About this file

36C24619R0073 0004 Answers to the RFI Questions.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 658-18-105 Upgrade Reverse Osmosis Water System in Sterile Processing Services, newest first.
File Type Posted
36C24619R0073-0006001.pdf PDF
36C24619R0073-0006000.docx DOCX document
36C24619R0073-0005001.pdf PDF
36C24619R0073-0005000.docx DOCX document
36C24619R0073-0004000.docx DOCX document
36C24619R0073-0004002.pdf PDF
36C24619R0073-0003000.docx DOCX document
36C24619R0073-0003001.pdf PDF
36C24619R0073-0002001.pdf PDF
36C24619R0073-0002000.docx DOCX document
36C24619R0073-0001000.docx DOCX document
36C24619R0073-001.docx DOCX document
36C24619R0073-002.pdf PDF
36C24619R0073-005.pdf PDF
36C24619R0073-004.pdf PDF
36C24619R0073-003.pdf PDF
36C24619R0073-000.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Sheet EP102, schedule for Panelboard LV lists circuit 18 as new water softener, circuit 22 as new SWC water heater, circuit 24/26 as RO water heater and circuit 28 as SWR water heater. I do not see this work on the “E” drawings and I only see two pieces of equipment listed on PQ101. Circuit 18 is for new water softener.

Circuit 22 is for the new SWC on demand water heater. There is only 1 new SWC water heater in project now.

2. Possibly related, Sheet PQ101 key note 12 lists (2) new process heaters @ 4KW 240 volt, Sheet EP102 Disconnect Switch Schedule lists DS-WH 30 amp 1 ph. 208 volt (4kw) but is not shown on drawings.

There is only 1 new SWC on demand water heater in project.