-0"
9" O.C.
2'-0"
/2
M
IN
T O
T O
P
6" 3'-0"
ACCESSIBLE TOILET WALL MOUNTED
1-1/2"
DIAMETER
GRAB BAR
SANITARY NAPKIN
DISPOSAL
TOILET SEAT
COVER
DISPENSER
HALL
LANTERN
ELEVATOR CALL BUTTON AND LANTERN
HALL CALL
BUTTON
1'-6"
"8
/4
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:1
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
G-100
GENERAL INFORMATION
2 5RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
KK
GENERAL SYMBOL LEGEND
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
24TH AVE S
H
IG
H L A
N D
A V
E
P
IE
R C
E A
V E
G A
R L A
N D
A V
E
24TH AVE S
SITE LOGISTICS LEGEND
BUILDING IN CONTRACT
EXISTING BUILDINGS
AREA OF WORK
PROPOSED STAGING AREA
A. CONTRACTOR SHALL PROVIDE TEMPORARY
ENTRANCES AND STAIR TOWERS TO PROVIDE
ACCESS TO CONSTRUCTION AREA.
B. CONTRACTOR TO ENSURE THAT TEMPORARY
ENTRANCES AND PROTECTIVE MEASURES
COMPLY WITH ALL OSHA REQUIREMENTS.
CONTRACTOR WILL BE RESPONSIBLE FOR
DESIGN AND ENGINEERING OF TEMPORARY
ENTRANCES AND PROTECTIVE MEASURES.
C. CONTRACTOR SHALL BE REQUIRED TO INSPECT
ALL TEMPORARY ENTRANCES AND PROTECTIVE
MEASURES DAILY TO ENSURE THEY ARE SAFE
AND COMPLY WITH OSHA REQUIREMENTS.
D. CONTRACTOR SHALL REPAIR ALL AREAS
DAMAGED OR DISTURBED DURING
CONSTRUCTION. THIS INCLUDES BUILDING
FINISHES, EXTERIOR OR INTERIOR, LANDSCAPE,
SIDEWALKS, PAVING OR ANY AREA DAMAGED BY
THE CONSTRUCTION WORK. RESTORE AREAS TO
ORIGINAL CONDITION.
E. DUMPSTER AND TRASH CHUTE LOCATIONS ARE
TO BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
F. CONTRACTOR SHALL PROTECT THE LANDSCAPE
SPRINKLER SYSTEM IN CONSTRUCTION LAY
DOWN ARE FROM DAMAGE. CAP ALL HEADS IN
THIS AREA DURING THE CONSTRUCTION PERIOD.
RESTORE SPRINKLER SYSTEM TO FULL
OPERATION AT END OF CONSTRUCTION.
G. CONTRACTOR SHALL PREPARE A PLAN OF THE
LAY DOWN/SECURITY FENCE AREA WITH
LOCATION ALL ELEMENTS INCLUDING DUMPSTER
AND TRASH CHUTE/COLLECTION AREA, TO BE
APPROVED BY COR.
H. CONTRACTOR TO ENSURE THE CONSTRUCTION
OF 7' 0" TALL FENCE WITH FABRIC TO SHIELD VIEW
INTO THE AREA. FENCING NEEDS TO HAVE
ACCESS GATES AS NOTED, AND BE
APPROPRIATELY SECURED TO NOT FALL OVER IN
HIGH WINDS.
I. CONTRACTOR SHALL COORDINATE ANY WORK
THAT PRODUCES EXCESSIVE NOISE TO BE
PERFORMED DURING OFF HOURS, AND
COORDINATE THIS WORK WITH COR.
J. CONTRACTOR SHALL RESTORE ALL
LANDSCAPING, HARDSCAPING AND SITE
ELEMENTS TO THE ORIGINAL CONDITION AT THE
COMPLETION OF CONSTRUCTION. CONTRACTOR
WILL PHOTOGRAPH AND DOCUMENT EXISTING
CONDITIONS PRIOR TO INSTALLING FENCING,
TEMPORARY ENTRANCES OR STARTING ANY
CONSTRUCTION WORK.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:1
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
G-101
SITE LOGISTICS PLAN
3 5RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
KK
N O
R T
HScale: 1" = 50'-0"
SITE LOGISTICS PLAN
1 APPROXIMATE CONSTRUCTION FENCE ROUTE
(REQUIRED PER SPECIFICATION SECTION 01 00 00).
2 PRIMARY CONSTRUCTION ENTRANCE.
3 PROPOSED CONSTRUCTION LAY-DOWN AREA TO
BE APPROVED BY COR. ALL MATERIAL STORAGE,
TRAILERS, EQUIPMENT AND PORTABLE TOILETS
SHALL BE PLACED IN THIS AREA. ALL MATERIALS
TO BE STORED INSIDE.
4 PRIMARY CONSTRUCTION ACCESS ROUTE.
5 ACCESS GATE.
6 EXISTING STAIRS TO REMAIN CLEAR FOR
EMERGENCY EGRESS.
7 FABRICATION SHOP FOR MECHANICAL
CONTRACTOR.
8 ENTRANCE TEMPORARILY CLOSED.
9 TEMPORARY CONSTRUCTION LAY-DOWN AREA TO
BE USED ON WEEKENDS ONLY, WITH COR
APPROVAL. ROAD TO REMAIN UNOBSTRUCTED
OTHERWISE.
10 TEMPORARY CONSTRUCTION ACCESS ROUTE.
11 TEMPORARY CONSTRUCTION ENTRANCE.
12 APPROXIMATE LOCATION FOR CONSTRUCTION
SCAFFOLDING.
GENERAL
1. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK. PERMITS INCLUDE: ICRA, PCRA, ILSM,
ABOVE CEILING, FIRE/SMOKE WALL, UTILITY, FIRE
SPRINKLER, FIRE ALARM SYSTEM, MEDICAL
GASES, CONFINED SPACE AND HOT WORK.
2. PROVIDE TEMPORARY SMOKE RESISTANT
BARRIERS CONSISTING OF 3-5/8" METAL STUD
FRAMING WITH 5/8" GYPSUM BOARD ON BOTH
SIDES. BARRIERS SHALL BE INSPECTED BY VA
COR STAFF PRIOR TO START OF CONSTRUCTION
IN SPACE. MAINTAIN NEGATIVE PRESSURE
VENTILATION IN THE CONSTRUCTION SPACE.
3. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT.
DUST CONTROL PLAN NOTES
A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY
VESTIBULE - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO
CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA AND TIGHT SEALS SHALL
BE MAINTAINED AT THE FULL PERIMETER OF
WALLS AND WALL PENETRATIONS. ANY DUST
SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER.
UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY AFTER VA COR'S APPROVAL TO
MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION
ACTIVITIES DUST AND DEBRIS CONTROL
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND
EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE. SIGNAGE
SHALL DIRECT PEDESTRIAN TRAFFIC AWAY
FROM THE CONSTRUCTION AREA AND
MATERIALS.
C. CONTRACTOR SHALL USE CLEAN CARTS TO
TRANSFER CONSTRUCTION MATERIAL IN AND
OUT OF THE PROJECT - CLEAN CART DAILY.
D. DEMOLITION DEBRIS: DEBRIS SHALL BE
REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, USING DESIGNATED TRAFFIC ROUTE.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT
DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES
SPECIFIED BY THE COR. IF CHUTES ARE USED TO
DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE
AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED
BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL
NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
E. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL
BE PROTECTED TO PREVENT DAMAGE BY
ADJACENT CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
F. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND
ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR
RE-CIRCULATED AIR; FILTERS SHALL BE ADDED
OR RETURN VENTS COVERED AS NEEDED WITH
FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY PLACES.
G. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH
NO DISRUPTION OF AIR SYSTEMS OF ADJACENT
AREAS. USE OF THE NEGATIVE AIR PRESSURE
SYSTEM WITHIN THE ENCLOSURE TO REMOVE
DUST SHALL PASS AIR THROUGH AN INDUSTRIAL
GRADE PORTABLE HEPA FILTER CAPABLE OF
FILTRATION RATES OF 300-800 CUBIC FEET PER
MINUTE. EXHAUST AIR DIRECTLY TO THE
OUTSIDE IF APPROVED BY COR IF EXHAUST
SHALL BE TIED INTO A RE-CIRCULATED AIR
SYSTEM, PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
H. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
I. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED
WITHOUT FILTRATION FROM THE CONSTRUCTION
AREA ELSEWHERE. PROVIDE AIR PRESSURE
TESTING THROUGHOUT THE PROJECT IN THE
FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES,
EQUIPMENT AND RELATED AREAS
J. WORKSITE CLOTHING: CONTRACTOR
PERSONNEL CLOTHING SHALL BE FREE OF
LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL
IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND
HEADGEAR) A HEPA-FILTERED VACUUM SHALL
BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. THE
CONTRACTOR SHALL CONSTRUCT AN
ANTEROOM FOR CHANGING CLOTHING AND
STORING EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED
AREAS SHALL BE MADE FREE FROM DUST AND
MOISTURE BY VACUUMING AND WET WIPING
BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
K. POST CONSTRUCTION: DO NOT REMOVE
BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION
SITE, CONTRACTOR HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE
CONTROL HAS INSPECTED AND APPROVED THE
CLEANING, AND AN RTO FORM HAS BEEN
COMPETED.
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY
REQUIRE MORE THAN ONE). FIRE
EXTINGUISHER TO BE SECURELY
MOUNTED TO FLOOR BRACKET TO
AVOID TOPPLING OVER.
CONTRACTOR IS TO ENSURE THAT IT
REMAINS VISIBLE AND READILY
ACCESSIBLE AT ALL TIMES DURING
CONSTRUCTION.
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
DOOR IN HARD ICRA
BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
G-102
G-100
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING
TO BE KEPT CLEAN.
FLOORS NOT BEING
REPLACED MUST BE
PROTECTED. COVER
WITH ROSIN PAPER /
FIRE RATED
PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT(S)
EXISTING WALL
EXISTING CEILING
FLEX DUCT
A P
P R
O X
A .F
.F
DOOR IN HARD
ICRA BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
G-102
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
UPGRADE ELEVATOR & MAIN FACILITY ACCESS
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
A
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work was being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant
5. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covers.
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology / MRI
• Respitory Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories (specimen)
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Medical Unit
• Negative pressure isolation rooms
• Oncology
• Operation rooms including C-section rooms
• Office Spaces
C L
A S
S I V
C L
A S
S I
II
C L
A S
S I I
C L A
S S
I
PATIENT RISK GROUPS
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project any Patient Risk
Construction Project Type
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.
It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:2
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
G-102
ICRA DETAILS
4 5RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
KK
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT UNIT (CUBE METHOD)
Scale: 1/2" = 1'-0"
ROOM ELEVATION
Scale: 6" = 1'-0"
ILSM SIGNAGE
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
Scale: 12" = 1'-0"
ICRA TEMPORARY BARRIER TAG
PHASE 1
PHASE 1
PHASE 3
PHASE 1
(LEVEL 1-5)
PHASE 2B PHASE 2A
PHASE 1
(LEVEL B-1)
P-10 P-11
P-14 P-15
STAIRWELL G4
STAIRWELL G1
DW-14
DW-7
DW-8
DW-9
G-103
TEMPORARY PEDESTRIAN
ENCLOSURE DURING PHASE
PHASE 2
PHASE 2
PHASE 3
PHASING LEGEND
PHASE 1
PHASE 2A
PHASE 2
PHASE 2B
PHASE 3
A. PROJECT CONSISTS OF 3 PHASES TO BE APPROVED
BY VA NASHVILLE COR, FOR THE NECESSARY
OPERATIONAL AND LOGISTICAL ARANGEMENTS TO
ACCOMMODATE STAFF AND VISITOR ACCESS DURING
CONSTRUCTION.
B. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE TVHS
NASHVILLE VA MEDICAL CENTER'S ICRA PERSONNEL,
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
ACTIVITY IN EACH PHASE. AREAS OF WORK IN EACH
PHASE MUST BE COMPLETED AND OPERATIONAL
PRIOR TO COMMENCING THE NEXT PHASE.
C. RENOVATION OF INTERIOR FINISHES NOT FULLY
WITHIN A ICRA BARRIER OF A PHASE MUST BE
PERFORMED OUTSIDE NORMAL OPERATING HOURS,
AND COORDINATED WITH THE VA COR. THESE AREAS
MUST BE READY FOR USE BY THE START OF
OPERATIONS THE NEXT DAY.
D. ALL PHASES WILL NEED TO ACCOMODATE VETERAN/
AND STAFF ACCESS TO BUILDING(S).
E. CONTRACTOR TO PROTECT ALL COMPLETED WORK IN
AREAS AND ELEVATORS TO BE OPERATIONAL
DURING CONSTRUCTION.
F. CONSTRUCTION PHASES ARE AS FOLLOWS:
PHASE 1:
CONSTRUCT NEW WAITING AREA WITH
TWO NEW MALE AND FEMALE TOILETS, REMOVE THE
EXISTING EQUIPMENT AT DUMBWAITERS DW-7, DW-8,
AND DW-9, INFILL EXISTING SLAB OPENING,
RENOVATE ADJACENT ROOM WITH RECLAIMED
SPACE, UPGRADE CONTROLS AT DW-14, AND
REPLACE THE EXISTING METAL STAIR AND RAILING
SYSTEM TO THE ELEVATOR MECHANICAL ROOM WITH
A PRE - MANUFACTURED METAL STAIR AND RAILING
SYSTEM. RENOVATE THE CROSSOVER BRIDGE WITH
TEMPORARY PROTECTIVE PEDESTRIAN ENCLOSURE
FOR CROSSOVER BRIDGE TO REMAIN IN SERVICE
DURING CONSTRUCTION, AND BEGIN GARAGE
FACADE RENOVATION. THE EXISTING MALE AND
FEMALE TOILETS AND ELEVATORS P-10 AND P-11 WILL
REMAIN IN SERVICE DURING CONSTRUCTION, BUT
ELEVATORS P-14 AND P-15 ALONG WITH STAIR G4
WILL BE OUT OF SERVICE DURING PHASE 1
CONSTRUCTION.
PHASE 2 :
DEMOLISH AND RENOVATE THE AREA OF THE
EXISTING MALE AND FEMALE TOILETS, AND
COMPLETE PORTION OF FINISH RENOVATIONS AT THE
HOSPITAL ENTRANCE INTO BRIDGE. THE NEW
WAITING AREA WITH TWO NEW MALE AND FEMALE
TOILETS, ELEVATORS P-14 AND P-15, STAIR G4 AND
PEDESTRIAN BRDGE WILL BE OPERATIONAL DURING
PHASE 2 CONSTRUCTION.
PHASE 2A:
AS PART OF PHASE 2, MODERNIZE ELEVATOR P-11
AND RELATED EQUIPMENT IN THE ELEVATOR
MECHANICAL ROOM. ELEVATORS P-10, P-14, P-15,
STAIRS G1 AND G4, AND PEDESTRIAN BRIDGE WILL
BE OPERATIONAL DURING PHASE 2A CONSTRUCTION.
PHASE 2B:
AS PART OF PHASE 2, MODERNIZE ELEVATOR P-10
AND RELATED EQUIPMENT IN THE ELEVATOR
MECHANICAL ROOM. ELEVATORS P-11, P-14, P-15,
STAIRS G1 AND G4, AND PEDESTRIAN BRIDGE WILL BE
OPERATIONAL DURING PHASE 2B CONSTRUCTION.
PHASE 3:
RENOVATE ELEVATOR LOBBY, AND COMPLETE FINISH
RENOVATIONS AT THE HOSPITAL ENTRANCE INTO
BRIDGE. THE NEW WAITING AND LOBBY AREA,
ELEVATORS P-10, P-11, P-14, P-15, STAIRS G1 AND G4,
AND PEDESTRIAN BRIDGE WILL BE OPERATIONAL
DURING PHASE 3 CONSTRUCTION.
EXISTING GARAGE
FLOOR LEVEL
9' - 10"
EXISTING STEEL FRAME
TO REMAIN
REMOVE GLAZING SYSTEM
REMOVE GLAZING SYSTEM
REMOVE MASONRY
REMOVE WALL
REMOVE FANCOIL UNITS
REMOVE SOFFIT SYSTEM
CONSTRUCT WOOD-FRAMED
PROTECTIVE PEDESTRIAN
ENCLOSURE PRIOR TO
BEGINNING DEMOLITION
1" / 12"
5/8" TYPE X MOISTURE-
RESISTANT GLASS-MAT
GYP BD
2/4 WOOD STUDS, FIRE-
RETARDANT TREATED
3/4" PLYWOOD, FIRE-
RETARDANT TREATED
TPO ROOF MEMBRANE
PAINT EXPOSED
PLYWOOD FACE
CLEAR
5'-6"
INSTALL TEMPORARY HEPA
FILTERED PACKAGE HVAC
UNITS FOR COOLING
ENCLOSURE DURING
CONSTRUCTION
11 1/8"
CONT SEALANT
TEMPORARY LIGHT
FIXTURE, SURFACE
MOUNTED, LINEAR LED
HANDRAIL
6'-0" TO 8'-0" SEGMENT LENGTH
3/4" FIRE RETARDANT TREATED PLYWOOD, PAINTED
5/8" TYPE X GYP BD
2X4 WOOD STUDS
HANDRAIL
CONSTRUCT TEMPORARY ENCLOSURE
AS PANELS FOR INSTALLATION
FIRE-RATED SEALANT
FIRE-RATED SEALANT
THE TEMPORARY PEDESTRIAN ENCLOSURE
IS INTENDED TO BE CONSTRUCTED AS
SEGMENTED PANELS TO FACILITATE RAPID
INSTALLATION DURING NIGHTS TO AVOID
HIGH-TRAFFIC TIMES.
PROGRAM SCHEDULE
Name
RENOVATION
Area
ADDITION
TOTAL AREA
2,499 SF
1,543 SF
4,042 SF
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:2
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
G-103
OVERALL PHASING PLAN
5 5RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
KK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/16" = 1'-0"
OVERALL PHASING PLAN
N O
R T
H
0 8 16 32
Scale: 1/2" = 1'-0"
BRIDGE SECTION DURING PHASE 1 0 1 2 4
Scale: 1 1/2" = 1'-0"
TEMPORARY PEDESTRIAN ENCLOSURE PLAN DETAIL 0 12"6"3"
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
ADO AUTOMATIC DOOR OPENING
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
PP PUSH PAD
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE WINDOW TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1##
# BID ALTERNATE SLOPE
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. CONTRACTOR SHALL COMMENCE NEW WORK AND INSTALL FINISHES ONLY AFTER COMPLETING SMOKE
REMEDIATION ACTIVITIES IN AREA OF WORK.
9. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
10. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
11. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
12. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
13. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
14. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED. ANY USE OF WOOD WOULD BE AN EXCEPTION TO VA STANDARDS AND ARE TYPICALLY NOT PERMITTED. SUBMIT USE OF WOOD TO COR FOR
APPROVAL.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. CONTRACTOR SHALL COMPLETE SMOKE REMEDIATION OF ALL EXISTING SURFACES BEFORE COMMENCING
NEW WORK.
9. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
10. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
11. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
12. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
13. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
14. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE
LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.
15. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
16. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE COR UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE COR WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE
COR, ARE TO BE REMOVED AND DISPOSED OF BY CONTRACTOR IN APPROVED MANNER.
17. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
18. THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WITH THE COR, THE USE OF THE CONSTRUCTION ACCESS ROUTE TO DUMPSTER AREA AND FREIGHT ELEVATOR (AS REQUIRED) FOR WASTE REMOVAL.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:4
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 24RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
KK
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND GENERAL NOTES
DEMOLITION NOTES
FEMALE TLT MALE TLT
ELEVATOR
LOBBY
BRIDGE
ELEVATOR
LOBBY
SMOKE ROOM
HAC
G-101D
TOILET
G-101A
TOILET
G-101B
TOILET
G-101C
PATIENT EDU
G-134
WAITING
G-112
8 8
P-10 P-11
X 0"
X 0"
X 0"
X -5" X 0"
X 0"
X -4.39"
X 0"
X -5"
FAN ROOM #17
1-G133
OUTPATIENT
FILLING/ASSEMBLY
1-G134
CORRIDOR
C1-21A
X -3.625" X -1.375"
0.25
STAIRWELL G1
P-14 P-15
STAIRWELL G4
G-103
17 16
16 18 19 16 18 19
15 17 16 15
17 16 15
12 12 9 20
17 16 15
/4
/4
+/- 5'-7 1/4" +/- 21'-2 7/8"
21 22
ELEVATOR
MECHANICAL
ROOM
P11 P10
LANDING ELEVATION
53' 0"
LANDING ELEVATION
46' 6"
4'-2"
DN
A. CONTRACTOR TO PROTECT WORK TO REMAIN FROM
DAMAGE DURING DEMOLITION.
B. CONTRACTOR SHALL COMPLETE SMOKE REMEDIATION OF
ALL EXISTING SURFACES BEFORE COMMENCING NEW WORK.
C. REMOVE WALLS / PARTITIONS COMPLETELY FROM FLOOR TO
STRUCTURE DECK ABOVE.
D. CONTRACTOR TO FILL VOIDS UP TO THE FINISH FLOOR LEVEL
AND PERFORM FLOOR LEVELING AFTER REMOVING EXISTING
MASONRY WALL.
E. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED FROM SITE
EACH DAY AND REMOVED OF PROPERLY PER CONTRACT
REQUIREMENTS.
F. CONTRACTOR TO PROVIDE PROTECTIVE BARRIERS,
WARNING SIGNS AND TEMPORARY PATHWAYS IN AREAS
THAT WILL BE OPERATING DURING THE CONSTRUCTION
PHASE. TEMPORARY WAY FINDING SIGNAGE TO BE
PROVIDED FOR THE DURATION OF THE CONSTRUCTION.
G. PROVIDE DUST AND DEBRIS BARRIER IN ACCORDANCE WITH
ICRA REQUIREMENTS.
H. CONTRACTOR TO PATCH ANY WORK TO REMAIN THAT WAS
DAMAGED DURING DEMOLITION TO MATCH EXISTING.
DAMAGED CEILING GRID AND TILE IS TO BE REPLACED IN
ENTIRETY.
I. REFER TO SHEET A-401 FOR TYPICAL SLAB INFILL DETAIL,
AND COORDINATE WITH STRUCTURAL DRAWINGS.
J. COORDINATE WITH COR FOR SALVAGE AND RETURN FOR
REUSE OF DOORS, HARDWARE, FRAMES AND CASEWORK AS
REQUIRED.
K. REMOVE SUPPORTS AND BRACKETS THAT SECURE
PARTITION FRAMING, CEILING COMPONETS AND CEILING
MOUNTED EQUIPMENT OF ALL WORK TO BE DEMOLISHED.
ENSURE NO DAMAGE ANY STRUCTURAL ELEMENTS OR
DECK.
L. CONTRACTOR TO ENSURE NO DAMAGE TO RATED SHAFT
WALLS OR FIRE / SMOKE RATED PARTITIONS. ANY RATED
WALLS DAMAGED DURING CONSTRUCTION ARE TO BE
REPAIRED PER RATED PARTITION REQUIREMENTS.
M. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK VIA PHOTO. NOTIFY THE COR OF ANY CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
N. REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL,
COMMUNICATION AND PLUMBING DOCUMENTS FOR
RESPECTIVE DEMOLITION AND NEW WORK INFORMATION.
O. ALL DEMOLITION WORK SHALL BE PERFORMED
WITH "DUE CARE AND DILIGENCE" IN ORDER TO PREVENT
ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR
CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OF CONDITIONS LOCATED
DIFFERENTLY FROM THAT INDICATED OF THAT ARE NOT
IDENTIFIED SHALL BE REPORTED TO THE COR.
P. CONTRACTOR TO COORDINATE INTERIM TRAFFIC CONTROL
MEASURES FOR PARKING GARAGE AND HOSPITAL ACCESS
FOR THE DURATION OF PROJECT.
Q. CONTRACTOR TO COORDINATE WITH COR, TIME TO ACCESS
AND EXECUTE WORK IN STAIRWELL G1. CONTRACTOR MUST
COORDINATE AND FOLLOW SAFETY PROTECTION MEASURES
AS APPROVED BY COR, FOR STAIR ACCESS BELOW AREA
OF WORK DURING CONSTRUCTION.
EXISTING WALL TO REMAIN
DEMOLISHED WALL
DEMOLISHED DOOR
DEMOLITION LEGEND
TEMPORARY BARRIER
FINISH FLOOR ELEVATIONX 0" = 10'-3" AFF
EXISTING DOOR TO REMAIN
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:0
:4
P
M C
U s e rs
\r ja c k s o n \D o c u m e n ts \A
-3
-V
A N a s h v ill e E le v a to rs
T N rj a c k s o n Q
N L
H
.r v t
AD101
SECOND FLOOR DEMOLITION FLOOR
PLANS - PHASE 1
2 24RMJ
UPGRADE ELEVATOR & MAIN
FACILITY ACCESS
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVE SOUTH
NASHVILLE, TN 37212 NOVEMBER 22, 2021
BID DOCUMENTS
626-21-20220-383
1, PARKING GARAGE,
BRIDGE
KK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
SECOND FLOOR DEMOLITION FLOOR PLAN - PHASE 1
1 REMOVE EXISTING MASONRY WALL.
2 REMOVE EXISTING STOREFRONT SYSTEM. PROVIDE
TEMPORARY COVER FOR WEATHER PROTECTION
DURING CONSTRUCTION.
3 REMOVE WALL MOUNTED DEVICES, ACCESSORIES
AND FIXTURES.
4 REMOVE EXISTING FURNITURE.
5 REMOVE EXISTING BOLLARDS.
6 REMOVE EXISTING STAIR, RAILING AND
ASSOCIATED STRUCTURE.
7 REMOVE EXISTING HVAC WINDOW UNITS.
8 REMOVE TOP +/1"-2" OF EXISTING SLAB TO
PREPARE FOR NEW CONCRETE INFILL/LEVELING
COMPOUND AND NEW FLOORING.
9 TEMPORARY 1 HR ICRA BARRIER.
10 EXISTING ELEVATORS AND STAIR TO BE CLOSED TO
THIS LEVEL DURING CONSTRUCTION. ADD SIGNAGE
TO AFFECTED FLOORS.
11 REMOVE EXISTING EXHAUST SYSTEM.
12 PROVIDE STICKY MATS.
13 RELOCATE EXISTING VENDING MACHINE.
14 EXISTING EQUIPMENT TO REMAIN.
15 REMOVE EXISTING FACE BRICK AND SUBSTRATE
DOWN TO STRUCTURAL FRAME.
16 REMOVE EXISTING CAST STONE/SOLID SURFACE
SILL.
17 REMOVE EXISTING STOREFRONT WINDOW SYSTEM.
18 REMOVE EXISTING FAN COIL UNITS AND
ASSOCIATED PLUMBING AND ELECTRICAL
COMPONENETS.
19 REMOVE EXISTING INTERIOR WALL FURRING DOWN
TO STRUCTURAL FRAME.
20 REMOVE EXISTING STOREFRONT ENTRANCE
SYSTEM. REMOVE PRIOR TO PEDESTRIAN
ENCLOSURE INSTALLATION. WORK TO BE
PERFORMED ON NIGHTS AND WEEKENDS.
SEPARATE AREA OF WORK WITH TEMPORARY 1
HOUR INFECTION CONTROL BARRIERS.
21 REMOVE PORTION OF EXISTING MASONRY WALL AS
REQUIRED TO RECEIVE NEW WORK.
22 REMOVE EXISTING STOREFRONT WINDOW SYSTEM.
N O
R T
H
0 4 8 16
Scale: 1/4" = 1'-0"
ELEVATOR MECHANICAL ROOM STAIR DEMO PLAN - PHASE 1
N O
R T
H
0 2 4 8
# KEY NOTES:
21 SEAL AROUND DOOR COMPLETELY. INSTALL
YELLOW CROSS TAPES AND CONSTRUCTION SIGN
STATING "TEAR OFF TAPES, EMERGENCY EXIT
ONLY". INSTALL TEMPORARY CONSTRUCTION SIGN
IN STAIRWELL G4 TO INDICATE NO ACCESS
THROUGH ELEVATOR LOBBY ON THIS LEVEL
DURING CONSTRUCTION. COORDINATE WITH VA
COR ABOUT SECURING EGRESS DOOR.
22 SEAL AROUND ELEVATOR DOORS COMPLETELY.
COVER CALL BUTTONS AND HALL LANTERNS.
PROTECT ELEVATOR DOORS FROM
CONSTRUCTION DUST AND DEBRIS. INSTALL
TEMPORARY CONSTRUCTION SIGN INSIDE OF THE
CAR TO INDICATE NO ACCESS THROUGH THIS
LEVEL DURING CONSTRUCTION. COORDINATE WITH
VA COR ABOUT SECURING ELEVATOR DOORS.
1 ADDENDUM NO. 1 05/24/2022
S
S
S
S
S S
S S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
FEMALE TLT MALE TLT
MALE
TLT
FEMALE
TLT
ELEVATOR
LOBBY
BRIDGE
HAC
G-101D
TOILET
G-101A
TOILET
G-101B
TOILET
G-101C
PATIENT EDU
G-134
WAITING
G-112
3 3
P-10 P-11
FAN ROOM #17
1-G133
OUTPATIENT
FILLING/ASSEMBLY
1-G134
CORRIDOR
C1-21A
X 0"
X 0"
X 0"
X 0"
X 0"
X -5"
X 0"
X 0"
X 0"
X 0"
X -5"
X -5"
X -5"
X 0"
ALCOVE
201A
ELEVATOR
LOBBY
STAIRWELL G1
P-14 P-15
STAIRWELL G4
+/- 7'-5"
/4
/2
/4
MALE
TLT
FEMALE
TLT
ALCOVE
201A
ELEVATOR
LOBBY
WAITING
ELEVATOR
LOBBY
BRIDGE
HAC
G-101D
TOILET
G-101A
TOILET
G-101B
TOILET
G-101C
PATIENT EDU
G-134
WAITING
G-112
DN
P-10 P-11
FAN ROOM #17
1-G133
OUTPATIENT
FILLING/ASSEMBLY
1-G134
CORRIDOR
C1-21A
X 0"
X 0"
X 0"
STAIRWELL G1
P-14 P-15STAIRWELL G4
5'-8
5'-0"
/4
A. CONTRACTOR TO PROTECT WORK TO REMAIN FROM
DAMAGE DURING DEMOLITION.
B. CONTRACTOR SHALL COMPLETE SMOKE REMEDIATION OF
ALL EXISTING SURFACES BEFORE COMMENCING NEW WORK.
C. REMOVE WALLS / PARTITIONS COMPLETELY FROM FLOOR TO
STRUCTURE DECK ABOVE.
D. CONTRACTOR TO FILL VOIDS UP TO THE FINISH FLOOR LEVEL
AND PERFORM FLOOR LEVELING AFTER REMOVING EXISTING
MASONRY WALL.
E. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED FROM SITE
EACH DAY AND REMOVED OF PROPERLY PER CONTRACT
REQUIREMENTS.
F. CONTRACTOR TO PROVIDE PROTECTIVE BARRIERS,
WARNING SIGNS AND TEMPORARY PATHWAYS IN AREAS
THAT WILL BE OPERATING DURING THE CONSTRUCTION
PHASE. TEMPORARY WAY FINDING SIGNAGE TO BE
PROVIDED FOR THE DURATION OF THE CONSTRUCTION.
G. PROVIDE DUST AND DEBRIS BARRIER IN ACCORDANCE WITH
ICRA REQUIREMENTS.
H. CONTRACTOR TO PATCH ANY WORK TO REMAIN THAT WAS
DAMAGED DURING DEMOLITION TO MATCH EXISTING.
DAMAGED CEILING GRID AND TILE IS TO BE REPLACED IN
ENTIRETY.
I. REFER TO SHEET A-401 FOR TYPICAL SLAB INFILL DETAIL,
AND COORDINATE WITH STRUCTURAL DRAWINGS.
J. COORDINATE WITH COR FOR SALVAGE AND RETURN FOR
REUSE OF DOORS, HARDWARE, FRAMES AND CASEWORK AS
REQUIRED.
K. REMOVE SUPPORTS AND BRACKETS THAT SECURE
PARTITION FRAMING, CEILING COMPONETS AND CEILING
MOUNTED EQUIPMENT OF ALL WORK TO BE DEMOLISHED.
ENSURE NO DAMAGE ANY STRUCTURAL ELEMENTS OR
DECK.
L. CONTRACTOR TO ENSURE NO DAMAGE TO RATED SHAFT
WALLS OR FIRE / SMOKE RATED PARTITIONS. ANY RATED
WALLS DAMAGED DURING CONSTRUCTION ARE TO BE
REPAIRED PER RATED PARTITION REQUIREMENTS.
M. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK VIA PHOTO. NOTIFY THE COR OF ANY CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
N. REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL,
COMMUNICATION AND PLUMBING DOCUMENTS FOR
RESPECTIVE DEMOLITION AND NEW WORK INFORMATION.
O. ALL DEMOLITION WORK SHALL BE PERFORMED
WITH "DUE CARE AND DILIGENCE" IN ORDER TO PREVENT
ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR
CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OF CONDITIONS LOCATED
DIFFEREN…
This is the start of the file's text. The full file is on GovTribe.