SF-30 36C24822Q0946 0001 02.pdf
PDF 253 KB Posted
- Attached to
- Brand Name Pyxis Automated Dispensing Equipment
- Solicitation number
- 36C24822Q0946
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24822Q0946 0002.pdf | ||
| 36C24822Q0946 0002_1.docx | DOCX document | |
| 36C24822Q0946 0001_1.docx | DOCX document | |
| COMBINED SS 36C24822Q0946 PYXIS SDVOSB.pdf | ||
| ATCH 2 CLAUSES AND PROVISIONS 36C24822Q0946.docx | DOCX document | |
| ATCH 3 LIMITATIONS OF SUBCONTRACTING 36C24822Q0946.docx | DOCX document | |
| ATCH 1 SCHEDULE SALIENT CHARACTERISTICS DELIVERY SCHEDULE AND JUSTIFICATION FOR BRAND NAME 36C24822Q0946.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
516-22-3-213-0238
36C248
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
Room 315, Bldg. 2
10,000 Bay Pines Blvd
Bay Pines FL 33744
36C248
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
C.W. Bill Young VA Medical Center
10000 Bay Pines Blvd. Room 315, Bldg. 2
Bay Pines FL 33744
To all Offerors/Bidders
36C24822Q0946
05-24-2022
X
X X
516-3620160-213-822400-3131 010040175
X
The purpose of this amendment is to provide answers to questions posed. See Pages 2 - 5.
Janice Fornaro
CONTINUATION PAGE
Reference:
ATCH+1+SCHEDULE+SALIENT+CHARACTERISTICS+DELIVERY+SCHEDULE+AND+JUSTIFICATION+F
OR+BRAND+NAME+36C24822Q0946
B.3 Delivery Schedule, Delivery Date
Question: BD’s current implementation timeframe is 270 days ARO, which allows for a kick-off within the first 30 days of contract award to develop a mutually agreed upon project timeline. Project milestone completion dates assume global supply chain constraints do not have an impact on the equipment delivery schedule. Is this acceptable to the government? Need this within 120 days since 4A is opening around September 2022.
Statement of Need
The contractor will provide a one-time training at installation of equipment (if applicable). The government will require additional training if applicable.
Question: BD provides on-site training sessions for the super users and system administrators. The BD project manager will create a mutually agreed upon project timeline that includes that training dates of training sessions. BD does not provide training post installation; for this reason, we do ask that site Super Users are trained during the on-site implementation. Is this acceptable to the government? Yes
Reference: Statement of Need
The contractor will ensure all Preventative Maintenance and/or Updates are current on the device at the point of installation that may have been issued since the device was manufactured and shipped.
Question: With an active support contract, BD will make available the ability to schedule mutually agreed upon Preventative Maintenance and/or Updates on the device at the point of installation that may have been issued since the device was manufactured and shipped. Is this acceptable to the government? Yes
Warranty of Equipment
Standard manufacturer industry warranty term. Government does not accept extended warranty, which requires advance payment.
BD Question: Does customer agree that upon acceptance of the equipment Vendor will provide a 12-month limited warranty to keep equipment performing in accordance with the specifications of it’s User Guide? Yes
BD Question: Will a support plan be contracted to service equipment after the 1-year warranty term has ended? Yes
Reference: LIQUIDATED DAMAGES FOR DATA BREACH
Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the
Security Incident Investigation section above. Upon such notification, VA must secure from a non-
Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
BD Question: Will the VA confirm that those damages constitute VA’s remedy for a data breach or privacy incident? This is only a portion of the required language from section 7 of VA
Handbook 6500.6. Below is the entire section that is required to be included in the contract, which includes the contractor’s responsibility for paying to the VA liquidated damages in the amount of $40 per affected individual to cover the cost of providing credit protections services to affected individuals. Below is additional language:
7. LIQUIDATED DAMAGES FOR DATA BREACH
a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
c. Each risk analysis shall address all relevant information concerning the data breach, including the following:
(1) Nature of the event (loss, theft, unauthorized access);
(2) Description of the event, including:
(a) date of occurrence;
(b) data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;
(3) Number of individuals affected or potentially affected;
(4) Names of individuals or groups affected or potentially affected;
(5) Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text;
(6) Amount of time the data has been out of VA control;
(7) The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);
(8) Known misuses of data containing sensitive personal information, if any;
(9) Assessment of the potential harm to the affected individuals;
(10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and
(11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.
d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $______ per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:
(1) Notification;
(2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;
(3) Data breach analysis;
(4) Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution;
(5) One year of identity theft insurance with $20,000.00 coverage at $0 deductible; and
(6) Necessary legal expenses the subjects may incur to repair falsified or damaged credit records, histories, or financial affairs.
Reference: TRAINING
BD Question: Will the VA allow BD to meet training requirements as outlined in the provided MOU
ISA, section 3.2.12 “Training and awareness" as well completing background investigation training through TMS as needed? No, a MOU is not acceptable in lieu of the required training specified in VA Handbook 6500.6, which states:
9. TRAINING
a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems:
(1) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems;
(2) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;
(3) Successfully complete the appropriate VA privacy training and annually complete required privacy training; and
(4) Successfully complete any additional cyber security or privacy training, as required for
VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document – e.g., any role-based information security training required in accordance with NIST Special
Publication 800-16, Information Technology Security Training Requirements.]
b. The contractor shall provide to the contracting officer and/or the COTR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.
In addition, a BAA is required prior to commencement of work.
File details come from the government source that posted it. Updated .