36C24719R0070-0001000.docx
DOCX document 23 KB Posted
- Solicitation number
- 36C24719R0070
About this file
36C24719R0070 0001 36C24719R0070 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24719R0070-001.docx | DOCX document | |
| 36C24719R0070-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) N/A Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker
GA
30084 Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker
GA
30084 To all Offerors/Bidders
36C24719R0070 03-20-2019
X X X
April 10, 2019 at 1:00 PM EST See CONTINUATION Page X This amendment to Solicitation 36C24719R0070 is to do the following:
1. Extend the solicitation end date from 3/21/19 at 1:00 PM EST to 4/10/19 at 1:00 PM EST
2. Proivde responses to all Request for Information received prior to deadline. (See Attached)
3. Revise Line Items 0002, 1002,2002, 3002 and 4002 (See Attached)
4. Change Base Year Period of Performance from 4/1/10 -9/30/19 to read 5/1/19- 9/30/19.
5. All Other Items will remain the same.
James Boles Contracting Officer
CONTINUATION PAGE
Responses to Request for Information Received 36C24719R0070- Chillers PM -Atlanta VAMC
1) How many run hours are on the Trane centrifugal chillers? If over the Trane recommended hours, have they been rebuilt?
Chiller 1 44631 hrs. new control panel installed 2015
| Chiller 2 10322 hrs. new chiller |
| Chiller 3 33907 hrs. |
| Chiller 4 2548 hrs. |
2) If not and require rebuilding per the OEM’s recommendations, should this contract price rebuilding of the machines? This isn’t typical in a full PM contract and of course would add considerable cost.
Trane Chiller #2 is only 2 years old and Trane chiller #1 is in the works of being replace within the next 2 years.
3) Covering tube bundles is not standard industry practice and would lead to a major price increase. Should we proceed with pricing tube bundle coverage?
Tube Bundle repair are not covered under this contract.
4) There is no language in the solicitation providing contractor coverage for acts of God, misuse by the customer, etc. Should this be included?
Catastrophic acts of GOD will be included under this solicitation.
5) Are major failures on machines past their ASHRA usable lifespan covered?
No (23 Years) chiller 1 is the only chiller that is past its life span and should be replace next year.
6) We “assume” the eddy current testing is only applicable to the 4 Centrifugal Chillers. Please clarify.
Yes, that is correct.
7) Statement of Work, Section D states the following: “Participation may be expanded to add medical centers within VISN 7 anytime throughout contract term if need arises. Please advise what this reference. We interpret this as meaning this contract could be expanded to cover additional facilities and to provide similar coverage as this contact.
Yes, the contract could possibly be expanded to add additional sites in the future.
8) If the assumption is correct in #11 above, will the contract be handled in the same manner, where a pre-inspection is conducted, and a deficiency list generated where chillers must be repaired in order to be accepted into the full maintenance program?
Yes
9) Regarding the pre-inspection of equipment being considered for the full maintenance program, how much time will the VA allow for this inspection? We expect this will be the longest and most thorough inspection of the whole contract.
This will be discussed at the Post Award Conference
10) The solicitation states that the pre-existing repairs will be handled on a different acquisition. Does this mean the VA intends to take the report generated from this contract and bid that work out? If so, this could be problematic. If we are to assume full risk of these machines for up to five years, it would add additional risk if another contractor makes the repairs because we have no way to confirm someone else’s repairs. If they don’t make the proper repairs, we could find ourselves in a situation where their repairs weren’t adequate and it ends up costing us a lot of money, especially if it’s for something like a motor or compressor. On a full-service contract like this, if another contractor makes the repairs on equipment from an inspection report we created and on equipment we’re expected to fully cover for 5 years, it may mean insurance companies won’t provide the coverage and it then becomes an unbiddable contract. We fully expect this is what would happen.
This statement “The Contractor has the option to perform a pre-inspection of chillers after contract award to determine any pre-existing repairs that may need to be performed on a different acquisition package.”
Will be amended to read as:
The Contractor has the option to perform a pre-inspection of chillers after contract award to determine any pre-existing repairs that may need to be performed prior to executing the Preventative Maintenance (PM) Contract.
Also, the line item for Emergency repairs (NTE $25,000), this is to cover pre-existing repairs or any items not covered by the PM contact. This will start at $0 and a contract modification will be processed to cover approved repairs by the Contracting Officer Representative (COR) and Contracting Officer (CO).
11) Will this contract require access to the VA’s computer system and require the back-ground inspection mentioned in the contract?
No, it will not
12) Who is currently providing maintenance for this scope of work?
The previous contract has expired and Trane provided maintenance.
13) Are the Chilled Water Pumps to be included under this agreement or only the Condenser Water Pumps?
No
14) Have any of the existing Centrifugal chiller been overhauled in the Past?
No
15) When was the last eddy current analysis performed on the chillers?
5 Years
16) When was the last vibration analysis preformed (chillers, cooling towers, and pumps)?
The vibration analysis has not been performed
17) Will the VA be able provide the awarded contractor the previous three years of repairs that have been made to the centrifugal chillers?
This information will be discussed in the post-award contract meeting
18) Who is the controls vendor for the VA hospital?
McKenny’s has the Tridium Support control contract.
19) Is there a cost to the contractor and if so, what is the cost to have a technician badged to work at the VA on the chiller maintenance contract?
There are no fees associated with getting a badge
20) Is there available parking for the contractor?
Yes, when servicing equipment.
21) Is there a fee associated with parking?
No
22) What is the redundancy level of the VA (N+1, N+2, Etc.)?
3+1 during Summer months
23) The solicitation stated eddy current every 3-5 years. In order to ensure all contractors are bidding the same thing, we recommend the VA require an initial eddy current inspection on the front end of the contract as part of the pre-inspection. This will determine tube condition and whether re-tubing is required in order to be accepted into the program. We also recommend another inspecting during the third year of the contract so the tube condition can be monitored half way through the contract and will provide the VA with a baseline and 3-year trend before going into the next 5-year contract after this one ends. This also ensures all contractors are bidding the same thing.
Eddy currents will be performed one per year of the contract, VA will let the contractor know which one to do first. Please price accordingly.
24) We don’t fully understand the $25,000 NTE for emergency repairs as listed in the price schedule. We thought this was a full-service PM contract and our price was to cover ALL emergency repairs. Does the VA intend for us to add an additional $25,000 on top of the estimate for each fiscal year? Please explain this because we’re unsure of how to apply the $25,000 shown in the price schedule.
This contract line item was included to cover any pre-existing repairs or items not covered by the PM contract that may be identified during a post contract award inspection. This will start as a $0 amount and a modification will be processed upon Contracting Officer receiving an approved invoice for repairs. This amount should not be added to your total price as it starts at a $0.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2.00 |
| QTR |
| __________________ |
| __________________ |
The Contractor shall provide full service to include but not limited to refrigerants, compressors, motors, tubes, leak repair, emergency and routine repair services to include all supervision, labor, equipment, and parts as necessary to maintain the listed Chillers, Cooling Tower and Condenser Pumps associated equipment in operational conditions according to manufacturer's specifications.
Contract Period: Base POP Begin: 05-01-2019 POP End: 09-30-2019
| 5.00 |
| MO |
| __________________ |
| __________________ |
Emergency Repairs not to exceed (NTE) $50,000.00 Contract Period: Base POP Begin: 05-01-2019 POP End: 09-30-2019
| 4.00 |
| QTR |
| __________________ |
| __________________ |
The Contractor shall provide full service to include but not limited to refrigerants, compressors, motors, tubes, leak repair, emergency and routine repair services to include all supervision, labor, equipment, and parts as necessary to maintain the listed Chillers, Cooling Tower and Condenser Pumps associated equipment in operational conditions according to manufacturer's specifications.
Contract Period: Option 1 POP Begin: 10-01-2019 POP End: 09-30-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
Emergency Repairs not to exceed (NTE) $50,000.00 Contract Period: Option 1 POP Begin: 10-01-2019 POP End: 09-30-2020
| 4.00 |
| QTR |
| __________________ |
| __________________ |
The Contractor shall provide full service to include but not limited to refrigerants, compressors, motors, tubes, leak repair, emergency and routine repair services to include all supervision, labor, equipment, and parts as necessary to maintain the listed Chillers, Cooling Tower and Condenser Pumps associated equipment in operational conditions according to manufacturer's specifications.
Contract Period: Option 2 POP Begin: 10-01-2020 POP End: 09-30-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
Emergency Repairs not to exceed (NTE) $50,000.00 Contract Period: Option 2 POP Begin: 10-01-2020 POP End: 09-30-2021
| 4.00 |
| QTR |
| __________________ |
| __________________ |
The Contractor shall provide full service to include but not limited to refrigerants, compressors, motors, tubes, leak repair, emergency and routine repair services to include all supervision, labor, equipment, and parts as necessary to maintain the listed Chillers, Cooling Tower and Condenser Pumps associated equipment in operational conditions according to manufacturer's specifications.
Contract Period: Option 3 POP Begin: 10-01-2021 POP End: 09-30-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
Emergency Repairs not to exceed (NTE) $50,000.00 Contract Period: Option 3 POP Begin: 10-01-2021 POP End: 09-30-2022
| 4.00 |
| QTR |
| __________________ |
| __________________ |
The Contractor shall provide full service to include but not limited to refrigerants, compressors, motors, tubes, leak repair, emergency and routine repair services to include all supervision, labor, equipment, and parts as necessary to maintain the listed Chillers, Cooling Tower and Condenser Pumps associated equipment in operational conditions according to manufacturer's specifications.
Contract Period: Option 4 POP Begin: 10-01-2022 POP End: 09-30-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Emergency Repairs not to exceed (NTE) $50,000.00 Contract Period: Option 4 POP Begin: 10-01-2022 POP End: 09-30-2023
| GRAND TOTAL |