Attachment A - Hazardous Material Reports.pdf
PDF 7 MB Posted
- Attached to
- Z2DA--Construct Building 17 (VA-20-00031147) PROJECT: 558-319 Federal contract opportunity
- Solicitation number
- 36C24621R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0001 0002.pdf | ||
| 36C24621R0001 0001.pdf | ||
| Attachment E - GEO Tech Report.pdf | ||
| SOW - Modified 4092021.pdf | ||
| Attachment C - 558-18-228 Bldg. #3 Demo - SOW.pdf | ||
| Attachment D - Existing Site Condtions More info.pdf | ||
| Government Responses to Industry Questions.pdf | ||
| Attachment B - ICRA Matrix.pdf | ||
| Bldg. #17 Pre-Bid Proposal Site Visit SIGN IN SHEET.pdf | ||
| 36C24621R0001_1.docx | DOCX document | |
| Combined Drawings - Part II.pdf | ||
| Outpatient Care Bldg 17 - 100_ Specifications - 01.15.16.pdf | ||
| Combined Drawings - Part I Section 2.pdf | ||
| Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C24621R0001.docx | DOCX document | |
| Combined Drawings - Part I Section 4.pdf | ||
| Combined Drawings - Part I Section 3.pdf | ||
| Combined Drawings - Part I Section 1.pdf | ||
| Combined Drawings - Part I Section 5.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C2421R0001 P00001
Construct New Outpatient Bldg. 17
Project No. 558‐319
Durham VAMC
Government Responses to Industry Questions
ATTACHMENT A
Asbestos & Lead Surveys: ‐ The following reports or excerpts of, as applicable, are part of the contract documents:
a. June 29, 2012 Lead‐Based Paint and Other Suspect Finishes Baseline Inspection and Management Plan, by Matrix Health & Safety Consultants, LLC. (none found)
b. April 21, 2014 Sampling to Identify Additional Asbestos‐Containing Materials by Matrix Health & Safety Consultants, LLC.
c. April 29, 2014 Report of Hazardous Material Survey, Buildings 3 and 8, by Matrix, Health & Safety Consultants, LLC.
d. April 30, 2017 Asbestos Baseline Survey Re‐Inspection, Reassessment and Management Plan, by Toland Mizell Molnar
Any reference to Building #3 in the above documents does not apply to this contract for it no longer exists.
a. June 29, 2012 Lead-Based Paint and Other Suspect Finishes Baseline Inspection and Management Plan, by Matrix Health & Safety Consultants, LLC. (none found)
b. April 21, 2014 Sampling to Identify Additional Asbestos-Containing Materials by Matrix Health & Safety Consultants, LLC.
c. April 29, 2014 Report of Hazardous Material Survey, Buildings 3 and 8, by Matrix, Health & Safety Consultants, LLC.
d. April 30, 2017 Asbestos Baseline Survey Re-Inspection, Reassessment and Management Plan, by Toland Mizell Molnar
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .