This is a combined synopsis and solicitation from the Department of Veterans Affairs seeking quotes for inspection and testing services of the electrical distribution system at the Veterans Affairs Medical Center in Altoona, Pennsylvania. Key details include that the solicitation number is 36C24422Q0272, quotes are due by January 24, 2022 at 12:00 PM Eastern Time, the estimated period of performance is February 1, 2022 through July 30, 2022, the NAICS code is 238210 for electrical contractors and the business size standard is $16.5 million, and the procurement is set aside for service-disabled veteran-owned small businesses. Quotes must follow specific instructions and include technical and price sections. The solicitation incorporates standard clauses and any resulting award will be a purchase order.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24422Q0272 0003_1.docx | DOCX document | |
| 36C24422Q0272 0002_1.docx | DOCX document | |
| 36C24422Q0272 0001_1.docx | DOCX document | |
| Inspection and Testing of Electrical Distribution Systems Questions 20211213.docx | DOCX document | |
| WD 2015-4221 Rev 18 DTD 10-20-2021.pdf | ||
| Drawings and Schematics.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24422Q0272
| SUBJECT* |
| Generators/Electrical: Inspection and Testing of Electrical Distribution System |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 15215 |
| SOLICITATION NUMBER* |
| 36C24422Q0272 |
| RESPONSE DATE/TIME/ZONE |
| 01-24-2022 12PM EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 90 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SBA |
| PRODUCT SERVICE CODE* |
| H159 |
| NAICS CODE* |
| 238210 |
| PLACE OF PERFORMANCE |
| Department of Veterans Affairs |
Altoona VAMC
2907 Pleasant Valley Blvd.
Altoona PA
| POSTAL CODE |
| 16602 |
| COUNTRY |
| USA |
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office 4 Services 1 1010 Delafield Road
POINT OF CONTACT*
Contract Specialist Jud Kale judson.kale@va.gov
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
General Information
| Document Type | Combined Solicitation/Synopsis | |
| Solicitation Number | 36C24422Q0272 | |
| Posted Date | 1/10/2021 | |
| Original Response Date | 1/24/2021 at 10:00 AM EST | |
| Product or Service Code | H159 | |
| Set Aside | SBA | |
| NAICS Code | 238210 |
Contracting Office Address 1010 Delafield Road, Pittsburgh PA, 15215
Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 in conjunction with Part 13 of Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This Solicitation is issued as a Request for Quote (RFQ), and the solicitation number is 36C24422Q0272.
This notice incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2021-05 effective March 10, 2021 and the Veterans Affairs Acquisition Regulations (VAAR). The complete text of any of the clauses and provisions may be accessed in full text at http://farsite.hill.af.mil.
This Solicitation is set-aside for SDVOSB. The NAICS Code is 238210 – Electrical Contractors and Other Wiring Installation Contractors and the business size standard is $ 16.5 million.
The Pittsburgh, PA Contracting Office is seeking to purchase services for Inspection and Testing of Electrical Distribution Services for the Veterans Affairs Medical Center located in Altoona, PA.
Service Contract Act Wage Determination apply to this acquisition and will be incorporated into the resulting contract. A copy of the Wage Determination is included in the solicitation as follows: WD 2015-4221 REV 18 dated 10/20/2021.
Complete instructions for submitting a response to this solicitation and applicable provisions and clauses are enclosed. All offerors are advised to pay careful attention to the quote submission instructions as there are very specific instructions as what is required to be provided.
The applicable line item/CLIN is enclosed.
The estimated purchase order period of performance (POP) is: 2/1/2022 – 7/30/2022.
Any award resulting from this solicitation will be issued on a Standard Form 1449.
In accordance with FAR 4.1102 and FAR 52.204-7 (b)(1) offerors must be registered in the System for Award Management (SAM) database at time of quote submission and at time of award. Registration may be done online at: www.acquisition.gov or www.sam.gov.
Contractors are advised that any and all questions concerning this solicitation must be sent in writing to the Contracting Office at NCO 4, Pittsburgh, PA. Questions may be sent via email to Mr. Jud Kale at Judson.kale@va.gov@va.gov. No questions will be answered after 17 January 2022 at 12:00 PM EST.
Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Contract Specialist, Mr. Jud Kale at Judson.kale@va.gov.
Presolicitation Notice Presolicitation Notice
| *=Required Field |
| Presolicitation Notice |
Presolicitation Notice
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Maintenance, Inspection & Testing of the Electrical Power Distribution System IAW the SOW.
| GRAND TOTAL |
| __________________ |
A.2 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| 2907 Pleasant Valley Blvd. |
Altoona, PA 16602
USA
1.00
Page 1 of
Maintenance, Inspection and Testing of the Electrical PowerDistributionSystem JamesE.VanZandtVAMedicalCenter
Page of Page 1 of Page 1 of
I. General
SCOPEOFWORK
Page 1 of Page 1 of
A. This Statement of Work (SOW) describes the requirements for themaintenance, inspection, testing, and/or calibration of the Electrical PowerDistribution System and all of its components at the James E. Van Zandt VAMedical Center (JEVZ VAMC). These work items are referenced as“MaintenanceandTesting” inthis document,hereafter.
B. This SOW describes the requirements for the Qualified Electrical ContractProfessionals – known as “Contractors” in this document, hereafter.Contractors who are contracted by the JEVZ VAMC to perform maintenanceand testing of the Electrical Power Distribution System, and all of itscomponentsshallmeetallrequirementsstatedinSectionIIofthisSOW.
C. This SOW describes the requirements to establish maintenance and testingreports.
II.
QualificationsofContractors A.
interest/specialtyoftheContractor’sbusiness.
industrialandcommercialelectricaldistributionsystems)shallbetheprimary ElectricalContracting(i.e.theconstruction,repair,testingandmaintenanceof trainedandlicensedpermanentstaffrequiredtoperformtheproposedwork.
ContractorsshallbeexperiencedElectricalContractors,havingproperly B.
hourconstructionsafetytraining.
trainingandallothersatminimumhavingcompletedtheOSHAapproved10- Safety&HealthAdministration(OSHA)approved30-hourconstructionsafety TechnicianswithonesitesupervisorhavingcompletedtheOccupational Association(NETA)or equivalentcertifyingorganization asC ertified ContractorsshallbecertifiedbytheInterNationalElectricalTesting C.
voltage);lowvoltagecontrols;emergencyandstandbygenerators;automatic include,butnotbelimitedto,switchboards&switchgear(lowandmedium years.Electrical componentsonwhichtheContractorshaveexperienceshall educational,andcommercialfacilitiesforaminimumoffive(5)continuous PowerDistributionSystemsandrelatedcomponentsinhealthcare,industrial, workingexperienceinmaintenance,inspection,andtestingofthe Electrical Contractorsshallhavetechnicaltraininganddemonstrabletrackrecordsof appurtenances.
transferswitches,wiring,transformers,meters,andother electrical
D. Contractors shall have safety trainings – either on-the-job or class-room type -in electrical safety outlined in the OSHA Standard 29 Code of FederalRegulations (CFR) 1910 Subpart S – Electrical, and theNFPA 70E –Standard for Electrical Safety in the Workplace. Training certification shall beprovided indicating each technician is aQualified Personas defined by NFPA70E. Training certifications shall be submitted to the VA Contracting Officerprior to work. If no trainingcertifications are available, the contractor’Employer shall certify that he/she has met this requirement in writing, andsubmitit tothe VAContracting Officerprior towork.
E. Contractors shall have ready access to the latest versions of the followingreferences:
1. NFPA70,NationalElectricalCode,latestedition.
2. NFPA 70B, Recommended Practice for Electrical EquipmentMaintenance,latest edition.
3. NFPA70E,StandardforElectricalSafetyfortheWorkplace,latestedition.
4. NFPA110,StandardforEmergencyandStandbyPowerSystem,latestedition.
5. OSHAStandard29CFR1910,SubpartsI& S.
6. InterNational Electrical Testing Association, Inc. (NETA) – MaintenanceandTesting Specifications.
7. Operating/Maintenance manuals, and specifications of the electricalequipment to be maintained and tested. These documents may beobtainedfromtheVHAMedicalCenter,ortheequipmentmanufacturers.
8. VHADirective1028,ElectricalPowerDistributionSystems
F. Contractors shall have and provide all necessary tools, equipment, andPersonal Protective Equipment (PPE) to perform the work safely, effectively,and timely. Tools, equipment, and PPE shall comply with the requirements ofOSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiatingwork, Contractor shall provide documentation that all instruments, testequipment, tools and PPE have current calibration. Dated calibration labelsshall be visible on all instruments, test equipment, tools and PPE asappropriate.
G. Contractorsshallprovidetheirownlockout/tagoutequipmentforallappropriatebreaker sizes.
H. Contractorsshallprovidetemporarylightingforoutagesaffectinglightinginoccupiedspaces.
I. Prior to initiating work, the Contractor shall submit a specific work plandetailing procedures to be used on and near the energized electricalequipment. Procedures shall include, but not limited to, barriers to be installedandsafety equipment tobe used.
J. The Contractor shall plan for no energized electrical or “hot” work. If it isdetermined that energized or “hot” work can take place, an energizedelectrical work plan must have the prior knowledge and approval of themedical facility Director. However, the Chief of Engineering Service mayapproveenergizedelectricalworkplanforBranchCircuits(i.e.,thosecircuitsand components thereof from the final overcurrent protecting devices to theoutlets) that do not service the critical patient care areas, such as SurgeryRooms, Critical Care, Intensive Care, Dialysis Units, Isolation Rooms,CatheterizationLaboratories,UrgentCare,orSterileProcessingAreas.
K. All Energized Electrical or “Hot” Work shall not be permitted until apermit has been issued.Hot Work permit shall include Elements of WorkPermit identified in NFPA 70E. Coordinate with VAMC Safety and the CORforHot Work permit approval.
III. Summary of Work
A. Workitems,definitions,andreferencesshallcomplywiththelatesteditionofthe NETA – Maintenance Testing Specifications (MTS) and with the VHADirective 1028, Electrical Power Distribution System. Attached is a list ofelectricalequipmentthatshallbemaintainedand tested:
1. SwitchgearandSwitchboardAssemblies.
2. Transformers,DryType,Air-Cooled,Low-voltage,Small.
3. Transformers,DryType,Air-Cooled,Low-voltage,Large.
4. Transformers,Liquid-Filled.
5. Metal–EnclosedBusways.
6. Switches,Air,Low-Voltage.
7. Switches, Air, Medium-Voltage, Metal-Enclosed.
8. Switches,Oil,Medium-Voltage.
9. Switches,Vacuum,Medium-Voltage.
10. Switches,SF6,Medium-Voltage.
11. CircuitBreakers,Air,Insulated-Case/Molded-Case.
12. CircuitBreakers,Air,Low-VoltagePower.
13. CircuitBreakers,Air,Medium-Voltage.
14. CircuitBreakers,Oil,MediumandHigh-Voltage.
15. CircuitBreakers,Vacuum,Medium-Voltage.
16. CircuitBreakers,SF6.
17. ProtectiveRelays,Mechanical,andSolidState.
18. ProtectiveRelays,MicroprocessorBased.
19. GroundingSystems.
20. Ground-faultProtectionSystems.
21. MotorControl,MotorStarters,Low-Voltage.
22. MotorControl,MotorStarter,Medium-Voltage.
23. EmergencySystems,EngineGenerators.
24. EmergencySystems,AutomaticTransferSwitches.
B. Infra-Red Scanning/Thermographic Survey shall be performed on electricalequipmentas definedin thisscope ofwork.
C. SystemFunctionTests.Providefunctiontestforallequipmentlistedinthisscopeof work.
D. Verification of current adjustable settings for applicable electrical equipmentand recommendations for settings deemed incorrect based on electrical studyfindingsperformed in thisscope of work.
E. Participationandassistanceinthe4-HourPowerOutageTestasdefinedinthisscope of work.
F. Documentation and reporting as defined in the Deliverables section of thisscopeof work.
G. Contractors shall report deficiencies that are deemed critical or catastrophicimmediatelytotheContractingOfficer,ChiefofEngineeringServiceandCORforimmediate actions.
IV. Specific Scope
A. Transformers, including all related components, shall be inspected, testedand maintained. At a minimum, the following shall be performed by theContractor:
1. Transformers must be cleaned exteriorly, inspected for signs ofoverheatingwithinfra-redthermaldetectingequipment,andinspectedforanydamagetothehousing,connectionpoints,orinsulation.
2. Liquid cooled transformers must have the cooling liquid tested andreplaced, when tests indicate that the liquid no longer meetsmanufacturer’s specification. The liquid must be re-filled to meet themanufacturer’sspecification.
3. Dry type transformers must be thoroughly cleaned exteriorly, andinspectedforoverheatingwithinfra-redthermaldetectingequipment.
B. Electrical equipment (including, but not limited to switchgears, switchboards,distribution panels, motor control centers, and all related components) shallbe inspected, tested, maintained, and/or calibrated by the Contractor.Contractor shall also document all work performed and any descrepanciesfound pertaining to the above listed inspection and maintenance. TheNational Electrical Testing Association (NETA) provides guidance which isconsidered best practice for the maintenance of electrical equipment; thesepracticesshouldbefollowedto theextentpossible.
1. Use lint-free rags to clean conductors, contact points between the circuitbreakers and main buss bars, buss bars and interior of the electricalequipment. Use a vacuum cleaner to remove large debris; compressed airisnottobeusedforthispurpose.Visuallyinspectforsignsofoverheating,misalignedcontacts,damagedinsulation,orloselugs.
2. Lubricateallmovingpartswithmanufacturer’sapprovedlubricants.
3. Test andexercise circuit breakerslocated inswitchgears, switchboard,and distribution panels to ensure operation under overload, and shortcircuit conditions. All molded case circuit breakers (including frames size225 amps or less) should be tested to determine if contacts open andreclose when breakeris manuallytrippedand restored.Allpanels aretobe tested including emergency panels. Contractor shall fully document alltested breakers and report any failures immediately so the breaker can bereplaced at that time. Spare breakers are to be left in the off/open position.Verify labeling of spare breaker in the panel schedule and update asnecessary.
4. Test ground fault protection devices for proper function if they are installedintheElectrical PowerDistributionSystem.
5. Inspect and tighten ground connections. Test ground resistance for theentire facility grounding system.Any method of ground resistance isacceptable if it can verify continuity and quantify the impedence to ground,to include but not limited to fall-of-potential, including frequency and clampon testing. If initial tests indicate a problem or concern (e.g., groundresistance greater than 25 ohms), a more detailed test must be performedusing fall-of-potential or 3-point test. The lightning protection systems mustbe inspected and tested for continuity to ground, ground resistance andcertification in accordance with Underwriters Laboratory (UL) standard96A.
6. Identifythehotspotsintheelectricalequipmentbyusinginfra-redthermaldetecting equipment. Tighten problem connections to meet equipmentmanufacturers’ specification using a torque wrench or other approveddeviceson the spot.
7. Calibrateandmaintainadjustableprotectiverelays.
8. Test all control systems equipment for proper operation after maintenanceisperformedandbeforeplacingthembackinnormalservice.
C. The Contractor shall prepare a complete short circuit and coordination studyincluding voltage drop calculations on the entire electrical system/s (bothnormal and emergency) at the JEVZ VAMC. It shall begin at the incomingutility electrical service (for the normal system) and at the emergencygenerators (for the emergency system) and continue through to each branchcircuit panelboard, motor control center or motor control panel in eachbuilding. The study shall include a system one-line diagram; short circuit andground fault analysis, protective coordination plots, voltage drop calculationsandthe followingfor each building:
1. OneLineDiagrams:
a. The one-line diagrams shall show the schematic wiring of theelectricaldistributionsystemforeachbuilding.Includeallelectricalequipmentandwiringprotectedbytheovercurrentdevices.
b. Also show on the one line diagrams the following specificinformation:
i. BuildingandRoomnumberforeachpieceofequipment.
ii. Calculatedshortcircuitvaluesateachbus.
iii. Breakerandfuseratings.
iv. TransformerkVA,voltageratingsandwiringconnections.
v. Voltageateachbus.
vi. Identificationofeachbus.
vii. Conduitmaterial,feedersizesandlengths.
viii. GeneratorkWandvoltageratings
2. Ground Resistance Analysis: A concise qualitative description (not toexceed one (1) page of narrative) describing the overall condition of thefacility ground resistance shall be provided. Any violations of NEC or otherabnormalities (high ground resistance, damaged/missing conductors orelectrodes, harmonics, etc) warranting further detailed study shall behighlighted.Analysisofthefacilitygroundresistanceshallbebasedupon:
a. Visual inspection of visible ground system components (madeduringsiteinvestigation).IncludephotographsinAppendices.
b. InterviewswithVAMCengineeringstaff;and
c. OtherdataongroundsystemmadeavailablebytheVAMC.
3. ShortCircuitStudy:
a. Systematically calculate the fault impedance to determine theavailable short circuit and ground fault currents at each bus.Incorporate the motor contribution in determining the momentaryand interrupting ratings of the protective devices. Motors less than25HP may be grouped together.
b. ThestudyshallbecalculatedbyusingSKMsoftware.Pertinentdata and the rationale employed in developing the calculations shallbeincorporatedintheintroductory remarksofthestudy.
c. Present the data determined by the short circuit study in a tableformat. Include the following:
i. Transformer kVA and voltage ratings, percent impedance,X/Rratiosand wiringconnections.
ii. GeneratorkWandvoltageratings.
iii. Conduitmaterial,feedersizes,lengthandX/Rratios.
iv. Deviceidentification(Manufacturer,CatalogNo.andDeviceCurveNo. and ID)
v. Operatingvoltage.
vi. Protectivedevice.
vii. Devicerating.
viii. Calculatedshortcircuitcurrent.
ix. Hazard-Riskcategoryateachpieceofequipmentfortheworst-casefault condition.
4. Hazard-Risk Table: For each piece of electrical equipment identified in theShort Circuit Study above, provide in table format the following informationusingNFPA70E,2018editionandcalculationsasappropriate:
a. A“Shock Risk Assessment”as defined in NFPA 70E, 130.4 shallbe performed and documented. The shock risk assessment shalldetermine all additional protective measures required as well asdetermining shock protection boundaries for each piece ofequipment.
b. From NFPA 70E, Table 130.4 (D) (a)“Shock ProtectionApproach Boundaries to Exposed Energized ElectricalConductorsorCircuitPartsforAlternating-CurrentSystems”.
i. LimitedApproachBoundary.
ii. RestrictedApproachBoundary.
c. From NFPA 70E, Article 130.5“Arc Flash Risk Assessment". AnArc Flash Risk Assessment shall be performed in order to identifyarc flash hazards, estimate the likelihood of occurrence of injuryand to determine if additional protective measures are required.The analysis shall determine theArc Flash Boundaryand theArcFlash PPEfor each piece of equipment using the tables ormethodsprescribed.
d. From NFPA 70E, Table 130.7 (C) (15) (a)“Arc-Flash PPECategories for Alternating Current (ac) Systems”, include in thetable the worst-case Arc-Flash PPE Category (1 through 4)associated each piece of equipment (i.e. work on any energizedparts of Metal Clad Switchgear, 1kV through 15kV, has a Arc-FlashPPE Category of 4). Include a list of required Personal ProtectiveEquipmentfor each category.
5. ArcFlashLabeling:
a. Contractor shall produce and deliver to the VAMC up to fivehundred(500)arcflashwarninglabelsinaccordancewithNFPA70(NEC) and NFPA 70E. Labels shall be 4” x 6” (nominal) printed onindustrial quality, adhesive backed vinyl. “Danger” labels shall havepre-printedheadersinred;“Warning”labelsshallhavepre-printed headers in orange. Electrical equipment shall be labeled inaccordance with NFPA 70, Article 110.16. The arc flash riskassessment shall be performed to determine the Arc FlashBoundaryforeachlabelandshallbecalculatedinaccordancewithNFPA 70E Paragraph 130.5. For each device for which an ArcFlash PPE analysis is conducted, the equipment shall be fieldmarked with a label containing the available incident energy orrequiredlevel of PPE.
b. In addition to the requirements of NFPA 70 and 70E, eachcustomized label containing specific available incident energy orrequired level of PPE shall identify the corresponding piece ofelectrical equipment, by Panelboard or device identifier, Roomnumber and Building number. Contractor to also recommend labelplacement based on applicable codes or industry trends. TheidentificationshallbeinamannerunderstoodbyVAMCpersonnelwhowillbeapplyingthelabelstotherespectivedevices.
6. CoordinationCurves:
a. Prepare the coordination curves to determine the required settingsof protective devices to assure selective coordination. Graphicallyillustrate (using log paper) that adequate time separation existsbetween series devices, including the utility company upstreamdevice.PlotthespecificTimeCurrentCharacteristics(TCC)ofeachdevicein theelectrical system asfollows:
i. Provide TCC curve down to the last branch-circuitpanelboard(regardlesstheprotectivedeviceisanadjustableor fixed device) in the three-branches of the EssentialElectricalSystem (EES).
ii. Provide TCC curve down to the last adjustable device (stopafter the first fixed device) in the Normal System but at thethe minimum two-level curves from each of the buildingServiceEntranceswitchgear/switchboardshallbeprovided.
b. The following specific information shall also be shown on thecoordinationcurvesateachlevelofpowerdistributionsystem:
i. Deviceidentification(includingManufacturer,CatalogNumber,andDeviceCurveNumberandID)
ii. Voltageandcurrentratioforcurves.
iii. 3-phaseand1-phaseANSIdamagepointsforeachtransformer.
iv. No-damage,melting,andclearingcurvesforfuses.
v. Cabledamagecurves.
vi. Transformerinrushpoints.
vii. Maximumshortcircuitcutoffpoint.
viii. Excerpts from one-line diagram reflecting the protectivedevices modeled on each curve. This excerpt may beinserted onto a corner (typically top right-hand) of the curveprint out or may be on the preceeding facing page for easeofreference.
ix. Provide explanation, analysis, and recommendation toachievebetter coordination.
x. The analysis for recommended curve of a particular deviceshall be put right after the existing curve in the report forcomparison.
c. Develop a table to summarize the settings selected for theprotective devices. Include all medium voltage devices in the table,as well as all low voltage devices which require modification,showingthe following data:
i. Deviceidentification.
ii. RelayCTratios,tap,timedial,andinstantaneouspickup.
iii. Circuit breaker sensor rating, long-time, short-time, andinstantaneoussettings,andtimebands.
iv. Fuseratingandtype.
v. Groundfaultpickupandtimedelay.
7. VoltageDropCalculations:
a. Provide voltage drop calculations for all three-phase branch andfeeder circuits. Show calculated voltages at each bus and voltagedropson each feeder.
b. Calculations shall be based of the maximum values of kVA, kW,kvar,powerfactorandamperesfor eachpowercircuit.
i. Forbranchcircuitlevel,use80%ofnameplaterating.
ii. Forincomingserviceanddistributionlevel,use50%ofthenameplate rating or actual maximum peak demand load.Contractor to coordinate with utility company in acquiringdemandload.
c. Provide tabular information showing the sizes of all cables,transformersand other circuitdata.
d. Provide a system one-line diagram which clearly identifiesindividual equipment busses, bus numbers, cable and busconnectionsandothercircuitinformation.
e. Provideaseparatesectionortableswhichprovideanevaluationofthe calculated voltage drops with recommendations forimprovements where voltage drops exceed the allowable NEClimits.
8. EmergencyPowerSystemAnalysis:
a. First, a narrative describing the existing emergency powersystem(s) at the medical center shall be provided, to include adescription of each emergency generator, physical location, size(kW and ampacity), voltage, configuration (phase, wire), circuitnumber, age, and overall condition. A summary of the averageloading on each generator (based on data provided by the VAMC)shall be provided and then compared to projected future loads (A-Eshalldeveloploadprojectionsfromdiscussingforecastprojectsandgrowth with VAMC engineering staff). Finally, A-E shall provide aqualitative narrative on the suitability of the existing generators tomeet projected future loads. If existing Emergency Power System,including generators, is not adequate to meeteither current orfuturedemands,recommendationsshallbeprovidedinthestudy.
9. AdditionalAnalysisandRecommendations
a. For all electrical equipment, determine if adequate code clearancesexist. Note cases by site, building number, room number, codeviolation and specific equipment that do not include adequate codeclearances. Contractor to provide method and cost estimate toresolvetheproblems.Provide informationintableformat.
b. Determine if ground fault protection exists where required by NFPA70 Articles 215 and 517. Note all cases where this condition existsand provide method and cost estimates to correct. Provideinformationin table format.
c. For all automatic transfer switches, determine if the correct 3-poleor 4-pole switches are used. Where ground fault protection is usedon the normal feed to the switch, determine if the switch is correctlywired. Note all cases where this condition exists and providemethod and cost estimates to correct. Provide information in tableformat.
d. Note any use of cable limiters and provide recommendations toavoid any single phasing conditions. Note all cases where thiscondition exists and provide method and cost estimates to correct.Provideinformation intable format.
e. On the medium voltage switchgear, where undervoltage relays (27)are used, determine whether all 3 phases are monitored or only 2phases are monitored. For those locations where only 2 phases aremonitored, provide a cost estimate for providing adequateprotectionfor all 3phases.
f. Analyze the short circuit calculations, and highlight any equipmentthat is determined to be underrated. Provide recommendations forreplacement or other methods to effectively protect the underratedequipment.
g. After developing the coordination curves, highlight areas lackingcoordination. Present a technical evaluation with a discussion of thelogicalcompromisesforbest coordination.
h. Assess the equipment condition using grading method in term of A,B,C, D and F.
GradeA-LikeNewCondition.Majorityofusefullifespanremains."Excellent".
GradeB-GoodCondition.Morethanhalfusefullifespanremains."Good"
GradeC-AverageCondition.Lessthanhalfusefullifespanremains."Average",or"Fair"
Grade D- Poor Condition. Useful life span has expired but failure is notcritical.
"Poor"or"Problematic"
GradeF-CriticalCondition.Usefullifespanhasexpiredandneedsimmediateattention.
"Failing"or"Critical"
10. ProtectiveDeviceSettings:
a. For all adjustable and fixed protective devices, provide tables toshow existing settings and new settings where changes arerecommendedfor properprotection.
b. If adjustments will not provide adequate protection, providerecommendations to update or replace the existing underratedequipment and include cost estimates to accomplish the necessarycorrections.
c. Provide table in Excel format to show ONLY the devices thatrequirethattheir settingsneedadjustment.
11. Infra-Red Scanning/Thermographic Survey
a. Infra-Red Scanning/Thermographic Survey shall be performed onelectricalequipment as follows:
b. Use an infra-red scanning camera to detect hot spots in theElectrical Power Distribution System. Objective of this work is todetectanyloose,broken,orcorrodedconnectionsinthesystem.
c. Problem connections shall be clearly identified and documented inareport.Reportshallalsoincludesuggestedcorrectiveactiontofixproblemconnections.
d. Note that since this work item must be done while the ElectricalPower Distribution System is energized, appropriate safetyprecautions must be taken before, during and after scanning thesystem.
e. Survey results shall be provided to all subcontractors, if performedbyanother subcontract.
12. 4-HourPowerOutageTest
a. The Contractor shall be present for and will participate in the VAMC4-hour test of the Essential Electrical System (EES). This test shallfulfill the requirements of VHA Directive 1028, Electrical PowerDistribution System, NFPA 110 (e.g. Para. 8.4.9.) and the JointCommission. This test will include opening of all utility serviceconnections serving the VAMC for a minimum of 4-hours. Duringthetestperiod,verifyoperationofallEEScomponentsincludingthe transfer to emergency power and return to normal service. TheContractor shall include in their bid proposal all costs associatedwith the services of the local utility company for the duration of thetest. The estimated duration of the Contractor’s involvement isbetween 8 – 12 hours. The Contractor shall assist the VAMC staffwith troubleshooting and correcting malfunctioning electricalequipment discovered during the test. Contractor shall make anyrequired adjustments and/or re-calibrations to all equipment whichhas been otherwise maintained, inspected, and tested under thisScopeof Work.
b. The Contractor is responsible for documenting any deficienciesfoundintheEESduringtheoutagetestandprovidingsolutionstoidentified deficiencies, not corrected during the test, in the FinalReport.
c. The Joint Commisssion now requires a 4-hour generator test underload that is at least 30 percent of the nameplate rating of thegenerator once every 36 months. If a facility’s generator requires anannual load bank to comply with EC.02.05.07 EP 5, it will alsorequire a load bank every 36 months for 4 hours to comply withEC.02.05.07 EP 8. It is important to note the annual load bank onlyexceeds 30 percent for 1.5 hours. Generators 3 and 4 require theuse of a load bank to achieve 30% of their nameplate ratingstherefore, the Contractor is responsible to furnish necessary loadbank(s)forGenerators3and4duringthe4hourgeneratortest.
V. Schedule A. The Contractor shall provide a proposed schedule with their bid proposal.Proposedscheduleshallataminimumdepictthefollowing:
1. Schedule shall be in the form of a progress Gantt chart of suitable scale toindicate the work scheduled for completion by any given date during thework period.
2. Site survey work shall begin immediately after coordination with andapproval by the JEVZ VAMC Engineering Service and Contracting OfficerRepresentative(COR).
3. Schedule shall allow adjustment based on input from reviewing staff andshow all critical path items and shutdowns. Shutdowns shall becoordinatedwithFacilities,IT,andIncident Command.
4. Schedule shall consider the least impact to patient care. Work will includenightsand weekends.
5. Alldeliverables,includingfinalreportsshallbecompleted,submittedandapprovedwithin150calendardaysaftertheNoticetoProceed.
6. Adraftofthefinalreportshallbesubmitted30daysbeforethesubmissionof the completed final report. The draft final report will be reviewed by thegovernment with comments, edits and corrections provided to thecontractorwithinthreeweeksafterreceiptofthedraftfinalreport.
VI. FurnishedDocumentation
A. A list of buildings to be assessed. The list shall identify each building (bycommonnameandbuildingnumber),thecurrentfunctionandtotalgrosssquarefootage. This information is only to be used to assist in determining costs for therequired services.
B. VHA Directive 1028 and existing Survey. The Directive and Survey shall bereviewed with the Chief Engineer/Facility Manager, the Contract Officer and theCORduring the entrancebriefing.
C. As-BuiltDrawings.As-builtdrawingsmaynotbe100%accurateandwillneedverification by the Contractor. Substantial deviations from actual as-builtconditionwhichaffectstheSOWshallbebroughttotheattentionoftheCOR.
D. PlansandOne-lineDiagrams.Siteplan,incomingelectricalserviceandprimarydistribution system one-line diagram and basic one-line diagrams for thebuildingsateach VAMC.
E. Additional as-built drawings, if available, as required by the contractor to verifyexistingfield conditions.
F. VAMC personnel knowledgeable of the existing electrical systems that shallaccompany the Contractor’s team members during the site investigation. Thecontractor shall coordinate and verify schedule and personnel, with the ChiefEngineer, in advance of site visit(s). Chief Engineer shall ensure that medicalcenter personnel are available to accompany the survey team. Field survey datacollection efforts shall require no more than two members of VAMC staff, unlessan additional number of contractor survey teams have been approved by theChiefEngineerinwriting priortothe fieldinvestigation.
G. Any significant electrical maintenance and testing reports performed at theVAMC.
H. Asmallconferenceworkroomwithtelephone.
VII. Deliverables A. ForDraft Final Report, provide two hard copies and electronic copies (compactdisc)oftheentireelectrical studyincludingthefollowing:
1. Drawings (Full-size 42”x30” for electrical site plan, primary one-linediagram and secondary one-line diagrams) Use the latest version ofAutoCAD(compatiblewiththelocalVAMCsversion)andprovidethevieweron each CD.
2. Reports shall be loose leaf, three-hole punched, in an appropriately sizedbinderto includeall dataand drawings.
3. Colorphotosthatshowdeviceslistedonthedeficiencyreport.
4. PrintoutsoftheproposedArcFlashBoundarySignage/LabelsreflectingtheHazard-Risk Table for review.
5. Allelectronicdocumentsshallbeinoriginalformatandfullysearchable.
B. ForFinal Report, provide four hard copies and electronic copies (compact disc) oftheentire electricalstudyincludingthe following:
1. Drawings (Full-size 42”x30” for electrical site plan, primary one-linediagram and secondary one-line diagrams) Use the latest version ofAutoCAD (compatible with the local VAMCs version) and provide theviewer on each CD. For the Final Report Submission,the VAMC shallreceive “live” CADD drawing files which can be manipulated andupdated.
2. Reports shall be loose leaf, three-hole punched, in an appropriately sizedbinderto includeall dataand drawings.
3. Electronic copy (CD) of the entire report shall include all data (includingbutnotlimitedtoSKMdata,AutoCad,Word,ExcelfilesandPDF).
4. Colorphotosthatshowdeviceslistedonthedeficiencyreport.
5. ArcFlashBoundarySignage/LabelsreflectingtheHazard-RiskTable.
6. Provide final report with stamp and signature by a Licensed ProfessionalElectrical Engineer.
7. Allelectronicdocumentsshallbeinoriginalformatandfullysearchable.
C. For each the draft final and final reports, the content requirements for eachsubmissionshall include:
1. Letter from local electric utility provider indicating the available faultcurrentat the point of service.
2. ExecutiveSummary.
3. MinutesoftheEntranceBriefingwiththeChiefofEngineering/FacilityManagementtoincludeVHADirective2006-056ComplianceSurvey.
4. Analysis and calculations for the Primary Distribution System and partialSecondary Distribution System for each building including switchgear,switchboardanddistributionpaneletc.AnalysisshallincludeShortCircuitStudyandProtectiveDeviceCoordinationCurves(blackonly).The analysis shall be based on the actual device data (including but not limit tofuses,breakers and relays).
5. Deficienciesreportandcostestimates.
6. All items identified in section IV, Specific Scope, as a separate Tab orSectionto include:
a. One-LineDiagram
b. GroundResistanceAnalysis
c. ShortCircuitStudy
d. Hazard-RiskTable
e. ArcFlashLabeling
f. CoordinationCurves(Inblack)
g. VoltageDropCalculations
h. EmergencyPowerAnalysis
i. AdditionalAnalysisandRecommendations
j. ProtectiveDeviceSettings
k. Infra-Red Scanning/Thermographic Survey
l. 4-HourPowerOutageTest
7. Completed analysis and calculations for the entire Primary andSecondaryDistribution;
8. Completed one-line diagrams. Each building on the Building List thatattachedtotheScopeofWorkshallbeidentifiedonthediagrams.
9. Prior to Final Report submission, all comments generated from VAMCreview of the Draft Final Report shall be discussed to determineapplicability. All comments deem applicable shall be incorporated intotheFinal Report.
10. Allelectronicdocumentsshallbeinoriginalformatandfullysearchable.
SECTION C - CONTRACT CLAUSES
| FAR Number |
| Title |
| Date |
| 52.212-4 |
| CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES |
| NOV 2021 |
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.204-13 |
| SYSTEM FOR AWARD MANAGEMENT MAINTENANCE |
| OCT 2018 |
| 52.204-18 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE |
| AUG 2020 |
| 52.232-40 |
| PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS |
| NOV 2021 |
C.2 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984) The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
(End of Clause) C.3 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)
(a) The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The following provisions and clauses that have been checked by the Contracting Officer are incorporated by reference.
[X] 852.203–70, Commercial Advertising.
[] 852.209–70, Organizational Conflicts of Interest.
[] 852.211–70, Equipment Operation and Maintenance Manuals.
[] 852.214–71, Restrictions on Alternate Item(s).
[] 852.214–72, Alternate Item(s). [Note: this is a fillable clause.] [] 852.214–73, Alternate Packaging and Packing.
[] 852.214–74, Marking of Bid Samples.
[X] 852.215–70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors.
[X] 852.215–71, Evaluation Factor Commitments.
[] 852.216–71, Economic Price Adjustment of Contract Price(s) Based on a Price Index.
[] 852.216–72, Proportional Economic Price Adjustment of Contract Price(s) Based on a Price Index.
[] 852.216–73, Economic Price Adjustment—State Nursing Home Care for Veterans.
[] 852.216–74, Economic Price Adjustment—Medicaid Labor Rates.
[] 852.216–75, Economic Price Adjustment—Fuel Surcharge.
[] 852.219–9, VA Small Business Subcontracting Plan Minimum Requirements.
[] 852.219–10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside.
[] 852.219–11, VA Notice of Total Veteran-Owned Small Business Set-Aside.
[] 852.222–70, Contract Work Hours and Safety Standards—Nursing Home Care for Veterans.
[] 852.228–70, Bond Premium Adjustment.
[] 852.228–71, Indemnification and Insurance.
[] 852.228–72, Assisting Service-Disabled Veteran-Owned and Veteran-Owned Small Businesses in Obtaining Bonds.
[X] 852.232–72, Electronic Submission of Payment Requests.
[] 852.233–70, Protest Content/Alternative Dispute Resolution.
[] 852.233–71, Alternate Protest Procedure.
[] 852.237–70, Indemnification and Medical Liability Insurance.
[] 852.246–71, Rejected Goods.
[] 852.246–72, Frozen Processed Foods.
[] 852.246–73, Noncompliance with Packaging, Packing, and/or Marking Requirements.
[] 852.270–1, Representatives of Contracting Officers.
[] 852.271–72, Time Spent by Counselee in Counseling Process.
[] 852.271–73, Use and Publication of Counseling Results.
[] 852.271–74, Inspection.
[] 852.271–75, Extension of Contract Period.
[] 852.273–70, Late Offers.
[] 852.273–71, Alternative Negotiation Techniques.
[] 852.273–72, Alternative Evaluation.
[] 852.273–73, Evaluation—Health-Care Resources.
[] 852.273–74, Award without Exchanges.
(b) All requests for quotations, solicitations, and contracts for commercial item services to be provided to beneficiaries must include the following clause:
[] 852.237–74, Nondiscrimination in Service Delivery.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 852.242-71 |
| ADMINISTRATIVE CONTRACTING OFFICER |
| OCT 2020 |
(End of Addendum to 52.212-4)
C.4 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115–91).
(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115–232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[] (1) 52.203–6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[] (2) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
[] (3) 52.203–15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[] (5) [Reserved] [] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[X] (8) 52.209–6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).
[] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
[] (10) [Reserved] [] (11) 52.219–3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).
[] (12) 52.219–4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[] (13) [Reserved] [X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
[] (ii) Alternate I (MAR 2020) of 52.219-6.
[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
[] (ii) Alternate I (MAR 2020) of 52.219-7.
[] (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
[] (17)(i) 52.219–9, Small Business Subcontracting Plan (NOV 2021) (15 U.S.C. 637(d)(4)).
[] (ii) Alternate I (NOV 2016) of 52.219-9.
[] (iii) Alternate II (NOV 2016) of 52.219-9.
[] (iv) Alternate III (JUN 2020) of 52.219–9.
[] (v) Alternate IV (SEP 2021) of 52.219–9.
[] (18)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
[] (ii) Alternate I (MAR 2020) of 52.219-13.
[] (19) 52.219–14, Limitations on Subcontracting (SEP 2021) (15 U.S.C. 657s).
[] (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
[] (21) 52.219–27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (SEP 2021) (15 U.S.C. 657f).
[X] (22) (i) 52.219–28, Post-Award Small Business Program Rerepresentation (SEP 2021) (15 U.S.C. 632(a)(2)).
[] (ii) Alternate I (MAR 2020) of 52.219–28.
[] (23) 52.219–29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).
[] (24) 52.219–30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).
[] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
[] (26) l(26) 52.219–33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
[X] (27) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
[] (28) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).
[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
[X] (30)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).
[] (ii) Alternate I (FEB 1999) of 52.222-26.
[] (31)(i) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
[] (ii) Alternate I (JULY 2014) of 52.222-35.
[X] (32)(i) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
[] (ii) Alternate I (JULY 2014) of 52.222-36.
[] (33) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
[] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
[X] (35)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[] (36) 52.222-54, Employment Eligibility Verification (NOV 2021). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
[] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
[] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
[] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (OCT 2015) of 52.223-13.
[] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-14.
[] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
[] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-16.
[X] (44) 52.223–18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).
[] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
[] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
[] (47) (i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
[] (ii) Alternate I (JAN 2017) of 52.224-3.
[] (48) 52.225-1, Buy American—Supplies (NOV 2021) (41 U.S.C. chapter 83).
[] (49)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (NOV 2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
[] (ii) Alternate I (JAN 2021) of 52.225-3.
[] (iii) Alternate II (JAN 2021) of 52.225-3.
[] (iv) Alternate III (JAN 2021) of 52.225-3.
[] (50) 52.225–5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[] (52) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
[] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
[] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
[X] (55) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).
[] (56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[] (57) 52.232-30, Installment…
This is the start of the file's text. The full file is on GovTribe.