36C24419B0046-0003002.pdf

PDF 18 KB Posted

Attached to
EMPI Funded-Emergency Generator 2B Federal contract opportunity
Solicitation number
36C24419B0046
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0046 0003 S06 Section 00 01 10 Table of Contents 4-03-19.pdf

View the file

Other files for this federal contract opportunity

Other files attached to EMPI Funded-Emergency Generator 2B, newest first.
File Type Posted
36C24419C0192-001.docx DOCX document
36C24419B0046-0003006.pdf PDF
36C24419B0046-0003008.pdf PDF
36C24419B0046-0003003.pdf PDF
36C24419B0046-0003005.pdf PDF
36C24419B0046-0003007.doc DOC document
36C24419B0046-0003000.docx DOCX document
36C24419B0046-0003009.pdf PDF
36C24419B0046-0003004.pdf PDF
36C24419B0046-0003001.docx DOCX document
36C24419B0046-0002002.docx DOCX document
36C24419B0046-0002000.docx DOCX document
36C24419B0046-0002001.docx DOCX document
36C24419B0046-0001003.zip ZIP file
36C24419B0046-0001000.docx DOCX document
36C24419B0046-0001001.docx DOCX document
36C24419B0046-0001005.zip ZIP file
36C24419B0046-0001002.zip ZIP file
36C24419B0046-0001004.zip ZIP file
S02_Drawings_-_Mechanical.zip ZIP file
S02_Drawings_-_Structural.zip ZIP file
S02_Drawings_-_Electrical.zip ZIP file
S02_Specification_for_Emergency_Power_Phase_2B.zip ZIP file
S02_GI001_Cover_Sheet.pdf PDF
S02_Wage_Determination_06-14-2019.pdf PDF
36C24419B0046-003.docx DOCX document
36C24419B0046-000.docx DOCX document
36C24419B0046-000.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Erie VA Medical Center VA Project #562-17-309 Replace Legacy EPSS Bid Document Submission Erie, PA April 3, 2019

00 01 10 - 1

DEPARTMENT OF VETERANS AFFAIRS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17 01 00 00.10 Sole Source Equipment List 01 00 00.20 Utility Outage Form 01 32 16.15 Project Schedules 02-15 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 33 23.10 Submittal Register 01 35 26 Safety Requirements 02-17 01 35 26.10 PCRA Form 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 01-18 01 45 29 Testing Laboratory Services 08-17 01 45 35 Special Inspections 04-18 01 45 35.10 Attachment A – Schedule 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-1 7 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 53 Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY

04 01 11 Maintenance of Masonry 02-16

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16 07 84 00 Firestopping 02-16

00 01 10 - 2

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 71 00 Door Hardware 01-16

DIVISION 09 – FINISHES

09 91 00 Painting 01-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Str uctural

Components 01-14

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and S team

Generation 08-17

23 05 11 Common Work Results for HVAC 08-17 23 05 41 Noise and Vibration Control for HVAC Pipin g and

Equipment 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15 23 22 13 Steam and Condensate Heating Piping 08-17

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors an d Cables 01-17 26 05 26 Grounding and Bonding for Electrical Syste ms 01-17 26 05 33 Raceway and Boxes for Electrical Systems 0 1-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 25 11 Busways 01-17 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01- 17 26 32 13 1 Bi-Fuel Engine Generators 01-18 26 36 23 Automatic Transfer Switches 01-17 26 38 00 1 Electronic Voltage Regulator 26 51 00 Interior Lighting 01-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

00 01 10 - 3

28 13 00 1 Physical Access Control System 10-11 28 31 00 1 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork 10-12

1 Specification Contains Proprietary Products

File details come from the government source that posted it.