36C24621B0007 0004.docx

DOCX document 6 MB Posted

Attached to
Z2DZ--Repair Boiler Plant Structure
Solicitation number
36C24621B0007
Issued by

About this file

This document summarizes a federal contract solicitation for construction services. The Department of Veterans Affairs is seeking a contractor to replace and repair structures and associated work at the boiler plant in Building 15 at the Hampton, Virginia Veterans Affairs Medical Center. The scope of work includes general construction, structural alterations, and plumbing construction per plans and specifications. The contract period is 120 calendar days from notice to proceed. The estimated value is between $250,000 and $500,000. The NAICS code is 238120. This solicitation is anticipated to be an open market set-aside for service-disabled veteran-owned small businesses. The solicitation materials will be available on or about May 4, 2021 on the listed website. Proposals will be due approximately 30 days after solicitation issuance. A site visit is scheduled for May 17, 2021 at 9:00 am eastern time. Drawings and an RFI form are attached for the site visit.

View the file

Other files

File Type Posted
Hampton VAMC Boiler Plant- 36C24621B0007- Amendment 0005.pdf PDF
DSCN3585.JPG JPG image
DSCN3584.JPG JPG image
DSCN3569.JPG JPG image
DSCN3564.JPG JPG image
DSCN3574.JPG JPG image
DSCN3556.JPG JPG image
DSCN3568.JPG JPG image
DSCN3567.JPG JPG image
DSCN3570.JPG JPG image
DSCN3562.JPG JPG image
36C24621B0007 0002.pdf PDF
RFI No 1 Specification Redacted.pdf PDF
Safety Handbook.pdf PDF
Wage Determination.pdf PDF
100 pct specification.pdf PDF
36C24621B0007.pdf PDF
S02 - RFI Form.doc DOC document
36C24621B0007 0001.docx DOCX document
100 pct drawings.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

TBD

590-19-125

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24621B0007 07-01-2021

X

The purpose of this amendment is to extend the bid opening date and provide RFI responses as follows:

1. The bid opening date is extended from 7/1/2021 to 7/9/2021.

2. RFI responses- See page 2-6

3. Lead-Based Paint Testing Report- See page 7-21

4. Water Proofing Specifications- See page 22-24

5. Existing condition photos- see attachments

6. Second Site Visit- 7/6/2021, 2:00pm-3:00pm eastern standard time , Meet at building 15 on the Medical Center campus.

7. All other terms and conditions remain unchanged.

Keith Norman Contracting Officer

Boiler Plant RFI Responses

1.Can the superintendent also be the SSHO? No
2.Can the superintendent also be the QCM? No
3.Can the superintendent be both the SSHO and the QCM? No
4.Is project tax exempt? No
5.Due to the existing COVID-19 restrictions, can this proposal be emailed to a designated person in lieu of hand deliver? Yes, bids can be emailed, hand delivered or sent via postal mail
6.Economic Price Adjustment for Labor and Material The VA administers firm fixed price contracts, additionally, this is a bid solicitation under FAR Part 14-Sealed Bidding. FAR clause 52.216-4 speaks to negotiated contracts.

Due to the fact that this solicitation requires us to “hold” our pricing for acceptance and given the recent uncertainty in materials and labor costs; would the government consider including the FAR Clause 52.216-4, Economic Price Adjustment for Labor and Material in this solicitation?

7.Can photos of existing areas be provided for review. Yes, See Attachments
8.Provide information and location of hazardous waste lock up as it relates to the GC lay down area. Located on page A101 above the work area where the building steps out. 24’ X 18’ approx.
9.Provide dimensions of GC lay down area as per Key Plan sheet GI001. Approx. 55’ X 55’.
10.Are funds currently available for this project? Yes
11.Specifications:
a.The project specification uploaded on the Sam.gov website appear to be incomplete and had details only up to the division 09 Trades finishes. One Section is missing. We have attached Section 07 14 16—Cold-fluid Applied Waterproofing in the Attachment.
b.Have materials been tested for ACM levels? Yes, apparently there is only lead paint present—ECS Test Report is Attached.
12.Architectural sheet questions
1.Sheet A100:
a.Demolition Notes
i.Notes 10 and 32 / 2 are not readable. Provide new text for review. See correct wording as follows:

Note #10-“Refer to Electrical, Mechanical, Plumbing, and Structural Drawings for additional demolition work. Where such work occurs, Architectural items and finishes shall be removed only to the extent to complete the New Work.”

Note #32-2. “Placement of effective barriers to protect susceptible patients from air-borne contaminants such as aspergillus sp.”

2.Sheet A100A:
a.Provide clarification of signage to be used for accurate pricing inclusion. Sheet A1001- Are samples of Signs—Verify with VA on the exact size and wording of the Signs.
3.Sheet A101:
a.Provide clarification of how can poly wall contain self-closing door assembly? Provide sheet metal studs, and work in a Poly-covered door assembly.
b.What is approx. height of 6 mil barricade to be installed and to what material is top of closure to be made too. From floor to ceiling (working around pipes and beams---approximately –20-feet height +/-.
c.Provide clarification of existing electrical lines as called out to be removed if inactive.
i.Provide number of lines which may need to be removed and location of termination (distance to panel)
d.Provide 2 existing condensers information for relocation. COR will address when

work starts.

e.Existing condenser, provide new pad design. Typical of 2 -4”concrete pad with 6x6-w1.4 xw1.4 mesh over 6”of gravel base. Concrete 3,000# mix.
f.Provide location of existing tunnel hatch / hatch size and how is access available. Is existing hatch buried or at the surface? Hatch is located in the grass area, and is visible. Contractor to verify the exact size of the access hatch.
g.Provide clarification on extent of tunnel lid to be removed / replaced from face of existing building. Is extent for waterproofing replacement of 15’ an accurate distance as lid removal per S201 calls for much less concrete lid removal. Waterproofing shall correspond to the size of the lid replacement. 15’ was a relative size.
h.Is new waterproofing materials compatible with existing materials in place? See section 07 17 16Attached.
4. Coded Notes:
1.Verify that existing sump pumps are currently in good working condition. Yes
2.Verify that existing sump pumps are currently in good working condition. Yes
3.Provide photos of existing building signage and method of reattachment. Building sign on Sheet A101 is free standing and can be removed and (after construction) can be-re-installed.
4.Provide details on what existing drain is connected to and size/materials of existing drain piping. 4” PVC drain line connected to the two sump pump.
5.Provide total extent of drain line and where is existing termination location. Contractor to verify infield.

13. Sheet S101:

a. New W8x24 transfer beam. Is bottom of beam @ 18’-2” AFF to rest on ex. beam perpendicular? Is existing beam able to take load from new transfer beam?

No, the top of the new steel beam aligns with the bottom of the existing perpendicular beam. This is depicted in section A on S201. Rather than being supported, the transfer beam supports the existing steel beam to provide an alternate load path while masonry in the corner is rebuilt. Alpha Corporation

b. New HSS4x4x1/4 shoring posts on exterior of masonry wall look to be resting on existing concrete tunnel walls?

Yes, this is also noted at plan 2 of S201, “COLUMN SITS DIRECTLY ON EX TUNNEL WALL.” Alpha Corporation

c. Clarify what new W8x24 is to do upon installation?

One W8X24 is a temporary transfer beam (just mentioned in item “a”) which supports existing framing at the second floor per section A on S201. The other four W8X24s are temporary needle beams, which support masonry per section B on S201 while headers are replaced. Alpha Corporation

2.Sheet S201:
a.Clarify that existing steam piping as called to remain is currently insulated / covered for the areas where work is to occur.

The condition of steam piping is not normally shown on structural drawings. Note 4 in the GENERAL NOTES section of drawing S001 requires field verification of existing conditions before starting construction. Alpha Corporation Section A:

a. Transfer beam (W8x24) appears to be shown in conflict with plan sheet S101. Plan with notes and section appear to be opposite of each other?

Wording on the plan note means that the top of steel for the new transfer beam should align with the bottom of existing beam elevation. Section illustrates this correctly. Alpha Corporation

b.Section A and Plan 2 show vertical support posts in conflict with each other.
i.Section A shows posts sitting inside pit walls. New Work Plan shows columns sitting on top of either pit wall lid or vertical existing wall.

Plans 1 on S101 and 2 of S201 are complementary but show different phases of the project. The focus of plan 1 is shoring, while the focus of plan 2 is installation of needle beams and the new tunnel lid (new work). The outline of plan 2 is depicted on plan 1 for context, as both shoring and permanent members will need to be installed as part of this work. The shoring plan, on which section A is cut, depicts only temporary framing which will eventually be removed. The new work plan depicts the final condition, after temporary members have been removed. This is the reason that shoring posts depicted in section A do not appear on plan 2. The columns depicted on top of pit walls in plan 2 do not follow this convention as they are temporary shoring elements but were depicted anyway in order that details of their bearing plates would be visible since the scale is larger. The size of these shoring columns is identified at the expected location in plan 1. These two shoring columns do not show up in section A because they are located outside the brick wall, and thus are not visible from the interior. Alpha Corporation

b. Vertical support posts are shown sitting on W14x30 x 10’ long? Provide side elevation / view of this to show how W14x30 is to be installed within existing pit.

Part of the 10’ length extends into the tunnel, as illustrated in this elevation view. Alpha Corporation

c. Spall repair is called out. If required, show existing photo reflecting extent of work.

Detail is provided because an 18”X18” section of concrete at the right side of the tunnel entrance sounded hollow. No spall was visible, so no photograph is available. Alpha Corporation Section B:

a. Clarify that removal of existing masonry from top of needle beam and between needle beams is correct and this should not be from bottom of existing needle beams?

Remove existing masonry below the bottom of needle beams in section B and in step 6 on S001. Alpha Corporation

b.New support beams (4) W10x22:
i.Are beams to be welded together on bottom flange or is a plate to be installed to cover all beam bottom flanges?

No welds are required between W10X22 beams. No bottom plate is required at W10X22 beams. Adjust gap between beams to evenly distribute them under the existing wall, whose thickness is shown as 2’0” VIF in this section. Alpha Corporation

c. Masonry shown in section above at ex. exhaust fan appears to be new, provide clarification and details for repairs There is no new work on masonry beside the exhaust fan. A different line weight was chosen for nearby existing brick to distinguish that this brick is beyond the original opening. Alpha Corporation Section C:

a. Is there existing water stop between existing concrete walls and existing concrete lid? If existing is new to be installed and what is specification for a retrofit water stop.

Record drawings do not depict any water stops. Retrofit water stops are not required. Alpha Corporation

b. If existing earth is to be removed on North side of existing concrete tunnel wall, is existing wall in an unrestrained condition sufficient to support temp support post as called out on New Work Plan 2 this sheet.

Yes. Alpha Corporation

c. #4 @ 12: OC running parallel with tunnel at lid. Is embed into existing to be 12”?

Yes. Alpha Corporation New Work Plan 2:

a. Provide detail for new bearing conditions of 6” and 12” as called out.

No special detail is needed, just measure the bearing length at beam centerline. Non-shrink grout meeting requirements given on S001 may be used to ensure full bearing. Alpha Corporation

b. Refer to notes for Sheet S101, note A and Sheet S201, Section A, note a for conflicts.

These apparent conflicts have been addressed in their respective sections, above. Alpha Corporation

LIMITEDLEAD-BASEDPAINTTESTINGREPORT

HAMPTONVAMCBUILDING15STEAMTUNNEL

100EMANCIPATIONDRIVE

HAMPTON,VIRGINIA23667

ECS PROJECT NO. 47:9122FOR:ADESIGNGROUP,LLCOCTOBER4,2019

1643MerrimacTrail,SuiteA,Williamsburg,Virginia23185•T:757-229-6677•F:703-834-5527•ecslimited.com

October4,2019

Mr.FrankSturgeon,AIA;NCARBADesignGroup,LLC 2787HillRoad Vienna,Virginia22181 ECSProjectNo.47:9122

Reference: LimitedLead-BasedPaintTesting,HamptonVAMCBuilding15SteamTunnel,100EmancipationDrive,Hampton,Virginia

DearMr.Sturgeon:

ECS Mid-Atlantic, LLC (ECS) is pleased to provide A Design Group, LLC with the results of the abovereferenced Limited Lead-Based Paint Testing performed for the Hampton VAMC Building 15 SteamTunnel renovation project. This report summarizes our observations, analytical results, findings, andrecommendationsrelatedtotheworkperformed.Theworkdescribedinthisreportwasperformedby ECS in general accordance with the Scope of Services described in ECS Proposal Number 47:11940andthetermsandconditionsoftheagreementauthorizingthoseservices.

ECS appreciates this opportunity to provide A Design Group, LLC with our services. If we can be offurtherassistancetoyou,pleasedonothesitatetocontactus.

Sincerely, ECSMid-Atlantic,LLC

NemanjaZivadinovicChristopherJ.Chapman,CIH
ProjectManagerDirectorofIndustrialHygiene
nzivadinovic@ecslimited.comcchapman@ecslimited.com
757-229-6677804-353-6333

EXECUTIVESUMMARY

ThesubjectbuildingisBuilding15locatedwithintheHamptonVAMedicalCenterat100Emancipation Drive in Hampton, Virginia. Based on the information provided to ECS, the beamsadjacenttothesteamtunnelconnectedtothebuildingarescheduledforstructuralrepairs/restoration.

The purpose of the survey was to determine if lead-based paints (LBPs) / lead-containing paints(LCPs) are present in the general area of the building expected to be impacted by the plannedrenovations.ThesurveywasperformedwithintherecessedareaofthebasementintheSoutheasterncornerofthebuilding.

The lead-based paint survey was performed by a Commonwealth of Virginia licensed lead riskassessor.Paintedand/orglazedsurfaceswereassessedforleadcontentusingaDirect-ReadX-RayFluorescence (XRF) Spectrometer. Lead-Based Glaze/Paint was identified on the following buildingmaterials/components:

· SteelI-beams

· Steelpipesupports

· Concretewalls

· Metalpipes

· Metalladder

· Metalfence Additionally,lead-containingpaintwasidentifiedonbrickwalls.

RecommendationsregardingthedisturbanceoftheLBPs/LCPsidentifiedbyECSunderthisscopeofworkcanbefoundinSection5.0ofthisreport.

The executive summary is not intended to replace the overall findings/recommendations discussedwithin the full report the findings discussed in this executive summary should only be reviewed withinthefullcontextofthereport.

ECSProject#47:9122

TABLEOFCONTENTS PAGE

1.0SITEDESCRIPTION1
2.0PURPOSE1
3.0METHODOLOGY1
4.0RESULTS1
5.0RECOMMENDATIONSANDREGULATORYREQUIREMENTS3
6.0LIMITATIONS4

TABLEOFAPPENDICES

AppendixI:PhotographsofIdentifiedLBPs/LCPsAppendixII:Certifications/Licenses

1.0SITEDESCRIPTION

ThesubjectbuildingisBuilding15locatedwithintheHamptonVAMedicalCenterat100Emancipation Drive in Hampton, Virginia. Based on the information provided to ECS, the beamsadjacenttothesteamtunnelconnectedtothebuildingarescheduledforstructuralrepairs/restoration.

2.0PURPOSE

The purpose of the survey was to determine if lead-based paints (LBPs) / lead-containing paints(LCPs) are present in the general area of the building expected to be impacted by the plannedrenovations.ThesurveywasperformedwithintherecessedareaofthebasementintheSoutheasterncornerofthebuilding.

3.0METHODOLOGY

ECS performed the authorized Scope of Services in general accordance with our proposal, standardindustrypractice(s)andmethodsspecifiedbyregulation(s)fortheidentificationofLead-BasedPaints(LBPs)/Lead-ContainingPaints(LCPs).

The Limited Lead-Based Paint (LBP) testing was performed by a State licensed Lead Risk Assessorusing an X-Ray Fluorescence (XRF) Spectrometer to identify lead concentrations in painted and glazedsurfaces.

The testing was conducted utilizing the U.S. EPA definition of LBP. Under this definition, paintedsurfaces which contain lead in concentrations equal to or greater than 1.0 milligrams per squarecentimeter (≥1.0 mg/cm2) are classified as coated with LBP. Paints with concentrations of leaddetectable by the XRF are considered lead-containing paints. Activities which disturb lead-containingpaintsandglazingorlead-basedpaintsandglazingareregulatedbyOSHA(29CFR1926.62).

Becausethecurrentorproposeduseofthepropertyisnotresidentialorchild-occupied,thescopeof the LBP survey was not conducted in accordance with HUD Chapter 7 requirements. Thisrepresentative survey included taking readings from building materials located in the recessedsectionofthebasementintheSoutheasterncornerofthebuilding.

4.0RESULTS

Thefollowingisasummaryoftestresults.ThetestingwasperformedonSeptember26,2019.

Paintandsurfacecoatingswhichcontaindetectableconcentrationsofleadareconsidered“lead-containingpaints”.SinceOSHAhasnospecificactionlevelforleadinpaint,allpaintonthesitefound to have a measurable concentration of lead should be assumed to be lead containing. Workperformed which may disturb lead-containing paint is regulated under OSHA as referenced under 29CFR1926.62.

A total of 25 readings were collected during the site visit, including calibration readings. Thesereadingsareprovidedinthetablebelow.Thematerialsidentifiedtobepaintedwithlead-basedpaintarehighlightedinred.Thematerialsidentifiedtobepaintedwithlead-containingpaintare

ECSProject#47:9122Page1 highlightedinyellow.

Photographsoflead-basedpaintandlead-containingpaintidentifiedarelocatedintheAppendix.

XRF Lead-Based PaintReadings -Hampton VAMC Building15 SteamTunnel Reading Pass/FailStandard Pb(mg/cm2) Pb

Component

Substrate

Side

Color

Condition

Room

PASS

Standardize

Positive 1.1 0.05 Calibrate

1.1

1.11

Negative 0.01 Wall Brick East White Intact Steamtunnel Negative Wall Brick East White Intact Steamtunnel Positive 4.36 0.42 I-Beam Steel East Gray Poor Steamtunnel Positive 1.98 0.23 I-Beam Steel East Gray Poor Steamtunnel Negative 0.09 0.06 PipeSupport Steel East Silver Intact Steamtunnel Negative Wall Concrete East Gray Intact Steamtunnel Negative Wall Concrete South Gray Intact Steamtunnel Negative Wall Brick South White Intact Steamtunnel Negative 0.01 0.01 Wall Brick South OffWhite Intact Steamtunnel Positive 3.46 0.32 I-Beam Steel South Gray Peeling Steamtunnel Positive 3.24 0.29 PipeSupport Steel South Gray Peeling Steamtunnel Negative Wall Plaster West White Peeling Steamtunnel Positive 0.04 Wall Concrete West Gray Intact Steamtunnel Negative 0.02 0.02 Wall Concrete South Gray Intact Steamtunnel Negative ElectricalBox Metal East Gray Intact Steamtunnel

Reading

Pass/FailStandard
Pb(mg/cm2)
Pb

Component

Substrate

Side

Color

Condition

Room

20
Positive
1
0.05
Pipes
Metal
Blue
Intact
Steamtunnel
21
Negative
0.01
0.01
Pipes
Metal
Black
Intact
Steamtunnel
22
Positive
5
0.53
Ladder
Metal
Yellow
Intact
Steamtunnel
23
Positive
5
1.08
Fence
Metal
Yellow
Intact
Steamtunnel
24
Positive
1.11
0.05
Calibrate
25
Positive
1.12
0.06
Calibrate
26
Positive
1.05
0.05
Calibrate
27
PASS

Standardize

5.0RECOMMENDATIONSANDREGULATORYREQUIREMENTS

BasedonourunderstandingofthepurposeoftheLimitedLead-BasedPaintTesting,testresults,andourfindingsandobservations,ECSpresentsthefollowingrecommendations.

Based on the findings of this report, detectable concentrations of lead were identified on paints andsurfacecoatingsintheareasidentifiedbytheclientasbeingimpactedbythisproject.

The presence of lead is a concern primarily when conditions exist where it may inhaled or ingested.Regardless of the analytical results of a material, all painted and/or glazed surfaces may still containconcentrationsofleadinthepaint,whichwhendisturbed,maygenerateleaddustgreaterthanthe Permissible Exposure Limit (PEL) of 50 micrograms per cubic millimeter (ug/m3) as an 8-hourTime Weighted Average (TWA) established by the OSHA “Lead Exposure in Construction Rule (29 CFR1926.62).”

TheOSHAstandardgivesnoguidanceonacceptablelevelsofleadinpaintatwhichnoexposureto airborne lead (above the action level) would be expected. Rather, OSHA defines airborneconcentrations,andreferencesspecifictypesofworkpracticesandoperationsfromwhichaleadhazardmaybegenerated(reference29CFR1926.62,section d). Environmental andpersonnelmonitoringshouldbeconductedduringanyremoval/demolitionprocess(asappropriate)to verify that actual personal exposures are below the Permissible Exposure Limit (PEL) of 50micrograms per cubic millimeter (μg/m3) as an 8-hour Time Weighted Average (TWA). Under OSHArequirements, the contractor performing renovation work/paint disturbance will be required toconduct this monitoring and follow applicable requirements under 29 CFR 1926.62 if disturbing LBP/LCP.

Note: Additional requirements regarding disturbance of LBPs/LCPs will be provided in the projectspecificationsasaseparatedocument.

6.0 LIMITATIONS

Theconclusionsandrecommendationspresentedwithinthisreportarebaseduponareasonablelevelofassessmentwithinnormalboundsandstandardsofprofessionalpracticeforasiteinthisparticulargeographicsetting.ECSisnotresponsibleorliableforthediscoveryandeliminationofhazardsthatmaypotentiallycausedamage,accidents,orinjuries.

The observations, conclusions, and recommendations pertaining to environmental conditions at thesubject site are necessarily limited to conditions observed, and/or materials reviewed at the time thisstudywasundertaken.Nowarranty,expressedorimplied,ismadewithregardtotheconclusionsandrecommendationspresentedwithinthisreport.Thisreportisprovidedfortheexclusiveuseoftheclient.ThisreportisnotintendedtobeusedorrelieduponinconnectionwithotherprojectsorbyotherunidentifiedthirdpartieswithoutthewrittenconsentofECSandtheclient.

Our recommendations are in part based on federal, state, and local regulations and guidelines. ECSdoes not assume the responsibility of the person(s) in charge of the site, or otherwise undertakeresponsibilityforreportingtoanylocal,state,orfederalpublicagencies,anyconditionsatthesitethat may present a potential danger to public health, safety, or the environment. Under this scope ofservices,ECSassumesnoresponsibilityregardinganyresponseactionsinitiatedasaresultofthesefindings. General compliance with regulations and response actions are the sole responsibility of theClientandshouldbeconductedinaccordancewithlocal,state,and/orfederalrequirements.

AppendixI:PhotographsofIdentifiedLBPs/LCPs

1 -LBPsteelIbeams

2 -LBPsteelIbeams

ECSProject#47:9122

3 -LBPsteelpipesupports

4 -LBPmetalpipes

5 -LBPladderandfence

6 -LBPconcretewall

7 -LCPbrickwall

Appendix II: Certifications/Licenses

11/1/2018 License Lookup:LicenseSearch Results DPORLicenseLookupLicenseNumber3356001106LicenseDetails

NameLicenseNumberLicenseDescription RankAddress InitialCertificationDate ExpirationDate

ZIVADINOVIC,NEMANJADRAGISA3356001106

LeadRiskAssessorLicenseLead AbatementRiskAssessorNORFOLK,VA23503 2016-10-28 2019-10-31

Page 1 of

ThedatalocatedonthiswebsitearenotthepublicrecordsoftheDepartmentofProfessionalandOccupationalRegulation(DPOR).Allpublicrecordsarephysicallylocatedat DPOR'sPublicRecordsSection:9960MaylandDrive,Suite400,Richmond,VA23233.WhileDPORworkstoensuretheaccuracyofthedataprovidedonline,thedataavailableonthesepagesareupdatedroutinelybutmaynotbeuptodateatalltimes(duetodocumentprocessingdelays,technicalmaintenance,etc.).

DPORassumesnoliabilityforanyerrors,omissions,orinaccuraciesintheinformationprovidedorforanyrelianceondataprovidedonline.WhileDPORhas attemptedtoensurethatthedatacontainedhereinareaccurateandreflectthestatusofitsregulants,DPORmakesnowarranties,expressedorimplied,concerningtheaccuracy,completeness,reliability,orsuitabilityofthis data.Ifdiscrepanciesorerrorsarediscovered,pleaseinformDPORsothatappropriateactionmaybetaken.

DPORLicenseLookupbuild1,198(built2017-07-1302:34:41).

http://dporweb.dpor.virginia.gov/LicenseLookup/LicenseDetail 1/1

Repair Structure at Boiler Plant Building #15Contract No: VA
Hampton VAMCVA Project #590-19-125
January 2020100% CD Submission

SECTION 07 14 16

COLD-FLUID APPLIED WATERPROOFING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Surface preparation.

B. Application of single-component, cold-applied, liquid waterproofing membrane.

1.02 RELATED SECTIONS

A. Section 03 30 00 – Cast-in-Place Concrete.

1.03 REFERENCES

A. ASTM D146-97 - Standard Test Methods for Sampling and Testing Bitumen- Saturated Felts and Fabrics Used in Roofing and Waterproofing.

1.04 SUBMITTALS

A. Comply with Section 01 33 23 – Shop Drawing.

B. Submit manufacturer's product data and application instructions.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

B. Store materials in a clean, dry area in accordance with manufacturer's instructions.

C. Store adhesives and primers at temperatures of 40o F (5o C) and above to facilitate handling.

D. Do not store at temperatures above 90o F (32o C) for extended periods.

E. Protect materials during handling and application to prevent damage or contamination.

1.06 ENVIRONMENTAL REQUIREMENTS

A. Product not intended for uses subject to abuse or permanent exposure to the elements.

B. Do not apply membrane when air, material, or surface temperatures are expected to fall below 30o F (-1o C) within four hours of completed application.

C. Do not apply membrane if rainfall is forecast or imminent within 12 hours.

D. Do not apply to frozen concrete.

E. Membrane can be applied to green concrete.

PART 2 PRODUCTS—MEL-Rol System by WR Medows

2.01 MANUFACTURER

A. W. R. MEADOWS®, INC., PO Box 338, Hampshire, Illinois 60140-0338. (800) 342-5976. (847) 683-4500. Fax (847) 683-4544. Web Site www.wrmeadows.com. (or equal)

2.02 MATERIALS

A.Waterproofing Membrane: single-component, polymer-modified, cold-applied, liquidwaterproofing membrane.
1.Performance Based Spec: Waterproofing membrane shall have the followingproperties as determined by laboratory testing:
a.Color: Black
b.Solids: 70%
c.Total Cure Time: 16-24 hours
d.Shore “00” Hardness, ASTM C836: Passes
e.Adhesion to Concrete, ASTM C836: Exceeds
f.Low Temperature Flex and Crack Bridging, ASTM C836: Passes
g.Stability, ASTM C836: Exceeds
h.Elongation, ASTM D412: 1500%
i.Water Absorption, ASTM D1970: 0.7%
j.Water Vapor Transmission, ASTM E96 (Method B): 0.03 perms

2. Proprietary Based Spec:

a. MEL-ROL LM Waterproofing System by W. R. MEADOWS.

2.03 ACCESSORIES

A. Concrete Repair Materials: MEADOW-PATCH™ 5 and 20 Concrete Repair Mortars.

B. Waterproofing Protection Course: PERMINATOR™ 10 mil.

C. Rolled Matrix Drainage System: MEL-DRAIN™.

PART 3 EXECUTION

3.01 EXAMINATION

A. Examine surfaces to receive membrane. Notify architect if surfaces are not acceptable. Do not begin surface preparation or application until unacceptable conditions have been corrected.

3.02 SURFACE PREPARATION

A. Protect adjacent surfaces not designated to receive waterproofing.

B. Clean and prepare surfaces to receive waterproofing in accordance with manufacturer's instructions.

C. Do not apply waterproofing to surfaces unacceptable to manufacturer.

D. Concrete surfaces must be clean, relatively smooth, and free of standing water.

E. Patch all holes and voids and smooth out any surface misalignments.

F. Remove and patch all concrete form ties.

G. Apply primer coat of membrane diluted 4:1 with water if necessary to reduce blistering on concrete surfaces at a coverage rate of 100-150 ft.2/U.S. gal (13.9 m2/3.78 L) by spraying or rolling.

H.Allow primer coat to dry before proceeding to membrane application.
3.03APPLICATION
A.Apply waterproofing membrane system in accordance with manufacturer's instructions.

B. Thoroughly mechanically mix membrane prior to application.

C. Apply membrane by spray, roller, or brush at a minimum coverage rate of 20-25 ft.2/U.S. gal (1.9-2.3 m2/3.78L) providing a thickness of 60 wet mils.

D. Frequently inspect surface area with a wet mil gauge to ensure consistent thickness.

E. Work material into any fluted rib forming indentations.

F. Cured thickness of membrane should be 45 mils dry.

G. Avoid use of products that contain tars, solvents, pitches, polysulfide polymers, or PVC materials that may come into contact with waterproofing membrane system.

3.04 PROTECTION

A. Protect membrane with application of waterproofing protection course, drainage board, or other approved material.

B. Backfill immediately using care to avoid damaging waterproofing membrane system.

END OF SECTION

See attached document: DSCN3556.

See attached document: DSCN3562.

See attached document: DSCN3564.

See attached document: DSCN3568.

See attached document: DSCN3569.

See attached document: DSCN3570.

See attached document: DSCN3572.

See attached document: DSCN3574.

See attached document: DSCN3584.

See attached document: DSCN3585.

See attached document: DSCN3567.

07 14 16-19 Cold-Fluid Applied Waterproofing image3.png image4.png image5.png image6.png image7.png image8.jpeg image9.jpeg image10.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image1.png image2.png image11.png