36C24619R0047-001.pdf
PDF 2 MB Posted
- Attached to
- Building 7 Finishes Federal contract opportunity
- Solicitation number
- 36C24619R0047
About this file
36C24619R0047 659-18-204 Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24619R0047-0002003.pdf | ||
| 36C24619R0047-0002001.pdf | ||
| 36C24619R0047-0002002.pdf | ||
| 36C24619R0047-0002000.docx | DOCX document | |
| 36C24619R0047-0001003.pdf | ||
| 36C24619R0047-0001001.pdf | ||
| 36C24619R0047-0001002.pdf | ||
| 36C24619R0047-0001000.docx | DOCX document | |
| 36C24619R0047-002.pdf | ||
| 36C24619R0047-000.docx | DOCX document | |
| 36C24619R0047.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100'50'0' 150' 200' 250' 300'
GENERAL NOTES DRAWING INDEX
BUILDING 7 FINISHES
COVER SHEET
11/20/2017
1 8
G-1
7 GW ARH
BUILDING 7 FINISHES
659-18-102
KEY NOTES
NOTES
DEMO PLAN
11/20/2017
2 8
A-D
7 GW ARH
ACOUSTICAL SEALANT
BOTH SIDES
FLOOR LINE
SOUND ATTENUATION
BATTS (SAB)
CEILING LINE
STRUCTURAL DECK
5/8" GWB BOTH SIDES OF
3 5/8" METAL STUD
NTS
SLOTTED
TOP TRACK
FIRE STOP
SEALANT
FLOOR LINE
FACE OF COLUMN
OR WALL
(NEW OR EXISTING)
5/8" GWB
7/8" METAL FURRING
CHANNEL
CEILING LINE
HORIZONTAL
FURRING
CHANNEL AT TOP
OF GWB
STRUCTURAL DECK
NTS
Q
ACOUSTICAL SEALANT
BOTH SIDES
FLOOR LINE
SOUND ATTENUATION
BATTS (SAB)
CEILING LINE
STRUCTURAL DECK
5/8" GWB BOTH SIDES OF
3 5/8" METAL STUD
C
NTS
1- HOUR WALL
C
SEE SCH
SEE SCH
SEE SCH
S E
E
S
C H
S E
E
S
C H
S E
E
S
C H
SEE SCH
S
SOLID DOOR
1 3/4" 1 3/4"
4-7/8"
WALL - SEE PLAN FOR
TYPE
SEALANT - EACH SIDE AND
ALL AROUND, TYP
HOLLOW METAL FRAME
1'-1 5/8"
ADJACENT WALL
WHERE OCCURS
SEALANT - EACH SIDE AND
ALL AROUND, TYP
HOLLOW METAL
FRAME
WALL - SEE PLAN
FOR TYPE
DOOR
DOOR #
ROOM
NAME
ROOM #
DIMENSIONS
W H
DOOR
TYPE
FRAME
TYPE
FRAME
ELEV
DETAIL
HEAD JAMB
HARDWARE
GROUP
FIRE
RATING
S
S
HW-1
DOOR AND FRAME SCHEDULE
1100B
1100C
TREAT/OFFICE
TREAT/OFFICE
3' - 0"
3' - 0"
7' - 0"
7' - 0"
WOOD
WOOD
HM
HM
See
Detail
1100B
1100C
See
Detail
See
Detail
See
Detail
S
CORRIDOR 3' - 0" 7' - 0" WOOD HM
See
Detail
See
Detail
S
BREAKROOM 3' - 0" 7' - 0" WOOD HM
See
Detail
See
Detail
S
PHYSICAL
THERAPY
3' - 0" 7' - 0" WOOD HM
See
Detail
See
Detail
HW-1
HW-1
HW-1
HW-1
SLOTTED TOP
TRACK
SLIP
CONNECTION
VERTICAL
STUD
GENERAL NOTES (COMMON TO ALL DETAILS)
ISOMETRIC VIEW OF SLOTTED TOP TRACK
ARCHITECTURAL
PLANS & DETAILS
11/20/2017
3 8
A-1
7 GW ARH
DEVICE LEGEND
ELECTRICAL
PLANS
11/20/2017
6 8
E-1
7 GW ARH
Prosthetics
Storage
Storage
Corridor
Women's
Locker
Men's
Locker
Elec/Tele
Wellness
HAC
EXAM
Toilet
Toilet
Corridor
Social
Worker
Office
Director
Office
Copy
Room
Passage
Secretary
Program
Supervisor
Office
Toilet
Corridor
Chief
Office
Waiting
Lobby
Prosthetics
Physician
Office
Office
Prosthetics
Office
Toilet
Corridor
Corridor
Prosthetics
Staff
Workroom
Toilet
Shower
Room
HAC
Elec/Tele
PT Staff
Workroom
Schedulers
Storage
OT
Cognitive
Testing
Driver
Training
Break
Room
Corridor
Splinting
Hall
Treat/Office
Treat/Office
Treat/Office
Treat/Office
Treat/Office
Occupational
Therapy
Treat/Office
Treat/Office
Treat/Office
Toilet
Physical
Therapy
Treat
Treat
Treat
Treat
Treat
HAC
Hall
Telecom Elec.
Passage
Wellness
Office
Passage
Work
Area
FEC
FEC
OFFICE
OT
Clinic
OT
Clinic
Kinesiotherapy
Toilet
Supply
Alcove
Treat/Office Treat/Office
1100B TREAT/OFFICE B2
1100C TREAT/OFFICE
1101 SPLINTING
1102 HALL
CORE CLINIC
Room Finish Schedule
NOTES
BASEROOM
NAMENO.
FLOOR
E
WALLS DOOR FRAME
S W TN
1103 TREAT/OFFICE
1104 TREAT/OFFICE
1105 TREAT/OFFICE
1110 TREAT/OFFICE
1117 TREAT
1118 TREAT
1119 TREAT
HALL
KINESIOTHERAPY
PASSAGE
1100A SUPPLY ALCOVE
1106 TREAT/OFFICE
1107 TREAT/OFFICE
1108 OCCUPATIONAL THERAPY
1109 TREAT/OFFICE
1116 TREAT
1115 TREAT
P6 P6
RF 1,2,3,4
B1 ------ P6 P6
P6 P6
P6 P6
1111 TREAT/OFFICE
1113 PASSAGE
WORK AREA
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
LVT
P9 P9B2
B1 B2
B2
B2 B2 B2 B2
B2 B2 B2
B2 B2 B2 B2 B2
B1
B1
B1 B1 B1 B1
Note 1: See drawing with paint plan legend for details. If you have any questions about paint details, ask COTR to get in touch with Interior Designer for paint plan clarification due to numerous bulkheads.
Note 2: See rubber flooring drawing for detail on sheet flooring design. Use coordinating welding rods to match the color sheet flooring you are welding
General Note 1: All transitions between LVT and rubber flooring to be ADA compliant .
General Note 2: All transitions between floor finishes to occur at center of the door.
General Note 3: Contractor to chalk mark all curved patterns in flooring for review and receive approval from Interior Designer prior to the installation of flooring.
General Note 3: All subfloors to be leveled and moisture RH testing to be performed and approved by manufacturer standards.
Room Finish Notes
ROOM FINISH
SCHEDULE
11/20/2017
4 8
A-2
7 GW ARH
GENERAL NOTES
MECHANICAL
PLANS
11/20/2017
5 8
M-1
7 GW ARH
PLUMBING PLAN
11/20/2017
7 8
P-1
7 GW ARH
RCP SYMBOL LEGEND
REFLECTED
CEILING PLAN
11/20/2017
8 8
A-C
7 GW ARH
| Building 7 Finishes - Cover Sheet |
| Building 7 Finishes - Demo Plan |
| Building 7 Finishes - Details |
| Building 7 Finishes - Electrical |
| Building 7 Finishes - Finish Schedule |
| Building 7 Finishes - Mechanical |
| Building 7 Finishes - Plumbing |
| Building 7 Finishes - RCF |
File details come from the government source that posted it.