SOW - Modified 4092021.pdf
PDF 90 KB Posted
- Attached to
- Z2DA--Construct Building 17 (VA-20-00031147) PROJECT: 558-319 Federal contract opportunity
- Solicitation number
- 36C24621R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0001 0002.pdf | ||
| 36C24621R0001 0001.pdf | ||
| Attachment D - Existing Site Condtions More info.pdf | ||
| Attachment E - GEO Tech Report.pdf | ||
| Attachment C - 558-18-228 Bldg. #3 Demo - SOW.pdf | ||
| Attachment A - Hazardous Material Reports.pdf | ||
| Government Responses to Industry Questions.pdf | ||
| Attachment B - ICRA Matrix.pdf | ||
| Bldg. #17 Pre-Bid Proposal Site Visit SIGN IN SHEET.pdf | ||
| 36C24621R0001_1.docx | DOCX document | |
| Combined Drawings - Part I Section 4.pdf | ||
| Combined Drawings - Part I Section 3.pdf | ||
| Combined Drawings - Part I Section 1.pdf | ||
| Combined Drawings - Part II.pdf | ||
| Outpatient Care Bldg 17 - 100_ Specifications - 01.15.16.pdf | ||
| Combined Drawings - Part I Section 2.pdf | ||
| Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C24621R0001.docx | DOCX document | |
| Combined Drawings - Part I Section 5.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct New Outpatient Care Building 17
Construction
Project 558-319
STATEMENT OF WORK
(a) General: Work includes the demolition of Building 8 along with the construction of new outpatient care
Building 17. All site work, utilities, and the entire building will be provided in accordance with the drawings, specifications, VA TIL, and VA construction requirements.
Contractor will provide shop drawings stamped by a licensed professional engineer.
(b) Construction Cost: Estimated cost of construction: Range: $5,000,000-$10,000,000+
(c) Construction Duration: 540 calendar days.
(d) Phasing: Project construction will be phased as indicated in drawings and specifications. Work will be scheduled to minimize the disruption to the medical center and other contractors.
(e) Construction Services: Perform work as described above and in accordance with professionally developed design drawings and specifications.
(f) Place of Performance: Tasks will be performed at the VA Medical Center Durham, NC. Work will be around an occupied healthcare facility in operation 24 hours a day.