36C24725Q0315 0002 - Questions.pdf
PDF 184 KB Posted
- Attached to
- Medical Gas Inspection and Certification
- Solicitation number
- 36C24725Q0315
About this file
This is an amendment (0002) to solicitation 36C24725Q0315 that provides Questions and Answers related to a Medical Gas Inspections and Certification requirement for the Department of Veterans Affairs VISN 7 Network Contracting Activity in Augusta, GA.
The Q&A clarifies approximate quantities that must be verified during a scheduled site visit on 2/14/25 at 10:00 AM EST, including: 200 medical gas outlets/inlets, 120 medical gas zone valves, 32 medical gas area alarm panels, 32 master alarm panels, and 6 booms in the OR. The answers indicate that pictures of equipment cannot be provided in advance and must be verified during the site visit. Regarding repairs, soft wearable parts (O-rings, labeling) would be included in the base pricing, while hard parts (faceplates, gauges, transducers) can be quoted separately with recommendations as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24725Q0315 0001 - Site Visit.pdf | ||
| 36C24725Q0315.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0002 02-11-2025
36C247
Department of Veterans Affairs
VISN 7 Network Contracting Activity
501 Greene Street
Hatcher Building - Suite 2
Augusta GA 30901
Department of Veterans Affairs
VISN 7 Network Contracting Activity
501 Greene Street
Hatcher Building - Suite 2
Augusta GA 30901
To all Offerors/Bidders
36C24725Q0315
X
X X
The purpose of this Amendment is to post Questions and Answers received by 2/7/2025.
All other terms and conditions shall remain unchanged.
Jacob A. Tackett
Contracting Officer
CONTINUATION PAGE
RFQ-36C24725Q0315 – Medical Gas Inspections and Certification
Questions and Answers
1. Total count of medical gas outlets/inlets?
Approximately 200 but must be verified during site visit.
2. Total count of medical gas zone valves?
Approximately 120 but must be verified during site visit.
3. Total count of medical gas area alarm panels?
Approximately 32 but must be verified during site visit.
4. Total count of master alarm panels?
Approximately 32, but must be verified during site visit.
5. Medical Air and Medical Vacuum Pumps; provide pictures of the control panel tags and pump/compressor tags. To include: model #, serial #, HP, and configuration. (This is needed to accurately quote maintenance). Most are listed but the Hitachi info listed is for a compressor, not a system so this would not be sufficient while quoting.
We cannot provide pictures at this time. It is suggested to be present during site visit to verify.
6. For the annual repairs, we can estimate soft wearable parts such as O-rings and labeling, but hard parts that get broken such as front assemblies (faceplates), gauges, and transducers are too expensive to provide a budget number per year when we have no idea the state of the existing system. For the purpose of this solicitation would the repair of soft wearable parts be included, and hard parts be allowed to be quoted separately as needed?
Repair would be included. Hard parts quote separately with recommendations.
7. Can we obtain photos of the source equipment plates?
We can not release photos at this time. It is recommended to be present for site walkthrough on 2/14/25.
8. How many booms are there in the OR? (It seems boom inspections are a part of the solicitation).
Approx Six, but this will have to be verified during the site visit.
9. Will there be a site visit scheduled for this requirement?
Yes, site visit is 2/14/25 at 10:00 AM EST.
File details come from the government source that posted it. Updated .