36C24619B0027-0001000.docx
DOCX document 3 MB Posted
- Solicitation number
- 36C24619B0027
About this file
36C24619B0027 0001 36C24619B0027 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24619B0027-011.pdf | ||
| 36C24619B0027-013.pdf | ||
| 36C24619B0027-010.pdf | ||
| 36C24619B0027-008.docx | DOCX document | |
| 36C24619B0027-012.pdf | ||
| 36C24619B0027-014.pdf | ||
| 36C24619B0027-009.pdf | ||
| 36C24619B0027-007.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-17-2019 652-19-107 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24619B0027 07-17-2019
X
The purpose of this amendment is to address questions listed on page 2.
Desiree Mills Contracting Officer
CONTINUATION PAGE
RFI Questions General 90 days period of performance does not appear to allow for time to generate subcontracts and time for submittal generation/review. Will the period of performance be extended?
VA Response: Yes. Period of Performance can be extended to 120 days.
Will the VA allow all three entrances to be worked simultaneously? See period of performance note above.
VA Response: Yes. All entrances can be worked simultaneously however, egress from the entrances must always be maintained.
Construction note 4.5 calls for application of Anti-Slip Sealant Coat. Please provide a specification for the desired coating and confirm this is only for new stamped concrete.
VA Response: Existing aggregate concrete is to be washed & treat with anti-slip sealant coat for CLC & SCI entrances. For South Mall Entrance, anti-slip sealant coat is required only for the new concrete area.
South Mall Entrance:
Are the surface bricks around planter bases to be replaced, replaced only in area where new concrete is shown, or left in place?
VA Response: Only replace surface bricks around planter bases which are adjacent to the areas being resurfaced.
There is a new drop inlet installation the bisects the south mall entrance. Can pedestrian traffic be routed to either the right or left around existing tree planters while this area is cordoned off for excavation and construction?
VA Response: DI connection should not bisect the south mall entrance but when needed pedestrian traffic shall be routed to keep traffic off of the work area.
CLC Entrance Existing to remain area is damaged. Will this be repaired under this contract?
VA Response: Yes. Scope of work to include the repair of damaged area.
Existing to remain concrete area caulking is cracked and failing. Will these areas need to be repaired?
VA Response: Scope of work to include the repair of the failing caulking.
image1.png image2.png image3.png