36C24619R0047-0002000.docx
DOCX document 152 KB Posted
- Attached to
- Building 7 Finishes Federal contract opportunity
- Solicitation number
- 36C24619R0047
About this file
36C24619R0047 0002 36C24619R0047 0002.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24619R0047-0002003.pdf | ||
| 36C24619R0047-0002001.pdf | ||
| 36C24619R0047-0002002.pdf | ||
| 36C24619R0047-0001000.docx | DOCX document | |
| 36C24619R0047-0001003.pdf | ||
| 36C24619R0047-0001001.pdf | ||
| 36C24619R0047-0001002.pdf | ||
| 36C24619R0047-000.docx | DOCX document | |
| 36C24619R0047-002.pdf | ||
| 36C24619R0047-001.pdf | ||
| 36C24619R0047.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information Project: 659-18-204, Building 7 Finishes Responses to RFI Questions
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 1 of 03-22-2019 659-18-204 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24619R0047 02-06-2019
X X X
The purpose of this amendment (0002) is to provide answers to RFIs. See below.
Attachments from Amendment 0001 are also attached. I f unable to v ie w please contact the Contracting Officer.
Due date for proposals is 04/01/2019 at 4PM (EST). Email proposals to craig.powell@va.gov.
See attached document: 659-18-204 Specs Combined.
See attached document: 659-18-204 Drawings Combined.
See attached document: 659-18-204 SOW.
1. Question: The scope of work/plans/specs does not contain information for the flooring for Bldg. 3, Skywalk to 42, and Bldg. 2 Pharmacy. Will plans/specs info be forthcoming on these areas?
Answer: See Amendment 0001
2. Question: For Bldg. 7 where the floor has to be cut to run the drains/plumbing for the sinks, is there an actual or estimated depth that will have to be excavated to reach the drain lines that will be tied into?
Answer: No
3. Question: For Bldg. 3 Flooring, will the VA be responsible for removing/reinstalling furniture/computers for the offices and reception areas?
Answer: Yes
4. Question: For Bldg. 3 Flooring, will the VA provide a phasing plan for the areas and how many offices and/or much of area can be completed at one time so that we can figure accurately for mobilizations?
Answer: Yes
5. Question: For Bldg. 3 Flooring, will rooms 1123 and 1119 be included in the project?
Answer: No
6. Question: Bldg. 2 Flooring/Pharmacy, how many phases should we figure since we could not see the area?
Answer: 10 Phases with about 300sf in each phase. We can adjust depending on circumstances. This will be evening/overnight work.
7. Question: Will the VA move the shelving/furniture in the Pharmacy area?
Answer: Yes
8. Question: Please provide additional information on the damaged expansion joint in the Skywalk to Bldg. 42. Does the VA desire a new expansion joint? If so, what material and/or type of joint would you like to place here? Please provide a detail of what is desired.
Answer: Install a new expansion joint.
Belzona 4111 Magma-Quartz Belzona 2211 MP Elastomer Belzona QD Conditioner Belzona 4411 Granogrip
9. Question: The plans indicate that sinks are to be placed in the offices. Are the sinks to be wall hung or will there be cabinets that the sinks are to be mounted in? If the sinks are to be mounted in cabinets, please provide information/plans on the cabinets that you desire.
Answer: See Picture. This sink was installed in house, so you have one less sink to worry about.
10. Question: The plans indicate three types of sinks on page 7 (plumbing), P-2, P-3, and P-4. In the specifications I can only find one sink type. Please provide a schedule or revised specs for the sinks/types.
Answer: Match the existing sink shown in the picture. The specification is listed in the drawing on page 7.
11. Question: If plans are to be issued for the flooring aspect of the project for the various buildings, can the RFI dead line be extended so that there is time to review the plans and submit questions for those areas?
Answer: These were submitted in Amendment 0001. Interested parties may contact the Contracting Officer if they were unable to view or download.
image1.jpeg image2.jpeg