36C24618B0597-00005002.docx
DOCX document 15 KB Posted
- Attached to
- Construct New MRI Facility (VA-18-00052235) Federal contract opportunity
- Solicitation number
- 36C24618B0597
About this file
36C24618B0597 00005 ANSWERS.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24618B0597-00005004.pdf | ||
| 36C24618B0597-00005001.pdf | ||
| 36C24618B0597-00005003.pdf | ||
| 36C24618B0597-00005000.docx | DOCX document | |
| 36C24618B0597-00004001.pdf | ||
| 36C24618B0597-00004000.docx | DOCX document | |
| 36C24618B0597-00004002.pdf | ||
| 36C24618B0597-00003000.docx | DOCX document | |
| 36C24618B0597-00003002.pdf | ||
| 36C24618B0597-00003001.pdf | ||
| 36C24618B0597-00002017.pdf | ||
| 36C24618B0597-00002021.pdf | ||
| 36C24618B0597-00002016.docx | DOCX document | |
| 36C24618B0597-00002018.pdf | ||
| 36C24618B0597-00002020.pdf | ||
| 36C24618B0597-00002019.pdf | ||
| 36C24618B0597-00001000.docx | DOCX document | |
| 36C24618B0597-001.docx | DOCX document | |
| 36C24618B0597-002.pdf | ||
| 36C24618B0597-003.pdf | ||
| 36C24618B0597-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANSWERS
1. By definition the Quality Control Manager is reviewing all work performed by the prime and subcontractors for quality and strict compliance with project specifications, manufactures requirements and industry standards. To allow the individual responsible for the placement of work to also be responsible for monitoring the quality of that work defeats the goal of independent quality control. I practice the Q.C. manager should be an independent agent, working outside of the direct supervision of anyone in the construction management arena of the construction team. A dedicated individual should be included in RFP numbers.
1. New Drawings Attached
1. Confirmed.
1. The temperature and humidity requirements are shown on Siemens Drawing M-101 “Environmental Requirements”.
1. Confirmed.
1. Confirmed.
1. The wall covering should be Koroseal and the handrail Acrovyn.
1. See drawing S-301, detail #6.
1. As builts are not available.