36C24620Q0095-0001000.docx

DOCX document Posted

Attached to
Chemical Water Treatment
Solicitation number
36C24620Q0095
Issued by

About this file

36C24620Q0095 0001 36C24620Q0095 0001.docx

View the file

Other files

File Type Posted
36C24620Q0095-0002000.docx DOCX document
36C24620Q0095-0001001.xlsx XLSX spreadsheet
36C24620Q0095-001.docx DOCX document
36C24620Q0095-002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11-22-2019 637-20-1-6064-0023 None Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24620Q0095

X X X

X Solicitation 36C24620Q0095 is hereby amended as follows:

1. To Post Questions and Answers.

Please see below for more information and attached excel spreadsheet

Ashley Korahaes Contracting Officer

QUESTIONS AND ANSWERS

RFQ: 36C24620Q0095

Chemical Treatment

1. When onsite for the walk-through, the operator stated that he could provide us with the last year of meter readings for Makeup, Feedwater, and Condensate Return. (This can simply be a starting reading with date and ending reading with date or you can provide us with the total accumulated reading along with the time frame that this was calculated.)

Please see excel sheet

1. What is the normal boiler rotation schedule?

Rotated to maintain equal run times. Both boilers are kept warmed and ready

1. What months do the boilers run? (ex. Boiler 1 or 2 runs from Oct-Mar and Boiler 3 runs Apr-Sep) Boilers run every month except for #3 which is out of service

1. Is there properly functioning automatic blowdown controls utilized on the boilers?

YES

1. Is all the feed and control equipment onsite owned by the VAMC (pumps, controllers, tanks/containment)?

Yes

1. Does the VAMC personnel currently transfer chemical from the shipping containers to the stationary feed tanks onsite? If so, why does the specification ask for hands free delivery (Chemicals and Testing Supplies, Item 6, Page 6)?

Yes , boiler personnel cannot leave the boiler room, having it delivered to the boiler room eliminates the need for this overtime.

1. There were a lot of empty drums onsite when the specification asks for the supplier to remove the empty containers immediately when empty (Chemicals and Testing Supplies, Item 7, Page 6); is drumless delivery required/preferred/enforced?

We currently buy the chemicals as needed therefore own the barrels and VA personnel have to dispose of the old barrels. Yes the statement of work will be followed and enforced

1. The specification required the FW hardness to be less than 1 PPM (Performance Requirements, Item 1, Page 7) but there is no softener onsite which would mean that condensate return would need to be around 90% or better to attain this level. Will a water softener be purchased and installed (none currently in place) if the FW hardness cannot be maintained below 1 ppm?

Condensate return is greater than 90%. VAMC Asheville (Asheville area) water is naturally soft and no softener has been required in the past. Yes if hardness cannot be maintained below 1 PPM one will be purchased and installed

1. Are corrosion coupons (copper and steel) currently in use as requested in the specification (Performance Requirements, Item 16, Page 7)? If so, can you please provide the most current analysis for review?

No

1. A magnetic layer of black iron oxide for corrosion barrier on the steel surfaces would require the use of a tannin product (Performance Requirements, Item 17, Page 7); is a tannin based product going to be specified for this application?

NO, The magnetic (magnetite) layer is normally created by proper chemical treatment and is already there, needs to be maintained

1. Can you please share the last test results for the DO monitoring of the DA Tank as required by the specification (On-site Services, Item C, Page 8)?

The 6 year NDT of the DA tank was just completed 10/22/2019 and it is cleaned and visually inspected annually. Currently don’t have any DO test results

1. When speaking with the operator during the walk-through, we were told that the current situation was that chemical was purchased on a “buy-as-needed” basis and that another charge was also incurred for the monthly onsite service visit/testing. The bid spec asks for Annual Pricing for each of the next 5 years and a total for the 5 years. Will this be the way pricing is evaluated and also the way the contract will actually bill?

Per page 3, Contract Administration Data, contractor is to submit invoices monthly in ARREARS. Each CLIN is broken down on a monthly/yearly basis. Please provide the monthly cost of services on the unit line and the total year cost of services (monthly cost x 12 months) on the amount line. This will be done for each Option Year CLIN.

See attached document: Boiler Water Usage.

File details come from the government source that posted it. Updated .