About this file

36C24419B0023 0003 General Decision Number PA20190077.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Modification to change FBO announcement response date to correct due date of 8/29/2019, newest first.
File Type Posted
36C24419B0023-0006001.docx DOCX document
36C24419B0023-0006001.docx DOCX document
36C24419B0023-0006000.docx DOCX document
36C24419B0023-0006000.docx DOCX document
36C24419B0023-0005000.docx DOCX document
36C24419B0023-0005000.docx DOCX document
36C24419B0023-0004000.docx DOCX document
36C24419B0023-0004000.docx DOCX document
36C24419B0023-0003000.docx DOCX document
36C24419B0023-0003001.pdf PDF
36C24419B0023-0003000.docx DOCX document
36C24419B0023-0002002.doc DOC document
36C24419B0023-0002001.pdf PDF
36C24419B0023-0002000.docx DOCX document
36C24419B0023-0002000.docx DOCX document
36C24419B0023-0002002.doc DOC document
36C24419B0023-0002001.pdf PDF
36C24419B0023-006.docx DOCX document
36C24419B0023-006.docx DOCX document
36C24419B0023-0001000.docx DOCX document
36C24419B0023-0001000.docx DOCX document
36C24419B0023-003.pdf PDF
36C24419B0023-001.docx DOCX document
36C24419B0023-002.pdf PDF
36C24419B0023-005.pdf PDF
36C24419B0023-004.pdf PDF
36C24419B0023-002.pdf PDF
36C24419B0023-001.docx DOCX document
36C24419B0023-005.pdf PDF
36C24419B0023-004.pdf PDF
36C24419B0023-003.pdf PDF
36C24419B0023-000.docx DOCX document
36C24419B0023-000.docx DOCX document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: PA20190077 07/05/2019

Superseded General Decision Number: PA20180101

State: Pennsylvania

Construction Type: Building

County: Blair County in Pennsylvania.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after

January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29

CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

1 01/11/2019

2 01/18/2019

3 02/01/2019

4 02/22/2019

5 05/10/2019

6 06/07/2019

7 06/28/2019

8 07/05/2019

* ASBE0023-008 07/01/2019

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System

Insulation)......................$ 33.80 27.21

BOIL0154-003 01/01/2017

BOILERMAKER......................$ 40.90 27.27

BRPA0009-011 12/01/2018

TILE FINISHER....................$ 25.59 15.12

TILE SETTER......................$ 31.30 19.42

BRPA0009-044 12/01/2018

BRICKLAYER (Including

Pointing, Caulking, Cleaning)....$ 29.46 19.58

MASON - STONE....................$ 29.46 19.58

CARP0142-015 06/01/2018

CARPENTER (Scaffold Building and Floor Laying-Hardwood

Only)............................$ 33.75 17.03

CARP0900-020 06/01/2018

CARPENTER (Includes

Acoustical Ceiling

Installation,Batt

Insulation,Drywall

Hanging,Metal Stud

Installation,Floor

Laying-Carpet and Vinyl,Form

Work and Gutter

Installation;Excludes

Scaffold Building and Floor

Laying-Hardwood Floors.).........$ 28.51 15.23

CARP2235-009 06/01/2018

MILLWRIGHT.......................$ 40.34 19.16

ELEC0005-016 12/21/2018

ELECTRICIAN (Includes Alarm

Installation, Installation of

Sound and Communication

System, Low Voltage Wiring and HVAC Temperature Control

Installation)....................$ 40.76 26.34

* ENGI0066-041 07/01/2014

POWER EQUIPMENT OPERATOR

Backhoe/Excavator/Trackhoe, Bulldozer, Crane* Loader, Mechanic....................$ 28.37 15.66

Bobcat/Skid Steer/Skid

Loader, Drill, Gradall, Grader/Blade, Paver

(Asphalt, Aggregate, and

Concrete)...................$ 32.59 18.10

Hoist, Pump.................$ 28.36 18.10

Oiler.......................$ 23.35 15.66

Roller......................$ 25.20 15.66

*Add to Crane rate:

Booms 101-150 jibs- Add $.50

Booms 151-200 jibs- Add $1.00

Booms 201-251 jibs- Add $1.50

IRON0003-013 06/01/2019

IRONWORKER (Ornamental, Reinforcing, Rigger, and

Structural)......................$ 29.58 29.92

LABO0125-005 06/01/2014

LABORER

Mason Tender -

Cement/Concrete.............$ 24.34 9.75

LABO0824-002 01/01/2019

LABORER (Mason Tender-Brick).....$ 20.56 17.05

PAIN0057-035 06/01/2017

PAINTER (Brush, Roller, and

Spray Only)......................$ 26.98 15.65

PAINTER (Drywall

Finishing/Taping Only)...........$ 27.80 18.75

PAIN0751-002 09/01/2018

GLAZIER..........................$ 23.10 19.52

PLAS0031-017 06/01/2015

PLASTERER........................$ 26.48 8.13

* PLAS0526-014 07/01/2019

CEMENT MASON/CONCRETE FINISHER...$ 28.49 17.35

PLUM0354-009 06/01/2017

PLUMBER (Industrial).............$ 37.88 22.90

PLUM0354-012 06/01/2019

PLUMBER (Excludes Work on

Industrial Sites)................$ 34.77 24.25

PLUM0520-013 05/01/2019

PIPEFITTER (Includes HVAC

Pipe Installation)...............$ 37.52 26.24

SFPA0669-004 01/01/2019

SPRINKLER FITTER (Fire

Sprinklers)......................$ 38.80 23.04

SHEE0019-017 06/01/2019

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 36.08 37.03

FOOTNOTE: Paid Holiday: Election Day

SUPA2011-035 08/20/2014

LABORER: Common or General......$ 18.15 9.76

OPERATOR: Forklift, All Types....$ 23.69 13.13

ROOFER, Excludes Waterproofing...$ 33.50 20.66

ROOFER: Waterproofing Only.......$ 29.50 21.10

SHEET METAL WORKER, Excludes

HVAC Duct Installation...........$ 32.03 22.87

TRUCK DRIVER: Dump Truck........$ 23.36 7.60

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick

Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the

EO

is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers.

indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July

1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in

2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour

Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION