About this file

36C24419B0023 S02 18015-Altoona DDC 100 CD-Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Modification to change FBO announcement response date to correct due date of 8/29/2019, newest first.
File Type Posted
36C24419B0023-0006001.docx DOCX document
36C24419B0023-0006001.docx DOCX document
36C24419B0023-0006000.docx DOCX document
36C24419B0023-0006000.docx DOCX document
36C24419B0023-0005000.docx DOCX document
36C24419B0023-0005000.docx DOCX document
36C24419B0023-0004000.docx DOCX document
36C24419B0023-0004000.docx DOCX document
36C24419B0023-0003000.docx DOCX document
36C24419B0023-0003001.pdf PDF
36C24419B0023-0003000.docx DOCX document
36C24419B0023-0003001.pdf PDF
36C24419B0023-0002000.docx DOCX document
36C24419B0023-0002002.doc DOC document
36C24419B0023-0002001.pdf PDF
36C24419B0023-0002002.doc DOC document
36C24419B0023-0002001.pdf PDF
36C24419B0023-0002000.docx DOCX document
36C24419B0023-006.docx DOCX document
36C24419B0023-006.docx DOCX document
36C24419B0023-0001000.docx DOCX document
36C24419B0023-0001000.docx DOCX document
36C24419B0023-003.pdf PDF
36C24419B0023-001.docx DOCX document
36C24419B0023-005.pdf PDF
36C24419B0023-004.pdf PDF
36C24419B0023-002.pdf PDF
36C24419B0023-003.pdf PDF
36C24419B0023-005.pdf PDF
36C24419B0023-002.pdf PDF
36C24419B0023-001.docx DOCX document
36C24419B0023-000.docx DOCX document
36C24419B0023-000.docx DOCX document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

18015

BUILDING 1 - REPLACE

PNEUMATIC HVAC WITH DDC

CONTROL

#503-15-202

CJC RWM/BK

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

GI001

COVER SHEET

03/01/2019 321

REPLACE BUILDING 1 PNEUMATIC

HEATING, VENTILATION, AIR

CONDITIONING WITH DIRECT

DIGITAL CONTROL

BUILDING 1

JAMES E. VAN ZANDT VA MEDICAL CENTER

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

VICINITY MAP

SITE

LOCATION MAP

SITE

PROJECT DIRECTORY

OWNER:

JAMES E. VAN ZANDT VA MEDICAL CENTER

2907 PLEASAANT VALLEY BLVD.

ALTOONA, PA 16602

(814) 943-8164

CONTACT: ZACHARIAH A. WASSER

ARCHITECT/ENGINEER:

AE WORKS, LTD

209 SANDUSKY STREET

PITTSBURGH, PA 15212

(412) 287-7333

CONTACT: RYAN MORGAN

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

GI001 COVER SHEET

MECHANICAL

M001 MECHANICAL SYMBOLS AND ABBREVIATIONS

MH10B-H1 BASEMENT HVAC PLAN

MH101-H1 LEVEL 1 HVAC PLAN

MH102-H1 LEVEL 2 HVAC PLAN

MH103-H1 LEVEL 3 HVAC PLAN

MH104-H1 LEVELS 4 AND 5 HVAC PLANS

MH105-H1 LEVELS 6 AND 7 HVAC PLANS

MH501 MECHANICAL DETAILS

MH502

MH503

MH504

MECHANICAL ROOM 18 PNEUMATIC VALVES

MECHANICAL ROOM 36 PNEUMATIC VALVES

MECHANICAL ROOM 158 PNEUMATIC VALVES

MH101-R1 LEVEL 1 RADIATOR PLAN

MH102-R1 LEVEL 2 RADIATOR PLAN

MH103-R1 LEVEL 3 RADIATOR PLAN

MH104-R1 LEVELS 4 AND 5 RADIATOR PLANS

MH105-R1 LEVELS 6 AND 7 RADIATOR PLANS

MH505

MH507

MECHANICAL ROOM A000A PNEUMATIC EQUIPMENT

MECHANICAL ROOM 623 PNEUMATIC VALVES

MH601

MH602

VAV SCHEDULE LEVELS 0B & 1

VAV SCHEDULE LEVELS 2 & 3

MH603 VAV SCHEDULE LEVELS 4, 5, & 7

REHEAT COILS SCHEDULEMH604

ELECTRICAL

E101

BASEMENT ELECTRICAL PLAN

E102

LEVEL 1 ELECTRICAL PLAN

E103

LEVEL 2 ELECTRICAL PLAN

E105

LEVEL 4 & 5 ELECTRICAL PLANE104

LEVEL 3 ELECTRICAL PLAN

E10B

LEVEL 6 & 7 ELECTRICAL PLAN

RADIATOR SCHEDULESMH605

ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTESE001

MH506 MECHANICAL ROOM A000A PNEUMATIC EQUIPMENT

CHWS

CD

CDR

CWR

CWS

CW

HW

HWR

HWS

STM

(E)

CHWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSATE DRAINAGE

CONDENSATE RETURN

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DOMESTIC COLD WATER

HOT WATER

HEATING WATER RETURN

HEATING WATER SUPPLY

STEAM

2"

PIPING SYMBOLS

KEYNOTE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

EXISTING PIPE TAG

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN

THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT

BE USED IN THIS SET OF DRAWINGS.

Room

INVERT: -10' - 1"

1/8" / 12" SLOPE 16"x8"

16"/8"

(E)

16"Ø

E/A

O/A

R/A

S/A

EXHAUST AIR

OUTSIDE AIR

RETURN AIR

SUPPLY AIR

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

HVAC SYMBOLS

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR DUCT RISE

MECHANICAL EQUIPMENT TAGS

ROUND DUCT SIZE TAG (DIAMETER)

DUCT BEING DEMOLISHED

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE

ROUND EXHAUST/RELIEF AIR DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP

EQUIPMENT BY OTHERS

(REFER TO OTHER DISCIPLINE

FOR ADDITIONAL

INFORMATION)

EXISTING EQUIPMENT

TO REMAIN(E)VAV-XX

VAV-XX

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CAV CONSTANT AIR VOLUME

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

CW COLD WATER

D DEGREE

DB DRY BULB

DIA DIAMETER

DN DOWN

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

E/A EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FD FIRE DAMPER

FDV FIRE DEPARTMENT VALVE

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

O/A OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

R/A RETURN AIR

RAD RADIATOR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

S/A SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACE MOUNT

SP STANDPIPE

SP STATIC PRESSURE

STM STEAM

T THERMOSTAT

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

ABBREVIATIONS

AC AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACCU AIR COOLING CONDENSING UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CWP CONDENSER WATER PUMP

CHWP CHILLED WATER PUMP

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

HRU HEAT RECOVERY UNIT

PRV POWER ROOF VENTILATOR

RE RETURN/EXHAUST FAN

RTU ROOFTOP UNIT

SEP SEWAGE EJECTOR PUMP

SF SUPPLY FAN

SP SUMP PUMP

UH UNIT HEATER

WH WATER HEATER

EQUIPMENT ABBREVIATIONS

VAV-XX

DEVICE TAGS

T THERMOSTAT

RAD-XX

WALL RATING LEGEND

1-HR RATED BARRIER

2-HR RATED BARRIER

SMOKE BARRIER

NEW VAV BOX

NEW RADIATOR

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

18015

BUILDING 1 - REPLACE

PNEUMATIC HVAC WITH DDC

CONTROL

#503-15-202

CJC RWM/AC

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

M001

MECHANICAL SYMBOLS AND

ABBREVIATIONS

03/01/2019 322

HVAC GENERAL NOTES

* SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.

* CONTRACTOR SHALL LOCATE THERMOSTATS AND TEMPERATURE SENSORS AT 5'-0" AFF, A

MINIMUM OF 8" FROM LIGHT SWITCH.

* ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE RATED FOR PRESSURE CLASS OF

2" W.G. UNLESS NOTED OTHERWISE.

* CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC EQUIPMENT AFTER ALL

DUST PRODUCING CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.

PROJECT GENERAL NOTES

* NOT ALL SYMBOLS ARE NECESSARILY USED.

* CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING HOT WATER FLOW (WHERE VAV

HAS A HW HEATING COIL) READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS

DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND WATER FLOW AND SHALL SUBMIT TEST

RESULTS (ORGANIZED PER ROOM) CLEARLY LABELING EACH VAV BOX TESTED. PRIOR TO

STARTING ANY NEW WORK, VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW AT TIME OF

MEASUREMENT.

* UPON NEW CONSTRUCTION COMPLETION, T&B CONTRACTOR SHALL BALANCE NEW VAV BOX TO

PRE-DEMOLITION VALUES FOR AIR AND WATER FLOW UNLESS INSTRUCTED OTHERWISE BY THE

COR/ENGINEER.

* DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND

COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.

* PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED, AND AS REQUIRED BY CODE.

* CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE

INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE

RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE

CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.

* INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE,

AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES, AND INSURANCE UNDERWRITER

REQUIREMENTS.

* COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL,

CIVIL, AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

* MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,

SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL

ROOMS.

* ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY MECHANICAL

EQUIPMENT OR PIPING INSULATION IS APPLIED.

* LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH A STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS

RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.

* TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED

AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU

(NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.

PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL STANDARD

RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S

QUALIFICATIONS.

* WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE

PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.

* COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED

DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED

FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.

* ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE,

DIVISION 26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE

UNDERWRITER REQUIREMENTS.

* THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE

SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.

THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND

RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE

APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

* ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF

MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS

OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR

AT NO ADDITIONAL COST TO THE OWNER.

* ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND

AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.

* ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING,

CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.

* UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS WITH TOP AT 48" ABOVE

FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. NOTIFY THE ENGINEER OF ANY

ROOMS WHERE THE ABOVE LOCATION CAN NOT BE MAINTAINED OR WHERE THERE IS A

QUESTION ON LOCATION. COORDINATE FINAL LOCATIONS WITH COR.

* LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, ETC.,) FOR UNOBSTRUCTED ACCESS TO UNIT

ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO NOT LOCATE FAN POWERED VAV

BOXES ABOVE LIGHTING FIXTURES.

* INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER

APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

* ALL ISOLATION VALVES SHALL BE IN A LOCATION AND ELEVATION WHICH ALLOWS FOR

EQUIPMENT AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE

ISOLATION VALVE.

* ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE

PROVIDED WITH POSITION INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).

* ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINER, AND PIPING SPECIALTIES AND

STRAINERS SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO

EQUIPMENT AND CONTROLS.

* MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED

AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL

DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR

ALTERATION AND REPAIRS.

* MEASURE, CUT, AND INSTALL PIPE LENGTH ACCURATELY TO MINIMIZE MISALIGNMENT. INSTALL

ALL PIPING WITHOUT FORCING OR SPRINGING.

* PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION

TRANSMISSION TO BUILDING STRUCTURE.

* ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE

COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL MEMBERS, BAR

JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER.

WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.

* MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR

DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL MEMBERS. COORDINATE WITH

STRUCTURAL DRAWINGS.

* UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IS OVERHEAD, TIGHT TO UNDERSIDE

OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.

* ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES,

MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION,

INSPECTION, AND MAINTENANCE.

* ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

* ALL DUCTS SHALL BE BONDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER

GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO BOTH THE

EQUIPMENT AND THE DUCT.

* ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL

BE APPROVED BY ENGINEER PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION.

* ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE

ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE PROTECTED, INSULATED,

OR CONTROLLED TO REMAIN BELOW 120°F.

* PROVIDE MANUAL VOLUME DAMPERS IN ALL RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS

FROM MAIN SUPPLY DUCT, AND IN ALL OTHER AREAS REQUIRED TO PROVIDE PROPER SYSTEM

AIRFLOW BALANCING.

* REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

* THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL

EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN THE SPACE.

* WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT

CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO

START OF WORK.

* FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO

ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES.

* LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE

ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT TO COMPLY WITH

NEC REQUIREMENTS.

* PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,

FLOORS, WALLS, AND ROOF.

* ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.

* PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS

SHOWN.

STATEMENT OF BID ITEMS

BID ITEM #1:

* GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION, MECHANICAL,

PLUMBING, AND ELECTRICAL ALTERATIONS, NECESSARY REMOVAL OF EXISTING STRUCTURES

AND CONSTRUCTION AND CERTAIN OTHER ITEMS TO REPLACE ALL PNEUMATICALLY

CONTROLLED EQUIPMENT TO DIRECT DIGITALLY CONTROLLED (DDC) EQUIPMENT. AN

ADDITIONAL 10 VAV BOXES (1 SIZE 4, 2 SIZE 5, 3 SIZE 6, 2, SIZE 7, AND 2 SIZE 8) SHALL BE

INCLUDED IN THE BID FOR LOCATIONS TO BE DETERMINED IN THE FUTURE. THE BID SHOULD

ALSO INCLUDE PRICING TO CONNECT THE HYDRONIC PIPING TO THESE VAV BOXES, A NEW

DDC CONTROL VALVE, A THERMOSTAT, AND ALL CONTROL WIRING REQUIRED TO CONNECT

THE NEW DDC SYSTEM. THESE 10 ADDITIONAL VAVS AND ‘CONNECTIONS’ HAVE BEEN

INCLUDED IN THE DRAWING SCHEDULES. THIS ALSO INCLUDES REPLACING ALL EXISTING

RADIATOR COVERS WITH NEW ONES. THE RADIATOR COVERS SHALL BE POWDER COATED.

SIZES OF THE RADIATOR COVERS WILL NEED TO BE FIELD VERIFIED BY THE CONTRACTOR AND

THE PAINT COLORS SHALL BE COORDIANTED WITH THE COR PRIOR TO ORDERING THE

REPLACEMENT COVERS. THE EXISTING COVERS SHALL REMAIN OVER THE RADIATORS UNTIL

THE NEW COVERS ARRIVE. AT NO POINT SHALL A RADIATIOR BE LEFT UNCOVERED.

BID ITEM #2: DEDUCT ALTERNATE NO.1:

* REPLACE ALL VAV BOXES AS IDENTIFIED ON THE “BASE BID” SCHEDULE BUT INSTEAD OF

REPLACING RADIATOR COVERS, THEY ARE TO BE REMOVED TO INSTALL THE NEW DDC

CONTROL VALVE AND THEN REINSTALLED WITHOUT ANY PAINTING OR MODIFICATIONS.

BID ITEM #3: DEDUCT ALTERNATE NO. 2:

* DELETE THE ADDITIONAL 10 VAV BOXES (1 SIZE 4, 2 SIZE 5, 3 SIZE 6, 2, SIZE 7, AND 2 SIZE 8) AS

REQUIRED IN THE BASE BID. ALSO, DELETE THE COST FOR CONNECTING THE HYDRONIC

PIPING TO THESE VAV BOXES, THE NEW DDC CONTROL VALVES, AND THERMOSTATS, AND ALL

CONTROL WIRING REQUIRED TO CONNECT THESE NEW VAV BOXES TO THE NEW DDC SYSTEM.

THESE 10 ADDITIONAL VAVS AND ‘CONNECTIONS’ HAVE BEEN INCLUDED IN THE DRAWING

SCHEDULES SO REMOVE THEM AS APPROPRIATE.

BID ITEM #4: DEDUCT ALTERNATE NO. 3:

* REPLACE AND RETROFIT THE VAV BOXES AS IDENTIFIED IN “DEDUCT ALT #3” SCHEDULES ON

DRAWINGS.

PHASING

GENERAL REQUIREMENTS:

* CONTRACTOR TO DEVELOP A DETAILED PHASING PLAN, SUBMIT IT TO THE COR, AND OBTAIN

APPROVAL BEFORE COMMENCING WORK.

* CONTRACTOR TO COMPLY WITH ALL SPACE CLEANLINESS AND SAFETY/ICRA REQUIREMENTS

PRIOR TO COMMENCING WORK. CONTRACTOR SHALL ALSO RETURN THE SPACE TO ITS

ORIGINAL CONDITIONS UPON COMPLETING THE WORK.

* CONTRACTOR TO COORDINATE WITH THE COR FOR ALL SHUTDOWNS REQUIRED PRIOR TO

COMMENCING WORK. MINIMUM TWO (2) WEEKS WRITTEN ADVANCED NOTICE REQUIRED.

* THERE ARE TWO AIR COMPRESSORS THAT CONTROL ALL PNEUMATIC EQUIPMENT IN THE

HOSPITAL. THEY ARE LOCATED IN MECHANICAL ROOM 171, WHICH SERVES THE PROJECT

NORTH (1984 ADDITION) OF FLOORS 1, 2, 3, AND 4 AND THE OTHER IS IN MECHANICAL ROOM 36, WHICH SERVES THE REMAINING HOSPITAL. THE AREAS/SPACES IN THE 1984 ADDITION SHALL

BE UPGRADED FIRST. THE AIR COMPRESSORS SHALL NOT BE DEMOLISHED UNTIL ALL

PNEUMATIC EQUIPMENT IS UPGRADED TO DDC FUNCTIONING CORRECTLY AND

COMMISSIONED COR TO GIVE APPROVAL TO PRIOR TO DEMOLITION.

SCHEDULE OF WORK:

* TRANE SC PANELS ARE TO BE INSTALLED FIRST IN THE DESIGNATED IT CLOSETS ON EACH

FLOOR. ALL WIRING IS TO BE RUN THE ROOMS/SPACES WHERE THE NEW DDC EQUIPMENT IS

TO BE INSTALLED.

* VAVS/CAVS/REHEAT COILS, ASSOCIATED ACTUATORS/CONTROL VALVES, THERMOSTATS,

RADIATOR CONTROL VALVES ARE TO BE INSTALLED NEXT.

* WHENEVER POSSIBLE, CONTRACTOR TO COMPLETE ALL WORK IN ONE ROOM (INSTALL ALL

DDC EQUIPMENT, VAV(S), ACTUATORS, THERMOSTATS, RADIATOR CONTROL VALVES, WIRING)

PRIOR TO STARTING WORK IN ANOTHER ROOM. A ROOM/AREA WILL NEED TO BE PROTECTED

FROM ANY DUST/DEBRIS PRIOR COMMENCING WORK AND THE SPACE SHALL BE RETURNED

TO ITS ORIGINAL CONDITION PRIOR TO THE NEXT DAY.

* AFTER ALL VAVS/CAVS/REHEAT COILS, THERMOSTATS, RADIATOR CONTROL VALVES ARE

INSTALLED, THE PNEUMATIC GATE VALVES, PRESSURE REGULATING VALVES, AND

ACTUATORS IN THE MECHANICAL ROOMS ARE TO BE INSTALLED. FOR THE VALVES, THIS WILL

REQUIRE THE STEAM TO BE SHUT OFF TO PERFORM THIS WORK. CONTRACTOR TO

COORDINATE WITH COR ON SHUTOFFS.

* AFTER ALL UPGRADES ARE COMPLETED FOR THE PNEUMATIC EQUIPMENT IN THE 1984

ADDITION, THE WORK IN THE REMAINING HOSPITAL CAN BEGIN. THE SAME ORDER OF

OPERATIONS SHALL BE APPLIED (I.E. INSTALL SC PANELS FIRST, RUN WIRING, THEN INSTALL

VAV, T-STATS, RADIATORS).

* ONCE ALL DDC IS EQUIPMENT IS INSTALLED, DEMOLISHING OF ALL REMAINING PNEUMATIC

CAN BEGIN. THIS INCLUDES ALL TRANSDUCER PANELS, AND THE ELECTRO-PNEUMATIC

EQUIPMENT IN ROOM 325. ALL COPPER SHALL BE RETURNED TO THE JAMES E. VAN ZANDT VA

MEDICAL CENTER FOR RECYCLING. THE AIR COMPRESSORS SHALL BE REMOVED LAST. THE

AIR COMPRESSORS IN MECHANICAL ROOM 36 SHALL BE SHALL BECOME PROPERTY OF THE

CONTRACTOR. THE AIR COMPRESSOR IN MECHANICAL ROOM 171 SHALL BE RETURNED TO THE

VA, BUILDING 3, BOILER PLANT.

PHASES:

* PHASES ARE NOTED ON THE MECHANICAL PLAN DRAWINGS.

* PHASE 1-1984 ADDITION FLOOR 1

* PHASE 2-1984 ADDITION FLOOR 2

* PHASE 3-1984 ADDITION FLOOR 3

* PHASE 4-1984 ADDITION FLOOR 1 MECH ROOM 171 AND FLOOR 4 MECH ROOM 445 REPLACE

ALL PNEUMATIC VALVES AND ACTUATORS.

* PHASE 5-BASEMENT FLOOR (UNLESS OTHERWISE INDICATED IN ANOTHER PHASE)

* PHASE 6-FLOOR 1 WEST AND MIDDLE AREAS (RADIOLOGY/MIDDLE OFFICES/LOUNGE/LOCKER

ROOM)

* PHASE 7-FLOOR 1 SOUTH AREA (YELLOW CLINIC AND LOBBY)

* PHASE 8-FLOOR 1 EAST AREA (MAIN LOBBY/URGENT CARE)

* PHASE 9-FLOOR 2

* PHASE 10-FLOOR 3

* PHASE 11-FLOOR 4

* PHASE 12-FLOOR 5

* PHASE 13-FLOOR 6

* PHASE 14-FLOOR 7

* PHASE 15-MECHANICAL ROOMS

* PHASE 16-DEMOLITION OF REMAINING EQUIPMENT

RADIATORS:

* ALL RADIATOR WITH PNEUMATIC CONTROL VALVES ARE TO BE REPLACED WITH A DDC

CONTROL VALVE. ALL COVERS ARE TO BE REPLACED WITH NEW COVERS. THE NEW COVERS

SHALL BE POWDER COATED. SIZES OF THE RADIATOR COVERS WILL NEED TO BE FIELD

VERIFIED BY THE CONTRACTOR AND THE PAINT COLOR SHALL BE COORDINATED WITH THE

COR PRIOR TO ORDERING THE REPLACEMENT COVERS. THE EXISTING COVERS SHALL

REMAIN OVER THE RADIATORS UNTIL THE NEW COVERS ARRIVE. AT NO POINT SHALL A

RADIATOR BE LEFT UNCOVERED.

VAVS/CAVS/REHEAT COILS:

* IN ORDER FOR THE VAV/CAV/REHEAT COIL TO FUNCTION, THE SPACE SENSOR MUST BE

INSTALLED AND CONNECTED TO THE VAV/CAV/REHEAT COIL. THE WIRING FROM THE

VAV/CAV/REHEAT COIL TO THE SC PANEL CAN BE CONNECTED AFTER SPACE SENSOR.

AREAS REQUIRING ESCORTS:

* BASEMENT-PHARMACY CACHE RM A000A

* 1ST FLOOR-CASHIER RM 150

* 3RD FLOOR-ICU STORAGE RM 346

* 3RD FLOOR-SPS AREA. (WILL REQUIRE SPECIAL GOWNING AND COVERINGS.)

* ALL IT CLOSETS

ACCESS TIMES: (MUST BE COORDINATED WITH COR PRIOR TO COMMENCING PORTION OF

WORK)

* BASEMENT PHARMACY CACHE-OCCUPIED BETWEEN 7AM-10PM.

* 1ST FLOOR-URGENT CARE AREA AFTER 8PM

* BLOOD LAB OPERATES 24/7. HOWEVER, LESS BUSY AFTER 4PM

* 1ST FLOOR PHARMACY- OCCUPIED BETWEEN 7AM-10PM

* 3RD FLOOR-ICU STORAGE RM 346-OCCUPIED BETWEEN 7AM-10PM

* ALL CLINICAL AREAS NEED TO BE ACCESSED AFTER 4PM

* 4TH FLOOR IS TEMPORARY PATIENT LIVE IN. WILL NEED TO COORDINATE WITH NURSING

STAFF ON ACCESS

* 5TH AND 6TH FLOORS ARE PATIENT LIVE-IN FLOORS. CONTRACTOR TO COORDINATE WITH

NURSING STAFF ON BEST TIMES TO ACCESS.

* COMMON AREAS/OFFICES CAN BE ACCESSED DURING THE DAY, BUT IT IS SUGGESTED TO DO

ALL WORK AFTER 4:30PM TO AVOID CONFLICTS AND WORK STOPPAGES.

* IT CLOSETS 8AM-4PM

CODES AND STANDARDS

1 PROJECT HAS BEEN DESIGNED TO, AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE

FOLLOWING BUILDING CODES AND STANDARDS:

A. LIFE SAETY CODE - NFPA 101, 2018

B. INTERNATIONAL BUILDING CODE - IBC, 2015

C. INTERNATIONAL MECHANICAL CODE - IMC, 2015

D. NATIONAL ELECTRIC CODE - NFPA 70, 2017

E. HEALTH CARE FACILITY CODE - NFPA 99, 2015

F. VA DESIGN GUIDE AND SPECIFICATIONS INCLUDING:

-ELECTRICAL DESIGN MANUAL, 2015

-HVAC DESIGN MANUAL, 2017

-FIRE PROTECTION DESIGN MANUAL, 2015

Title Sheet Revision

MECH PIT

POLICE TRAINING

ROOM

MECH RM

ELEC CL

37A

STOR A+MM

EQ STOR

31A

MECH RM

ELEV

E02

HAC

HAC STOR

LOBBY

27A

CORR

47A

STAIRS

S00

MECH RV ENG SVC

MECH ROOM

LOCKER RM EMS

17A

SHOWER

16B

M TLT EMS

16A

STORAGE VCS

ELEV

E00A

ELEV

E00B

KITCHEN

15A

SIGN SH

STOR A+MM

STOR A+MM

41A

CHEF M+R OFFICE

ELEC SHOP ENG

SVC

STORAGE

18A

PAINT SHOP

CARPENTER SHOP

ENG SVC

MACHINE SHOP

ENG SVC

STAIRS

S02

STORAGE MAS

CORR

48C

STAIRS

S01

STOR A+MM

A/C SHOP ENG SVC

CORR

47B

ELEV

E00REF

15C

TEL

42A

STOR VCS

COMP. RM

PLAN ROOM

22A

STAIRS

S04

MECH RM

OFFICE

A000H

OFFICE

A000I

OFFICE

A000K

OFFICE

A000J

DATA

A000F

ELEC

A000E

PANDEMIC

A000D

HVAC SHOP

A000B

STAIRS

AS000

MECH SHAFT

MECH

A000A

HSK ROOM

41B

STAIR

S03STOR VCS

OFFICE CRED UN

OFFICE EMS

CORR

18B

STOR

TLT

26A

PLUMBING SHOP

CORR

BC2

CORR

DINING RM VCS

RETAL STORE

OFFICE CRED UN

CRED UN

LOCKER RM

OFFICE

A000G

PHARMACY CACHE

A000C

VAV-B-15

VAV-B-3

VAV-B-5

VAV-B-6

VAV-B-7 VAV-B-8

VAV-B-9

VAV-B-12

VAV-B-13 VAV-B-14

VAV-B-10

VAV-B-11

VAV-B-16

T

T

T

T

T

T T T T T

T

T

T

4 4

3 3

TT

T

T

T

VAV-B-1

VAV-B-4

VAV-B-2

3 3 3

9 9

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

18015

BUILDING 1 - REPLACE

PNEUMATIC HVAC WITH DDC

CONTROL

#503-15-202

CJC RWM/AC

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

MH10B-H1

BASEMENT HVAC PLAN

03/01/2019 323

1/16" = 1'-0"MH10B-H1

1 BASEMENT HVAC PLAN

HVAC NEW WORK KEYNOTES

REPLACE PNEUMATIC STEAM/WATER CONTROL VALVE

ON PIPING WITH DDC CONTROLLED STEAM/WATER

CONTROL VALVE. REMOVE SUFFICIENT AMOUNT OF

PIPING TO ALLOW FOR NEW CONTROL VALVE.

ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO

DDC CONTROLS AS PART OF A DIFFERENT PROJECT.

NO WORK IS REQUIRED IN THE SCOPE OF THIS

PROJECT ON THE VAV BOX.

REPLACE PNEUMATIC PRESSURE REGULATING VALVE (PRV)

ON PIPING WITH DDC CONTROLLED PRV. REMOVE

SUFFICIENT AMOUNT OF PIPING TO ALLOW FOR NEW PRV. REFER

TO DETAILS ON SHEET M502, M505, AND M506.

REPLACE PNEUMATIC GATE VALVES ON PIPING WITH DDC

CONTROLLED GATE VALVES. REMOVE SUFFICIENT AMOUNT

OF PIPING TO ALLOW FOR NEW GATE VALVE. REFER

TO DETAILS ON SHEET M502, M503, M505, AND M506.

AIR COMPRESSOR IN THIS ROOM TO BE DEMOLISHED BY

THE CONTRACTOR AND BECOME PROPERTY OF THE

CONTRACTOR.

REPLACE ALL PNEUMATIC EQUIPMENT IN THIS ROOM.

REFER TO SHEET M505 FOR ADDITIONAL DETAILS OF

THE EQUIPMENT.

INSTALL NEW TRANE SC PANEL IN THIS LOCATION.

SC PANEL SHALL CONTROL ALL NEW DDC EQUIPMENT.

SC PANEL TO TIE INTO NEAREST TELECOMMUNICATION CLOSET,

AS SHOWN BY DASHED LINE.

PNEUMATIC TRANSDUCER PANEL IN THIS ROOM TO

BE DEMOLISHED. CONTRACTOR RESPONSIBLE FOR

REMOVING TRANSDUCER PANEL FROM THE STATION.

REPLACE PNEUMATICALLY CONTROLED ACTUATOR ON

SUPPLY AIR DUCT PLENUM BOX ABOVE CEILING WITH A

DDC ACTUATOR AND CONTROLLER. EXISTING DAMPER AND

SHAFT TO REMAIN AS-IS.

REPLACE PNEUMATICALLY CONTROLLED ACTUATOR

WITH A DDC ACTUATOR AND CONTROLLER. EXISTING DAMPER AND

SHAFT TO REMAIN AS-IS.

NEW TRANE SC PANEL IN ELEC ROOM (ELEC CL 37A) TO TIE INTO

IT SYSTEM IN THIS TELECOM ROOM (TEL 42A).

SHEET ABBREVIATIONS

VARIABLE AIR VOLUMEVAV

SHEET SYMBOLS

VAV TERMINAL

T THERMOSTAT

HVAC NEW WORK DRAWING NOTES

REMOVE ALL PNEUMATICALLY CONTROLLED THERMOSTATS,

INCLUDING THE HOSE/COPPER LINE, AND REPLACE WITH

WIRELESS DDC CONTROLLED THERMOSTATS.

REMOVE ALL VAV BOXES SHOWN, INCLUDING THE PNEUMATIC

CONTROLS, AND ASSOCIATED PIPING. REPLACE WITH NEW VAV

BOX WITH DDC CONTROLLED ACTUATORS AND CONTROL VALVES.

CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING

HOT WATER FLOW (WHERE VAV HAS A HW HEATING COIL)

READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS

DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND

WATER FLOW AND SHALL SUBMIT TEST RESULTS

(ORGANIZED PER ROOM) CLEARLY LABELING EACH

VAV BOX TESTED. PRIOR TO STARTING ANY NEW WORK,

VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW

AT TIME OF MEASUREMENT.

ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL POINTS ON THE

EXISTING TRANE GRAPHICS SYSTEM.

ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE

CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO

COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.

IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,

ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF

EQUIPMENT.

REFER TO SHEET M001 FOR FURTHER DETAILS ON THE

PHASING PLANS.

PHASE 5

PHASE 15

PHASE 15

PHASE 15

PHASE 16

PHASE 16

PHASE 16

NORTH

TRUE NORTH=

PROJECT

210.0°

LAUNDRY

141D

ELEC CL

158A

OXYGEN STOR

141N

PAT. CLOTHING

CORR

141G

LAUNDRY

141C

VET BEN

141Q

VET BEN

141L

STOR

MECH RM

SMOKING RM

141M

ELEV

E102

OFFICE

WOMENS LOCKER

144A

EMPLOYEE

LOUNGE

OFFICE

145A

OFFICE

145B XRAY

OFFICE

AUDIOLOGY

148C

XRAY FILE

131G

OFFICE

131H

ULTRA SOUND

131J

XRAY FILE

131F

COMP RM

131E

OFFICE

131D

STAIRS

S100

SOILED

OFFICE

TLT

134A

TLT

MORGUE

140 FREEZE

140B

FREEZE

140C

VEST

131B

CAT SCAN CNTRL

131C

XRAY

CAT SCAN

DEXA SCAN

129A

RADIOLOGY

129B

STOR

131A

XRAY

TLT

125A

AUDIOLOGY CLINIC

AUDIOLOGY

EXAM RM

EXAM ROOM

NURSE INTERV.

113B

CONSULT

113A

NURSE

EXAM RM

OFFICE

OFFICE

NURSE

SURG

ENT/CONF.

DIRTY UT.

102A

EQUIP RM

100B

101A

NURSE STA.

101B

STAIRS

S103

EXAM / TREAT

116A

TLT

TLT

115A

EXAM/ TREAT

116D

WAITING

EXAM / TREAT

116C

EXAM / TREAT

116B

TLT

117B

RESP.

CONSULT

DIET

OFFICE

OFFICE

W TLT

ELEV

E100

OFFICE

120 OPMGR

120A

ELEC RM

198C

TEL CL

199A

STAIRS

S102

BILLING OFF

M TLT

197A

W TLT

CASHIER

CLERK OFF

MULTI-PURPOSE

156A4

CLERK OFF

CHIEF CLERK

STAFF

A123

CLEAN UT

A124

SOILED

A126

EX/TRT/OFF

A127

MEDS

A125

EXAM RM

A129

EX/TRT/OFF

A131

EXAM RM

A130

EX/TRT/OFF

A116

EX/TRT/OFF

A115 EXAM

A112

STAFF TLT

A119

PAT TLT

A120

STAIRS

AS100

ELEC CL

A140A

EX/TRT/OFF

A137

EX RM

A136

EX/TRT/OFF

A135

EX/TRT/OFF

A134

EX/TRT/OFF

A133

HAC

A140

PAT TLT

A139

DECONTAMINATION

A141

VESTIBULE

194A

OFFICE

193F

EQUP

193E

CLERK

193C

CLERK

193D

STAIRS

S104

160A159

HAC

WAITING RM

159C 159B

EXAM RM

EXAM RM

EXAM RM

PHARM OFF

STOR

177A

TLT

175A

HAC

157C

DIR OF SERV.

OFFICE

168A

TEL CL

TLT

EXMA RM

169A

EXAM RM

169BEXAM RM

169C

TLT

168B

EXAM RM

EXAM RM

TLT

BP SCR

ELEC CL

OFFICE

176 CONF ROOM

183 184 185

DIR SECURITY

MECH RM

M TLT

188A

POLICE

EXAM

A111

OXYGEN STOR

A110

TRIAGE

A144

MED RM

A146

CLERK A

VIC OFFICE

A106E STAFF TLT

A106C

OPERATOR

A106B

VESTIBULE

A100

Space

Space

W TLT

EXAM RM

EXAM RM

EXAM RM

EXAM RM

VESTIBULE

A142

STAIR

S101

STOR

141E

LAUNDRY

141A

VIEWING

LOBBY

194C

CORR

194B

ECHO LAB

CARDIO LAB

147C

MED RECORDS

MED RECORDS

193C

WAITING

A117A

CLERKS

A121

DISCHARGE

A122A

DISCHARGE

A122B

ER WAITING

WAITING

A101B

CORR

A102

ELIGIBILITY

A106F

REGISTRATION

CONSULT

156B

CONSULT

156A

ELEV

E101

PHARMACY

157J

MED PREP

157A

172F

CLERK

172D

CLERK

172E

CLERK

172G

CLERK

176H

OUTPATIENT

LOBBY

180A

140C

AUTOPSY

140A

XRAY WAIT

RESP.

117A

RESP

118B

CLERK/HBA

100D

CLERK/HBA

CLERK/HBA

100A

CORR

WAITING

SUPERVISOR

SECRETARY

PR CARE

195B

PR CARE

OFFICE

198D

PRIMARY CARE

WHEEL CHAIR

STOR

A101A

WAITING

A101CENTRAL

REGISTRATION

REC

A101C

TLT/SHW

A107A

ON CALL

A107

LOCKERS

A106D

MACHINES

A106A

NOUR

A138G

CORR

A109

CORR

A143

EQUIP ALCOVE

A138A

CORR

A138

NURSES STA

A138F

CORR

A117

CONF/MTG

A118

CORR

A114

EX RM

A132

CORR

A128

CORR

A128

BED 1

A138B

BED 2

A138C

BED 4

A138E

BED 3

A138D

CLERK OFF

OFFICE

XRAY

172J

CLERK OFF

152A

T

T T

T

T

T

T

T

T T

T

T

T TT

T

T

T

T

T

T

T

T

T

TT

T T

T

T

T T

T

T

T

T

T

T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T T

VAV-1-73 VAV-1-74

VAV-1-71

VAV-1-76 VAV-1-77

VAV-1-72

VAV-1-78

VAV-1-79

VAV-1-80

VAV-1-81

VAV-1-82

VAV-1-66

VAV-1-84

VAV-1-67

VAV-1-63

VAV-1-83

VAV-1-59

VAV-1-85

VAV-1-86

VAV-1-51

VAV-1-54

VAV-1-52

VAV-1-53

VAV-1-55

VAV-1-57

VAV-1-58

VAV-1-56

VAV-6-10 VAV-6-9

VAV-6-8

VAV-6-7VAV-6-12

VAV-6-13

VAV-6-6

VAV-6-5

VAV-6-15

VAV-6-3

VAV-6-2

VAV-6-1VAV-6-21

VAV-1-12

VAV-1-13

VAV-1-15

VAV-1-14

VAV-1-16

VAV-1-18

VAV-1-17

VAV-1-19

VAV-1-4

VAV-1-5

VAV-1-6

VAV-1-7

VAV-1-8

VAV-1-9

VAV-1-28

VAV-1-29

VAV-1-49

VAV-1-50

VAV-1-52

VAV-1-51

VAV-1-53

VAV-1-54

VAV-1-30

VAV-1-31

VAV-1-32

VAV-1-45

VAV-1-39

VAV-1-40

VAV-1-38

VAV-1-41

VAV-1-42

VAV-1-43

VAV-1-44

VAV-1-50

VAV-1-49

VAV-1-87

VAV-1-88

VAV-1-95

VAV-1-96

VAV-1-97

VAV-1-94

VAV-1-93

VAV-1-89

VAV-1-90

VAV-1-92

VAV-1-91

VAV-1-99

VAV-1-98

CAV-1-1

CAV-1-2

VAV-1-101VAV-1-100

VAV-1-104

VAV-1-105

VAV-1-106

VAV-1-102

VAV-1-103

VAV-1-107

VAV-1-108

VAV-1-111

VAV-1-109

VAV-1-119 VAV-1-118

VAV-1-117VAV-1-116

VAV-1-115

VAV-1-114

VAV-1-113

VAV-1-112

VAV-6-22

VAV-6-23

VAV-6-25

VAV-6-26

VAV-6-27

VAV-6-28

VAV-1-65

VAV-1-61

VAV-1-64

VAV-1-62

VAV-1-60

T

TT

T

VAV

TSTAT

TSTAT

CONTROLS SIDE

WALL DIFFUSER

6 6

T T

VAV-1-20

VAV-1-11

VAV-1-3

VAV-1-21

T

T

T

T

TTT

T

T

T

T

T

T

195B 195A

195C

VAV-1-1

VAV-1-2

VAV-1-10

VAV-1-23

VAV-1-22

VAV-1-24

VAV-1-25

VAV-1-26

VAV-1-27

VAV-1-34

VAV-1-35

VAV-1-36

VAV-1-37

VAV-1-47

VAV-1-46

VAV-1-48

MATCH LINE

SEE VIEW 2 ON MH101-H1

MATCH LINE

SEE VIEW 2 ON MH101-H1

T T

T T

T

T

T

T

T

T

T

T

T T T

VAV-6-4

VAV-6-11

VAV-6-14

VAV-6-16

VAV-6-17

VAV-6-18

VAV-6-19

VAV-6-20

T

T

VAV-6-24

VAV-1-75

VAV-1-69

VAV-1-70

VAV-1-68

VAV-1-110

T

VAV-1-33

T

T

MATCH LINE

SEE VIEW 1 ON MH101-H1

MATCH LINE

SEE VIEW 1 ON MH101-H1

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

18015

BUILDING 1 - REPLACE

PNEUMATIC HVAC WITH DDC

CONTROL

#503-15-202

CJC RWM/AC

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

MH101-H1

LEVEL 1 HVAC PLAN

03/01/2019 324

1/16" = 1'-0"MH101-H1

1 LEVEL 1 - HVAC PLAN

HVAC NEW WORK KEYNOTES

ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO

DDC CONTROLS AS PART OF A DIFFERENT PROJECT.

NO WORK IS REQUIRED IN THE SCOPE OF THIS

PROJECT ON THE VAV BOX.

AIR COMPRESSOR IN THIS ROOM TO BE REMOVED AND RETURNED

TO VA, BUILDING 3, BOILER PLANT.

LOCATION OF EXISTING TRANE BUILDING CONTROL UNIT (BCU).

EXISTING BCU TO BE REPLACED WITH TRANE SC PANEL. NEW

DDC EQUIPMENT LOCATED IN URGENT CARE, LOBBY,

PHARMACY, AND BLUE TEAM SHALL BE CONTROLLED BY

THIS SC PANEL. CONTRACTOR RESPONSIBLE FOR REMOVING

THE CONTROL UNIT FROM THE STATION.

INSTALL NEW TRANE SC PANEL IN THIS LOCATION. SC PANEL

SHALL CONTROL ALL OTHER NEW DDC EQUIPMENT. SC

PANEL TO TIE INTO NEAREST TELECOMMUNICATION CLOSET,

AS INDICATED BY THE DASHED LINE.

REPLACE PNEUMATIC GATE VALVES ON PIPING WITH DDC

CONTROLLED GATE VALVES. REMOVE SUFFICIENT AMOUNT

OF PIPING TO ALLOW FOR NEW GATE VALVE. REFER TO

SHEET M504 & M507.

RETROFIT PNEUMATICALLY CONTROLLED LOUVER ACTUATOR

WITH AN ELECTRO-PNEUMATIC CONVERTER TO ALLOW

DDC CONTROLS.

LOCATION OF EXISTING TRANE BUILDING CONTROL UNIT (BCU).

EXISTING BCU TO BE REPLACED WITH TRANE SC PANEL.

CONTRACTOR RESPONSIBLE FOR REMOVING THE CONTROL

UNIT FROM THE STATION.

PNEUMATIC TRANSDUCER PANEL IN THIS ROOM TO

BE DEMOLISHED. CONTRACTOR RESPONSIBLE FOR

REMOVING THE PANEL FROM THE STATION.

REPLACE PNEUMATIC PRESSURE REGULATING VALVE (PRV)

ON PIPING WITH DDC CONTROLLED PRV. REMOVE

SUFFICIENT AMOUNT OF PIPING TO ALLOW FOR NEW PRV. REFER

TO DETAILS ON SHEET M504.

BCU PANEL IN ELEC CLOSET TO TIE INTO IT SYSTEM

IN THIS TELECOM ROOM (TEL 199A).

VAV LOCATED ABOVE AUDIOLOGY BOOTHS. SPACE ABOVE BOOTHS

IS LIMITED. BOOTHS MUST NOT BE DAMAGED. CONTRACTOR

RESPONSIBLE FOR ANY AND ALL REPAIR COST.

1/16" = 1'-0"MH101-H1

2 LEVEL 1 HVAC PLAN - PT/OT ADDITION

SHEET ABBREVIATIONS

CONSTANT AIR VOLUMECAV

SHEET SYMBOLS

VAV OR CAV TERMINAL

T THERMOSTAT

VARIABLE AIR VOLUMEVAV

HVAC NEW WORK DRAWING NOTES

REMOVE ALL PNEUMATICALLY CONTROLLED THERMOSTATS,

INCLUDING THE HOSE/COPPER LINE, AND REPLACE WITH

WIRELESS DDC CONTROLLED THERMOSTATS.

REMOVE ALL VAV BOXES SHOWN, INCLUDING THE PNEUMATIC

CONTROLS, AND ASSOCIATED PIPING. REPLACE WITH NEW VAV

BOX WITH DDC CONTROLLED ACTUATORS AND CONTROL VALVES.

CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING

HOT WATER FLOW (WHERE VAV HAS A HW HEATING COIL)

READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS

DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND

WATER FLOW AND SHALL SUBMIT TEST RESULTS

(ORGANIZED PER ROOM) CLEARLY LABELING EACH

VAV BOX TESTED. PRIOR TO STARTING ANY NEW WORK,

VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW

AT TIME OF MEASUREMENT.

ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL POINTS ON THE

EXISTING TRANE GRAPHICS SYSTEM.

THE WOMEN'S LOCKER ROOM (144A) CONTAINS ASBESTOS CONTAINING

AIR CELL PIPE INSULATION ON THE STEAM PIPING. CONTRACTOR TO TAKE

NECESSARY PRECAUTIONS WHEN WORKING IN THIS ROOM. THIS PIPING

SHOULD NOT BE DISTURBED AS PART OF THIS PROJECT. HOWEVER, IF IT IS

INADVERTENTLY DISTURBED, CONTRACTOR TO IMMEDIATELY

TAKE NECESSARY SAFETY PRECAUTIONS AND CONTACT COR. REFER

TO THE ADDENDUM IN THE SPECIFICATIONS FOR THE HAZZARDOUS

MATERIAL REPORT.

ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE

CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO

COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.

IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,

ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF

EQUIPMENT.

REFER TO SHEET M001 FOR FURTHER DETAILS ON THE

PHASING PLANS.

PHASE 1

PHASE 6

PHASE 8

PHASE 7

PHASING

BOUNDARY

PHASING

BOUNDARY

PHASING

BOUNDARY

PHASING

BOUNDARY

PHASE 15

PHASE 4

PHASE 16

PHASE 16

NORTH

TRUE NORTH=

PROJECT

210.0°

PHASE 6

PHASE 1

PHASE 6

PHASE 1

P H

A S

E

P H

A S

E

PHASE 8

PHASE 6

P H

A S

E

P H

A S

E

PHASE 7

PHASE 6

PHASE 7

PHASE 6

LAUNDRY

141D

ELEC CL

158A

OXYGEN STOR

141N

PAT. CLOTHING

CORR

141G

LAUNDRY

141C VET BEN

141Q

VET BEN

141L

STOR

MECH RM

SMOKING RM

141M

ELEV

E102 OFFICE

WOMENS LOCKER

144A

EMPLOYEE

LOUNGE

OFFICE

145A

OFFICE

145B

XRAY

OFFICE

AUDIOLOGY

148C

XRAY FILE

131G

OFFICE

131H

ULTRA SOUND

131J

XRAY FILE

131F

COMP RM

131E

OFFICE

131D

STAIRS

S100

SOILED

136OFFICE

TLT

134A

TLT

MORGUE

FREEZE

140B

FREEZE

140C

VEST

131B

CAT SCAN CNTRL

131C

XRAY

CAT SCAN

DEXA SCAN

129A

RADIOLOGY

129B

STOR

131A

XRAY

TLT

125A

AUDIOLOGY CLINIC

AUDIOLOGY

EXAM RM

EXAM ROOM

NURSE INTERV.

113B CONSULT

113A

NURSE

EXAM RM

OFFICE

OFFICE

NURSE

SURG

ENT/CONF.

DIRTY UT.

102A

EQUIP RM

100B

101A

NURSE STA.

101B

STAIRS

S103

EXAM / TREAT

116A

TLT

TLT

115A

EXAM/ TREAT

116D

WAITING

EXAM / TREAT

116C

EXAM / TREAT

116B

TLT

117B

RESP.

CONSULT

DIET

OFFICE

OFFICE

W TLT

ELEV

E100

OFFICE

OPMGR

120A

ELEC RM

198C

TEL CL

199A

STAIRS

S102

BILLING OFF

M TLT

197A

W TLT

CASHIER

CLERK OFF

MULTI-PURPOSE

156A4

CLERK OFF

CHIEF CLERK

STAFF

A123

CLEAN UT

A124

SOILED

A126

EX/TRT/OFF

A127

MEDS

A125

EXAM RM

A129

EX/TRT/OFF

A131

EXAM RM

A130

EX/TRT/OFF

A116

EX/TRT/OFF

A115 EXAM

A112

STAFF TLT

A119

PAT TLT

A120

STAIRS

AS100

ELEC CL

A140A

EX/TRT/OFF

A137

EX RM

A136

EX/TRT/OFF

A135

EX/TRT/OFF

A134

EX/TRT/OFF

A133

HAC

A140

PAT TLT

A139

DECONTAMINATION

A141

VESTIBULE

194A

OFFICE

193F

EQUP

193E

CLERK

193C

CLERK

193D

STAIRS

S104

160160A159

HAC

WAITING RM

159C 159B

EXAM RM

EXAM RM

EXAM RM

EXAM RM

PHARM OFF

STOR

177A

TLT

175A

HAC

157C

DIR OF SERV.

OFFICE

168A

TEL CL

TLT

EXMA RM

169A

EXAM RM

169B

EXAM RM

169C

TLT

168B

EXAM RM

EXAM RM

TLT

BP SCR

ELEC CL

OFFICE

176 CONF ROOM

183 184 185

DIR SECURITY

MECH RM

M TLT

188A

POLICE

EXAM

A111

OXYGEN STOR

A110

TRIAGE

A144

MED RM

A146

CLERK A

VIC OFFICE

A106E STAFF TLT

A106C

OPERATOR

A106B

VESTIBULE

A100

Space

Space

W TLT

EXAM RM

EXAM RM

EXAM RM

EXAM RM

VESTIBULE

A142

STAIR

S101

STOR

141E

LAUNDRY

141A

VIEWING

LOBBY

194C

CORR

194B

ECHO LAB

CARDIO LAB

147C

MED RECORDS

MED RECORDS

193C

WAITING

A117A

CLERKS

A121

DISCHARGE

A122A

DISCHARGE

A122B

ER WAITING

WAITING

A101BCORR

A102

ELIGIBILITY

A106F

REGISTRATION

CONSULT

156B

CONSULT

156A

ELEV

E101

PHARMACY

157J

MED PREP

157A

172F

CLERK

172D

CLERK

172E

CLERK

172G

CLERK

176H

OUTPATIENT

LOBBY

180A

140C

AUTOPSY

140A

XRAY WAIT

RESP.

117A

RESP

118B

CLERK/HBA

100D

CLERK/HBA

CLERK/HBA

100A

CORR

WAITING

SUPERVISOR

SECRETARY

PR CARE

195B

PR CARE

OFFICE

198D

PRIMARY CARE

WHEEL CHAIR

STOR

A101A

WAITING

A101CENTRAL

REGISTRATION

REC

A101C

TLT/SHW

A107A

ON CALL

A107

LOCKERS

A106D

MACHINES

A106A

NOUR

A138G

CORR

A109

CORR

A143

EQUIP ALCOVE

A138A

CORR

A138

NURSES STA

A138F

CORR

A117

CONF/MTG

A118

CORR

A114

EX RM

A132

CORR

A128

CORR

A128

BED 1

A138B

BED 2

A138C

BED 4

A138E

BED 3

A138D

CLERK OFF

OFFICE

129 XRAY

172J

162A

CLERK OFF

152A

RAD-1-2

RAD-1-1

RAD-1-3

RAD-1-4 RAD-1-5 RAD-1-6

RAD-1-7

RAD-1-8

RAD-1-9

RAD-1-10

RAD-1-11

RAD-1-12

RAD-1-13

RAD-1-14

RAD-1-15

RAD-1-16

RAD-1-17

RAD-1-18RAD-1-19

RAD-1-20

RAD-1-21

RAD-1-22

RAD-1-23

RAD-1-24

RAD-1-25

RAD-1-26

RAD-1-27

RAD-1-28

RAD-1-29

RAD-1-30

RAD-1-31

RAD-1-32

RAD-1-33

RAD-1-34

RAD-1-35

RAD-1-36

RAD-1-37

RAD-1-38RAD-1-39

RAD-1-40

RAD-1-41

RAD-1-42

RAD-1-43

RAD-1-44

RAD-1-45

RAD-1-46

RAD-1-47

RAD-1-51

RAD-1-52

RAD-1-53

RAD-1-60

RAD-1-54

RAD-1-55

RAD-1-56

RAD-1-57

RAD-1-58

RAD-1-59

RAD-1-48

RAD-1-49

RAD-1-50

MATCH LINE

SEE DRAWING 2 ON MH101-R1

MATCH LINE

SEE DRAWING 2 ON MH101-R12

MATCH LINE

SEE VIEW 1 ON MH101-H1

MATCH LINE

SEE VIEW 1 ON MH101-H1

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

18015

BUILDING 1 - REPLACE

PNEUMATIC HVAC WITH DDC

CONTROL

#503-15-202

CJC RWM

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

MH101-R1

LEVEL 1 RADIATOR PLAN

03/01/2019 325

HVAC NEW WORK KEYNOTES

LOCATION OF EXISTING TRANE BUILDING CONTROL UNIT (BCU).

EXISTING BCU TO BE REPLACED WITH TRANE SC PANEL. NEW

DDC EQUIPMENT LOCATED IN URGENT CARE, LOBBY,

PHARMACY, AND BLUE TEAM SHALL BE CONTROLLED BY

THIS SC PANEL. CONTRACTOR RESPONSIBLE FOR REMOVING

BCU FROM THE STATION.

INSTALL NEW TRANE SC PANEL IN THIS LOCATION. SC PANEL

SHALL CONTROL ALL OTHER NEW DDC EQUIPMENT. SC

PANEL TO TIE INTO NEAREST TELECOMMUNICATION CLOSET.

BCU PANEL IN ELEC CLOSET TO TIE INTO IT SYSTEM

IN THIS TELECOM ROOM (TEL 199A).

ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO

DDC CONTROLS AS PART OF A DIFFERENT PROJECT.

NO WORK IS REQUIRED IN THE SCOPE OF THIS

PROJECT ON THE VAV BOX.

1/16" = 1'-0"MH101-R1

1 LEVEL 1 - RADIATOR PLAN

HVAC NEW WORK DRAWING NOTES

ALL RADIATOR WITH PNEUMATIC CONTROL VALVES ARE

TO BE REPLACED WITH A DDC CONTROL VALVE. ALL

COVERS ARE TO BE REPLACED WITH NEW COVERS. THE

NEW COVERS SHALL BE POWDER COATED. SIZES OF THE

RADIATOR COVERS WILL NEED TO BE FIELD VERIFIED BY

THE CONTRACTOR AND THE PAINT COLOR SHALL BE

COORDINATED WITH THE COR PRIOR TO ORDERING THE

REPLACEMENT COVERS. THE EXISTING COVERS SHALL

REMAIN OVER THE RADIATORS UNTIL THE NEW COVERS

ARRIVE. AT NO POINT SHALL A RADIATOR BE LEFT UNCOVERED.

ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL

POINTS ON THE EXISTING TRANE GRAPHICS SYSTEM.

THE WOMEN'S LOCKER ROOM (144A) CONTAINS ASBESTOS CONTAINING

AIR CELL PIPE INSULATION ON THE STEAM PIPING. CONTRACTOR TO TAKE

NECESSARY PRECAUTIONS WHEN WORKING IN THIS ROOM. THIS PIPING

SHOULD NOT BE DISTURBED AS PART OF THIS PROJECT. HOWEVER, IF IT IS

INADVERTENTLY DISTURBED, CONTRACTOR TO IMMEDIATELY

TAKE NECESSARY SAFETY PRECAUTIONS AND CONTACT COR. REFER

TO THE ADDENDUM IN THE SPECIFICATIONS FOR THE HAZZARDOUS

MATERIAL REPORT.

ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE

CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO

COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.

IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,

ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF

EQUIPMENT.

REFER TO SHEET M001 FOR FURTHER DETAILS ON THE

PHASING PLANS.

SHEET ABBREVIATIONS

RADIATORRAD

SHEET SYMBOLS

RADIATOR

1/16" = 1'-0"MH101-R1

2 LEVEL 1 RADIATOR PLAN - PT/OT ADDITION

PHASE 1

PHASE 6

PHASE 8

PHASE 7

PHASING

BOUNDARY

PHASING

BOUNDARY

PHASING

BOUNDARY

PHASING

BOUNDARY

NORTH

TRUE NORTH=

PROJECT

210.0°

PHASE 6

PHASE 1

PHASE 6

PHASE 1

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

PHASE 8

PHASE 6

PHASE 15

PHASE 16

PHASE 4

PHASE 16

PHASE 7

PHASE 6

PHASE 7

PHASE 6

STAIRS

S204

REC

234A

RECEIVING

STOR

236A

BREAK

ELEC CLO

TEL

255A

TLT

253E

TLT

253F

SUPPLY STOR

253L

HAC

253M

BLOOD BANK

253J

STOR

STOR

253L

EQUIP ROOM

253O

MICROBIOLOGY

253S

LAB OFFICE

253T

MICROBIOLOGY

253U

TLT

254B

LIBRARY

LIB. WORK RM

256A

LIBR. OFFICE

256B

ED SPACE OFFICE

256C

LAB CONF RM

TLT

254A

CHEM LAB

PHLEBOTOMY

253H 253G

WASH RM

253P

STORAGE

253R

SPEC CHEM

253N

HISTOLOGY

253V

CORR

SW OFFICE

SW OFFICE

SW OFFICE

SW OFFICE

SW CONF. ROOM

SOCIAL OFFICE

SOCIAL OFFICE

SOCIAL OFFICE

SEC OFFICE

SOCIAL OFFICE

ENG HVAC STOR

TELEHEALTH CONF

TELEHEALTH

CLERK

TLT

TELEHEALTH

CUBICLES

TELEHEALTH

OFFICE

SOCIAL OFFICE

SOCIAL OFFICE

STAIRS

S201

TELEHEALTH

OFFICE

CORR

PATIENT ROOM

256 ED SPACE

256D

STAIRS

S202

CATHOLIC CHAPLIN

SEC VOL SERV

CHIEF VOL SERV

OFFICE

SACRISTY

205A

CHAPLAIN OFFICE

CHAPEL

CORR

274A

VOL LOUNGE

ELEV

E200

VOL KIT

DAYROOM

LOBBY

OFFICE

ED CLASS

240D

DIETICIAN

240C

CHEIF NUTRITION

240B

WAREHOUSE

W202

OFFICE

234A

TLT

W207

STOR

232C

REC/TRASH

W208

FREEZER

DISH ROOM

DIET COMM

CORR

274B

INGREDIENT STOR

FOOD FREEZER

FREEZER

FREEZER

229A

TLT

CLEAN SUPP

STAIRS

S201

BREAK ROOM

KITCHEN

ELEV

E202

SOILED

CORR

STOR

CORR

TLT

EXAM

SOILED

EXAM

STERILE

EXAM

CORR

274FRECEPTION

XRAY

LAB

EXAM

COR 274G

WAITING

253D

SECRETARY

252A253B

253A

EXAM

252A

EXAM

EXAM

WAITING

251A

VESTIBULE

247C

ORAL SURG

241A

CLEAN

CORR

275A

CORR

CORR

275B

ELEL CL

HAC

STOR

TEL

273A

STOR

CORR

274D

MENS

WOMENS

SW OFFICE

T

T

T

T T

T

T

T

T T T

TTTT

T

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

VAV-2-45

VAV-2-46VAV-2-43

VAV-2-44

VAV-2-47

VAV-2-48

VAV-2-49

VAV-2-51

VAV-2-50

VAV-2-52

VAV-2-53

VAV-2-54

VAV-2-55

VAV-2-57

VAV-2-58

VAV-2-56

VAV-2-36

VAV-2-35

VAV-2-10

VAV-2-11

VAV-2-12

CAV-2-1

VAV-2-33

VAV-2-34

VAV-2-13

VAV-2-31

VAV-2-14

VAV-2-15 VAV-2-17

VAV-2-16

VAV-2-18

VAV-2-28

VAV-2-29

VAV-2-27

VAV-2-26

VAV-2-21

VAV-2-19

VAV-2-20 VAV-2-22 VAV-2-23

VAV-2-37

VAV-2-39

VAV-2-38

RH-2-1

VAV-2-40

VAV-2-41

VAV-2-42

VAV-2-76

VAV-2-75

VAV-2-71

VAV-2-74

VAV-2-73

VAV-2-72

VAV-2-70

VAV-2-69

VAV-2-68

VAV-2-67

VAV-2-66

VAV-2-65

VAV-2-64VAV-2-63

VAV-2-62

VAV-2-9

VAV-2-8

VAV-2-4

VAV-2-5

VAV-2-3

VAV-2-2

VAV-2-1

VAV-2-24

T

VAV-2-7

VAV-2-6

T

VAV-2-77

T

VAV-2-32

T

VAV-2-30

VAV-2-25

P6

ROOF BELOW

P7

OFFICE

229B

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

18015

BUILDING 1 - REPLACE

PNEUMATIC HVAC WITH DDC

CONTROL

#503-15-202

CJC RWM/AC

2907 PLEASANT VALLEY BOULEVARD

ALTOONA, PA 16602

MH102-H1

LEVEL 2 HVAC PLAN

03/01/2019 326

HVAC NEW WORK KEYNOTES

ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO

DDC CONTROLS AS PART OF A DIFFERENT PROJECT.

NO WORK IS REQUIRED IN THE SCOPE OF THIS

PROJECT ON THE VAV BOX.

INSTALL NEW TRANE SC PANEL IN THIS LOCATION. SC

PANEL SHALL CONTROL ALL NEW DDC EQUIPMENT ON

THIS FLOOR. SC PANEL TO TIE INTO NEAREST

TELECOMMUNICATION CLOSET, AS INDICATED BY THE

DASHED LINE.

REMOVE EXISTING REHEAT COIL AND REPLACE WITH

A NEW REHEAT COIL. REPLACE PNEUMATIC STEAM/WATER

CONTROL VALVE ON PIPING WITH DDC CONTROLLED

STEAM/WATER CONTROL VALVE. REMOVE SUFFICIENT

AMOUNT OF PIPING TO ALLOW FOR NEW CONTROL VALVE.

INSTALL NEW REHEAT COIL.

NEW TRANE SC PANEL IN ELEC CLOSET (ELEC 272) TO

TIE INTO IT SYSTEM IN THIS TELECOM ROOM (TEL 273A).

1/16" = 1'-0"MH102-H1

1 LEVEL 2 - HVAC PLAN

1/16" = 1'-0"MH102-H1

2 LEVEL 2 HVAC PLAN - PT/OT

SHEET ABBREVIATIONS

VARIABLE AIR VOLUMEVAV

SHEET SYMBOLS

VAV TERMINAL

T THERMOSTAT

HVAC NEW WORK DRAWING NOTES

REMOVE ALL PNEUMATICALLY CONTROLLED THERMOSTATS,

INCLUDING THE HOSE/COPPER LINE, AND REPLACE WITH

WIRELESS DDC CONTROLLED THERMOSTATS.

REMOVE ALL VAV BOXES SHOWN, INCLUDING THE PNEUMATIC

CONTROLS, AND ASSOCIATED PIPING. REPLACE WITH NEW VAV

BOX WITH DDC CONTROLLED ACTUATORS AND CONTROL VALVES.

CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING

HOT WATER FLOW (WHERE VAV HAS A HW HEATING COIL)

READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS

DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND

WATER FLOW AND SHALL SUBMIT TEST RESULTS

(ORGANIZED PER ROOM) CLEARLY LABELING EACH

VAV BOX TESTED. PRIOR TO STARTING ANY NEW WORK,

VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW

AT TIME OF MEASUREMENT.

ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL POINTS ON THE

EXISTING TRANE GRAPHICS SYSTEM.

ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE

CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO

COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.

IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,

ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF

EQUIPMENT.

REFER TO SHEET M001 FOR FURTHER DETAILS ON THE

PHASING PLANS.

PHASE 2

PHASE 9

PHASING

BOUNDARY

PHASING

BOUNDARY

NORTH

TRUE NORTH=

PROJECT

210.0°

P H

A S

E

P H

A S

E

PHASE 2

PHASE 9

S204

REC

234A

RECEIVING

STOR

236A

BREAK

ELEC CLO

TEL

255A

TLT

253E

TLT

253F

SUPPLY STOR

253L

HAC

253M

BLOOD BANK

253J

STORSTOR

253L

EQUIP ROOM

253O

MICROBIOLOGY

253S

LAB OFFICE

253T MICROBIOLOGY

253U

TLT

254B

LIBRARY

LIB. WORK RM

256A

LIBR. OFFICE

256B

ED SPACE OFFICE

256C

LAB CONF RM

TLT

254A

CHEM LAB

PHLEBOTOMY

253H

253G

WASH RM

253P

STORAGE

253R

SPEC CHEM

253N

HISTOLOGY

253V

CORR

SW OFFICE

SW OFFICE

SW OFFICE

SW OFFICE

SW CONF. ROOM

SOCIAL OFFICE

SOCIAL OFFICE

SOCIAL OFFICE

SEC OFFICE

ELEVATOR-1

E201-1

SOCIAL OFFICE

ENG HVAC STOR

TELEHEALTH CONF

TELEHEALTH

CLERK

TLT

TELEHEALTH

CUBICLES

TELEHEALTH

OFFICE

SOCIAL OFFICE

SOCIAL OFFICE

STAIRS

S201

TELEHEALTH

OFFICE

CORR

PATIENT ROOM

ED SPACE

256D

STAIRS

S202

CATHOLIC CHAPLIN

SEC VOL SERV

CHIEF VOL SERV

OFFICE

OFFICE

STOR

PROSTHETIC

OFFICE

STAIRS

S203

SACRISTY

205A

CHAPLAIN OFFICE

CHAPEL

CORR

274A

VOL LOUNGE

ELEV

E200

VOL KIT

DAYROOM

LOBBY

OFFICE

ED CLASS

240D

DIETICIAN

240C

CHEIF NUTRITION

240B

WAREHOUSE

W202

OFFICE

234A

TLT

W207

STOR

232C

REC/TRASH

W208

FREEZER

DISH ROOM

DIET COMM

CORR

274B

INGREDIENT STOR

FOOD FREEZER

FREEZER

FREEZER

229A

TLT

CLEAN SUPP

STAIRS

S201

BREAK ROOM

KITCHEN

ELEV

E202

SOILED

CORR

STOR

CORR

TLT

EXAM

SOILED

EXAM

STERILE

EXAM

CORR

274F

RECEPTION

XRAY

LAB

EXAM

COR 274G

WAITING

253DSECRETARY

252A 253B253A

EXAM

252A

EXAM

EXAM

WAITING

251A

VESTIBULE

247C

ORAL SURG

241A

CLEAN

CORR

275A

CORR

CORR

275B

ELEL CL

HAC

STOR

TEL

273A

STOR

CORR

274D

MENS

WOMENS

SW OFFICE

RAD-2-1 RAD-2-2 RAD-2-3

RAD-2-7

RAD-2-8

RAD-2-10

RAD-2-11

RAD-2-12

RAD-2-13

RAD-2-14

RAD-2-15

RAD-2-16

RAD-2-17

RAD-2-18

RAD-2-19

RAD-2-20

RAD-2-22

RAD-2-23

RAD-2-24

RAD-2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.