36C24919B0003-0004000.docx
DOCX document 17 KB Posted
- Attached to
- 603-18-508 - Replace Satellite Chillers Federal contract opportunity
- Solicitation number
- 36C24919B0003
About this file
36C24919B0003 0004 36C24919B0003 0004.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24919C0111-000.docx | DOCX document | |
| 36C24919B0003-0007000.docx | DOCX document | |
| 36C24919B0003-0006001.pdf | ||
| 36C24919B0003-0006000.docx | DOCX document | |
| 36C24919B0003-0005000.docx | DOCX document | |
| 36C24919B0003-0004008.pdf | ||
| 36C24919B0003-0004009.pdf | ||
| 36C24919B0003-0004003.pdf | ||
| 36C24919B0003-0004005.pdf | ||
| 36C24919B0003-0004012.pdf | ||
| 36C24919B0003-0004007.pdf | ||
| 36C24919B0003-0004001.pdf | ||
| 36C24919B0003-0004013.pdf | ||
| 36C24919B0003-0004014.pdf | ||
| 36C24919B0003-0004011.pdf | ||
| 36C24919B0003-0004006.pdf | ||
| 36C24919B0003-0004010.pdf | ||
| 36C24919B0003-0004004.pdf | ||
| 36C24919B0003-0004002.pdf | ||
| 36C24919B0003-0003001.pdf | ||
| 36C24919B0003-0003000.docx | DOCX document | |
| 36C24919B0003-0002000.docx | DOCX document | |
| 36C24919B0003-0001000.docx | DOCX document | |
| 36C24919B0003-002.pdf | ||
| 36C24919B0003-003.pdf | ||
| 36C24919B0003-001.docx | DOCX document | |
| 36C24919B0003-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-08-2019 603-18-508 90C Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro
TN
37129 90C Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway Suite 400 Murfreesboro
TN
37129 To all Offerors/Bidders
36C24919B0003 02-21-2019
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
3/25/2019 X Amendment 0004 is being posted to provide more information pertaining to the following project.
Please review all attachments.
Last, the Statement of Work has some changes and has been included in this amendment.
See attached document: S06- Attachment 1 - Common Work Results for HVAC.
See attached document: S06 - Attachment 2 - Testing, Adjusting, and Balancing for HVAC.
See attached document: S06 - Attachment 3 - HVAC Insulation.
See attached document: S06 - Attachment 4 - Direct-Digital Control System for HVAC.
See attached document: S06 - Attachment 5 - Hydro Piping.
See attached document: S06 - Attachment 6 - Steam and Condensate Heating Piping 02.
See attached document: S06 - Attachment 7 - Decentralized Unitary HVAC Equipment.
See attached document: S06 - Attachment 8 - Requirements for Electrical Installations.
See attached document: S06 - Attachment 9 - Low-Voltage Electrical Power Conductors and Cables.
See attached document: S06 - Attachment 10 - Grounding and Bonding for Electrical Systems.
See attached document: S06 - Attachment 11 - Raceway and Boxes for Electrical Systems.
See attached document: S06 - Attachment 12 - Wiring Devices.
See attached document: S06 - Attachment 13 - Enclosed Switches and Circuit Breakers.
See attached document: S06 - Attachment 14 - STATEMENT OF WORK CORRECTIONS.
File details come from the government source that posted it.