36C24618B0597-00002018.pdf
PDF 6 MB Posted
- Attached to
- Construct New MRI Facility (VA-18-00052235) Federal contract opportunity
- Solicitation number
- 36C24618B0597
About this file
36C24618B0597 00002 Drawings 1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24618B0597-00005000.docx | DOCX document | |
| 36C24618B0597-00005002.docx | DOCX document | |
| 36C24618B0597-00005004.pdf | ||
| 36C24618B0597-00005001.pdf | ||
| 36C24618B0597-00005003.pdf | ||
| 36C24618B0597-00004000.docx | DOCX document | |
| 36C24618B0597-00004001.pdf | ||
| 36C24618B0597-00004002.pdf | ||
| 36C24618B0597-00003000.docx | DOCX document | |
| 36C24618B0597-00003002.pdf | ||
| 36C24618B0597-00003001.pdf | ||
| 36C24618B0597-00002017.pdf | ||
| 36C24618B0597-00002021.pdf | ||
| 36C24618B0597-00002016.docx | DOCX document | |
| 36C24618B0597-00002020.pdf | ||
| 36C24618B0597-00002019.pdf | ||
| 36C24618B0597-00001000.docx | DOCX document | |
| 36C24618B0597-003.pdf | ||
| 36C24618B0597-001.docx | DOCX document | |
| 36C24618B0597-002.pdf | ||
| 36C24618B0597-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRAMIING LUMBER
CONCRETE
CMU
FINISH WOOD
BRICKPLYWOOD
PARTICLE BOARD
STEEL
BATT INSULATION
GYPSUM WALL BOARD
RIGID INSULATION
GRAVEL FILL
EARTH
B
A
A3-1
A2-1WINDOW TYPE
PARTITION TYPE
BULDING SECTION
DOOR NUMBER
WALL/DETAIL SECTION
A3-1
3 WALL/DETAIL SECTION
A3-1
3 DETAIL INDICATORA SPECIFIC SHEET NOTES
INDICATES SECTION
INDICATES SHEET WHERE SECTION IS DRAWN
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
A-001
ARCHITECTURAL
GENERAL NOTES AND CODE
ANALYSIS
CONSTRUCT NEW MRI
FACILITY
02-14-2018 DM / VS PBL
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
STANDARD ARCHITECTURAL ABBREVIATIONS
SYMBOLS USED AS ABBREVIATIONS:
ANGLE
@ AT
CENTERLINE
CHANNEL
DIAMETER
# NUMBER
PERPENDICULAR
PLATE
STANDARD ABBREVIATIONS:
AC AIR CONDITIONING
ACC. ACCESSIBLE
ADJ. ADJACENT
A.F.F. ABOVE FINISHED FLOOR
AGG. AGGREGATE
ALT. ALTERNATE
AL. ALUMINUM
ANNOD. ANODIZED
APC. ACOUSTICAL PANEL CLG.
APPX. APPROXIMATE
ARCH. ARCHITECTURAL
A.S.T.M. AMERICAN SOCIETY FOR
TESTING MATERIALS
AUTO AUTOMATIC
A.S.U. ACOUSTICAL SPACE UNITS
B.C. BRICK COURSE
B.E.J. BRICK EXPANSION JOINT
BLDG. E.J. BUILDING EXPANSION JOINT
BD. BOARD
BET. BETWEEN
BIT. BITUMINOUS
B.L. BUILDING LINE
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BEAM
BOT. BOTTOM
B.S. BRICK SHELF
BSMT. BASEMENT
BTU BRITISH THERMAL UNIT
CAB. CABINET
C.B. CATCH BASIN
C.D. CEILING DIFFUSER
CEM. CEMENT
CER. CERAMIC
C.G. CORNER GUARD
C.H. CEILING HEIGHT
C.I. CAST IRON
C.J. CONTROL JOINT
CK.BD. CHALKBOARD
CLOS. CLOSET
CLG. CEILING
CM. CENTIMETER
C.M.T. CERAMIC MOSAIC TILE
C.M.U. CONCRETE MASONRY UNIT
COL. COLUMN
COR CONSTRUCTION OWNER
REPRESENTATIVE
CONC. CONCRETE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONTR. CONTRACTOR
CONV. CONVECTOR
COORD. COORDINATE
CPT. CARPET
C.R. CEILING REGISTER
C.S. CEMENT SEALER
C.T. CERAMIC TILE
CTSK. COUNTERSUNK
CU. CUBIC
CWPA CEMENTIOUS WOOD-FIBER
PANELS - SUSPENDED
DEMO DEMOLITION
DEP. DEPRESSED
DEPT. DEPARTMENT
DET. DETAIL
D.H. DOUBLE HUNG
D.F. DRINKING FOUNTAIN
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DIV. DIVISION
DN. DOWN
DR. DOOR
DWG. DRAWING
E. EAST
EA. EACH
EC. END CAP
EL. ELEVATION
ELEC. ELECRIC
ELEV. ELEVATOR
EMER. EMERGENCY
EMR. ELEV. MACHINE ROOM
ENCL. ENCLOSURE
ENT. ENTRANCE
EP. EPOXY PAINT
EQ. EQUAL
EQUIP. EQUIPMENT
E.W.C. ELECTRICAL WATER COOLER
EXCAV. EXCAVATE
EXH. EXHAUST
EXIST. EXISTING
EXP. EXPOSED
E.J. EXPANSION JOINT
EXT. EXTERIOR
F.A.F. FACTORY APPLIED FINISH
F.A.I. FRESH AIR INTAKE
F.D. FLOOR DRAIN
FDN. FOUNDATION
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.H.E.C. FIRE HOSE & EXTINGUISHER
CABINET
F.H.C . FIRE HOSE CABINET
FIN. FINISH
FL. FLOOR
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
GENERAL CONTRACTOR NOTESMATERIALS AND SYMBOLS KEY
FLASH. FLASHING
FLUOR. FLOURESCENT
F.P. FIREPROOFING
F.P.S.C. FIREPROOF SELF-CLOSING
F.R. FIRE RATING
FRP FIBERGLASS REINFORCED
POLYESTER
F.S. FULL SIZE
FT. FOOT
FTG. FOOTING
FURR. FURRING
FUT. FUTURE
GA. GAUGE
GALV. GALVANIZED
G.B. GRAB BAR
GBL. GLAZED BLOCK
G.C. GENERAL CONTRACTOR
GEN. GENERAL
G.I. GALVANIZED IRON
GL. GLASS
G.W.B. GYPSUM WALL BOARD
G.W.T. GLAZED WALL TILE
GYP. GYPSUM
H.B. HOSE BIB
HC. FOR HANDICAPPED USE
HDR. HEADER
HDW. HARDWARE
H.M. HOLLOW METAL
HOR. HORIZONTAL
H.P. HIGH POINT
H.R. HANDRAIL
HR. HOUR
HT. HEIGHT
HTG. HEATING
H.V.A.C HEATING, VENTILATION
AIR CONDITIONING
HD.WD. HARDWOOD
I.D. INSIDE DIAMETER
IN. INCH
INCAND. INCANDESCENT
INCL. INCLUSIVE
INSUL. INSULATION
INT. INTERIOR
INTER. INTERMEDIATE
INV. INVERT
J.C. JANITORS CLOSET
JT. JOINT
LAB. LABORATORY
LAM. LAMINATED
LAV. LAVATORY
LBS. POUNDS
LH. LEFT HAND
L.L. LIVE LOAD
LONG. LONGITUDINAL
L.P. LOW POINT
LT.WT. LIGHT WEIGHT
M. METER
MACH. MACHINE
MAINT. MAINTENANCE
MAR. MARBLE
MAS. MASONRY
MAT. MATERIAL
MAX. MAXINUM
MECH. MECHANICAL
MED. MEDIUM
MET. METAL
MFR. MANUFACTURER
M.H. MANHOLE
MIN. MINIMUM
MISC. MISCELLANEOUS
MLD. MOLDINGS
MM. MILLIMETER
M.O. MASONRY OPENING
MOD. MODULAR
MTL. MATERIAL
N. NORTH
N.I.C. NOT IN CONTRACT
NO. NUMBER
NOM. NOMINAL
N.R.C. NOISE REDUCTION
COEFFICIENT
N.T.S. NOT TO SCALE
NFPA NATIONAL FIRE
PROTECTION AGENCY
OA OVERALL
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OPPOSITE HAND
OPNG. OPENING
OPP. OPPOSITE
P. PAINT
PASS. PASSENGER ELEVATOR
ELEV.
PER. PERIMETER
PERF. PERFORATED
PGB PAINTED GYPSUM BOARD
PL. PLATE
P.LAM PLASTIC LAMINATE
PLAS. PLASTER
PNL. PANEL
PREFAB. PREFABRICATE
PSI. POUNDS PER SQUARE INCH
PT. POINT
PTN. PARTITION
PVC. POLYVINYL CHLORIDE
PWD. PLYWOOD
Q.T. QUARRY TILE
QTY. QUALITY
R. RISER
RAD. RADIUS
R.B. RUBBER BASE
R.D. ROOF DRAIN
REF. REFERENCE
REG. REGISTER
REINF. REINFORCING
REQD. REQUIRED
RET. RETURN
REV. REVISION
R.H. RIGHT HAND
RM. ROOM
R.O. ROUGH OPENING
S. SOUTH
SAN. SANITARY
SCHED. SCHEDULE
SECT. SECTION
S.F. STAINED FINISH
SIM. SIMILAR
S.P. STARTING POINT
SPEC. SPECIFICATION
SQ. SQUARE
S.S. STAINLESS STEEL
ST. STEEL
S.T.C.SOUND TRANSMISSION
STD. STANDARD
STOR. STORAGE
STR. STRUCTURAL
SUSP. SUSPEND
SYM. SYMETRICAL
SYN. SYNTHETIC
T.&B. TOP AND BOTTOM
TB. TACKBOARD
T.C. TERRA COTTA
T.D. TRENCH DRAIN
TEL. TELEPHONE
TEMP. TEMPERED
TER. TERRAZZO
T.&G. TONGUE AND GROOVE
THK. THICKNESS
THRU THROUGH
T.O. TRIMMED OPENING
T.O.S. TOP OF SLAB
TR. TREAD
TV. TELEVISION
T.W. TOP OF WALL
TYP. TYPICAL
U.L. UNDERWRITER'S
LABORATORY
U.O.N. UNLESS OTHERWISE
NOTED
V.P. VISION PANEL
V.C.T.VINYL COMPOSITION TILE
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
V. VINYL
V.W.C. VINYL WALL COVERING
W. WEST
W/ WITH
W.C. WATER CLOSET
WD. WOOD
W/O WITH OUT
W.O. WINDOW OPENING
W.P. WATERPROOFING
W.PT. WORKING POINT
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
GENERAL CONTRACTOR NOTES
ALL WORK TO BE DONE IN ACCORDANCE WITH THE LATEST VERSIONS OF ALL APPLICABLE LOCAL, STATE, AND
FEDERAL AUTHORITIES, CODES, RULES, AND REGULATIONS.
CONTRACTOR IS SPECIFICALLY RESPONSIBLE FOR ALL MEANS AND METHODS OF JOB SITE SAFETY.
ALL PRESSURE-TREATED LUMBER SHALL BE FOR GROUND CONTACT.
NO MATERIALS CONTAINING ASBESTOS WILL BE USED.
ALL PAINTING AND COATING MATERIALS, BOTH INTERIOR AND EXTERIOR, TO BE FREE OF LEAD AND MERCURY.
MATERIALS SHALL HAVE LOW OR NO "VOLATILE ORGANIC COMPOUNDS" (V.O.C.) COMPLIANT WITH STATE AND LOCAL
REGULATIONS.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD. VERIFY ALL EXISTING CONDITIONS AS THEY RELATE TO THE WORK. REQUEST CLARIFICATION OF ALL CONFLICTS PRIOR TO PROCEEDING. THE CONTRACTOR SHALL CONTACT THE COR IMMEDIATELY REGARDING ANY DIMENSIONAL DISCREPANCIES NOTED ON THE DRAWINGS OR INCURRED DURING THE CONSTRUCTION PROCESS. NO ADDITIONAL COST WILL BE PAID FOR
VARYING DIMENSIONAL CONDITIONS.
ALL DIMENSIONS SHOWN ON DRAWINGS ARE NOTED FROM FACE OF C.M.U., CONCRETE, MASONRY, OR ROUGH FRAMING. FINISH MATERIAL TO FINISH MATERIAL DIMENSIONS MAY BE USED WITH EXISTING CONDITIONS AND
DETAILS.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND CONFIRMING ALL QUANTITIES IN ACCORDANCE W/ THE CONTRACT DOCUMENTS. LISTED QUANTITY ASSUMPTIONS ARE FOR BIDDING PURPOSES ONLY. CONTRACTOR IS
RESPONSIBLE FOR VERIFYING AND CONFIRMING ALL QUANTITIES.
CONTRACTOR SHALL MAKE THEMSELVES FAMILIAR WITH ALL SITE CONDITIONS, UTILITIES, ELEVATIONS AND DIMENSIONS PRIOR TO START OF WORK. THE CONTRACTOR IS TO CONTACT THE COR FOR ANY DISCREPANCIES. THE
CONTRACTOR IS RESPONSIBLE FOR SURVEY, LAYOUT, AND COORDINATION OF ALL WORK.
DURING THE BID PHASE, CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR REVIEWING AND PRICING
ALL CONTRACT DOCUMENTS AS A COMPLETE SET.
CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGE TO BUILDING AND SHALL TAKE ALL PRECAUTIONS NECESSARY TO
PROTECT ALL EQUIPMENT AND BUILDING FROM DUST AND WATER DAMAGE.
ALL WORK SHALL BE DONE IN WORKMANLIKE MANNER AND IN CONFORMANCE WITH MANUFACTURER'S
INSTALLATION AND GUARANTEE REQUIREMENTS.
ISOLATE ANY ALUMINUM SURFACE THAT WILL BE IN CONTACT WITH ANY FERROUS METAL WHETHER THE FERROUS METAL IS NOW PAINTED OR NOT. THE ISOLATION SHALL BE PERFORMED BY THE CONTRACTOR AS PER THE
SPECIFICATIONS.
PROVIDE ELECTROLYTIC PROTECTION WITH BITUMINOUS COATING BETWEEN ALL DISSIMILAR METALS, BETWEEN
METAL AND CONCRETE/CMU WALL AND AT DOOR/LOUVER FRAMING.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL UTILITY SERVICE CONNECTIONS TO ALL EQUIPMENT TO INSURE THAT THE EQUIPMENT IS IN FULLY FUNCTIONAL OPERATIONS E.I. WIRING DEVICES, POWER SUPPLIES, ACCESSORIES, CONTROLS, CONDUIT, SUPPORTS, FASTENERS, PIPING, GROUNDING, ETC.
DRAWINGS SHALL NOT BE SCALED.
ANY CONFLICT IN THE DRAWINGS OR BETWEEN DRAWINGS AND SPECIFICATIONS ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN
CLARIFICATION FROM THE COR IS RECEIVED.
ANY UNFORESEEN OR UNCLEAR CONDITIONS TO BE REPORTED TO THE COR PRIOR TO PROCEEDING WITH WORK.
ANY DEVIATION FROM, OR IN FIELD ALTERATION TO THESE DRAWINGS AND SPECIFICATIONS IS STRICTLY PROHIBITED WITHOUT PRIOR APPROVAL OF COR. ANY SUCH ALTERATIONS SHALL BE CORRECTED AT ONCE, WITH
NO EXPENSE TO THE COR.
DEMOLITION, CUTTING AND PATCHING OF ANYTHING REQUIRED TO CONSTRUCT THE PROJECT, IS HEREIN MADE A PART THE PROJECT SCOPE OF WORK AND SHALL CONFORM TO THE LEVEL OF FINISH REQUIRED FOR THIS PROJECT.
ALL NAILERS, BLOCKING, SHIMS OR FURRING AND OTHER ROUGH CARPENTRY FOR USE AT CONCRETE, OR MASONRY MATERIALS SHOWN ON DRAWINGS SHALL BE PRESSURE AND FIRE-RETARDANT TREATED. PRESERVATIVE TREATMENT FOR GROUND-CONTACT APPLICATION SHALL FOLLOW THE AMERICAN WOOD PROTECTION
ASSOCIATION (AWPA).
NOT USED.
NO ITEMS SHALL BE SUPPORTED OR HUNG FROM EACH OTHER. G.C. SHALL CONFIRM WITH STRUCTURAL ENGINEER
IF SUSPENDED ITEMS CAN BE FASTENED SECURELY TO WALLS AND/OR STRUCTURAL MEMBERS.
COORDINATE AND PROVIDE APPROPRIATE BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS, I.E. CABINETS, SHELVING, COUNTERS, GRAB BARS, HOOKS, MECHANICAL, ELECTRICAL & PLUMBING EQUIPMENT & SUPPLY FOR
EACH, ETC, TYPICAL.
ALL EXPOSED STEEL, SUCH AS, BUT NOT LIMITED TO BEAMS, COLUMNS, LINTELS, ANGLES, JOINTS, SHALL BE COATED BY CORROSIVE RESISTANT PAINT ON ALL SURFACES. COLOR TO BE SELECTED BY COR.
ALL EXPOSED CONCRETE SURFACES SHALL HAVE CLASS "A" FINISH.
CUT NEATLY AROUND ALL DUCTS, PIPING, ETC. IN EXPOSED AREAS AND SEAL TIGHT.
PROVIDE SEALANT AT ALL FIXTURES AND CHANGE IN MATERIAL, TYPICAL.
PROVIDE ACOUSTICAL INSULATION IN ALL WALLS OF BATHS.
PROVIDE SHOP DRAWINGS FOR ALL WINDOWS & DOORS, BUILT-IN CABINETRY, INCLUDING ALL KITCHEN CABINETS, SHELVES, AND COUNTERTOPS. ALL DRAWINGS SHALL BE AT A MINIMUM OF ½”=1’-0” FOR PLAN, ELEVATIONS AND SECTIONS, WITH 1 ½” = 1’-0” DETAILS. DRAWINGS SHALL BE SUBMITTED TO COR FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. DIGITAL DRAWINGS IN PDF FORMAT WILL BE ACCEPTABLE FOR SUBMISSION.
ALL REQUIRED EXITS, EXIT ACCESS, AND EXIT DISCHARGE AREAS SHALL BE CONTINUOUSLY MAINTAINED CLEAR AND UNOBSTRUCTED FOR INSTANT USE IN THE EVENT OF A FIRE OT OTHER EMERGENCY(NFPA 101-7.1.10.1).
IBC 2015 CODE
CHAPTER 3 - USE AND OCCUPANCY
IBC 304.1 - BUSINESS GROUP 'B':
OUTPATIENT CLINIC
CHAPTER 4 - SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
N/A
CHAPTER 5 - GENERAL BUILDING HEIGHTS AND AREAS
IBC TABLES 504.3, 504.4, AND 506.2:
GROUP 'B', CONSTRUCTION TYPE 'IIB', SPRINKLERED
MAXIMUM HEIGHT 75-FEET ACTUAL <75-FEET
4-STORY LIMIT ACTUAL 1 STORY
92,000 SQ.FT. MAXIMIUM AREA ACTUAL 3,008 SQ.FT.
CHAPTER 6 - TYPES OF CONSTRUCTION
IBC TABLE 601 - FIRE RESISTANT RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS)
TYPE IIB CONSTRUCTION:
PRIMARY STRUCTURAL FRAME TO BE 0 HRS
BEARING EXTERIOR WALLS TO BE 0 HRS
BEARING INTERIOR WALLS TO BE 0 HOURS
NONBEARING EXTERIOR WALLS WITH FIRE SEPARATION DISTANCE BEYOND 30-FEET TO BE 0 HRS
NONBEARING INTERIOR WALLS AND PARTITIONS TO BE 0 HRS
FLOOR CONSTRUCTION TO BE 0 HRS
ROOF CONSTRUCTION TO BE 0 HRS
CHAPTER 7 - FIRE AND SMOKE PROTECTION FEATURES
N/A
CHAPTER 8 - INTERIOR FINISHES
IBC TABLE 803.9 - INTERIOR WALL AND CEILING FINISH REQUIREMENTS
GROUP
BUSINESS, SPRINKLERED
CORRIDORS
C
ROOMS
C
REMARKS
IBC 803.1.1 - INTERIOR WALL AND CEILING FINISH MATERIALS:
CLASS 'A' = FLAME SPREAD INDEX 0-25 / SMOKE-DEVELOPED INDEX 0-450.
CLASS 'B' = FLAME SPREAD INDEX 26-75 / SMOKE-DEVELOPED INDEX 0-450.
CLASS 'C' = FLAME SPREAD INDEX 76-200 / SMOKE-DEVELOPED INDEX 0-450.
CERTIFICATES FOR INTERIOR FINISHES SHALL BE MADE AVAILABLE TO FIRE MARSHAL FOR FIELD INSPECTION.
EXIT
PASSAGEWAYS
B
CHAPTER 9 - FIRE PROTECTION SYSTEMS
IBC 903 - EXISTING BUILDING IS SPRINKLERED AND NEW ADDITION WILL BE SPRINKLERED ACCORDING
TO SECTION 903.
CHAPTER 10 - MEANS OF EGGRESS
IBC TABLE 1004.1.2
FUNCTION OF SPACE: BUSINESS AREAS 100 GROSS SQ.FT. PER OCCUPANT
EXISTING BUILDING AND ADDITION 3,181 GROSS SQ.FT. 32 OCCUPANT LOAD
IBC 1006.2.2 - ONE EXIT ACCESS DOORWAY IS REQUIRED FOR SPACES WITH A MAXIMUM OCCUPANT LOAD OF 49.
IBC 1006.3.2, cond 2 - A SINGLE EXIT PER STORY IS PERMITTED IBC TABLE 1017.2 - EXIT ACCESS TRAVEL DISTANCE IN 'B' OCCUPANCY WITH SPRINKLER SYSTEM IS 300 FEET.
IECC 2015 CODE REQUIREMENTS
CHAPTER 4 [CE] - COMMERCIAL ENERGY EFFICIENCY
CLIMATE ZONE: 4
IECC TABLE C402.1.3 OPAQUE THERMAL ENVELOPE INSULATION COMPONENT MINIMUM REQUIREMENTS, R-VALUE
METHOD
IECC TABLE C402.1.4 OPAQUE THERMAL ENVELOPE ASSEMBLY MAXIMUM REQUIREMENTS, U-FACTOR METHOD, NOTED IN
SPECIFICATIONS
IECC TABLE C402.4 BUILDING ENVELOPE FENESTRATION MAXIMUM U-FACTOR AND SHGC REQUIREMENTS, NOTED IN
SPECIFICATIONS
ASSEMBLY
ROOF DECK (ABOVE)
R-VALUE
R-30
U-FACTOR
U-0.032
BUILDING
BUILDING
110C
ADDITION WALLS ABOVE GRADE R-9.5 CI
SLAB ON GRADE R-10 FOR 24" BELOW
OPAQUE DOORS R-4.75
U-0.104
U-0.54
U-0.61
JOIST/FRAMING FLOOR R-10 U-0.033
ENTRANCE DOOR U-0.77
SHGC
0.40
NFPA 101, 2015 CODE
CHAPTER 3 - USE AND OCCUPANCY
NFPA CHAPTER 38: NEW BUSINESS OCCUPANCY
NFPA TABLE 20.1.6.1, CONSTRUCTION TYPE II 000
NFPA 38.2.6.2: EXIT ACCESS TRAVEL 300-FEET
NFPA 12.2.5.1.2: COMMON PATH OF TRAVEL: 75-FEET FOR COMMON PATH SERVING
LESS THAN 50 OCCUPANTS.
WINDOW U-0.38 0.40
No. DESCRIPTION DATE
CONTROL ROOM
CORRIDOR
MRI ROOM 1
EQUIPMENT
ROOM 1
SOILED UTILITY
TOILET
DRESSING RM 2
DRESSING RM 1
CORRIDOR
CHECK-IN/OFFICE
READING ROOM
WAITING ROOM
CORRIDOR
UTILITIES/STORAGE
REMOVE STOREFRONT
REMOVE MASONRY
VENEER AND
INSULATION. LEAVE
CMU BACK UP TO
REMAIN.
REMOVE
PORTION OF
WALL
'-2
'-2
TEMPORARY ICRA
PARTITION
(INTERIOR)
'-0
REMOVE WALL WATCH AND CABINETRY AND INSTALL AGAINST
TEMPORARY ICRA PARTITION DURING CONSTRUCTION. SEE
PICTURES. INSTALL ON PERMANENT WALLS AT THE END OF
CONSTRUCTION.
EXISTING COUNTER TO REMAIN
SALVAGE SINK, SOAP AND
PAPER TOWEL
DISPENSERS. REINSTALL
AFTER ICRA WALL IS
INSTALLED.
REMOVE CHARGERS
AND CO2
READOUT/ALARM
AND RELOCATE ON
ICRA PARTITION
FEC TO REMAIN
EXISTING AREAWAY
RELOCATE
CONDENSATE
PIPE
SALVAGE SIGN
TEMPORARY ICRA PARTITION (WEATHER-TIGHT)
SE
E
SC
H
ED
U
LE
W
IN
D O
W O
P N
G 2'
-0
REMOVE FLOOR FINISH
REMOVE FLOOR FINISH,
WALL PROTECTION, WALL
FINISHES AND HANDRAIL
REMOVE
FLOOR
FINISH
NOTE:
ALL WORK HAS TO BE ENCLOSED SUCH THAT CONSTRUCTION
DUST REMAINS WITHIN CONSTRUCTION AREA.
CONTRACTOR IS RESPONSIBLE TO CLEAN ALL DUST
ASSOCIATED WITH THE CONSTRUCTION, AND WILL CLEAN ANY
DUST OUTSIDE WORK AREA.
PARTITION SHALL BE ASSEMBLED FROM FLOOR TO UNDERSIDE
OF ROOF DECK.. SEAL ALL GAPS ON BOTH SIDES. PROVIDE
REQUIRED BRACING.
PROVIDE 0.01 NEGATIVE PRESSURE HEPA FILTRATION IN
CONSTRUCTION SIDE.
EXISTING
DECK ABOVE
10 MIL. FIRE-RETARDANT
POLY AT PARTITION,
EXTENDED TO
UNDERSIDE OF
STRUCTURE ABOVE,
TAPED AND SEALED AT
ALL EDGES, AROUND
STEEL BEAMS AND
AROUND ALL
PENETRATIONS
EXISTING FLOOR
2-LAYERS 5/8 GYP. BD,
TYPE X, EACH SIDE.
OCCUPIED AREA
CONSTRUCTION
ZONE
2-HR FIRE RATED INTERIOR ICRA PARTITION WEATHER-TIGHT ICRA PARTITION
EXISTING
DECK ABOVE
10 MIL. FIRE-RETARDANT POLY
AT PARTITION, EXTENDED TO
UNDERSIDE OF STRUCTURE
ABOVE OR EXTENDED 8"
ABOVE OPENING, TAPED AND
SEALED AT ALL EDGES,
AROUND STEEL BEAMS AND
AROUND ALL PENETRATIONS
EXISTING
WOOD PARTITION WITH
1/2" EXTERIOR GRADE
PLYWOOD ON EACH SIDE
CONSTRUCTION
ZONE
R-19
WEATHER BARRIER
BASE FLASHING
PROVIDE ADDITIONAL SUPPORT
FOR WALL-MOUNTED
EQUIPMENT
FIRE-TREATED WOOD STUDS AT
16" O.C.
FULL-PERIMETER SEALANT ALL SIDES, TYP.
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AD100
ARCHITECTURAL
DEMOLITION
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
1/4" = 1'-0"1 LEVEL 1 - DEMOLITION
DEMOLITION NOTES:
1. DASHED LINES INDICATES CONSTRUCTION TO BE REMOVED.
2. SEE MEP DRAWINGS FOR MEP RELATED DEMOLITION.
3. COORDINATE WITH COR LOCATION OR STORAGE OF SALVAGED ITEMS.
4. CONTRACTOR IS RESPONSIBLE FOR TRASH AND DEBRIS REMOVAL.
5. PATCH AND REPAIR DEMOLITION AREA TO MATCH EXISTING AT NO EXPENSE TO THE OWNER BEFORE/ AFTER INSTALLING NEW MATERIALS.
6. PROTECT EXISTING FINISHES "TO REMAIN"
7. CONTRACTOR TO REPAIR/REPLACE ANY DAMAGE TO EXISTING ADJACENT FINISHES OR FITTINGS THAT OCCURS DURING THE CONSTRUCTION WORK.
8. REMOVE EXISTING EXTERIOR DOORS, GLAZED OR METAL TRANSOM PANELS, GRILLES IT IS THE INTENT OF THESE DOCUMENTS THAT THE
CONTRACTOR SHALL REMOVE AND REPLACE EXTERIOR DOORS AND WINDOW SYSTEMS. THE CONTRACTOR SHALL PROVIDE A COMPLETE SURVEY PRIOR TO SUBMITTING A BID TO ENSURE WHICH EXTERIOR DOORS AD WINDOWS WILL BE REPLACED. NO ADDITIONAL COST WILL BE PAID FOR ANY
OPENINGS NOT SHOWN ON THE DRAWINGS.
9. REMOVE AND REPLACE ALL SECURITY SYSTEM DEVICES CURRENTLY INSTALLED ON EXTERIOR DOORS AND WINDOWS. VERIFY OPERATION PRIOR TO
INSTALLATION OF NEW FRAMES AND AFTER INSTALLATION IS COMPLETE.
10. PATCH AND REPAIR EXISTING WALL WHERE WALL WAS DAMAGED DUE TO RELOCATING PLUMBING FIXTURES.
11. COORDINATE WITH COR FOR THE RELOCATION AND STORAGE OF LINEN CART, SPHYGMOMANOMETER WITH BATTERY CHARGING RACK, CHARTING
DESK, AND MEDS CABINET.
3/4" = 1'-0"
ICRA PARTITION
REMOVE AND INSTALL CHARGERS AND CO2 READOUT/ALARM ON ICRA PARTITION.
INSTALL ON PERMANENT WALL AFTER CONSTRUCTION.
ROLL-OUT / REMOVE CABINETS AND WALL
EQUIPMENT AND INSTALL ON ICRA PARTITION
DURING CONSTRUCTION. RE-INSTALL ON
PERMANENT WALL AFTER CONSTRUCTION.
SALVAGE PLUMBING FIXTURES AND
ACCESSORIES, AND RE-INSTALL AFTER ICRA
PARTITION IS INSTALLED.
ISOCENTER
FD
MRI ROOM 2
EQUIPMENT
ROOM 2
TOILET
STORAGE / UPS
CORRIDOR
CONTROL ROOM
CONTROL ROOM
CORRIDOR
MRI ROOM 1
EQUIPMENT
ROOM 1
SOILED UTILITY
TOILET
DRESSING RM 2
DRESSING RM 1
CORRIDOR
CHECK-IN/OFFICE
READING ROOM
WAITING ROOM
CORRIDOR
UTILITIES/STORAGE
33'-4" ADDITION
'-4
23'-1" ROOM
'-0
" R O
O M
7' -0
7'
-0
8'-6"
FURR OUT EXISTING CMU
RADIO FREQUENCY (RF) SHIELDING AND PASSIVE
MAGNETIC SHIELDING
SOUND ABSORPTION PERIMETER
1'
-9
1' -2
7'
-1 1"
7' -3
/4
1'
-3
E
XI
S T
5' -2
'-3
1'-9"
S101
1' -1
1" M
O :8
'-0
4"
ILUMINATED SIGN
ABOVE DOOR
PENETRATION
PANEL WITH RF
FILTER PLATE
0.5 mT LINE
AE302
AE301 3
AE301
STORM
DRAIN PIPE
CART STORAGE
8'-0" +/- EXIST.
EXISTING AREAWAY
EQ EQ
13'-0"
AE501
AE501
AE401
AE501
AE501
AE501
AE501
A
B
C
AE501
AE501
46'-10" +/- EXISTING
AE302
AE302
AE302
3'-7" 2' -3
AE301
CONCRETE
SIDEWALK. TIE TO
EXISTING WALKWAY
4' -6
5'-0"
ADA PUSH PLATE
PREPARE WALL FOR
NEW FINISHES
PATCH AND FINISH
THIS WALL
4'-0" CORNER GUARD (TYP. OF 9)
CRASH RAIL, TYP.
ADA TOILET SIGN
(UNISEX)
16'-0" 8'-6 1/2"
9' -6
24'-9" 21'-0"
A
B
C
C
D E E
F
F
F
C1
C
C
C
G G
FURR-OUT EXISTING WALL
E
E3' -9
1' -8
INTERIOR ADA PUSH PLATE
CRASHRAIL, WALL PROTECTION
AND WALL GUARD IN THIS
CORRIDOR AND CONTROL ROOM 1
7' -6
8'-6"
3' -5
EQ EQ 3'-0"
EXT. INSULATED TINTED
TEMPERED GLASS (TYP.)
9"
3' -6
TYPE 'A' TYPE 'B' TYPE 'C'
9"
TYPE 'D'
RF SHIELDA B C
5/8" GYP. BD.,
BOTH SIDES
WALL TYPE 'E'
DOOR FRAME,
UNEQUAL
RABBET
DOOR
HEAD
5/8" GYP. BD.,
BOTH SIDES
W
AL
L
TY
P E
'E
DOOR FRAME,
UNEQUAL
RABBET
DOOR
JAMB
SECURITY
ANCHOR
AND BASE
ANCHOR
DOOR
HEAD
EXISTING
MASONRY WALL
WALL TYPE 'G'
FURR-OUT CMU WALL
WITH 5/8" GYP. BD.
CONT. SEALANT
BOTH SIDESDOOR FRAME,
UNEQUAL
RABBET AND T-
ANCHOR
LINTEL. SEE STRUCT.
LINTEL L1. SEE
STRUCT.
5/8" GYP. BD., TYP.
2 1/2" MTL STUD
BLKG. & SHIM
FULL PERIMETER
SEALANT, BOTH
SIDES
FLUOROPOLYMER
SYSTEM HIGH-
PERFORMANCE
COATING ON LINTEL
MTL THRU-WALL
FLASHING
HEAD
STOREFRONT
HEAD JAMB
4"
"W
A
LL
TY
P
E 'B
2"
RF-DOOR FRAME
RF-DOOR
FULL-PERIMETER
SEALANT. BOTH SIDES
FERROMAGNETIC DETECTOR
11" WALL TYPE 'B'
2"
RF-DOOR
FRAME
RF-DOOR
FULL-
PERIMETER
SEALANT. BOTH
SIDES
FERROMAGNETIC
DETECTOR
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE101
ARCHITECTURAL
NEW WORK PLAN
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
1/4" = 1'-0"1 LEVEL 1 - NEW WORK
NOTES:
1. ALL DIMENSIONS SHOWN ARE TAKEN FROM FINISHED SURFACES, UNLESS SPECIFIED OTHERWISE.
2. CONTRACTOR SHALL VERIFY WITH MRI EQUIPMENT MANUFACTURER FINAL INSTALLATION DRAWINGS, THE LOCATIONS AND TRAVEL OF ALL
ANCILLARY EQUIPMENT TO BE CEILING- OR WALL-MOUNTED.
3. ALL REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY AT THE FOLLOWING
LOCATIONS: TOILET ROOM 121.
4. ALL PENETRATIONS THROUGH WALLS SHALL BE FIRE SEALED.
5. ALL WOOD AND BLOCKING SHALL BE PRESSURE TREATED.
6. CORRIDOR WALKING SURFACE TO BE SLIP RESISTANT.
7. PATCH AND REPAIR EXISTING WALL WHERE WALL WAS DAMAGED DUE TO RELOCATING PLUMBING FIXTURES.
8. REPAIR ANY HOLES AND CRACKS IN EXISTING GWB WALLS. REPAINT ENTIRE WALLS WITH FINISH TO MATCH ADJACENT SURFACES.
9. ALL METAL USED FOR THE CONSTRUCTION OF THE MRI ROOM SHALL BE NON-FERROMAGNETIC.
10. INSTALL AN ILLUMINATED SIGN OUTSIDE AND IMMEDIATELY ABOVE THE 'MRI ROOM 2' DOOR, WHICH INDICATES "MAGNET IS ON". THIS SIGN
SHALL BE ON EMERGENCY POWER WITH BATTERY BACK-UP.
11. MRI EQUIPMENT HAS STRICT TEMPERATIRE/HUMIDITY REQUIREMENTS. VERIFY CONDITIONS WITH VENDOR.
DOOR SCHEDULE
MARK TYPE FUNCTION CONSTRUCTION HEIGHT WIDTH THICKNESS DOOR FINISH HARDWARE
SET
REMARKS
S101 A EXTERIOR 7'-0" 3'-0" WHIT HW1
118 C INTERIOR 1 3/4"7'-0" 4'-0"
119 B 1 3/4"3'-0"
120 D
WINDOW SCHEDULE
MARK SIZE
H x W
FRAME GLASS
A 3'- 1/2" X 4'-3/4" MATCH MRI ROOM
1 WINDOW
OPERATION
FIXED
FRAME
MATERIAL
HOLLOW METAL
DOOR TYPES
GLASS
TINTED, TEMPERED
LAMINATED
REMARKS
NON-FERROUS
ALUMINUM
ALUM.
HEAD SILL JAMB HEAD JAMB
ALUMINUM
DOOR AND HARDWARE PROVIDED BY THE RF
SHIELD VENDOR
STC-32
INTERIOR
INTERIOR
7'-0"
1 3/4"3'-0"7'-0"
121 D INTERIOR 1 3/4"3'-0"7'-0"
HOLLOW METAL
HOLLOW METAL HW3
HW2
HW2
RADIO FREQUENCY SHIELD PROVIDED BY
RF SHIELD VENDOR
DOOR NOTES:
1. DOOR HARDWARE SYSTEM SHALL MATCH AMBULATORY CARE BUILDING.
2. STOREFRONT DOOR SHALL HAVE DOOR CLOSURE.
3. ALL DOORS SHALL BE ADA ACCESSIBLE.
4. ALL WOOD DOORS SHALL BE SOLID CORE FLUSH PANEL WOOD IN HOLLOW METALL FRAME. WOOD
DOORS SHALL MATCH EXISTING DOORS IN BUILDING 110C; ASSUME RED OAK WITH MEDIUM CHERRY
FINISH, PLAIN SLICED, FACTORY FINISHED.
5. DOOR JAMBS SHALL HAVE HOSPITAL TYPE SANITARY STOPS THAT STOP 8" FROM THE FLOOR TO
FACILITATE MOPPING.
6. ALL WOOD DOORS SHALL RECEIVE KICK/MOP PLATES AT EACH SIDE.
WOOD
WOOD
WOOD
WOOD
B
C
FIXED ALUM. WHITE
FINISH TO MATCH
EXISTING.
NONE
NONE
NONE
PROVIDE AUTOMATIC DOOR OPENER
SLIDER
SEE SPECS.
SEE SPECS.
SEE SPECS.
SEE SPECS.
3'- 1/2" X 4'-3/4"
3'- 10.5" X 4'-9" V.I.F.
ALUM. WHITE
FINISH
RF SHIELD GLASS
1" INSULATED UNIT
1/4"-1/2"-1/4"
1/4" TEMPERED
4&5 /
AE501
2/AE501
7/AE501
10/AE501
9/AE501 U-0.38 / SHGC 0.40
11/AE501
12/AE501
/AE501
/AE501
1 1/2" = 1'-0"3 DOOR DETAILS
3/AE101
3/AE101
1 1/2" = 1'-0"4 DOOR 121 - HEAD DETAIL
4 /
AE101
1 1/2" = 1'-0"5 DOOR 101 - HEAD DETAIL
5 /
AE101
1 1/2" = 1'-0"6 RF-DOOR DETAILS
6/AE101
AE302
SBS MODIFIED-BITUMEN ROOFING
3'-6" 3'-6"
3' -6
3'
-6
7'X7' ROOF HATCH,
CENTERED ON
ISOCENTER EXISTING HATCH TO REMAIN.
REPLACE COVERING.
EXISTING
PARAPET TO
REMAIN
S
LO
P E
1/
4"
2"
S
LO
EXISTING LADDER TO REMAIN
AE302
AE302
AE302
TAPERED
INSUL.
SLO
PE
TAPERED INSUL..
DRAIN VALLEY
R.D.
REPLACE ROOF COVERING WITH
SBS MODIFIED-BITUMEN ROOFING
REPLACE EXISTING PARAPET COPING, TYP.
RD
RD
AE502
Sim
AE111
Sim
AE111
Sim
AE111
Sim
OVERFLOW DRAIN
S
LO
SLOPE 1/4" = 12"
SLOPE 1/4" = 12"
S
LO
TAPPERED INSUL.
V.T.R.
AHU
TAPERED INSUL.
MECH UNIT
AE111
Sim
AE111
Sim
OSHA RAILING
OSHA RAILING
OVERFLOW DRAIN
TOP OF MASONRY
2' -0
COPING
CONTINUOUS CLEAT
MTL FLASHGING UNDER COPINGP.T. WD.
BLKG.
ROOF MEMBRANE. EXTEND UP TO
TOP OF WD. BLKG.
1/2" FIBER BOARD
ROOF INSULATION R-30
EXIST. MTL. DECK
AND ROOF FRAME
JOIST BEARING
CANT
5" TAPERED INSULATION
8" M
AX
EXISTING EXTERIOR WALL ASSEMBLY
BAKER ROD AND SEALANT, BOTH SIDES
COPING
MTL FLASHGING UNDER COPING
P.T. WD. BLKG.
ROOF MEMBRANE. EXTEND UP TO
TOP OF WD. BLKG., BOTH SIDES
1/2" FIBER BOARD, BOTH SIDES
ROOF INSULATION R-30,
BOTH SIDES
CANT, BOTH SIDES
TAPERED INSULATION
8" M
AX
EXISTING EXTERIOR WALL ASSEMBLY
MTL. DECK AND
ROOF FRAME EXIST. MTL. DECK
AND ROOF FRAME
EXISTINGADDITION
BAKER ROD AND SEALANT, BOTH SIDES
ROOF MEMBRANE
ON FLANGE
1/2" FIBER BOARD
ROOF INSULATION R-30
AND TAPPERED INSUL.
MTL. DECK
ROOF FRAME
ROOF DRAIN
CONT. SEALANT
1/4:12 SLOPE1/4:12 SLOPE
SEE PLUMBING
DWGS FOR
CONTINUATION
CONTINUOUS CLEAT
ROOF MEMBRANE.
EXTEND UP ON WALL
1/2" FIBER BOARD
ROOF INSULATION R-30
EXIST. MTL. DECK
AND ROOF FRAME
CANT
TAPERED INSULATION
8" M
AX
8" M
IN
REGLET
CONT.
SEALANT
MORTAR SEALANT
6"
FACE OF EXISTING
1/2" FIBER BOARD
ROOF
INSULATION
MTL. DECK
ROOF FRAME
ROOF VENTILATOR
CONTINUOUS CLEAT
ROOF MEMBRANE.
EXTEND UP ON CURB
REGLET
CONT.
SEALANT
CONT. SEALANT
WD. NAILING
24" PRE-FAB CURB. SEE
MECH DWGS.
ROOF MEMBRANE. BELLOW
BETWEEN CANT AND HATCH AND
LAY ON HATCH FIBER BOARD
1/2" FIBER BOARD
ROOF INSULATION R-30
TAPERED INSULATION
MTL. DECK AND
ROOF FRAME
MTL. DECK AND
HATCH FRAME
ROOF INSULATION R-30,
FIBERBOARD AND
MEMBRANE
EYEBOLT
MTL FLASHING
FULL-PERIMETER
SILICONE SEALANT
FULL-PERIMETER SILICONE SEALANT
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE111
ARCHITECTURAL
ROOF PLAN
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
ROOF NOTES:
1. THE ROOF SYSTEM WILL BE AN SBS-MODIFIED BITUMEN CAP PLY FOR USE IN APPROVED MULTI-PLY MEMBRANE AND FLASHING ASSEMBLIES. TOPSIDE IS TO BE SURFACED WITH A HIGHLY REFLECTIVE WHITE FILM.
2. BUILT-UP ROOF SHALL HAVE SUFFICIENT PITCH AND DRAINS TO ASSURE THAT RAINWATER WILL NOT ACCUMULATE.
MINIMUM SLOPE TO BE 1/4" PER 12".
3. PROVIDE POSITIVE DRAINAGE TO ALL ROOF DRAINS AT ¼” PER FT. SLOPE MIN., UNLESS OTHERWISE NOTED.
4. PROVIDE VENT NOTCHES IN WOOD BLOCKING/NAILERS AT 12” O.C. TYPICAL FULL PERIMETER OF PARAPET, CURBS, MECH UNITS AND THRU ROOF PENETRATIONS.
5. PROVIDE CRICKETS OR SADDLES AT ALL ROOF PENETRATIONS AS REQUIRED TO INSURE PROPER DRAINAGE TO
ROOF DRAINS.
6. PROVIDE ½” SPACE BETWEEN PARAPET WALLS AND WOOD NAILERS, CONTINUOUS WHERE ROOF ABUTS THESE
WALLS.
7. TURN UP MEMBRANE ROOFING AT ALL WALLS, CURBS & PENETRATIONS 2” MINIMUM.
8. PROVIDE TAPERED INSULATION AS REQUIRED TO INSURE PROPER SLOPE DRAINS.
9. PROPOSED ROOF COVERING IS CLASS 'A'.
10. GUARDS SHALL BE PROVIDED WHERE A ROOF OPENING IS LOCATED 10' OF A ROOF EDGE OR OPEN SIDE OF A
WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30" ABOVE THE FLOOR, ROOF OR GRADE BELOW. THE GUARD SHALL BE CONSTRUCTED SO AS TO PREVENT THE PASSAGE OF A 21-INCH-DIAMETER SPHERE.
11. BASE FLASHING SHOULD EXTEND 8 TO 12 IN. ABOVE HIGHEST ANTICIPATED WATERLINE.
12. METAL COUNTERFLASHING SHOULD LAP BASE FLASHING BY AT LEAST 4 IN. LAP ALL VERTICAL JOINTS.
13. ALL WOOD TO BE PRESSURE TREATED.
14. ROOF COVERINGS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTION SUCH THAT THE
ROOF COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE.
15. FLASHING SHALL BE INSTALLED IN SUCH A MANNER SO AS TO PREVENT MOISTURE ENTERING THE WALL AND ROOF
THROUGH JOINTS AND COPINGS, THROUGH MOISTURE-PERMEABLE MATERIALS AND AT INTERSECTIONS WITH
PARAPET WALLS AND OTHER PENETRATIONS THROUGH THE ROOF PLANE.
16. FLASHING SHALL BE INSTALLED AT WALL AND ROOF INTERSECTIONS, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OR DIRECTION AND AROUND ROOF OPENINGS. WHERE FLASHING IS OF METAL, THE METAL ALL BE CORROSION RESISTANT WITH A THICKNESS OF NOT LESS THAN 0.019” (NO. 26 GALVANIZED SHEET).
17. PARAPET WALLS SHALL BE PROPERLY COPED WITH NONCOMBUSTIBLE, WEATHERPROOF MATERIALS OF A WIDTH NO
LESS THAN THE THICKNESS OF THE PARAPET WALL.
18. ROOF COVERINGS INSTALLED ON LOW-SLOPE ROOFS SHALL DEMONSTRATE PHYSICAL INTEGRITY OVER THE WORKING LIFE OF THE ROOF BASED UPON 2,000 HOURS EXPOSURE OF EXPOSURE TO ACCELERATED WEATHERING
TESTS.
1/4" = 1'-0"1 ROOF PLAN
1 1/2" = 1'-0"2 EXISTING PARAPET DETAIL
1 1/2" = 1'-0"3 ROOF TRANSITION COPING
1 1/2" = 1'-0"4 ROOF DRAIN
1 1/2" = 1'-0"5 EXISTING WALL/ROOF DETAIL
1 1/2" = 1'-0"6 ROOF VENTILATOR - SEE MECH DWGS.
1 1/2" = 1'-0"7 REMOVABLE HATCH DETAIL
BULKHEAD, 6" BELOW
LOWEST CEILING ON
EITHER SIDE (8'-6"
A.F.F.)
WAITING ROOM
STORAGE / UPS
TOILET
EQUIPMENT
ROOM 2
CORRIDOR
MRI ROOM 2
10'-0"
8'-0"
10'-0"
WAITING ROOM
CORRIDOR
UTILITIES/STORAGE
TOILET
DRESSING RM 2
DRESSING RM 1
CORRIDOR
CHECK-IN/OFFICE
READING ROOM
CORRIDOR
MRI ROOM 1
CONTROL ROOM
CONTROL ROOM
EQUIPMENT
ROOM 1
SOILED UTILITY
ISOCENTER
ISOCENTER
9'-0"
9'-0"
ALIGN NEW WITH EXISTING
E
E
E
E
3'-8" EQ EQ
9'-0"
BULKHEAD ABOVE WALL CABINETS
MRI TURRET
LIGHT
DOWN LIGHT
SUPPLY AIR, SEE MECH.
RETURN AIR, SEE MECH.
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE201
ARCHITECTURAL
REFLECTED CEILING PLAN
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
1/4" = 1'-0"1 Level 1 REFLECTED CEILING PLAN
REFLECTED CEILING NOTES:
1. SEE MECHANICAL/ELECTRICAL DWGS. FOR LOCATION OF ALL CEILING REGISTERS,
DIFFUSERS & SMOKE DETECTORS. COORDINATE WITH CEILING GRID.
2. CENTER ALL MECHANICAL AND ELECTRICAL ITEMS WITHIN EACH GRID U.O.N.
3. ALL BATHROOMS TO BE WATER RESISTANT GYPSUM BOARD CEILING PAINTED U.N.O.
4. REPAIR ANY HOLES AND CRACKS IN EXISTING GWB CEILING. PAINT ENTIRE CEILING WITH
SEMI-GLOSS PAINT.
5. PROVIDE ACCESS PANELS WHERE REQUIRED. COORDINATE LOCATION IN FIELD.
6. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL ACCESS PANELS WITH THE
LOCATION OF PLUMBING, MECHANICAL AND ELECTRICAL ITEMS.
7. UNDER NO CIRCUMSTANCES WILL THE CEILING HEIGHT BE LESS THAN 7'-6"
8. REWORK DUCTWORK TO SUIT NEW CONFIGURATIONS. NOTIFY ARCHITECT IF PROPOSED
BULKHEADS WILL NOT SUFFICE.
9. COORDINATE EXISTING SPRINKLER HEADS AS REQUIRED TO MEET BUILDING CODE. ALL
SPRINKLER HEADS SHALL BE CENTERED IN CEILING TILES.
10. LOCATIONS OF MECHANICAL AND ELECTRICAL EQUIPMENT SHOWN ON THIS DRAWING
ARE FOR COORDINATION AND LOCATION PURPOSES ONLY. REFER TO MECHANICAL AND
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
11. ANY CEILING-MOUNTED SPECIALTIES FOR THE MRI ROOM (MONITORS, ILLUMINATED
PANELS, INJECTOR ARMS, PROCEDURE LIGHTS, MEDICAL GASSES, ETC.) MUST BE
CAREFULLY COORDINATED FOR THEIR ATTACHMENT TO THE RF SHIELD. UNDER NO
CIRCUMSTANCES SHOULD ANYONE OTHER THAN THE RF SHIELD VENDOR MAKE ANY
MODIFICATIONS TO THE RF SHIELD SYSTEM.
12. SUSPENDED CEILING IN MRI ROOM MUST BE STATICALLY SUSPENDED, IN LIEU OF
MOVABLE CLAMPS, SPRINGS, ETC...
13. CORRUGATED RODS IN SUSPENDED CEILINGS MUST BE INSTALLED SECURELY. INSTALL A
WIRE JUMPER BETWEEN RODS.
CEILING SYMBOL LEGEND
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE202
ARCHITECTURAL
FINISH SCHEDULE
CONSTRUCT NEW MRI
FACILITY
02-14-2018 DM AR
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
Finish Room Schedule
Number Name Floor Finish Base Finish Wall Finish Ceiling Finish
101 CORRIDOR SSRF (RSF 4 &5) 4" HIGH RESILIENT BASE (RB-1) PAINT (P-2) E.T.R.
102 WAITING ROOM CARPET TILE (CAR-1) 4" HIGH RESILIENT BASE(RB-2) PAINT PTD. GYP. BD. (P-2)
103 UTILITIES/STORAGE E.T.R. E.T.R. E.T.R. E.T.R.
104 READING ROOM E.T.R. E.T.R. PAINT (P-2) E.T.R.
105 CHECK-IN/OFFICE E.T.R. E.T.R. PAINT (P-2) E.T.R.
106 DRESSING RM 1 E.T.R. E.T.R. PAINT (P-2) E.T.R.
107 DRESSING RM 2 E.T.R. E.T.R. PAINT (P-2) E.T.R.
108 TOILET E.T.R. E.T.R. PAINT (P-2) E.T.R.
109 SOILED UTILITY E.T.R. E.T.R. PAINT (P-2) E.T.R.
110 CORRIDOR SSRF (RSF 3,4,5) 4" HIGH RESILIENT BASE (RB-1) PAINT (P-2) E.T.R.
111 CORRIDOR SSRF (RSF 1,3,4,5) 4" HIGH RESILIENT BASE (RB-1) PAINT (P-2) E.T.R.
112 EQUIPMENT ROOM 1 E.T.R. E.T.R. E.T.R. E.T.R.
113 MRI ROOM 1 E.T.R. E.T.R. E.T.R. E.T.R.
114 CONTROL ROOM 1 SSRF (RSF 3,4,5) 4" HIGH RESILIENT BASE (RB-1) PAINT (P-2) E.T.R.
115 CORRIDOR SSRF (RSF 3,4,5) 4" HIGH RESILIENT BASE (RB-1) ACOUSTICAL CEILING TILE (ACT-1) 116 CONTROL ROOM 2 SSRF (RSF 3,4,5) 4" HIGH RESILIENT BASE (RB-1) PAINT (P-2) ACOUSTICAL CEILING TILE /ACT-1) 118 MRI ROOM 2 SSRF (RSF 3,4,5) SEE NOTE 2 AND 5 4" HIGH RESILIENT BASE (RB-1) Absorptive Material. see wall detail. SEE NOTE 5 (P-2)
NON-FERROMAGNETIC ACOUSTIC CEILING TILE.
SEE NOTE 4 & 5 (ACT-1)
119 EQUIPMENT ROOM 2 SSRF (RSF 4) 4" HIGH RESILIENT BASE (RB-1) PAINT (P-2) ACOUSTICAL CEILING TILE (ACT-1) 120 STORAGE / UPS SSRF (RSF 4) 4" HIGH RESILIENT BASE (RB-1) ACOUSTICAL CEILING TILE (ACT-1) 121 TOILET PORCELAIN TILE (CT-F1) PORCELAIN TILE (CTB-1) PORCELAIN TILE AND PAINT
(P-2, CT-W1)
PTD. GYP. BD. (P-2)
INTERIOR MATERIALS AND COLORS
RESILIENT SHEET FLOORING
EQUAL TO TARKETT
RSF-1 TARKETT IQ NATURAL
COLOR: # 259, ‘RUBY FIRESTONE’ (RED)
RSF-2 TARKETT IQ GRANIT SD
COLOR: # 3096726, ‘SIDEWALK’ (MEDIUM GRAY)
RSF-3 TARKETT MELODIA 2.0
COLOR: # 968, ‘ANCHOR’ (DK GRAY)
RSF-4 TARKETT MELODIA 2.0
COLOR: # 967, ‘NIMBUS’ (MEDIUM GRAY)
RSF-5 TARKETT MELODIA 2.0
COLOR: # 964, ‘SILVER LINING’ (LT GRAY)
RESILIENT BASE
EQUAL TO 4" HIGH RESILIENT RUBBER COVE
RB-1 BASE
# 38 ‘PEWTER’ (LT GRAY)
RB-2 BASE
# 71 ‘STORM CLOUD’ (MEDIUM GRAY)
CERAMIC TILE – FLOOR
EQUAL TO DALTILE
CT-F1 12” X 12” COLORBODY PORCELAIN FLOOR TILE
DALTILE PORCEALTO, COLOR: ‘CD49, LABRADORITE’ (LT GRAY)
MAPEI STANDARD GROUT, COLOR: # 39, ‘IVORY’
CERAMIC TILE – COVE BASE
EQUAL TO DALTILE
CTB-1 6”H X 12”W X 5/16” THICK MATCHING COVE BASE (SET FLUSH WITH FLOOR TILE)
DALTILE PORCEALTO, COLOR: ‘CD49, LABRADORITE’ (LT GRAY)
MAPEI STANDARD GROUT COLOR: # 39, ‘IVORY’
CERAMIC TILE – WALL
EQUAL TO DALTILE
CT-W1 12" X 12" COLORBODY PORCELAIN WALL TILE FIELD AND 4” X 12” BULLNOSE EDGE
DAL-TILE PORCEALTO, COLOR: CD05, ‘BIANCO ALPI” (LT SAND)
MAPEI STANDARD GROUT COLOR: #39, ‘IVORY’
PAINT
EQUAL TO SHERWIN WILLIAMS:
P-1 PAINTED TRIM/DOOR FRAMES: # SW 7670, ‘GRAY SHINGLE’ (MATCH VINYL BASE)
P-2 PAINTED WALLS: # SW 7010, ‘WHITE DUCK’ (LIGHT CREAM)
ACOUSTICAL CEILING TILES
ACT-1 SUSPENDED TEGULAR CEILING TILES, EQUAL TO 2X2 ARMSTRONG CIRRUS SERIES,
ANTI-MOLD/ MILDEW, HUMI-GUARD, SAG RESISTANT
COLOR: # 584 WHITE WITH WHITE GRID
CASEWORK
EQUAL TO WILSONART
PL-1 CASEWORK HIGH PRESSURE LAMINATE
COLOR: #4843 ‘MISTED ZEPHYR’
SS-1 COUNTERTOPS SOLID SURFACE
COLOR: #9194TM ‘STEEL GREY TEMPEST’
WALL PROTECTION
EQUAL TO INPRO
HR-1 HANDRAIL
COLOR: # 0107 ‘PEWTER GRAY’
BR-1 BUMPER RAIL
COLOR: # 0107 ‘PEWTER GRAY’
CG-1 CORNER GAURD
COLOR: # 0151 “GRAYSTONE’
VS-1 VINYL SHEET WALL PROTECTION
COLOR: # 0151 “GRAYSTONE’
CARPET TILE
EQUAL TO SHAW CONTRACT
CAR-1 COLLECTION: NO RULES
PATTERN: DIFFUSE
MONOLITHIC INSTALLATION,
COLOR: #75597 ‘PASSPORT’
FINISHES NOTES:
1. E.T.R.: EXISTING TO REMAIN
2. STATIC CHARGE DISSIPATION: MRI ROOM FLOOR COVERING SHALL DISSIPATE STATIC CHARGES. RESILIENT SHEET FLOORING SHALL HAVE INTEGRAL DISSIPATION ELEMENTS
WITH AN ELECTRICAL RESISTANCE OF < 109 OHMS; SHALL BE INSTALLED WITH A STATIC DISSPATIC ADHESIVE, COPPER GROUND STRIPS, AND A STATIC DISSIPATIVE POLISH.
3. INTERIOR FINISHES SHALL MATCH THE QUALITY, LAYOUT AND WORKMANSHIP OF EXISTING MRI BUILDING.
4. MRI ROOM CEILING SHALL BE STATICALLY SUSPENDED, NOT SUSPENDED WITH MOVABLE CLAMPS, SPRINGS, ETC. CORRUGATED RODS IN SUSPENDED CEILING MUST BE
INSTALLED SECURELY. GALVANIC CONTENT BETWEEN THE CORRUGATED RODS MUST BE GUARANTEED: THEY CANNOT JUST LIE ON TOP OF ONE ANOTHER.
5. NON-FERROUS HANGES, FASTENERS, FINISHES AND APPURTENANCES WITHON THE RF ENCLOSURE.
6. SEE SPECIFICATION SECTION 090600 FOR FINISHES AND COLORS.
AE302
ALIGN
RED BRICK TO
MATCH EXISTING
ARCHITECTURAL
PRE-CAST TO
MATCH EXISTING
ALIGN
CONTROL JOINT
AE302
ALIGN
EXISTING
NEW WINDOW TO MATCH EXISTING
GRADE
REPLACE COPING ON EXISTING PARAPET
COPING
NEW ADDITION
EXISTING BUILDING 110C
JOINTS
4'-0"
CORNER PRE-CAST
1'-5"
LOUVER
EXISTINGADDITION
CHILLER
EXISTING BUILDING
EXISTING BUILDING
ALIGN
RED BRICK TO
MATCH EXISTING
ARCHITECTURAL
PRE-CAST TO
MATCH EXISTING
ALIGN
S101
REINSTALL SIGN
WALL PAK, TYP.
AE302
AE302
JOINT, TYP.
4'-0"
RAISED
ALUMINUM
SIGNAGE, 12"
HIGH
PRE-CAST RETURN
12" +/-
PRECAST RETURN
11" +/-
CORNER
2'-0" PRE-CAST
PIPE SLEEVE
EXISTIN ADDITION
EXISTING FIN. FLR.
0"
AE302
AE302
DOOR OPENER.
ACCESSIBLE PUSH PLATE
JOINTS
4'-0"
ALIGN
RED BRICK TO
MATCH EXISTING
ARCHITECTURAL
PRE-CAST TO
MATCH EXISTING
ALIGN
CONTROL JOINT
REPLACE COPING ON
EXISTING PARAPET
COPING
CORNER
10" PRE-CAST
4'-0"
3' -3
5'-0" +/-EIXSTING BUILDING
HOSE BIB.
SEE PLUMB.
2' -0
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE301
ARCHITECTURAL
ELEVATIONS
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
1/4" = 1'-0"2 SOUTH ELEVATION
1/4" = 1'-0"3 WEST ELEVATION
1/4" = 1'-0"1 NORTH ELEVATION
EXISTING FIN. FLR.
0"
CORRIDOR
TOILET
WAITING ROOM
CRAWL SPACE
FACE OF EXISTING BUILDING
ARCHITECTURAL PRE-
CAST BASE TO MATCH
EXISTING
RED BRICK VENEER TO
MATCH EXISTING
ROOF MEMBRANE OVER
ROOF INSUL. OVER
ROOF DECK, OVER
STEEL FRAME
R-10 SLAB ON
GRADE
INSULATION, TYP. R-30 FLOOR
INSULATION, TYP.
SLAB ON GRADE
WITH 2" CONC.
TOPPING TO
MATCH EXISTING
GRADE
AE302
AE302
S1018'
-0
2'-0"
ROOF DRAIN
TIE ROOF DRAIN TO
STORM DRAIN SYSTEM
AE111
Sim
AE501
Sim 13
AE501
AE501
EXISTING FIN. FLR.
0"
AE302
EQUIPMENT
ROOM 2
CORRIDOR
CORRIDOR
AE302
2" CONC. TOPPING
TO MATCH EXISTING
FINISH FLOOR
REPLACE EXISTING
ROOFING
REPLACE COPING ON
EXISTING PARAPET
3' -0
LINTEL AT NEW
OPENING. SEE
STRUCTURAL.
8' -6
6"
AE502
Sim
EXISTINGADDITION
AE111
Sim
CONC. MAT, TYP.
AE501
Sim
R-30 FLOOR INSULATION, TYP.
CRAWL SPACE
AE502
Sim
EXISTING FIN. FLR.
0"
AE302
MRI ROOM 2
CONTROL ROOM
AE302
R-10 SLAB ON
GRADE
INSULATION, TYP.
T.O. MASONRY
JOIST BEARING
'-4
" M
AS
O N
R Y
IN
C
R
EM
EN
T
2" FLOOR FINISH
EXISTING
2' -0
2'
-8
AE503
EXISTINGADDITION
AE111
Sim
RF-SHIELD
ABOVE
CEILING
RAMOVABLE HATCH
CONTROL ROOM
AE501
Sim
EXISTING FIN. FLR.
0"
AE302
AE302
STORAGE / UPS
EQUIPMENT
ROOM 2
119MRI ROOM 2
T.O. MASONRY
MATCH EXISTING
2" CONCRETE
TOPPING ON PLANKS,
TYP. EXCEPT MRI
ROOM
R-10 SLAB ON
GRADE
INSULATION, TYP.
R-30 FLOOR
INSULATION, TYP.
2'-0"
JOIST BEARING
'-4
" M
AS
O N
R Y
IN
C
R
EM
EN
T
V .I.
F .
2' -0
AE502
2"
CONC. MAT
CEILING
RF SHIELD
AE503
Sim
3' -6
OSHA RAILING
ROOF HATCH
PARTITION
UP TO DECK
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE302
ARCHITECTURAL
SECTIONS
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
1/4" = 1'-0"1 ADDITION SECTION 1
1/4" = 1'-0"2 ADITION SECTION 2
1/4" = 1'-0"3 ADDITION SECTION 3
1/4" = 1'-0"4 ADDITION SECTION 4
ISOCENTER
0"
ISOCENTER
PATIENT SUPERVISION CAMERA
1' -3
EXISTING FIN. FLR.
0"
8'-6" TO ISOCENTER
3' -4
/4
EXTENT OF RF FILTER PLATE
BEHIND RF SHIELD
R F
SH
IE
LD
O
P' G
1' -4
/4
7'
-0 " C
O O
R D
W
IT
H M
R I M
AN
U
FA
C
TU
R
ER
3'-7" RF SHIELD OPENING3'-3 1/2"
4'-7" FINISHED WALL OPENING
W A
LL
O
P 'G
2' -5
/2
" F
IN
IS
H
E D
EXPOSED WALL RF SHIELD
MAGNET STOP
3' -6
EXISTING FIN. FLR.
0"
FERROMAGNETIC DETECTION
SYSTEM
NO SWITCHES,
SOLENOIDS, ETC. 1'-0"
AROUND DOOR OBSERVATION
WINDOW
ISOCENTER
1' -3
1'-0"
EMERG.
DOOR
OPEN
EXISTING FIN. FLR.
0"
3' -4
/4
ISOCENTER
TURRET COVER
LASER OPTICAL OXYGEN SENSOR
AE302
AE302
MAGNET IS ALLWAYS ON
SIGN
FERROMAGNETIC DETECTION
SYSTEM
J-BOX FOR FERROMAGNETIC
DETECTION, MOUNTED ABOVE
CEILING
FERROMAGNETIC
DETECTOR
CLR.
5'-0"
5'-0"
1' -0
NO SWITCHES,
SOLENOIDS, ETC. 1'-0"
AROUND DOOR
MRC OPERATING
CONSOLE COUNTER
OBSERVATION
WINDOW
CONTAINER FOR HOST PC
OFF THE FLOOR AND
HOST PC MRC
ALARM BOX
ROOM SIGN
EMERG. DOOR OPEN
EMERGENCY STOP
SWITCHES/CONTROLS
CO2 ALARM
3' -0
AE501
AE501
AE303
AE3033
EQUIPMENT
ROOM 2
CONTROL ROOM
116MRI ROOM 2
PATIENT SUPERVISION CAMERA
INJECTOR CRU
MONITOR
MRC OPERATING
CONSOLE COUNTER
PATIENT MONITOR
HOST PC MRC
CORNER GUARD, TYP.
CRASH RAIL, TYP.
ALARM BOX
RF SHIELD
RF-FILTER PLATE
4'-7" FINISHED WALL OPENING
ELECTRONICS CABINET
INJECTIOR
POWER
SUPPLY
MAGNET STOP
COLD HEAD COMPRESSOR
KKT KRAUS
INTERFACE PANEL
POWERWARE UPD
W/ EBM
7' -6
16'-0"
'-0
23'-1" 7'-4"
31'-4"
'-8
FURR OUT OPENING
FURR OUT EXISTING
MASONRY WALL
2' -4
3' -9
BASE PLATE FOR MRI
TABLE TO BE SUPPLIED
BY MRI MANUFACTURER
AND INSTALLED BY G.C.
SCREWS FOR SECURING
TABLE BASE TO FLOORING,
TYP. FOLLOW SHOP
DRAWINGS FOR EXACT
LOCATIONS
STOP-SHOCK SPRING.
LADDER TRAY, TYP. SEE
ELC. DWGS AND
COORDINATE HEIGHT
WITH MRI
MANUFACTURER
CRASH RAIL
THRESHOLD. SEE 3/AE501
BLACK/YELLOW VINYL BAND ON FLOOR
RECESSED FLOOR, THIS
ROOM ONLY, AS REQ'D FOR
RF SHIELDING, BASED UPON
APPROVED SHOP DRAWINGS.
SEE STRUCT.
A Serv ic e
D is ab l e d Ve t e ran Owned Sma ll Bus iness
SDVOSB
CVE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F o n e e ig h th in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e h a lf in ch o n e f o o t th re e in ch e s o n e f o o t
6"
6" 6"
6" 6"
Office of Construction and Facilities Management
Department of Veterans Affairs
Drawing
Building
Project
DrawCheck
Locati
Dat
Project Drawing
Approved: Project
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
PROFESSIONAL SEALCONSULTANTS:
Miller-Remick LLC M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856) 429-4000
FAX: (856) 429-5002
MR PROJECT NO: 0500-0006
FULLY SPRINKLERED
401 Woodbourne Ave Baltimore, Maryland 21212
T 410-435-6677 | F 410-435-6868 www.PenzaBailey.com
\\A O
-re vi t-s er ve r\A rc hi
O ffi ce \R ev it
C en tra l F ile s\
- V
A M
R I\C
2-
7-
VA
M
R I.r vt
AE303
ARCHITECTURAL
MRI ROOM
CONSTRUCT NEW MRI
FACILITY
02-14-2018 PB PB
BID DOCUMENTS
110C
590-CSI-701
HAMPTON VAMC, VIRGINIA
PBA No. 17017
1/2" = 1'-0"5 MRI ROOM - WEST WALL ELEVATION
1/2" = 1'-0"2 MRI ROOM - NORTH WALL ELEVATION
1/2" = 1'-0"1 MRI ROOM - EAST WALL ELEVATION
1/2" = 1'-0"4 MRI ROOM - SOUTH EWALL ELEVATION
1/2" = 1'-0"3
CONTROL ROOM - ELEVATION INTO MRI
ROOM
1/2" = 1'-0"6 MRI ROOM PLAN DETAIL
FILTER PLATE NOTES:
1. STRUCTURAL SUPPORT AND INTEGRATION OF THE FILTER PLATE WITH MAGNETIC AND RF SHIELDING SHALL BE SPECIFIED, DETAILED AND NOTED BY THE RF AND MAGNETIC SHIELDING MANUFACTURER WITH OVERALL
COORDINATION WITH THESE DRAWINGS.
2. THE FILTER PLATE FRAME, RF FILTER PLATE BLANK, RF GASKET AND MOUNTING HARDWARE SHALL BE
INSTALLED BY THE SHIELDING CONTRACTOR U.N.O.
MRI EQUIPMENT NOTES, TO BE CONFIRMED WITH SUBMITTAL PACKAGE:
A. NOTES, DIMENSIONS, AND SPECIFICATIONS ARE BASED ON THE FOLLOWING EQUIPMENT: SIEMENS MAGNETOM SKYRA 3T.
B. GENERAL CONTRACTOR SHALLTOUCH-UP AND INSTALL ANY COSMETIC OR TRIM WORK AFTER INSTALLING MRI EQUIPMENT AND
ANY ASSOCIATED SUPPORT APPARATUS.
C. ONLY NON-MAGHNETIC MATERIALS ARE TO BE USED AND INSTALLED IN THE MRI ROOM.
D. RADIO FREQUENCY (RF) SHIELDING:
a. MRI ROOM 2 MUST BE RF SHIELDED. THE REQUIRED ATTENUATION IS 90dB IN THE FREQUENCY RANGE OF 15-128 MHz.
b. FOLLOW MRI EQUIPMENT VENDOR'S SHIELDING PLAN.
c. RF SHIELD ASSEMBLIES MUST BE CONTIGUOUS ON ALL SIDES, FLOOR AND CEILING.
d. ALL PROVIDED DOORS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.