36C24419B0046-0003002.pdf
PDF 18 KB Posted
- Attached to
- EMPI Funded-Emergency Generator 2B Federal contract opportunity
- Solicitation number
- 36C24419B0046
About this file
36C24419B0046 0003 S06 Section 00 01 10 Table of Contents 4-03-19.pdf
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Erie VA Medical Center VA Project #562-17-309 Replace Legacy EPSS Bid Document Submission Erie, PA April 3, 2019
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-17 01 00 00.10 Sole Source Equipment List 01 00 00.20 Utility Outage Form 01 32 16.15 Project Schedules 02-15 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 33 23.10 Submittal Register 01 35 26 Safety Requirements 02-17 01 35 26.10 PCRA Form 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 01-18 01 45 29 Testing Laboratory Services 08-17 01 45 35 Special Inspections 04-18 01 45 35.10 Attachment A – Schedule 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-1 7 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 53 Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY
04 01 11 Maintenance of Masonry 02-16
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16 07 84 00 Firestopping 02-16
00 01 10 - 2
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 71 00 Door Hardware 01-16
DIVISION 09 – FINISHES
09 91 00 Painting 01-16
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Str uctural
Components 01-14
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and S team
Generation 08-17
23 05 11 Common Work Results for HVAC 08-17 23 05 41 Noise and Vibration Control for HVAC Pipin g and
Equipment 02-15
23 07 11 HVAC and Boiler Plant Insulation 02-15 23 22 13 Steam and Condensate Heating Piping 08-17
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors an d Cables 01-17 26 05 26 Grounding and Bonding for Electrical Syste ms 01-17 26 05 33 Raceway and Boxes for Electrical Systems 0 1-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 25 11 Busways 01-17 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01- 17 26 32 13 1 Bi-Fuel Engine Generators 01-18 26 36 23 Automatic Transfer Switches 01-17 26 38 00 1 Electronic Voltage Regulator 26 51 00 Interior Lighting 01-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
00 01 10 - 3
28 13 00 1 Physical Access Control System 10-11 28 31 00 1 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork 10-12
1 Specification Contains Proprietary Products
File details come from the government source that posted it.