36C24618B0597-00003001.pdf

PDF 611 KB Posted

Attached to
Construct New MRI Facility (VA-18-00052235) Federal contract opportunity
Solicitation number
36C24618B0597
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24618B0597 00003 Drawings 1.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New MRI Facility (VA-18-00052235), newest first.
File Type Posted
36C24618B0597-00005002.docx DOCX document
36C24618B0597-00005004.pdf PDF
36C24618B0597-00005001.pdf PDF
36C24618B0597-00005003.pdf PDF
36C24618B0597-00005000.docx DOCX document
36C24618B0597-00004000.docx DOCX document
36C24618B0597-00004001.pdf PDF
36C24618B0597-00004002.pdf PDF
36C24618B0597-00003000.docx DOCX document
36C24618B0597-00003002.pdf PDF
36C24618B0597-00002017.pdf PDF
36C24618B0597-00002021.pdf PDF
36C24618B0597-00002016.docx DOCX document
36C24618B0597-00002018.pdf PDF
36C24618B0597-00002020.pdf PDF
36C24618B0597-00002019.pdf PDF
36C24618B0597-00001000.docx DOCX document
36C24618B0597-001.docx DOCX document
36C24618B0597-002.pdf PDF
36C24618B0597-003.pdf PDF
36C24618B0597-000.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRICAL WATER COOLER

VATE

UST

ING

SED

NSION JOINT

RIOR

ORY APPLIED FINISH

H AIR INTAKE

R DRAIN

DATION

EXTINGUISHER

EXTINGUISHER CABINET

HOSE & EXTINGUISHER

CABINET

HOSE CABINET

H R

IN. INCH

INCAND. INCANDESCENT

INCL. INCLUSIVE

INSUL. INSULATION

INT. INTERIOR

INTER. INTERMEDIATE

INV. INVERT

J.C. JANITORS CLOSET

JT. JOINT

LAB. LABORATORY

LAM. LAMINATED

LAV. LAVATORY

LBS. POUNDS

LH. LEFT HAND

L.L. LIVE LOAD

LONG. LONGITUDINAL

L.P. LOW POINT

LT.WT. LIGHT WEIGHT

M. METER

MACH. MACHINE

MAINT. MAINTENANCE

PL. PLATE

P.LAM PLASTIC LAMINATE

PLAS. PLASTER

PNL. PANEL

PREFAB. PREFABRICATE

PSI. POUNDS PER SQUARE INCH

PT. POINT

PTN. PARTITION

PVC. POLYVINYL CHLORIDE

PWD. PLYWOOD

Q.T. QUARRY TILE

QTY. QUALITY

R. RISER

RAD. RADIUS

R.B. RUBBER BASE

R.D. ROOF DRAIN

REF. REFERENCE

REG. REGISTER

REINF. REINFORCING

REQD. REQUIRED

RET. RETURN

REV. REVISION

U.O.N.

V.P.

V.C.T.VI

VERT.

V.I.F.

V.

V.W.C.

W.

W/ W.C.

WD.

W/O W.O.

W.P.

W.PT.

WT.

W.W.F.

CHAPTER 8 - INTERIOR FINISHES

IBC TABLE 803.9 - INTERIOR WALL AND CEILING FINISH REQUIREMENTS

GROUP

BUSINESS, SPRINKLERED

CORRIDORS

C

ROOMS

C

REMARKS

IBC 803.1.1 - INTERIOR WALL AND CEILING FINISH MATERIALS:

CLASS 'A' = FLAME SPREAD INDEX 0-25 / SMOKE-DEVELOPED INDEX 0-450.

CLASS 'B' = FLAME SPREAD INDEX 26-75 / SMOKE-DEVELOPED INDEX 0-450.

CLASS 'C' = FLAME SPREAD INDEX 76-200 / SMOKE-DEVELOPED INDEX 0-450.

CERTIFICATES FOR INTERIOR FINISHES SHALL BE MADE AVAILABLE TO FIRE MARSHAL

EXIT

PASSAGEWAYS

B

CHAPTER 9 - FIRE PROTECTION SYSTEMS

NCY

T

75-FEET FOR COMMON PATH SERVING

C

'-2

'-0

RELOCATE

CONDENSATE

PIPE

SE

E

SC

H

ED

U

LE

W

IN

D O

W O

P N

G 2'

-0

ICRA PARTITION

EXISTING

WOOD PARTITION WITH

1/2" EXTERIOR GRADE

PLYWOOD ON EACH SIDE

CONSTRUCTION

ZONE

R-19

BASE FLASHING

1/4" = 1'-0"1 LEVEL 1 - DEMOLITION

REMOVE AND INSTALL CHARGERS AND CO2 READOUT/ALARM ON ICRA PARTITION.

INSTALL ON PERMANENT WALL AFTER CONSTRUCTION.

SALVAGE PLUMBING FIXTURES AND

ACCESSORIES, AND RE-INSTALL AFTER ICRA

PARTITION IS INSTALLED.

ISOCENTER

MRI ROOM 2

CONTROL ROOM

33'-4" ADDITION

'-4

23'-1" ROOM

'-0

" R O

O M

7' -0

7'

-0

8'-6"

DIO FREQUENCY (RF) SHIELDING AND PASSIVE

MAGNETIC SHIELDING

SOUND ABSORPTION PERIMETER

1' -9

1'

-2

1'-9"

ILUMINATED SIGN

ABOVE DOOR

0.5 mT LINE

AE301

EQ EQ

AE501

A

B

C

AE501

AE302

A

B

C

C

D

1/4" = 1'-0"1 LEVEL 1 - NEW WORK

DOOR SCHEDULE

CTION CONSTRUCTION HEIGHT WIDTH THICKNESS DOOR FINISH HARDWARE

SET

RFRAME

MATERIAL

GLASS HEAD JAMB

3'-6" 3'-6"

3' -6

3'

-6

7'X7' ROOF HATCH,

CENTERED ON

ISOCENTER

AE302 4

AE502

Sim

AE111

Sim7

AE111

Sim

OSHA RAILING

CONTINUOUS CLEAT

ROOF MEMBRANE.

EXTEND UP ON WALL

CANT

REGLET

MORTAR SEALANT

6"

FACE OF EXISTING

ROOF VENTILATOR

REGLET

CONT. SEALANT

WD. NAILING

1/4" = 1'-0"1 ROOF PLAN

MRI ROOM 2

CONTROL ROOM

ISOCENTER

ISOCENTER

9'-0"

MRI TURRET

1/4" = 1'-0"1 Level 1 REFLECTED CEILING PLAN

Number Name

101 CORRIDOR SSRF (RSF 4

102 WAITING ROOM CARPET TILE

INTED WALLS: # SW 7010, ‘WHITE DUCK’ (LIGHT CREAM)

AL CEILING TILES

SPENDED TEGULAR CEILING TILES, EQUAL TO 2X2 ARMSTRONG CIRRUS SERIES,

TI-MOLD/ MILDEW, HUMI-GUARD, SAG RESISTANT

LOR: # 584 WHITE WITH WHITE GRID

K

WILSONART

CASEWORK HIGH PRESSURE LAMINATE

COLOR: #4843 ‘MISTED ZEPHYR’

COUNTERTOPS SOLID SURFACE

COLOR: #9194TM ‘STEEL GREY TEMPEST’

OTECTION

INPRO

HANDRAIL

COLOR: # 0107 ‘PEWTER GRAY’

BUMPER RAIL

COLOR: # 0107 ‘PEWTER GRAY’

CORNER GAURD

COLOR: # 0151 “GRAYSTONE’

VINYL SHEET WALL PROTECTION

COLOR: # 0151 “GRAYSTONE’

LE

SHAW CONTRACT

COLLECTION: NO RULES

PATTERN: DIFFUSE

MONOLITHIC INSTALLATION,

COLOR: #75597 ‘PASSPORT’

A

RED BRICK TO

MATCH EXISTING

ARCHITECTURAL

PRE-CAST TO

MATCH EXISTING

AE302

COPING

NEW ADDITION

JOINTS

4'-0"

CORNER PRE-CAST

1'-5"

LOUVER

ADDITION

CHILLER

1/4" = 1'-0"3 WEST ELEVA

2 CONC. TOPPING

TO MATCH EXISTING

FINISH FLOOR

T.O.

JOIS

AE302

EQUIPMENT

EILING

RF SHIELD

3' -6

OSHA RAILING

ROOF HATCH

PARTITION

UP TO DECK

ISO

EXISTING FIN. FLR.

0"

OXYGEN SENSOR

RF-FILTER P

4'-7" FINISHED WALL OPENING

ELECTRONICS CABINET

INJECTIOR

POWER

SUPPLY

7' -6

'-0

'-8

WARE SHALL BE

7' -1

0"

4' -1

0" 3'

-0

1'-3"

2' -1

0" 2'

-0

2'-1"

4"

(ACT

(PL-1

(PL-1

(PL-1

REF

ELE

FOR

DOO

BLO

(TYP

CONTROL ROOM

ROL ROOM

EXISTING

MASONRY WALL

FINISH THIS SIDE

OF EXISTING WALL

D

EYOND

ALIGN

ER

H SIDES

GYP. BD. ON BLKG

SILL, BOTH SIDES

CRASH RAIL

W

AL

L

TY

P E

C

S

IM

1' -6

1/ 4"

SE

E

R

F S S

G

CONTR

MRI ROOM 2

W

AL

L

TY

PE

C

1' -9

"S

EE

RF SHIELD

2"

2"

1 1/2" = 1'-0"7 WALL / WINDOW 'C' PLAN DETAIL

RF SHIELD AT WALL

ARCHITECTURAL

PRE-CAST

S

MRI ROOM 2

RF CEILIN

2"

C

TOP OF ARCHITECTURAL

PRECAST (ALIGN WITH

EXISTING)

AE502

Sim

GRADE WITH POSITIVE DRAINAGE

W G

R A

D E

M

IN

THRU-WALL FLASHING

WEEP HOLE AT 32" O.C.

8" CMU, ALIGN WITH

INTERIOR FACE OF

EXISTING, ABUTTING

WALL

AIR BARRIER, LAPPED

ON FLASHING

EXISITNG. ALIGN

WITH EXTERIOR

FACE OF EXISTING,

ABUTTING WALL

2' -8

START MASONRY COURSING

AE503

Sim

'-4

2"

1/2" GYP. BD. ON 2x3 NOM

WD. STUDS AT 16" O.C.

COPPER RF SHIELD OR PANEL

SOUND ATTENUATION

BLANKET, NC 40.

SLAB TO BELEVEL

AT 1/4" PER 72"

RF MSHIELD SUPPORT

AE503

Sim

EXISTING FIN. FLR.

0"

MRI ROOM 2

AE503

Sim

1/2" GYP. BD. ON 2x3 NOM

WD. STUDS AT 16" O.C.

COPPER RF SHIELD

OR PANEL

SOUND ATTENUATION

BLANKET, NC 40

SLAB TO BELEVEL

AT 1/4" PER 72"

RF MSHIELD SUPPORT

DETAILS

EXTEND TO UNDERSIDE OF ROOF DECK

1 1/2" = 1'-0"2 WALL TYPE B

File details come from the government source that posted it.