36C24419B0023-004.pdf
PDF 17 MB Posted
- Attached to
- Modification to change FBO announcement response date to correct due date of 8/29/2019 Federal contract opportunity
- Solicitation number
- 36C24419B0023
About this file
36C24419B0023 S02 18015-Altoona DDC 100 CD-Drawings.pdf
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
18015
BUILDING 1 - REPLACE
PNEUMATIC HVAC WITH DDC
CONTROL
#503-15-202
CJC RWM/BK
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
GI001
COVER SHEET
03/01/2019 321
REPLACE BUILDING 1 PNEUMATIC
HEATING, VENTILATION, AIR
CONDITIONING WITH DIRECT
DIGITAL CONTROL
BUILDING 1
JAMES E. VAN ZANDT VA MEDICAL CENTER
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
VICINITY MAP
SITE
LOCATION MAP
SITE
PROJECT DIRECTORY
OWNER:
JAMES E. VAN ZANDT VA MEDICAL CENTER
2907 PLEASAANT VALLEY BLVD.
ALTOONA, PA 16602
(814) 943-8164
CONTACT: ZACHARIAH A. WASSER
ARCHITECT/ENGINEER:
AE WORKS, LTD
209 SANDUSKY STREET
PITTSBURGH, PA 15212
(412) 287-7333
CONTACT: RYAN MORGAN
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
GI001 COVER SHEET
MECHANICAL
M001 MECHANICAL SYMBOLS AND ABBREVIATIONS
MH10B-H1 BASEMENT HVAC PLAN
MH101-H1 LEVEL 1 HVAC PLAN
MH102-H1 LEVEL 2 HVAC PLAN
MH103-H1 LEVEL 3 HVAC PLAN
MH104-H1 LEVELS 4 AND 5 HVAC PLANS
MH105-H1 LEVELS 6 AND 7 HVAC PLANS
MH501 MECHANICAL DETAILS
MH502
MH503
MH504
MECHANICAL ROOM 18 PNEUMATIC VALVES
MECHANICAL ROOM 36 PNEUMATIC VALVES
MECHANICAL ROOM 158 PNEUMATIC VALVES
MH101-R1 LEVEL 1 RADIATOR PLAN
MH102-R1 LEVEL 2 RADIATOR PLAN
MH103-R1 LEVEL 3 RADIATOR PLAN
MH104-R1 LEVELS 4 AND 5 RADIATOR PLANS
MH105-R1 LEVELS 6 AND 7 RADIATOR PLANS
MH505
MH507
MECHANICAL ROOM A000A PNEUMATIC EQUIPMENT
MECHANICAL ROOM 623 PNEUMATIC VALVES
MH601
MH602
VAV SCHEDULE LEVELS 0B & 1
VAV SCHEDULE LEVELS 2 & 3
MH603 VAV SCHEDULE LEVELS 4, 5, & 7
REHEAT COILS SCHEDULEMH604
ELECTRICAL
E101
BASEMENT ELECTRICAL PLAN
E102
LEVEL 1 ELECTRICAL PLAN
E103
LEVEL 2 ELECTRICAL PLAN
E105
LEVEL 4 & 5 ELECTRICAL PLANE104
LEVEL 3 ELECTRICAL PLAN
E10B
LEVEL 6 & 7 ELECTRICAL PLAN
RADIATOR SCHEDULESMH605
ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTESE001
MH506 MECHANICAL ROOM A000A PNEUMATIC EQUIPMENT
CHWS
CD
CDR
CWR
CWS
CW
HW
HWR
HWS
STM
(E)
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAINAGE
CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DOMESTIC COLD WATER
HOT WATER
HEATING WATER RETURN
HEATING WATER SUPPLY
STEAM
2"
PIPING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT
BE USED IN THIS SET OF DRAWINGS.
Room
INVERT: -10' - 1"
1/8" / 12" SLOPE 16"x8"
16"/8"
(E)
16"Ø
E/A
O/A
R/A
S/A
EXHAUST AIR
OUTSIDE AIR
RETURN AIR
SUPPLY AIR
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG (DIAMETER)
DUCT BEING DEMOLISHED
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINE
FOR ADDITIONAL
INFORMATION)
EXISTING EQUIPMENT
TO REMAIN(E)VAV-XX
VAV-XX
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RAD RADIATOR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
VAV-XX
DEVICE TAGS
T THERMOSTAT
RAD-XX
WALL RATING LEGEND
1-HR RATED BARRIER
2-HR RATED BARRIER
SMOKE BARRIER
NEW VAV BOX
NEW RADIATOR
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
18015
BUILDING 1 - REPLACE
PNEUMATIC HVAC WITH DDC
CONTROL
#503-15-202
CJC RWM/AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
M001
MECHANICAL SYMBOLS AND
ABBREVIATIONS
03/01/2019 322
HVAC GENERAL NOTES
* SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
* CONTRACTOR SHALL LOCATE THERMOSTATS AND TEMPERATURE SENSORS AT 5'-0" AFF, A
MINIMUM OF 8" FROM LIGHT SWITCH.
* ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE RATED FOR PRESSURE CLASS OF
2" W.G. UNLESS NOTED OTHERWISE.
* CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC EQUIPMENT AFTER ALL
DUST PRODUCING CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.
PROJECT GENERAL NOTES
* NOT ALL SYMBOLS ARE NECESSARILY USED.
* CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING HOT WATER FLOW (WHERE VAV
HAS A HW HEATING COIL) READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS
DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND WATER FLOW AND SHALL SUBMIT TEST
RESULTS (ORGANIZED PER ROOM) CLEARLY LABELING EACH VAV BOX TESTED. PRIOR TO
STARTING ANY NEW WORK, VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW AT TIME OF
MEASUREMENT.
* UPON NEW CONSTRUCTION COMPLETION, T&B CONTRACTOR SHALL BALANCE NEW VAV BOX TO
PRE-DEMOLITION VALUES FOR AIR AND WATER FLOW UNLESS INSTRUCTED OTHERWISE BY THE
COR/ENGINEER.
* DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND
COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.
* PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED, AND AS REQUIRED BY CODE.
* CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE
RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE
CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.
* INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE,
AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES, AND INSURANCE UNDERWRITER
REQUIREMENTS.
* COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL,
CIVIL, AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
* MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL
ROOMS.
* ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY MECHANICAL
EQUIPMENT OR PIPING INSULATION IS APPLIED.
* LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH A STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS
RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
* TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED
AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU
(NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.
PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL STANDARD
RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S
QUALIFICATIONS.
* WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.
* COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.
* ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE,
DIVISION 26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE
UNDERWRITER REQUIREMENTS.
* THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.
THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
* ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF
MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR
AT NO ADDITIONAL COST TO THE OWNER.
* ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND
AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
* ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING,
CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.
* UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS WITH TOP AT 48" ABOVE
FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. NOTIFY THE ENGINEER OF ANY
ROOMS WHERE THE ABOVE LOCATION CAN NOT BE MAINTAINED OR WHERE THERE IS A
QUESTION ON LOCATION. COORDINATE FINAL LOCATIONS WITH COR.
* LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, ETC.,) FOR UNOBSTRUCTED ACCESS TO UNIT
ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO NOT LOCATE FAN POWERED VAV
BOXES ABOVE LIGHTING FIXTURES.
* INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
* ALL ISOLATION VALVES SHALL BE IN A LOCATION AND ELEVATION WHICH ALLOWS FOR
EQUIPMENT AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE
ISOLATION VALVE.
* ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE
PROVIDED WITH POSITION INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
* ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINER, AND PIPING SPECIALTIES AND
STRAINERS SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO
EQUIPMENT AND CONTROLS.
* MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED
AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL
DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
* MEASURE, CUT, AND INSTALL PIPE LENGTH ACCURATELY TO MINIMIZE MISALIGNMENT. INSTALL
ALL PIPING WITHOUT FORCING OR SPRINGING.
* PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION
TRANSMISSION TO BUILDING STRUCTURE.
* ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE
COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL MEMBERS, BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER.
WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.
* MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR
DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL MEMBERS. COORDINATE WITH
STRUCTURAL DRAWINGS.
* UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IS OVERHEAD, TIGHT TO UNDERSIDE
OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
* ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES,
MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION,
INSPECTION, AND MAINTENANCE.
* ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
* ALL DUCTS SHALL BE BONDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER
GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO BOTH THE
EQUIPMENT AND THE DUCT.
* ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL
BE APPROVED BY ENGINEER PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION.
* ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE
ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE PROTECTED, INSULATED,
OR CONTROLLED TO REMAIN BELOW 120°F.
* PROVIDE MANUAL VOLUME DAMPERS IN ALL RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCT, AND IN ALL OTHER AREAS REQUIRED TO PROVIDE PROPER SYSTEM
AIRFLOW BALANCING.
* REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
* THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL
EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN THE SPACE.
* WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK.
* FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO
ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES.
* LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT TO COMPLY WITH
NEC REQUIREMENTS.
* PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
* ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.
* PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS
SHOWN.
STATEMENT OF BID ITEMS
BID ITEM #1:
* GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION, MECHANICAL,
PLUMBING, AND ELECTRICAL ALTERATIONS, NECESSARY REMOVAL OF EXISTING STRUCTURES
AND CONSTRUCTION AND CERTAIN OTHER ITEMS TO REPLACE ALL PNEUMATICALLY
CONTROLLED EQUIPMENT TO DIRECT DIGITALLY CONTROLLED (DDC) EQUIPMENT. AN
ADDITIONAL 10 VAV BOXES (1 SIZE 4, 2 SIZE 5, 3 SIZE 6, 2, SIZE 7, AND 2 SIZE 8) SHALL BE
INCLUDED IN THE BID FOR LOCATIONS TO BE DETERMINED IN THE FUTURE. THE BID SHOULD
ALSO INCLUDE PRICING TO CONNECT THE HYDRONIC PIPING TO THESE VAV BOXES, A NEW
DDC CONTROL VALVE, A THERMOSTAT, AND ALL CONTROL WIRING REQUIRED TO CONNECT
THE NEW DDC SYSTEM. THESE 10 ADDITIONAL VAVS AND ‘CONNECTIONS’ HAVE BEEN
INCLUDED IN THE DRAWING SCHEDULES. THIS ALSO INCLUDES REPLACING ALL EXISTING
RADIATOR COVERS WITH NEW ONES. THE RADIATOR COVERS SHALL BE POWDER COATED.
SIZES OF THE RADIATOR COVERS WILL NEED TO BE FIELD VERIFIED BY THE CONTRACTOR AND
THE PAINT COLORS SHALL BE COORDIANTED WITH THE COR PRIOR TO ORDERING THE
REPLACEMENT COVERS. THE EXISTING COVERS SHALL REMAIN OVER THE RADIATORS UNTIL
THE NEW COVERS ARRIVE. AT NO POINT SHALL A RADIATIOR BE LEFT UNCOVERED.
BID ITEM #2: DEDUCT ALTERNATE NO.1:
* REPLACE ALL VAV BOXES AS IDENTIFIED ON THE “BASE BID” SCHEDULE BUT INSTEAD OF
REPLACING RADIATOR COVERS, THEY ARE TO BE REMOVED TO INSTALL THE NEW DDC
CONTROL VALVE AND THEN REINSTALLED WITHOUT ANY PAINTING OR MODIFICATIONS.
BID ITEM #3: DEDUCT ALTERNATE NO. 2:
* DELETE THE ADDITIONAL 10 VAV BOXES (1 SIZE 4, 2 SIZE 5, 3 SIZE 6, 2, SIZE 7, AND 2 SIZE 8) AS
REQUIRED IN THE BASE BID. ALSO, DELETE THE COST FOR CONNECTING THE HYDRONIC
PIPING TO THESE VAV BOXES, THE NEW DDC CONTROL VALVES, AND THERMOSTATS, AND ALL
CONTROL WIRING REQUIRED TO CONNECT THESE NEW VAV BOXES TO THE NEW DDC SYSTEM.
THESE 10 ADDITIONAL VAVS AND ‘CONNECTIONS’ HAVE BEEN INCLUDED IN THE DRAWING
SCHEDULES SO REMOVE THEM AS APPROPRIATE.
BID ITEM #4: DEDUCT ALTERNATE NO. 3:
* REPLACE AND RETROFIT THE VAV BOXES AS IDENTIFIED IN “DEDUCT ALT #3” SCHEDULES ON
DRAWINGS.
PHASING
GENERAL REQUIREMENTS:
* CONTRACTOR TO DEVELOP A DETAILED PHASING PLAN, SUBMIT IT TO THE COR, AND OBTAIN
APPROVAL BEFORE COMMENCING WORK.
* CONTRACTOR TO COMPLY WITH ALL SPACE CLEANLINESS AND SAFETY/ICRA REQUIREMENTS
PRIOR TO COMMENCING WORK. CONTRACTOR SHALL ALSO RETURN THE SPACE TO ITS
ORIGINAL CONDITIONS UPON COMPLETING THE WORK.
* CONTRACTOR TO COORDINATE WITH THE COR FOR ALL SHUTDOWNS REQUIRED PRIOR TO
COMMENCING WORK. MINIMUM TWO (2) WEEKS WRITTEN ADVANCED NOTICE REQUIRED.
* THERE ARE TWO AIR COMPRESSORS THAT CONTROL ALL PNEUMATIC EQUIPMENT IN THE
HOSPITAL. THEY ARE LOCATED IN MECHANICAL ROOM 171, WHICH SERVES THE PROJECT
NORTH (1984 ADDITION) OF FLOORS 1, 2, 3, AND 4 AND THE OTHER IS IN MECHANICAL ROOM 36, WHICH SERVES THE REMAINING HOSPITAL. THE AREAS/SPACES IN THE 1984 ADDITION SHALL
BE UPGRADED FIRST. THE AIR COMPRESSORS SHALL NOT BE DEMOLISHED UNTIL ALL
PNEUMATIC EQUIPMENT IS UPGRADED TO DDC FUNCTIONING CORRECTLY AND
COMMISSIONED COR TO GIVE APPROVAL TO PRIOR TO DEMOLITION.
SCHEDULE OF WORK:
* TRANE SC PANELS ARE TO BE INSTALLED FIRST IN THE DESIGNATED IT CLOSETS ON EACH
FLOOR. ALL WIRING IS TO BE RUN THE ROOMS/SPACES WHERE THE NEW DDC EQUIPMENT IS
TO BE INSTALLED.
* VAVS/CAVS/REHEAT COILS, ASSOCIATED ACTUATORS/CONTROL VALVES, THERMOSTATS,
RADIATOR CONTROL VALVES ARE TO BE INSTALLED NEXT.
* WHENEVER POSSIBLE, CONTRACTOR TO COMPLETE ALL WORK IN ONE ROOM (INSTALL ALL
DDC EQUIPMENT, VAV(S), ACTUATORS, THERMOSTATS, RADIATOR CONTROL VALVES, WIRING)
PRIOR TO STARTING WORK IN ANOTHER ROOM. A ROOM/AREA WILL NEED TO BE PROTECTED
FROM ANY DUST/DEBRIS PRIOR COMMENCING WORK AND THE SPACE SHALL BE RETURNED
TO ITS ORIGINAL CONDITION PRIOR TO THE NEXT DAY.
* AFTER ALL VAVS/CAVS/REHEAT COILS, THERMOSTATS, RADIATOR CONTROL VALVES ARE
INSTALLED, THE PNEUMATIC GATE VALVES, PRESSURE REGULATING VALVES, AND
ACTUATORS IN THE MECHANICAL ROOMS ARE TO BE INSTALLED. FOR THE VALVES, THIS WILL
REQUIRE THE STEAM TO BE SHUT OFF TO PERFORM THIS WORK. CONTRACTOR TO
COORDINATE WITH COR ON SHUTOFFS.
* AFTER ALL UPGRADES ARE COMPLETED FOR THE PNEUMATIC EQUIPMENT IN THE 1984
ADDITION, THE WORK IN THE REMAINING HOSPITAL CAN BEGIN. THE SAME ORDER OF
OPERATIONS SHALL BE APPLIED (I.E. INSTALL SC PANELS FIRST, RUN WIRING, THEN INSTALL
VAV, T-STATS, RADIATORS).
* ONCE ALL DDC IS EQUIPMENT IS INSTALLED, DEMOLISHING OF ALL REMAINING PNEUMATIC
CAN BEGIN. THIS INCLUDES ALL TRANSDUCER PANELS, AND THE ELECTRO-PNEUMATIC
EQUIPMENT IN ROOM 325. ALL COPPER SHALL BE RETURNED TO THE JAMES E. VAN ZANDT VA
MEDICAL CENTER FOR RECYCLING. THE AIR COMPRESSORS SHALL BE REMOVED LAST. THE
AIR COMPRESSORS IN MECHANICAL ROOM 36 SHALL BE SHALL BECOME PROPERTY OF THE
CONTRACTOR. THE AIR COMPRESSOR IN MECHANICAL ROOM 171 SHALL BE RETURNED TO THE
VA, BUILDING 3, BOILER PLANT.
PHASES:
* PHASES ARE NOTED ON THE MECHANICAL PLAN DRAWINGS.
* PHASE 1-1984 ADDITION FLOOR 1
* PHASE 2-1984 ADDITION FLOOR 2
* PHASE 3-1984 ADDITION FLOOR 3
* PHASE 4-1984 ADDITION FLOOR 1 MECH ROOM 171 AND FLOOR 4 MECH ROOM 445 REPLACE
ALL PNEUMATIC VALVES AND ACTUATORS.
* PHASE 5-BASEMENT FLOOR (UNLESS OTHERWISE INDICATED IN ANOTHER PHASE)
* PHASE 6-FLOOR 1 WEST AND MIDDLE AREAS (RADIOLOGY/MIDDLE OFFICES/LOUNGE/LOCKER
ROOM)
* PHASE 7-FLOOR 1 SOUTH AREA (YELLOW CLINIC AND LOBBY)
* PHASE 8-FLOOR 1 EAST AREA (MAIN LOBBY/URGENT CARE)
* PHASE 9-FLOOR 2
* PHASE 10-FLOOR 3
* PHASE 11-FLOOR 4
* PHASE 12-FLOOR 5
* PHASE 13-FLOOR 6
* PHASE 14-FLOOR 7
* PHASE 15-MECHANICAL ROOMS
* PHASE 16-DEMOLITION OF REMAINING EQUIPMENT
RADIATORS:
* ALL RADIATOR WITH PNEUMATIC CONTROL VALVES ARE TO BE REPLACED WITH A DDC
CONTROL VALVE. ALL COVERS ARE TO BE REPLACED WITH NEW COVERS. THE NEW COVERS
SHALL BE POWDER COATED. SIZES OF THE RADIATOR COVERS WILL NEED TO BE FIELD
VERIFIED BY THE CONTRACTOR AND THE PAINT COLOR SHALL BE COORDINATED WITH THE
COR PRIOR TO ORDERING THE REPLACEMENT COVERS. THE EXISTING COVERS SHALL
REMAIN OVER THE RADIATORS UNTIL THE NEW COVERS ARRIVE. AT NO POINT SHALL A
RADIATOR BE LEFT UNCOVERED.
VAVS/CAVS/REHEAT COILS:
* IN ORDER FOR THE VAV/CAV/REHEAT COIL TO FUNCTION, THE SPACE SENSOR MUST BE
INSTALLED AND CONNECTED TO THE VAV/CAV/REHEAT COIL. THE WIRING FROM THE
VAV/CAV/REHEAT COIL TO THE SC PANEL CAN BE CONNECTED AFTER SPACE SENSOR.
AREAS REQUIRING ESCORTS:
* BASEMENT-PHARMACY CACHE RM A000A
* 1ST FLOOR-CASHIER RM 150
* 3RD FLOOR-ICU STORAGE RM 346
* 3RD FLOOR-SPS AREA. (WILL REQUIRE SPECIAL GOWNING AND COVERINGS.)
* ALL IT CLOSETS
ACCESS TIMES: (MUST BE COORDINATED WITH COR PRIOR TO COMMENCING PORTION OF
WORK)
* BASEMENT PHARMACY CACHE-OCCUPIED BETWEEN 7AM-10PM.
* 1ST FLOOR-URGENT CARE AREA AFTER 8PM
* BLOOD LAB OPERATES 24/7. HOWEVER, LESS BUSY AFTER 4PM
* 1ST FLOOR PHARMACY- OCCUPIED BETWEEN 7AM-10PM
* 3RD FLOOR-ICU STORAGE RM 346-OCCUPIED BETWEEN 7AM-10PM
* ALL CLINICAL AREAS NEED TO BE ACCESSED AFTER 4PM
* 4TH FLOOR IS TEMPORARY PATIENT LIVE IN. WILL NEED TO COORDINATE WITH NURSING
STAFF ON ACCESS
* 5TH AND 6TH FLOORS ARE PATIENT LIVE-IN FLOORS. CONTRACTOR TO COORDINATE WITH
NURSING STAFF ON BEST TIMES TO ACCESS.
* COMMON AREAS/OFFICES CAN BE ACCESSED DURING THE DAY, BUT IT IS SUGGESTED TO DO
ALL WORK AFTER 4:30PM TO AVOID CONFLICTS AND WORK STOPPAGES.
* IT CLOSETS 8AM-4PM
CODES AND STANDARDS
1 PROJECT HAS BEEN DESIGNED TO, AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
FOLLOWING BUILDING CODES AND STANDARDS:
A. LIFE SAETY CODE - NFPA 101, 2018
B. INTERNATIONAL BUILDING CODE - IBC, 2015
C. INTERNATIONAL MECHANICAL CODE - IMC, 2015
D. NATIONAL ELECTRIC CODE - NFPA 70, 2017
E. HEALTH CARE FACILITY CODE - NFPA 99, 2015
F. VA DESIGN GUIDE AND SPECIFICATIONS INCLUDING:
-ELECTRICAL DESIGN MANUAL, 2015
-HVAC DESIGN MANUAL, 2017
-FIRE PROTECTION DESIGN MANUAL, 2015
Title Sheet Revision
MECH PIT
POLICE TRAINING
ROOM
MECH RM
ELEC CL
37A
STOR A+MM
EQ STOR
31A
MECH RM
ELEV
E02
HAC
HAC STOR
LOBBY
27A
CORR
47A
STAIRS
S00
MECH RV ENG SVC
MECH ROOM
LOCKER RM EMS
17A
SHOWER
16B
M TLT EMS
16A
STORAGE VCS
ELEV
E00A
ELEV
E00B
KITCHEN
15A
SIGN SH
STOR A+MM
STOR A+MM
41A
CHEF M+R OFFICE
ELEC SHOP ENG
SVC
STORAGE
18A
PAINT SHOP
CARPENTER SHOP
ENG SVC
MACHINE SHOP
ENG SVC
STAIRS
S02
STORAGE MAS
CORR
48C
STAIRS
S01
STOR A+MM
A/C SHOP ENG SVC
CORR
47B
ELEV
E00REF
15C
TEL
42A
STOR VCS
COMP. RM
PLAN ROOM
22A
STAIRS
S04
MECH RM
OFFICE
A000H
OFFICE
A000I
OFFICE
A000K
OFFICE
A000J
DATA
A000F
ELEC
A000E
PANDEMIC
A000D
HVAC SHOP
A000B
STAIRS
AS000
MECH SHAFT
MECH
A000A
HSK ROOM
41B
STAIR
S03STOR VCS
OFFICE CRED UN
OFFICE EMS
CORR
18B
STOR
TLT
26A
PLUMBING SHOP
CORR
BC2
CORR
DINING RM VCS
RETAL STORE
OFFICE CRED UN
CRED UN
LOCKER RM
OFFICE
A000G
PHARMACY CACHE
A000C
VAV-B-15
VAV-B-3
VAV-B-5
VAV-B-6
VAV-B-7 VAV-B-8
VAV-B-9
VAV-B-12
VAV-B-13 VAV-B-14
VAV-B-10
VAV-B-11
VAV-B-16
T
T
T
T
T
T T T T T
T
T
T
4 4
3 3
TT
T
T
T
VAV-B-1
VAV-B-4
VAV-B-2
3 3 3
9 9
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
18015
BUILDING 1 - REPLACE
PNEUMATIC HVAC WITH DDC
CONTROL
#503-15-202
CJC RWM/AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
MH10B-H1
BASEMENT HVAC PLAN
03/01/2019 323
1/16" = 1'-0"MH10B-H1
1 BASEMENT HVAC PLAN
HVAC NEW WORK KEYNOTES
REPLACE PNEUMATIC STEAM/WATER CONTROL VALVE
ON PIPING WITH DDC CONTROLLED STEAM/WATER
CONTROL VALVE. REMOVE SUFFICIENT AMOUNT OF
PIPING TO ALLOW FOR NEW CONTROL VALVE.
ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO
DDC CONTROLS AS PART OF A DIFFERENT PROJECT.
NO WORK IS REQUIRED IN THE SCOPE OF THIS
PROJECT ON THE VAV BOX.
REPLACE PNEUMATIC PRESSURE REGULATING VALVE (PRV)
ON PIPING WITH DDC CONTROLLED PRV. REMOVE
SUFFICIENT AMOUNT OF PIPING TO ALLOW FOR NEW PRV. REFER
TO DETAILS ON SHEET M502, M505, AND M506.
REPLACE PNEUMATIC GATE VALVES ON PIPING WITH DDC
CONTROLLED GATE VALVES. REMOVE SUFFICIENT AMOUNT
OF PIPING TO ALLOW FOR NEW GATE VALVE. REFER
TO DETAILS ON SHEET M502, M503, M505, AND M506.
AIR COMPRESSOR IN THIS ROOM TO BE DEMOLISHED BY
THE CONTRACTOR AND BECOME PROPERTY OF THE
CONTRACTOR.
REPLACE ALL PNEUMATIC EQUIPMENT IN THIS ROOM.
REFER TO SHEET M505 FOR ADDITIONAL DETAILS OF
THE EQUIPMENT.
INSTALL NEW TRANE SC PANEL IN THIS LOCATION.
SC PANEL SHALL CONTROL ALL NEW DDC EQUIPMENT.
SC PANEL TO TIE INTO NEAREST TELECOMMUNICATION CLOSET,
AS SHOWN BY DASHED LINE.
PNEUMATIC TRANSDUCER PANEL IN THIS ROOM TO
BE DEMOLISHED. CONTRACTOR RESPONSIBLE FOR
REMOVING TRANSDUCER PANEL FROM THE STATION.
REPLACE PNEUMATICALLY CONTROLED ACTUATOR ON
SUPPLY AIR DUCT PLENUM BOX ABOVE CEILING WITH A
DDC ACTUATOR AND CONTROLLER. EXISTING DAMPER AND
SHAFT TO REMAIN AS-IS.
REPLACE PNEUMATICALLY CONTROLLED ACTUATOR
WITH A DDC ACTUATOR AND CONTROLLER. EXISTING DAMPER AND
SHAFT TO REMAIN AS-IS.
NEW TRANE SC PANEL IN ELEC ROOM (ELEC CL 37A) TO TIE INTO
IT SYSTEM IN THIS TELECOM ROOM (TEL 42A).
SHEET ABBREVIATIONS
VARIABLE AIR VOLUMEVAV
SHEET SYMBOLS
VAV TERMINAL
T THERMOSTAT
HVAC NEW WORK DRAWING NOTES
REMOVE ALL PNEUMATICALLY CONTROLLED THERMOSTATS,
INCLUDING THE HOSE/COPPER LINE, AND REPLACE WITH
WIRELESS DDC CONTROLLED THERMOSTATS.
REMOVE ALL VAV BOXES SHOWN, INCLUDING THE PNEUMATIC
CONTROLS, AND ASSOCIATED PIPING. REPLACE WITH NEW VAV
BOX WITH DDC CONTROLLED ACTUATORS AND CONTROL VALVES.
CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING
HOT WATER FLOW (WHERE VAV HAS A HW HEATING COIL)
READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS
DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND
WATER FLOW AND SHALL SUBMIT TEST RESULTS
(ORGANIZED PER ROOM) CLEARLY LABELING EACH
VAV BOX TESTED. PRIOR TO STARTING ANY NEW WORK,
VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW
AT TIME OF MEASUREMENT.
ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL POINTS ON THE
EXISTING TRANE GRAPHICS SYSTEM.
ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE
CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO
COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.
IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,
ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF
EQUIPMENT.
REFER TO SHEET M001 FOR FURTHER DETAILS ON THE
PHASING PLANS.
PHASE 5
PHASE 15
PHASE 15
PHASE 15
PHASE 16
PHASE 16
PHASE 16
NORTH
TRUE NORTH=
PROJECT
210.0°
LAUNDRY
141D
ELEC CL
158A
OXYGEN STOR
141N
PAT. CLOTHING
CORR
141G
LAUNDRY
141C
VET BEN
141Q
VET BEN
141L
STOR
MECH RM
SMOKING RM
141M
ELEV
E102
OFFICE
WOMENS LOCKER
144A
EMPLOYEE
LOUNGE
OFFICE
145A
OFFICE
145B XRAY
OFFICE
AUDIOLOGY
148C
XRAY FILE
131G
OFFICE
131H
ULTRA SOUND
131J
XRAY FILE
131F
COMP RM
131E
OFFICE
131D
STAIRS
S100
SOILED
OFFICE
TLT
134A
TLT
MORGUE
140 FREEZE
140B
FREEZE
140C
VEST
131B
CAT SCAN CNTRL
131C
XRAY
CAT SCAN
DEXA SCAN
129A
RADIOLOGY
129B
STOR
131A
XRAY
TLT
125A
AUDIOLOGY CLINIC
AUDIOLOGY
EXAM RM
EXAM ROOM
NURSE INTERV.
113B
CONSULT
113A
NURSE
EXAM RM
OFFICE
OFFICE
NURSE
SURG
ENT/CONF.
DIRTY UT.
102A
EQUIP RM
100B
101A
NURSE STA.
101B
STAIRS
S103
EXAM / TREAT
116A
TLT
TLT
115A
EXAM/ TREAT
116D
WAITING
EXAM / TREAT
116C
EXAM / TREAT
116B
TLT
117B
RESP.
CONSULT
DIET
OFFICE
OFFICE
W TLT
ELEV
E100
OFFICE
120 OPMGR
120A
ELEC RM
198C
TEL CL
199A
STAIRS
S102
BILLING OFF
M TLT
197A
W TLT
CASHIER
CLERK OFF
MULTI-PURPOSE
156A4
CLERK OFF
CHIEF CLERK
STAFF
A123
CLEAN UT
A124
SOILED
A126
EX/TRT/OFF
A127
MEDS
A125
EXAM RM
A129
EX/TRT/OFF
A131
EXAM RM
A130
EX/TRT/OFF
A116
EX/TRT/OFF
A115 EXAM
A112
STAFF TLT
A119
PAT TLT
A120
STAIRS
AS100
ELEC CL
A140A
EX/TRT/OFF
A137
EX RM
A136
EX/TRT/OFF
A135
EX/TRT/OFF
A134
EX/TRT/OFF
A133
HAC
A140
PAT TLT
A139
DECONTAMINATION
A141
VESTIBULE
194A
OFFICE
193F
EQUP
193E
CLERK
193C
CLERK
193D
STAIRS
S104
160A159
HAC
WAITING RM
159C 159B
EXAM RM
EXAM RM
EXAM RM
PHARM OFF
STOR
177A
TLT
175A
HAC
157C
DIR OF SERV.
OFFICE
168A
TEL CL
TLT
EXMA RM
169A
EXAM RM
169BEXAM RM
169C
TLT
168B
EXAM RM
EXAM RM
TLT
BP SCR
ELEC CL
OFFICE
176 CONF ROOM
183 184 185
DIR SECURITY
MECH RM
M TLT
188A
POLICE
EXAM
A111
OXYGEN STOR
A110
TRIAGE
A144
MED RM
A146
CLERK A
VIC OFFICE
A106E STAFF TLT
A106C
OPERATOR
A106B
VESTIBULE
A100
Space
Space
W TLT
EXAM RM
EXAM RM
EXAM RM
EXAM RM
VESTIBULE
A142
STAIR
S101
STOR
141E
LAUNDRY
141A
VIEWING
LOBBY
194C
CORR
194B
ECHO LAB
CARDIO LAB
147C
MED RECORDS
MED RECORDS
193C
WAITING
A117A
CLERKS
A121
DISCHARGE
A122A
DISCHARGE
A122B
ER WAITING
WAITING
A101B
CORR
A102
ELIGIBILITY
A106F
REGISTRATION
CONSULT
156B
CONSULT
156A
ELEV
E101
PHARMACY
157J
MED PREP
157A
172F
CLERK
172D
CLERK
172E
CLERK
172G
CLERK
176H
OUTPATIENT
LOBBY
180A
140C
AUTOPSY
140A
XRAY WAIT
RESP.
117A
RESP
118B
CLERK/HBA
100D
CLERK/HBA
CLERK/HBA
100A
CORR
WAITING
SUPERVISOR
SECRETARY
PR CARE
195B
PR CARE
OFFICE
198D
PRIMARY CARE
WHEEL CHAIR
STOR
A101A
WAITING
A101CENTRAL
REGISTRATION
REC
A101C
TLT/SHW
A107A
ON CALL
A107
LOCKERS
A106D
MACHINES
A106A
NOUR
A138G
CORR
A109
CORR
A143
EQUIP ALCOVE
A138A
CORR
A138
NURSES STA
A138F
CORR
A117
CONF/MTG
A118
CORR
A114
EX RM
A132
CORR
A128
CORR
A128
BED 1
A138B
BED 2
A138C
BED 4
A138E
BED 3
A138D
CLERK OFF
OFFICE
XRAY
172J
CLERK OFF
152A
T
T T
T
T
T
T
T
T T
T
T
T TT
T
T
T
T
T
T
T
T
T
TT
T T
T
T
T T
T
T
T
T
T
T
TT
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T T
VAV-1-73 VAV-1-74
VAV-1-71
VAV-1-76 VAV-1-77
VAV-1-72
VAV-1-78
VAV-1-79
VAV-1-80
VAV-1-81
VAV-1-82
VAV-1-66
VAV-1-84
VAV-1-67
VAV-1-63
VAV-1-83
VAV-1-59
VAV-1-85
VAV-1-86
VAV-1-51
VAV-1-54
VAV-1-52
VAV-1-53
VAV-1-55
VAV-1-57
VAV-1-58
VAV-1-56
VAV-6-10 VAV-6-9
VAV-6-8
VAV-6-7VAV-6-12
VAV-6-13
VAV-6-6
VAV-6-5
VAV-6-15
VAV-6-3
VAV-6-2
VAV-6-1VAV-6-21
VAV-1-12
VAV-1-13
VAV-1-15
VAV-1-14
VAV-1-16
VAV-1-18
VAV-1-17
VAV-1-19
VAV-1-4
VAV-1-5
VAV-1-6
VAV-1-7
VAV-1-8
VAV-1-9
VAV-1-28
VAV-1-29
VAV-1-49
VAV-1-50
VAV-1-52
VAV-1-51
VAV-1-53
VAV-1-54
VAV-1-30
VAV-1-31
VAV-1-32
VAV-1-45
VAV-1-39
VAV-1-40
VAV-1-38
VAV-1-41
VAV-1-42
VAV-1-43
VAV-1-44
VAV-1-50
VAV-1-49
VAV-1-87
VAV-1-88
VAV-1-95
VAV-1-96
VAV-1-97
VAV-1-94
VAV-1-93
VAV-1-89
VAV-1-90
VAV-1-92
VAV-1-91
VAV-1-99
VAV-1-98
CAV-1-1
CAV-1-2
VAV-1-101VAV-1-100
VAV-1-104
VAV-1-105
VAV-1-106
VAV-1-102
VAV-1-103
VAV-1-107
VAV-1-108
VAV-1-111
VAV-1-109
VAV-1-119 VAV-1-118
VAV-1-117VAV-1-116
VAV-1-115
VAV-1-114
VAV-1-113
VAV-1-112
VAV-6-22
VAV-6-23
VAV-6-25
VAV-6-26
VAV-6-27
VAV-6-28
VAV-1-65
VAV-1-61
VAV-1-64
VAV-1-62
VAV-1-60
T
TT
T
VAV
TSTAT
TSTAT
CONTROLS SIDE
WALL DIFFUSER
6 6
T T
VAV-1-20
VAV-1-11
VAV-1-3
VAV-1-21
T
T
T
T
TTT
T
T
T
T
T
T
195B 195A
195C
VAV-1-1
VAV-1-2
VAV-1-10
VAV-1-23
VAV-1-22
VAV-1-24
VAV-1-25
VAV-1-26
VAV-1-27
VAV-1-34
VAV-1-35
VAV-1-36
VAV-1-37
VAV-1-47
VAV-1-46
VAV-1-48
MATCH LINE
SEE VIEW 2 ON MH101-H1
MATCH LINE
SEE VIEW 2 ON MH101-H1
T T
T T
T
T
T
T
T
T
T
T
T T T
VAV-6-4
VAV-6-11
VAV-6-14
VAV-6-16
VAV-6-17
VAV-6-18
VAV-6-19
VAV-6-20
T
T
VAV-6-24
VAV-1-75
VAV-1-69
VAV-1-70
VAV-1-68
VAV-1-110
T
VAV-1-33
T
T
MATCH LINE
SEE VIEW 1 ON MH101-H1
MATCH LINE
SEE VIEW 1 ON MH101-H1
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
18015
BUILDING 1 - REPLACE
PNEUMATIC HVAC WITH DDC
CONTROL
#503-15-202
CJC RWM/AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
MH101-H1
LEVEL 1 HVAC PLAN
03/01/2019 324
1/16" = 1'-0"MH101-H1
1 LEVEL 1 - HVAC PLAN
HVAC NEW WORK KEYNOTES
ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO
DDC CONTROLS AS PART OF A DIFFERENT PROJECT.
NO WORK IS REQUIRED IN THE SCOPE OF THIS
PROJECT ON THE VAV BOX.
AIR COMPRESSOR IN THIS ROOM TO BE REMOVED AND RETURNED
TO VA, BUILDING 3, BOILER PLANT.
LOCATION OF EXISTING TRANE BUILDING CONTROL UNIT (BCU).
EXISTING BCU TO BE REPLACED WITH TRANE SC PANEL. NEW
DDC EQUIPMENT LOCATED IN URGENT CARE, LOBBY,
PHARMACY, AND BLUE TEAM SHALL BE CONTROLLED BY
THIS SC PANEL. CONTRACTOR RESPONSIBLE FOR REMOVING
THE CONTROL UNIT FROM THE STATION.
INSTALL NEW TRANE SC PANEL IN THIS LOCATION. SC PANEL
SHALL CONTROL ALL OTHER NEW DDC EQUIPMENT. SC
PANEL TO TIE INTO NEAREST TELECOMMUNICATION CLOSET,
AS INDICATED BY THE DASHED LINE.
REPLACE PNEUMATIC GATE VALVES ON PIPING WITH DDC
CONTROLLED GATE VALVES. REMOVE SUFFICIENT AMOUNT
OF PIPING TO ALLOW FOR NEW GATE VALVE. REFER TO
SHEET M504 & M507.
RETROFIT PNEUMATICALLY CONTROLLED LOUVER ACTUATOR
WITH AN ELECTRO-PNEUMATIC CONVERTER TO ALLOW
DDC CONTROLS.
LOCATION OF EXISTING TRANE BUILDING CONTROL UNIT (BCU).
EXISTING BCU TO BE REPLACED WITH TRANE SC PANEL.
CONTRACTOR RESPONSIBLE FOR REMOVING THE CONTROL
UNIT FROM THE STATION.
PNEUMATIC TRANSDUCER PANEL IN THIS ROOM TO
BE DEMOLISHED. CONTRACTOR RESPONSIBLE FOR
REMOVING THE PANEL FROM THE STATION.
REPLACE PNEUMATIC PRESSURE REGULATING VALVE (PRV)
ON PIPING WITH DDC CONTROLLED PRV. REMOVE
SUFFICIENT AMOUNT OF PIPING TO ALLOW FOR NEW PRV. REFER
TO DETAILS ON SHEET M504.
BCU PANEL IN ELEC CLOSET TO TIE INTO IT SYSTEM
IN THIS TELECOM ROOM (TEL 199A).
VAV LOCATED ABOVE AUDIOLOGY BOOTHS. SPACE ABOVE BOOTHS
IS LIMITED. BOOTHS MUST NOT BE DAMAGED. CONTRACTOR
RESPONSIBLE FOR ANY AND ALL REPAIR COST.
1/16" = 1'-0"MH101-H1
2 LEVEL 1 HVAC PLAN - PT/OT ADDITION
SHEET ABBREVIATIONS
CONSTANT AIR VOLUMECAV
SHEET SYMBOLS
VAV OR CAV TERMINAL
T THERMOSTAT
VARIABLE AIR VOLUMEVAV
HVAC NEW WORK DRAWING NOTES
REMOVE ALL PNEUMATICALLY CONTROLLED THERMOSTATS,
INCLUDING THE HOSE/COPPER LINE, AND REPLACE WITH
WIRELESS DDC CONTROLLED THERMOSTATS.
REMOVE ALL VAV BOXES SHOWN, INCLUDING THE PNEUMATIC
CONTROLS, AND ASSOCIATED PIPING. REPLACE WITH NEW VAV
BOX WITH DDC CONTROLLED ACTUATORS AND CONTROL VALVES.
CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING
HOT WATER FLOW (WHERE VAV HAS A HW HEATING COIL)
READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS
DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND
WATER FLOW AND SHALL SUBMIT TEST RESULTS
(ORGANIZED PER ROOM) CLEARLY LABELING EACH
VAV BOX TESTED. PRIOR TO STARTING ANY NEW WORK,
VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW
AT TIME OF MEASUREMENT.
ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL POINTS ON THE
EXISTING TRANE GRAPHICS SYSTEM.
THE WOMEN'S LOCKER ROOM (144A) CONTAINS ASBESTOS CONTAINING
AIR CELL PIPE INSULATION ON THE STEAM PIPING. CONTRACTOR TO TAKE
NECESSARY PRECAUTIONS WHEN WORKING IN THIS ROOM. THIS PIPING
SHOULD NOT BE DISTURBED AS PART OF THIS PROJECT. HOWEVER, IF IT IS
INADVERTENTLY DISTURBED, CONTRACTOR TO IMMEDIATELY
TAKE NECESSARY SAFETY PRECAUTIONS AND CONTACT COR. REFER
TO THE ADDENDUM IN THE SPECIFICATIONS FOR THE HAZZARDOUS
MATERIAL REPORT.
ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE
CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO
COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.
IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,
ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF
EQUIPMENT.
REFER TO SHEET M001 FOR FURTHER DETAILS ON THE
PHASING PLANS.
PHASE 1
PHASE 6
PHASE 8
PHASE 7
PHASING
BOUNDARY
PHASING
BOUNDARY
PHASING
BOUNDARY
PHASING
BOUNDARY
PHASE 15
PHASE 4
PHASE 16
PHASE 16
NORTH
TRUE NORTH=
PROJECT
210.0°
PHASE 6
PHASE 1
PHASE 6
PHASE 1
P H
A S
E
P H
A S
E
PHASE 8
PHASE 6
P H
A S
E
P H
A S
E
PHASE 7
PHASE 6
PHASE 7
PHASE 6
LAUNDRY
141D
ELEC CL
158A
OXYGEN STOR
141N
PAT. CLOTHING
CORR
141G
LAUNDRY
141C VET BEN
141Q
VET BEN
141L
STOR
MECH RM
SMOKING RM
141M
ELEV
E102 OFFICE
WOMENS LOCKER
144A
EMPLOYEE
LOUNGE
OFFICE
145A
OFFICE
145B
XRAY
OFFICE
AUDIOLOGY
148C
XRAY FILE
131G
OFFICE
131H
ULTRA SOUND
131J
XRAY FILE
131F
COMP RM
131E
OFFICE
131D
STAIRS
S100
SOILED
136OFFICE
TLT
134A
TLT
MORGUE
FREEZE
140B
FREEZE
140C
VEST
131B
CAT SCAN CNTRL
131C
XRAY
CAT SCAN
DEXA SCAN
129A
RADIOLOGY
129B
STOR
131A
XRAY
TLT
125A
AUDIOLOGY CLINIC
AUDIOLOGY
EXAM RM
EXAM ROOM
NURSE INTERV.
113B CONSULT
113A
NURSE
EXAM RM
OFFICE
OFFICE
NURSE
SURG
ENT/CONF.
DIRTY UT.
102A
EQUIP RM
100B
101A
NURSE STA.
101B
STAIRS
S103
EXAM / TREAT
116A
TLT
TLT
115A
EXAM/ TREAT
116D
WAITING
EXAM / TREAT
116C
EXAM / TREAT
116B
TLT
117B
RESP.
CONSULT
DIET
OFFICE
OFFICE
W TLT
ELEV
E100
OFFICE
OPMGR
120A
ELEC RM
198C
TEL CL
199A
STAIRS
S102
BILLING OFF
M TLT
197A
W TLT
CASHIER
CLERK OFF
MULTI-PURPOSE
156A4
CLERK OFF
CHIEF CLERK
STAFF
A123
CLEAN UT
A124
SOILED
A126
EX/TRT/OFF
A127
MEDS
A125
EXAM RM
A129
EX/TRT/OFF
A131
EXAM RM
A130
EX/TRT/OFF
A116
EX/TRT/OFF
A115 EXAM
A112
STAFF TLT
A119
PAT TLT
A120
STAIRS
AS100
ELEC CL
A140A
EX/TRT/OFF
A137
EX RM
A136
EX/TRT/OFF
A135
EX/TRT/OFF
A134
EX/TRT/OFF
A133
HAC
A140
PAT TLT
A139
DECONTAMINATION
A141
VESTIBULE
194A
OFFICE
193F
EQUP
193E
CLERK
193C
CLERK
193D
STAIRS
S104
160160A159
HAC
WAITING RM
159C 159B
EXAM RM
EXAM RM
EXAM RM
EXAM RM
PHARM OFF
STOR
177A
TLT
175A
HAC
157C
DIR OF SERV.
OFFICE
168A
TEL CL
TLT
EXMA RM
169A
EXAM RM
169B
EXAM RM
169C
TLT
168B
EXAM RM
EXAM RM
TLT
BP SCR
ELEC CL
OFFICE
176 CONF ROOM
183 184 185
DIR SECURITY
MECH RM
M TLT
188A
POLICE
EXAM
A111
OXYGEN STOR
A110
TRIAGE
A144
MED RM
A146
CLERK A
VIC OFFICE
A106E STAFF TLT
A106C
OPERATOR
A106B
VESTIBULE
A100
Space
Space
W TLT
EXAM RM
EXAM RM
EXAM RM
EXAM RM
VESTIBULE
A142
STAIR
S101
STOR
141E
LAUNDRY
141A
VIEWING
LOBBY
194C
CORR
194B
ECHO LAB
CARDIO LAB
147C
MED RECORDS
MED RECORDS
193C
WAITING
A117A
CLERKS
A121
DISCHARGE
A122A
DISCHARGE
A122B
ER WAITING
WAITING
A101BCORR
A102
ELIGIBILITY
A106F
REGISTRATION
CONSULT
156B
CONSULT
156A
ELEV
E101
PHARMACY
157J
MED PREP
157A
172F
CLERK
172D
CLERK
172E
CLERK
172G
CLERK
176H
OUTPATIENT
LOBBY
180A
140C
AUTOPSY
140A
XRAY WAIT
RESP.
117A
RESP
118B
CLERK/HBA
100D
CLERK/HBA
CLERK/HBA
100A
CORR
WAITING
SUPERVISOR
SECRETARY
PR CARE
195B
PR CARE
OFFICE
198D
PRIMARY CARE
WHEEL CHAIR
STOR
A101A
WAITING
A101CENTRAL
REGISTRATION
REC
A101C
TLT/SHW
A107A
ON CALL
A107
LOCKERS
A106D
MACHINES
A106A
NOUR
A138G
CORR
A109
CORR
A143
EQUIP ALCOVE
A138A
CORR
A138
NURSES STA
A138F
CORR
A117
CONF/MTG
A118
CORR
A114
EX RM
A132
CORR
A128
CORR
A128
BED 1
A138B
BED 2
A138C
BED 4
A138E
BED 3
A138D
CLERK OFF
OFFICE
129 XRAY
172J
162A
CLERK OFF
152A
RAD-1-2
RAD-1-1
RAD-1-3
RAD-1-4 RAD-1-5 RAD-1-6
RAD-1-7
RAD-1-8
RAD-1-9
RAD-1-10
RAD-1-11
RAD-1-12
RAD-1-13
RAD-1-14
RAD-1-15
RAD-1-16
RAD-1-17
RAD-1-18RAD-1-19
RAD-1-20
RAD-1-21
RAD-1-22
RAD-1-23
RAD-1-24
RAD-1-25
RAD-1-26
RAD-1-27
RAD-1-28
RAD-1-29
RAD-1-30
RAD-1-31
RAD-1-32
RAD-1-33
RAD-1-34
RAD-1-35
RAD-1-36
RAD-1-37
RAD-1-38RAD-1-39
RAD-1-40
RAD-1-41
RAD-1-42
RAD-1-43
RAD-1-44
RAD-1-45
RAD-1-46
RAD-1-47
RAD-1-51
RAD-1-52
RAD-1-53
RAD-1-60
RAD-1-54
RAD-1-55
RAD-1-56
RAD-1-57
RAD-1-58
RAD-1-59
RAD-1-48
RAD-1-49
RAD-1-50
MATCH LINE
SEE DRAWING 2 ON MH101-R1
MATCH LINE
SEE DRAWING 2 ON MH101-R12
MATCH LINE
SEE VIEW 1 ON MH101-H1
MATCH LINE
SEE VIEW 1 ON MH101-H1
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
18015
BUILDING 1 - REPLACE
PNEUMATIC HVAC WITH DDC
CONTROL
#503-15-202
CJC RWM
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
MH101-R1
LEVEL 1 RADIATOR PLAN
03/01/2019 325
HVAC NEW WORK KEYNOTES
LOCATION OF EXISTING TRANE BUILDING CONTROL UNIT (BCU).
EXISTING BCU TO BE REPLACED WITH TRANE SC PANEL. NEW
DDC EQUIPMENT LOCATED IN URGENT CARE, LOBBY,
PHARMACY, AND BLUE TEAM SHALL BE CONTROLLED BY
THIS SC PANEL. CONTRACTOR RESPONSIBLE FOR REMOVING
BCU FROM THE STATION.
INSTALL NEW TRANE SC PANEL IN THIS LOCATION. SC PANEL
SHALL CONTROL ALL OTHER NEW DDC EQUIPMENT. SC
PANEL TO TIE INTO NEAREST TELECOMMUNICATION CLOSET.
BCU PANEL IN ELEC CLOSET TO TIE INTO IT SYSTEM
IN THIS TELECOM ROOM (TEL 199A).
ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO
DDC CONTROLS AS PART OF A DIFFERENT PROJECT.
NO WORK IS REQUIRED IN THE SCOPE OF THIS
PROJECT ON THE VAV BOX.
1/16" = 1'-0"MH101-R1
1 LEVEL 1 - RADIATOR PLAN
HVAC NEW WORK DRAWING NOTES
ALL RADIATOR WITH PNEUMATIC CONTROL VALVES ARE
TO BE REPLACED WITH A DDC CONTROL VALVE. ALL
COVERS ARE TO BE REPLACED WITH NEW COVERS. THE
NEW COVERS SHALL BE POWDER COATED. SIZES OF THE
RADIATOR COVERS WILL NEED TO BE FIELD VERIFIED BY
THE CONTRACTOR AND THE PAINT COLOR SHALL BE
COORDINATED WITH THE COR PRIOR TO ORDERING THE
REPLACEMENT COVERS. THE EXISTING COVERS SHALL
REMAIN OVER THE RADIATORS UNTIL THE NEW COVERS
ARRIVE. AT NO POINT SHALL A RADIATOR BE LEFT UNCOVERED.
ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL
POINTS ON THE EXISTING TRANE GRAPHICS SYSTEM.
THE WOMEN'S LOCKER ROOM (144A) CONTAINS ASBESTOS CONTAINING
AIR CELL PIPE INSULATION ON THE STEAM PIPING. CONTRACTOR TO TAKE
NECESSARY PRECAUTIONS WHEN WORKING IN THIS ROOM. THIS PIPING
SHOULD NOT BE DISTURBED AS PART OF THIS PROJECT. HOWEVER, IF IT IS
INADVERTENTLY DISTURBED, CONTRACTOR TO IMMEDIATELY
TAKE NECESSARY SAFETY PRECAUTIONS AND CONTACT COR. REFER
TO THE ADDENDUM IN THE SPECIFICATIONS FOR THE HAZZARDOUS
MATERIAL REPORT.
ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE
CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO
COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.
IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,
ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF
EQUIPMENT.
REFER TO SHEET M001 FOR FURTHER DETAILS ON THE
PHASING PLANS.
SHEET ABBREVIATIONS
RADIATORRAD
SHEET SYMBOLS
RADIATOR
1/16" = 1'-0"MH101-R1
2 LEVEL 1 RADIATOR PLAN - PT/OT ADDITION
PHASE 1
PHASE 6
PHASE 8
PHASE 7
PHASING
BOUNDARY
PHASING
BOUNDARY
PHASING
BOUNDARY
PHASING
BOUNDARY
NORTH
TRUE NORTH=
PROJECT
210.0°
PHASE 6
PHASE 1
PHASE 6
PHASE 1
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
PHASE 8
PHASE 6
PHASE 15
PHASE 16
PHASE 4
PHASE 16
PHASE 7
PHASE 6
PHASE 7
PHASE 6
STAIRS
S204
REC
234A
RECEIVING
STOR
236A
BREAK
ELEC CLO
TEL
255A
TLT
253E
TLT
253F
SUPPLY STOR
253L
HAC
253M
BLOOD BANK
253J
STOR
STOR
253L
EQUIP ROOM
253O
MICROBIOLOGY
253S
LAB OFFICE
253T
MICROBIOLOGY
253U
TLT
254B
LIBRARY
LIB. WORK RM
256A
LIBR. OFFICE
256B
ED SPACE OFFICE
256C
LAB CONF RM
TLT
254A
CHEM LAB
PHLEBOTOMY
253H 253G
WASH RM
253P
STORAGE
253R
SPEC CHEM
253N
HISTOLOGY
253V
CORR
SW OFFICE
SW OFFICE
SW OFFICE
SW OFFICE
SW CONF. ROOM
SOCIAL OFFICE
SOCIAL OFFICE
SOCIAL OFFICE
SEC OFFICE
SOCIAL OFFICE
ENG HVAC STOR
TELEHEALTH CONF
TELEHEALTH
CLERK
TLT
TELEHEALTH
CUBICLES
TELEHEALTH
OFFICE
SOCIAL OFFICE
SOCIAL OFFICE
STAIRS
S201
TELEHEALTH
OFFICE
CORR
PATIENT ROOM
256 ED SPACE
256D
STAIRS
S202
CATHOLIC CHAPLIN
SEC VOL SERV
CHIEF VOL SERV
OFFICE
SACRISTY
205A
CHAPLAIN OFFICE
CHAPEL
CORR
274A
VOL LOUNGE
ELEV
E200
VOL KIT
DAYROOM
LOBBY
OFFICE
ED CLASS
240D
DIETICIAN
240C
CHEIF NUTRITION
240B
WAREHOUSE
W202
OFFICE
234A
TLT
W207
STOR
232C
REC/TRASH
W208
FREEZER
DISH ROOM
DIET COMM
CORR
274B
INGREDIENT STOR
FOOD FREEZER
FREEZER
FREEZER
229A
TLT
CLEAN SUPP
STAIRS
S201
BREAK ROOM
KITCHEN
ELEV
E202
SOILED
CORR
STOR
CORR
TLT
EXAM
SOILED
EXAM
STERILE
EXAM
CORR
274FRECEPTION
XRAY
LAB
EXAM
COR 274G
WAITING
253D
SECRETARY
252A253B
253A
EXAM
252A
EXAM
EXAM
WAITING
251A
VESTIBULE
247C
ORAL SURG
241A
CLEAN
CORR
275A
CORR
CORR
275B
ELEL CL
HAC
STOR
TEL
273A
STOR
CORR
274D
MENS
WOMENS
SW OFFICE
T
T
T
T T
T
T
T
T T T
TTTT
T
T
T
T
T
T
T
T
T
T
T
T T
T T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
VAV-2-45
VAV-2-46VAV-2-43
VAV-2-44
VAV-2-47
VAV-2-48
VAV-2-49
VAV-2-51
VAV-2-50
VAV-2-52
VAV-2-53
VAV-2-54
VAV-2-55
VAV-2-57
VAV-2-58
VAV-2-56
VAV-2-36
VAV-2-35
VAV-2-10
VAV-2-11
VAV-2-12
CAV-2-1
VAV-2-33
VAV-2-34
VAV-2-13
VAV-2-31
VAV-2-14
VAV-2-15 VAV-2-17
VAV-2-16
VAV-2-18
VAV-2-28
VAV-2-29
VAV-2-27
VAV-2-26
VAV-2-21
VAV-2-19
VAV-2-20 VAV-2-22 VAV-2-23
VAV-2-37
VAV-2-39
VAV-2-38
RH-2-1
VAV-2-40
VAV-2-41
VAV-2-42
VAV-2-76
VAV-2-75
VAV-2-71
VAV-2-74
VAV-2-73
VAV-2-72
VAV-2-70
VAV-2-69
VAV-2-68
VAV-2-67
VAV-2-66
VAV-2-65
VAV-2-64VAV-2-63
VAV-2-62
VAV-2-9
VAV-2-8
VAV-2-4
VAV-2-5
VAV-2-3
VAV-2-2
VAV-2-1
VAV-2-24
T
VAV-2-7
VAV-2-6
T
VAV-2-77
T
VAV-2-32
T
VAV-2-30
VAV-2-25
P6
ROOF BELOW
P7
OFFICE
229B
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
18015
BUILDING 1 - REPLACE
PNEUMATIC HVAC WITH DDC
CONTROL
#503-15-202
CJC RWM/AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602
MH102-H1
LEVEL 2 HVAC PLAN
03/01/2019 326
HVAC NEW WORK KEYNOTES
ALL PNEUMATIC CONTROLS ALREADY UPGRADED TO
DDC CONTROLS AS PART OF A DIFFERENT PROJECT.
NO WORK IS REQUIRED IN THE SCOPE OF THIS
PROJECT ON THE VAV BOX.
INSTALL NEW TRANE SC PANEL IN THIS LOCATION. SC
PANEL SHALL CONTROL ALL NEW DDC EQUIPMENT ON
THIS FLOOR. SC PANEL TO TIE INTO NEAREST
TELECOMMUNICATION CLOSET, AS INDICATED BY THE
DASHED LINE.
REMOVE EXISTING REHEAT COIL AND REPLACE WITH
A NEW REHEAT COIL. REPLACE PNEUMATIC STEAM/WATER
CONTROL VALVE ON PIPING WITH DDC CONTROLLED
STEAM/WATER CONTROL VALVE. REMOVE SUFFICIENT
AMOUNT OF PIPING TO ALLOW FOR NEW CONTROL VALVE.
INSTALL NEW REHEAT COIL.
NEW TRANE SC PANEL IN ELEC CLOSET (ELEC 272) TO
TIE INTO IT SYSTEM IN THIS TELECOM ROOM (TEL 273A).
1/16" = 1'-0"MH102-H1
1 LEVEL 2 - HVAC PLAN
1/16" = 1'-0"MH102-H1
2 LEVEL 2 HVAC PLAN - PT/OT
SHEET ABBREVIATIONS
VARIABLE AIR VOLUMEVAV
SHEET SYMBOLS
VAV TERMINAL
T THERMOSTAT
HVAC NEW WORK DRAWING NOTES
REMOVE ALL PNEUMATICALLY CONTROLLED THERMOSTATS,
INCLUDING THE HOSE/COPPER LINE, AND REPLACE WITH
WIRELESS DDC CONTROLLED THERMOSTATS.
REMOVE ALL VAV BOXES SHOWN, INCLUDING THE PNEUMATIC
CONTROLS, AND ASSOCIATED PIPING. REPLACE WITH NEW VAV
BOX WITH DDC CONTROLLED ACTUATORS AND CONTROL VALVES.
CONTRACTOR TO PROVIDE PRE-DEMOLITION AIR AND HEATING
HOT WATER FLOW (WHERE VAV HAS A HW HEATING COIL)
READINGS AT FOR ALL EXISTING VAV BOXES SHOWN ON THIS
DRAWING. CONTRACTOR TO MEASURE TOTAL AIR AND
WATER FLOW AND SHALL SUBMIT TEST RESULTS
(ORGANIZED PER ROOM) CLEARLY LABELING EACH
VAV BOX TESTED. PRIOR TO STARTING ANY NEW WORK,
VAV BOXES MUST BE OPERATING AT MAXIMUM AIRFLOW
AT TIME OF MEASUREMENT.
ALL NEW DDC EQUIPMENT IS TO BE ADDED AS CONTROL POINTS ON THE
EXISTING TRANE GRAPHICS SYSTEM.
ALL NEW DDC VAV/CAV BOXES, RADIATORS, AND REHEAT COILS ARE TO BE
CONTROLLED WITH WIRELESS THERMOSTATS. CONTRACTOR TO
COORDINATE THE LOCATIONS OF THE THERMOSTATS WITH THE COR.
IN ROOMS WHERE THERE IS BOTH A VAV/CAV/REHEAT COIL AND A RADIATOR,
ONLY ONE THERMOSTAT IS REQUIRED TO CONTROL BOTH PIECES OF
EQUIPMENT.
REFER TO SHEET M001 FOR FURTHER DETAILS ON THE
PHASING PLANS.
PHASE 2
PHASE 9
PHASING
BOUNDARY
PHASING
BOUNDARY
NORTH
TRUE NORTH=
PROJECT
210.0°
P H
A S
E
P H
A S
E
PHASE 2
PHASE 9
S204
REC
234A
RECEIVING
STOR
236A
BREAK
ELEC CLO
TEL
255A
TLT
253E
TLT
253F
SUPPLY STOR
253L
HAC
253M
BLOOD BANK
253J
STORSTOR
253L
EQUIP ROOM
253O
MICROBIOLOGY
253S
LAB OFFICE
253T MICROBIOLOGY
253U
TLT
254B
LIBRARY
LIB. WORK RM
256A
LIBR. OFFICE
256B
ED SPACE OFFICE
256C
LAB CONF RM
TLT
254A
CHEM LAB
PHLEBOTOMY
253H
253G
WASH RM
253P
STORAGE
253R
SPEC CHEM
253N
HISTOLOGY
253V
CORR
SW OFFICE
SW OFFICE
SW OFFICE
SW OFFICE
SW CONF. ROOM
SOCIAL OFFICE
SOCIAL OFFICE
SOCIAL OFFICE
SEC OFFICE
ELEVATOR-1
E201-1
SOCIAL OFFICE
ENG HVAC STOR
TELEHEALTH CONF
TELEHEALTH
CLERK
TLT
TELEHEALTH
CUBICLES
TELEHEALTH
OFFICE
SOCIAL OFFICE
SOCIAL OFFICE
STAIRS
S201
TELEHEALTH
OFFICE
CORR
PATIENT ROOM
ED SPACE
256D
STAIRS
S202
CATHOLIC CHAPLIN
SEC VOL SERV
CHIEF VOL SERV
OFFICE
OFFICE
STOR
PROSTHETIC
OFFICE
STAIRS
S203
SACRISTY
205A
CHAPLAIN OFFICE
CHAPEL
CORR
274A
VOL LOUNGE
ELEV
E200
VOL KIT
DAYROOM
LOBBY
OFFICE
ED CLASS
240D
DIETICIAN
240C
CHEIF NUTRITION
240B
WAREHOUSE
W202
OFFICE
234A
TLT
W207
STOR
232C
REC/TRASH
W208
FREEZER
DISH ROOM
DIET COMM
CORR
274B
INGREDIENT STOR
FOOD FREEZER
FREEZER
FREEZER
229A
TLT
CLEAN SUPP
STAIRS
S201
BREAK ROOM
KITCHEN
ELEV
E202
SOILED
CORR
STOR
CORR
TLT
EXAM
SOILED
EXAM
STERILE
EXAM
CORR
274F
RECEPTION
XRAY
LAB
EXAM
COR 274G
WAITING
253DSECRETARY
252A 253B253A
EXAM
252A
EXAM
EXAM
WAITING
251A
VESTIBULE
247C
ORAL SURG
241A
CLEAN
CORR
275A
CORR
CORR
275B
ELEL CL
HAC
STOR
TEL
273A
STOR
CORR
274D
MENS
WOMENS
SW OFFICE
RAD-2-1 RAD-2-2 RAD-2-3
RAD-2-7
RAD-2-8
RAD-2-10
RAD-2-11
RAD-2-12
RAD-2-13
RAD-2-14
RAD-2-15
RAD-2-16
RAD-2-17
RAD-2-18
RAD-2-19
RAD-2-20
RAD-2-22
RAD-2-23
RAD-2-24
RAD-2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.