36C24819Q0955-0002005.pdf
PDF 215 KB Posted
- Attached to
- Replacement of Fisher House A/C Systems
- Solicitation number
- 36C24819Q0955
About this file
36C24819Q0955 0002 S05 Answers 36C24819Q0955 0002.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24819Q0955-0004002.pdf | ||
| 36C24819Q0955-0004000.docx | DOCX document | |
| 36C24819Q0955-0004001.pdf | ||
| 36C24819Q0955-0003000.docx | DOCX document | |
| 36C24819Q0955-0002004.docx | DOCX document | |
| 36C24819Q0955-0002006.pdf | ||
| 36C24819Q0955-0001001.pdf | ||
| 36C24819Q0955-0001000.docx | DOCX document | |
| 36C24819Q0955-001.pdf | ||
| 36C24819Q0955-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0002 08-13-2019
None
36C248
Department of Veterans Affairs
Miami VA Healthcare System
1201 NW 16th Street
Miami FL 33125
36C546
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
Miami VA Healthcare System
1201 NW 16th Street
Miami FL 33125
To all Offerors/Bidders
36C24819Q0955
08-02-2019
X
X X
X
Please see continuation page.
CONTINUATION PAGE
The purpose of this Amendment is to answer Vendor’s Questions:
Questions and Answers
36C24819Q0955
Question No. 1: Section B.2 Price Cost Sheet list and Section 4.1 of the Performance Requirements does not specify model/tonnage for the preferred Trane system. Should an ‘equal’
(such as the currently installed Carrier) be acceptable, the specifications need to be supplied.
Answer: Yes. This is brand name or equal.
Question No. 2: Section B.2 Price Cost Sheet list and Section 4.2 instructs to replace the blower wheel and evaporator coil for AHU #3 in the attic with no specification given. (Typically, these are a matched pair to meet the system requirements and come as a unitized equipment, not separate items).
Answer: Typically, yes. These items can be purchased separately. Air handling units are
Carrier 40RM007-034, 40RMQ008-028, 40 RMS008-034, 50/60Hz.
Question No. 3: Section B.2 Price Cost Sheet and Section 4.3 instructs to replace 32 Nailor, Variable
Air Volume (VAVs) controllers with no specification, such as model number.
Answer: Information currently not available. The government will supplement this answer when, and if the information becomes available.
Question No. 4: Due to the lack of access to the VAVs, is it the intention of the client to have the ceiling opened for replacement of these units and then repair?
Answer: The Miami Bruce W. Carter VA Medical Center personnel will install access panels to gain access to the VAVs if necessary.
Question No. 5: Section 4.3 indicates tie in to an existing control system, but the specifications of that system are not given, nor was this item/equipment group shown to us during the walk through. VAV system will be stand alone.
Answer: Each VAV system will have an individual thermostat in each individual room.
Question No. 6: The solicitation package did not contain any mechanical drawings from which we can determine duct sizes or system CFM/pressure design to adequately match replacement equipment. Will these be made available?
Answer: The size of the air handlers, condensing unit, VAV system is as follows: 15 ton; 15 ton. Please see the attached mechanical drawings.
Question No. 7: We note that government is asking for Trane unit systems of 16 SEER, they are going to provide us a model number?; (sic) also, note that commercial units do not have 16 SEER.
Answer: There is no specific model number. Commercial units do come in 16 SEER.
Question No. 8: Could you please provide a copy of the sign in sheet?
Answer: Negative.
Question No. 9: Is this ALL (sic) daytime work hours?
Answer: Yes.
Question No. 10: How many VAV’s will be able to replace at once? The work will be phase (sic) to maximize the effort.
Answer: Minimum of (4) VAV per workday.
Question No. 11: Please provide the cut sheets for the existing VAV boxes?
Answer: Three (3) phase 208/230 reduced to 24 volts.
Questions No. 12: What is the current CFM’S for the current VAV boxes?
Answer: Various.
Question No. 13: Please provide a floor plan layout for the VAV locations.
Answer: Please see the attached.
Question No. 14: Are all the VAV’s in the attic or are they above the hard ceiling?
Answer: Some are in the attic and some are in the rooms on the first floor.
Question No. 15: If the VAV’s are above the hard ceiling in the rooms is there access panels? We only looked at 1 vav (sic) box during the walkthrough. If there is (sic) no access panels how do we access the VAV’S?
Answer: See answer to Question No. 4.
Question No. 16: Please provide a lifting and staging location for the crane needed for the removal and replacement of the condensing units?
Answer: The West and South area of the Fisher House, if required.
Question No. 17: Can the existing AHU and COND disconnects be used?
Answer: No.
Question No. 18: If a new disconnect is required for the AHU and COND does it need to be NEMA
4x stainless steel?
Question No. 19: Due to the space limitations in the attic “IF” the area is too tight to remove and replace the evaporator coil and the blower fan assy. Will you be deducting this from the project?
Answer: Negative. The Government believes the work can be completed.
Question No. 20: You spec’d out new systems with Trane or similar for the split systems, we would like to replace with same for same and go with Carrier. Will that be acceptable.
Answer: See answer to Question No. 1.
Question No. 21: In the SOW (sic) you wanted the systems only replaced, but during the walkthrough of the mechanical rooms the duct work going to the new systems was deteriorated and needs replaced as well. Are we to reconnect to existing duct work or should we include the price for new duct work?
Answer: Yes. Reconnect the existing duct work.
Question No. 22: Who is responsible for the controls currently onsite Siemens/JCI?
Answer: There is not a current maintenance contract in place. Knox Roman has performed troubleshooting in the past.
Question No. 23: Is infectious control/ICRA going to be required for this project?
Question No. 24: The supply and return plenum insulation in the mechanical room is poor and should be replaced. This was not on the SOW (sic), will you be adding a line item for this replacement considering the new units will be reconnecting to this ductwork?
Answer: No. We will be using existing ducts.