36C24619R0047-0002003.pdf

PDF 86 KB Posted

Attached to
Building 7 Finishes Federal contract opportunity
Solicitation number
36C24619R0047
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24619R0047 0002 659-18-204 SOW.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Building 7 Finishes, newest first.
File Type Posted
36C24619R0047-0002001.pdf PDF
36C24619R0047-0002002.pdf PDF
36C24619R0047-0002000.docx DOCX document
36C24619R0047-0001003.pdf PDF
36C24619R0047-0001001.pdf PDF
36C24619R0047-0001002.pdf PDF
36C24619R0047-0001000.docx DOCX document
36C24619R0047-002.pdf PDF
36C24619R0047-001.pdf PDF
36C24619R0047-000.docx DOCX document
36C24619R0047.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Building 7 Finishes Project #: 659-18-102

STATEMENT OF WORK

Contractor shall provide all labor, materials, tools, equipment, and supervision, and perform all operations necessary for the renovation of bldg.7, at the Veterans Affairs Medical Center, Salisbury, NC. Work includes, but is not limited to, removing all existing flooring from the core clinic and installing new flooring according to the drawings and specifications, constructing 2 new offices and modifying current HVAC. This work will take place at building 7 in the core clinic area, Bldg. 2, Bldg. 3, and Bldg. 6 skywalk. The contractor shall complete all work as further described in the construction documents. Work includes, but is not limited to, general construction, alterations, mechanical, electrical, plumbing, necessary removal of existing structures and construction and certain other items.

All work, including final cleanup and completion of any punch list items, shall be performed within Two Hundred & Ten (210) calendar days of receipt of the Notice to Proceed. Work shall be completed in strict accordance with the drawings and specifications.