Other files attached to H359--Electrical Testing-581 | Extend Close Date and post QnA All Quotes must be submitted electronically to timothy. russell@va. gov, newest first.
File Type Posted
36C24520Q0265-0001003.pdf PDF
36C24520Q0265-001.txt TXT text file
36C24520Q0265-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Amendment to a Previous Combined Solicitation

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation H359 Electrical Testing-581 | Extend Close Date and post QnA All Quotes must be submitted electronically to timothy.russell@va.gov 26301-4199 36C24520Q0265 04-03-2020 N

SDVOSBC

811219 Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199 Timothy Russell timothy.russell@va.gov Huntington VAMC 1540 Spring Valley Road Huntington, WV 25704

USA

timothy.russell@va.gov See attached document: S02 2009 Electrical one line diagram Model (1).

S02 Amendment Solicitation Close Date is hereby extended to 1600 hours EST., on 3 April 2020.

Questions with answers in reference to solicitation 36C24520Q0265 H359--Electrical Testing-581 at the Huntington, WV VAMC:

1) Can Single Line Diagrams (SLDs) be provided to assist with proposal preparation? YES, see attachment

2) Can front view photos of key equipment be provided? NO

3) Can side drawing of key equipment be provided? NO

4) Is the contractor allowed to use existing on-site power to support testing? YES

5) What technical certifications or license will be required of the technicians performing the specific repairs mentioned as replacement of transformer temperature indicator, replace C-phase arrestor on transformer and replace B-Phase surge arrestor on transformer? OSHA 30 HR Certified (1.1.D-E). Refer to 26.00.00 1.2, A-C for minimum qualification requirements

6) For clarification, the temperature indicator (Trans. #1), C-phase arrestor (Trans. #2) and B-phase arrestor (Trans. #5) are to be furnished by the Contractor, correct? YES

7) For other repairs not considered minor, can the proposal include a "not to exceed" amount set aside option to cover those costs when authorized by the VA? NO

8) Section 1.2 PERFORMANCE (pg 8 of the solicitation) states: "The Contractor shall verify conditions as they exist prior to bidding the project." What options are available to the Contractor if no site visit is planned? Coordinate with COR for site visit

9) Can an example of a previous shutdown schedule for the Huntington VAMC be provided to assist with proposal preparation? NO. We will work with the successful contractor to build a shutdown schedule based on current infrastructure.

10) Could you provide nameplate data for the items below in order to ensure the right replacement parts.? No significant repairs are to be performed under this contract.

NO. If the contractor would like to make a site visit to obtain the information, please coordinate with the COR for site visit. Joseph A. Prine PE, FMP / Assistant Chief of Engineering / Huntington, WV VAMC / Office Phone: (304) 429-6755 x2378

11) Is the NICET certification a suitable substitution for the NETA certification? NO, NICET is not equivalent to NETA and per the SOW the technicians require NETA certification.

12) How will these substations become available? Able to test these substations sequentially? Scheduling will be coordinated with the successful contractor.

13) It mentions multiple appendices in the solicitation. Will these be provided? Appendices are incorporated in SOW.