S02 EXHIBIT B - Calculation of Self-Performed Work 36C24422R0198.docx
DOCX document 39 KB Posted
- Attached to
- Y1DA--Perform Heating Repairs
- Solicitation number
- 36C24422R0198
About this file
This document provides details for a federal design-build contract opportunity to perform heating repairs at a Veterans Affairs medical center. The prime contractor will be required to partner with an engineering firm to complete design and construction activities. Work must comply with applicable codes, VA guidelines, and the contract terms. The contractor shall furnish all labor, materials, tools, equipment, and supervision to replace automatic transfer switches as specified. The project scope includes providing design-build services to design and construct the heating repairs project in accordance with VA and EPA standards to meet local requirements. The best value two-phase solicitation will evaluate phase one proposals to select offerors to submit phase two offers. The firm fixed price contract will have a 266-day period of performance for the $500,000 to $1 million magnitude project. Questions are due by a specified date, and the solicitation will issue on another provided date. The opportunity is 100% set aside for SDVOSBs performing the identified NAICS code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 Supplemental Attachments - EC-17 PROJECT DESIGN AND REVIEW.pdf | ||
| S02 Supplemental Attachments - EC-32 Safety and Health During Construstion.pdf | ||
| S02 Wage Determination 10-07-22.pdf | ||
| S02 VA Privacy Training.pdf | ||
| 36C24422R0198_2.docx | DOCX document | |
| S02 Records Management Language for Contracts_Updated Version.docx | DOCX document | |
| S02 Solicitation 36C24422R0198 10-17-22.docx | DOCX document | |
| S02 EXHIBIT A - Project Example.docx | DOCX document | |
| S02 SOW Perform Heating Repairs - Rev 1.pdf | ||
| 36C24422R0198_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal 36C24422R0198
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract” = $
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %