About this file

36C24919Q0456 P09-QASP 614 Regulated Medical Waste.docx

View the file

Other files for this federal contract opportunity

Other files attached to Regulated Medical Waste Services, newest first.
File Type Posted
36C24920D0007-000.docx DOCX document
36C24919Q0456-0003000.docx DOCX document
36C24919Q0456-0003000.docx DOCX document
36C24919Q0456-0002000.docx DOCX document
36C24919Q0456-0002000.docx DOCX document
36C24919Q0456-0001000.docx DOCX document
36C24919Q0456-0001000.docx DOCX document
36C24919Q0456-002.docx DOCX document
36C24919Q0456-001.docx DOCX document
36C24919Q0456-001.docx DOCX document
36C24919Q0456-000.docx DOCX document
36C24919Q0456-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

THE QASP IS PROVIDED FOR INFORMATION ONLY. THE QASP WILL NOR BECOME PART OF THE CONTRACT DOCUMENT

For: Regulated Medical Waste Disposal, Memphis VAMC

Contract Number: TBD

Contract Description: The Memphis VAMC has a need for Regulated Medical Waste Disposal. Regulated Medical Waste Disposal will be transported and disposed in compliance with Federal, State and Local regulation

Regulated Medical Waste Disposal Services consist of physically collecting and disposing of medical waste on a regularly scheduled basis. Individual weight tickets for Regulated Medical Waste are required as described in specifications. Contractor will not make any change in where Regulated Medical Waste is hauled to without prior written approval by the Contracting Officer.

Contractor’s name: TBD

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: David Milner Organization or Agency: Network Contracting Office Nine (NCO-09)

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Primary COR:Glenn Heard
Memphis VAMC
1030 Jefferson Ave
Memphis, TN 38104

c. Other Key Government Personnel: Don Anthony, Chief, EMS

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as Contractor’s Program Manager(s) for this contract.

a. Program Manager: XXXXX XXXXXX

b. Other Contractor Personnel: XXXXX XXXXX

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Task
ID
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Incentive

Rating

Container Service
1.4
All waste containers properly serviced as indicated in SOW
Waste containers will be serviced as outlined in SOW schedule
100% compliance
Validated User/Customer Complaint
See Paragraph 5
Satisfactory = 95% or greater effectiveness level

Unsatisfactory = >%95 effectiveness level

Containers Serviceable

1.4
Vendor responds to service calls
Replacement of damaged containers will take place within 24 hours after the service call is made.
Replacement completed within standard 100% of the time
Validated User/Customer Complaint

Periodic Inspection

See Paragraph 5
Excellent = < 24 hours

Satisfactory = 24 hours

Unsatisfactory = > 24 hours

Monthly Reports
1.6
Vendor to provide monthly poundage summary of Medical Waste disposed of.
Vendor to provide report of how much waste was disposed of within monthly timeframe
Must be provided at least 30 days after last work day of month.
Periodic Inspection
See Paragraph 5
Satisfactory = reports received on time

Unsatisfactory = not received on time or not at all

Reporting Spills
1.7
Reporting to the COR all spills, regardless of quantity, and all personnel exposures
reported by telephone immediately following the incident and shall be followed up in writing no later than seven (7) days after the initial report.
100% Compliance
Observation
See Paragraph 5
Satisfactory = 100% effectiveness level

5. INCENTIVES

The Government shall use exercise of ordering periods and CPARS past performance assessments as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

PERIODIC INSPECTION/OBSERVATION: Inspections may be scheduled quarterly.

Performance Standard ID – 1.4, 1.6, 1.7

VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)

Performance Standard ID – 1.4

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Excellent = Exceeds Standards Satisfactory = Meets Standards Unsatisfactory = Fails To Meet Standards

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager with a copy to the Contracting Officer.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.

<After award, both the contractor’s Program Manager and the COR shall sign this document.>