36C24418B0580-006.pdf

PDF 6 MB Posted

Attached to
SPS Storage Room Climate Control, Project 542-17-102 Federal contract opportunity
Solicitation number
36C24418B0580
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24418B0580 02-Drawing-Architecture-SPS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to SPS Storage Room Climate Control, Project 542-17-102, newest first.
File Type Posted
36C24418C0218-000.docx DOCX document
36C24418B0580-0002002.pdf PDF
36C24418B0580-0002001.pdf PDF
36C24418B0580-0002000.docx DOCX document
36C24418B0580-0001000.docx DOCX document
36C24418B0580-002.pdf PDF
36C24418B0580-007.pdf PDF
36C24418B0580-001.docx DOCX document
36C24418B0580-005.pdf PDF
36C24418B0580-004.pdf PDF
36C24418B0580-003.pdf PDF
36C24418B0580-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE TRANSPORTATION

ALUM ALMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOD BASIS OF DESIGN

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH

CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT COTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CR CRASH RAIL

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETR EXISTING TO REMAIN

ETS EXPOSED TO STRUCTURE

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GYP BD GYPSUM BOARD

GYP GYPSUM

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEPF MECHANICAL, ELECTRICAL,

PLUMBING,

FIRE PROTECTION (CONDUIT)

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PAINT

PARTN PARTITION

PBD PARTICLE BOARD

PBSW PATIENT BED SERVICE WALL

PCC PRECAST CONCRETE

PI INPATIENT PSYCHIATRIC

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PMU PSYCHIATRIC MEDICAL UNIT

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT CONC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RFT RESILIENT FLOOR TILE

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

ARCHITECTURAL NOTES, SYMBOLS,

AND ABBREVIATIONS

DOOR TAG

ROOM TAG

REVISION TAG

KEYNOTE TAG

SECTION TAG

DETAIL TAG

EXTERIOR

ELEVATION TAG

WALL DEMOLITION

NEW DOOR

A101

REF

A101

SIM

Room

A101 1

DRAWING REFERENCE LEGEND

X

X

SCALE: N.T.S.

1 HR RATED WALL

2 HR RATED WALL

NEW WALL

SWRSJP

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

AE001

GENERAL NOTES

COORDINATE WORK OF ALL TRADES PRIOR TO STARTING

CONSTRUCTION.

ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD FRAMING,

FINISHED FACE OF EXISTING WALL SURFACE, OR FACE OF

CONCRETE / MASONRY UNITS UNLESS

NOTED OTHERWISE.

AT FIRE RATED WALLS WHERE OPENINGS ARE GREATER THAN 16

SQUARE INCHES OR WHERE TOTAL AREA OF OPENINGS EXCEEDS

100 SQUARE INCHES IN 100 SQUARE FEET, WRAP 5/8" TYPE 'X'

GYPSUM BOARD BEHIND OPENINGS PER U.L. DESIGN #U510.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING

THE WORK AND SYSTEMS TO COMPLY WITH ALL APPLICABLE

FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS,

HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH

ALL NECESSARY PERMITS.

DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH

BUILDING COMPONENT LOCATION. BRING DISCREPANCIES TO THE

COR'S ATTENTION IN WRITING IMMEDIATELY.

PROVIDE SHEET METAL OR FIRE RETARDANT WOOD BLOCKING IN

WALL CAVITIES FOR ITEMS THAT ARE REQUIRED TO BE SECURED TO

THE WALLS.

PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT

MATERIALS.

EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO BIDDING

OR BEGINNING OF WORK. ANY ERRORS OR OMISSIONS SHALL BE

BROUGHT TO THE COR'S ATTENTION IN WRITING IMMEDIATELY.

ALL EXISTING SPRINKLER HEADS WITHIN THE AREA OF WORK SHALL

REMAIN. THEY SHALL BE PROTECTED PRIOR TO STARTING

CONSTRUCTION. COORDINATE WITH NEW CEILING WORK. (NOTIFY

COR IMMEDIATELY IF DISCREPANCY HAS BEEN FOUND, THE COR

WILL THEN COORDINATE WITH THE DESIGN TEAM.)

A.

B.

C.

D.

E.

F.

G.

H.

I.

DRAWINGS AND DIMENSIONS

1.

2.

INDICATION OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, AND ARE NOT TO BE TAKEN

LITERALLY. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY THE

CONTRACTOR AND APPROVED BY THE COR BEFORE

CONSTRUCTION WORK BEGINS.

VERIFY INSTALLATION REQUIREMENTS FOR ALL

PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS

FOR RECESSED OR SEMI-RECESSED PRODUCTS), AND

ACCOMMODATE AND COORDINATE CHANGES TO OTHER MATERIALS OR

PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3.

4.

THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY

SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL,

MECHANICAL, ELECTRICAL, ETC.) ARE COMPLEMENTARY; ITEMS SHOWN IN ANY

ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE

REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN

INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN

EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR

INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE

INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE

ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE

CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY

OF WORK.

USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE

CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF

EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF

DISCREPANCY DISCOVERED.

5.

6.

CHECK ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS

PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND

ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE

WORK.

7.

DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR

REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL

OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

8.

ALL DIMENSIONS INDICATED ARE TO FACES OF STRUCTURAL MATERIALS OR

COLUMN GRID LINES UNLESS NOTED OTHERWISE. ROUGH OPENINGS SHALL

ALLOW FOR SHIM SPACE.

THE TERM "ALIGN" REFERS TO LOCATING DIFFERENT COMPONENTS OF

CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.

SHOULD DIMENSIONS BE MISSING OR CONFLICTING, NOTIFY COR PRIOR

TO PROCEEDING WITH RELATED WORK.

9.

ARCHITECTURAL ABBREVIATIONS

DEDUCT NO.1: All work associated with Building 4, Room B05A.

DEDUCT NO. 2: All work associated with Building 4, Room B07H.

DEDUCT NO. 3: All work associated with Building 58, Room 105F.

DEDUCT NO. 4: All work associated with Building 58, Room 105G.

DEDUCT NO. 5: All work associated with Building 38.

D3 D2

D1 D4

D5

REMOTE

D1D4

D3

D2

REMOTE

D3

D4

D1 D2

D1

D3

D4 D5

D3D4

D1

REMOTE

D2 D6

D1

D3D4

D5

D3D4

D1

D3

D4

D2

6 3

1 6

5 4

REMOTE

1 6

5 4

5 4

REMOTE

D1

REMOTE

D2

D3

D4 www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

1HR RATED

2HR RATED

20MIN RATED

REMOVE PORTION OF EXISTING SUSPENDED ACT CEILING AS REQUIRED FOR

INSTALLATION OF NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS.

REMOVE PORTION OF EXISTING MASONRY WALL AS REQUIRED FOR CONNECTION

OF NEW WATER LINES. SEE DETAIL 2/AE500.

SEE NOTE D2 - REMOTE LOCATION - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRANCE.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

REMOVE EXISTING SECONDARY PLASTER CEILING ABOVE SUSPENDED ACOUSTIC

CEILING. SEE SPECIFICATIONS FOR ASBESTOS MASTIC REMOVAL AT PLASTER

CEILING.

REMOVE EXISTING SUSPENDED ACOUSTIC CEILING.

FAN COIL UNIT - SEE MECHANICAL DRAWINGS. BOTTOM OF UNIT TO BE FLUSH

WITH EXISTING ADJACENT SUSPENDED ACOUSTIC CEILING. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATIONS AS

REQUIRED.

HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

REPAIR RATED MASONRY WALL - REFER TO DETAIL 2/AE500. SEE MECHANICAL

DRAWINGS FOR NEW WATER LINE CONNECTIONS.

SEE NEW WORK KEY NOTE #3, REMOTE LOCATION - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PATCH SUSPENDED ACT, MATCH CEILING TILE AND GRID TYPE OF EXISTING

ADJACENT ACT.

INSTALL SUSPENDED ACOUSTIC CEILING AT 8'-0" A.F.F.

1. PROVIDE HEPA-FILTERED DUST CONTROL SYSTEM DURING DEMOLITION AND

CONSTRUCTION. BLOCK OFF EXISTING AIR REGISTERS AND GRILLES DURING

DEMOLITION AND CONSTRUCTION.

2. REMOVE AND PATCH BACK EXISTING FINISHES AS REQUIRED TO PERFORM

THE WORK. PATCH BACK TO MATCH EXISTING ADJACENT FINISHES TO

REMAIN.

3. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

4. COORDINATE WITH VA COR FOR SITE ACCESS REQUIREMENTS FOR

CONSTRUCTION PERSONNEL, AND SEPARATION OF CONSTRUCTION AREAS.

5. COMPLY WITH VA REQUIREMENTS FOR ICRA PROTECTIVE BARRIERS AND

ACCESS TO WORK AREAS.

6. REFER TO MECHANICAL PLANS FOR LOCATIONS OF REMOTE PIPING

CONNECTIONS

7. SEE MECHANICAL DRAWINGS FOR TYPICAL PIPING PENETRATION DETAIL AT

RATED AND NON-RATED WALLS.

8. SEE MECHANICAL DRAWINGS FOR TYPICAL DUCTWORK PENETRATION DETAIL

AT RATED AND NON-RATED WALLS.

9. SEE SHEET AE500 FOR WINDOW TYPES AND DETAILS.

10. PROVIDE NEW WEATHERSTRIPPING AND THRESHOLD AT SPS CLOSET DOORS,

TYP.

11. WHERE SUSPENDED ACOUSTIC CEILING IS REMOVED, IN TOTAL OR PORTION

THEREOF TEMPORARILY SUPPORT CEILING MOUNTED EQUIPMENT, FIXTURES

AND DEVICES.

REMOTE

REMOTE

D1

D2

D2

D3

D4

NORTH

NORTH

D5

D6

3 2 1

D1

D2

D3 www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

NEW HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

INSTALL SUSPENDED ACOUSTIC CEILING AT 8'-0" A.F.F.

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

NORTH

REMOVE EXISTING SUSPENDED ACOUSTIC CEILING.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRANCE.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

D1

D2

D3

D4 D4

D2

D3

D5

D1

D4

D2

D3

D6

D2 D3

D6

WINDOW

TYPE

WINDOW

TYPE

WINDOW

TYPE

5 5

D2

D3

D6

2 3 www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

REMOVE PORTION OF EXISTING SUSPENDED ACT CEILING AS REQUIRED FOR

INSTALLATION OF NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRANCE.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

REMOVE EXISTING WINDOW, SEE DETAIL 4/AE500. MAINTAIN TEMPORARY

WEATHER TIGHT CONDITION UNTIL WINDOW IS REPLACED.

EXISTING FCU ABOVE TO BE REMOVED/ REPLACED. SEE MECHANICAL DRAWINGS.

REMOVE EXISTING SUSPENDED ACOUSTIC CEILING.

NEW HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PATCH SUSPENDED ACOUSTIC CEILING, MATCH CEILING TILE AND GRID TYPE OF

EXISTING ADJACENT CEILING.

PROVIDE NEW WINDOW. SEE DETAIL 4/AE500.

NEW FAN COIL UNIT ABOVE TO REPLACE EXISTING - SEE MECHANICAL DRAWINGS.

INSTALL SUSPENDED ACOUSTIC CEILING AT 8'-0" A.F.F.

D1

D2

D3

D4

D5

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

NORTH

D3D45 4

D3

D4 5

D6

REMOTE1 3

D3

D4

D1

D2

D5

REMOTE

D4

D2 REMOTE

D3

D1

D1

D2 D4

D3

REMOTE

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

REMOVE PORTION OF EXISTING SUSPENDED ACT CEILING AS REQUIRED FOR

INSTALLATION OF NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS.

REMOVE PORTION OF EXISTING MASONRY WALL AS REQUIRED FOR CONNECTION

OF NEW WATER LINES, SEE DETAIL 2/AE500.

SEE NOTE D2 - REMOTE LOCATION - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRANCE.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

REMOVE EXISTING SECONDARY PLASTER CEILING ABOVE SUSPENDED ACOUSTIC

CEILING. SEE SPECIFICATIONS FOR ASBESTOS MASTIC REMOVAL AT PLASTER

CEILING.

REMOVE EXISTING SUSPENDED ACOUSTIC CEILING.

NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS. BOTTOM OF UNIT TO BE WITH

EXISTING ADJACENT SUSPENDED ACT CEILING. REFER TO MECHANICAL

DRAWINGS FOR LOCATIONS OF PIPING PENETRATIONS AS REQUIRED.

NEW HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

REPAIR RATED MASONRY WALL - SEE MECHANICAL DRAWINGS FOR NEW WATER

LINE CONNECTIONS. SEE DETAIL 2/AE500.

SEE PLAN NOTE #3, REMOTE LOCATION - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PATCH SUSPENDED ACOUSTIC CEILING. MATCH CEILING TILE AND GRID TYPE OF

EXISTING ADJACENT CEILING.

INSTALL SUSPENDED ACOUSTIC CEILING AT 8'-0" A.F.F.

REMOTE

REMOTE

D1

D2

D2

D3

D4

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

NORTH

NORTH

D5

D1 D2

D4

D3

D1 D2

D4

D3

D4D3

D1

D2

REMOTE

D1

D2

D4D3

D1

D2

D4 D3

D5

D3

D2

D4

D1

D3 D4

D1D2

REMOTE

3 1

REMOTE

REMOTE

2 6 www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

REMOVE PORTION OF EXISTING SUSPENDED ACT CEILING AS REQUIRED FOR

INSTALLATION OF NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS.

REMOVE PORTION OF EXISTING MASONRY WALL AS REQUIRED FOR CONNECTION

OF NEW WATER LINES. SEE DETAIL 2/AE500.

SEE NOTE D2 - REMOTE LOCATION - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRANCE.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

REMOVE EXISTING SECONDARY PLASTER CEILING ABOVE SUSPENDED ACOUSTIC

CEILING. SEE SPECIFICATIONS FOR ASBESTOS MASTIC REMOVAL AT PLASTER

CEILING.

NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS. BOTTOM OF UNIT TO BE WITH

EXISTING ADJACENT SUSPENDED ACT CEILING. REFER TO MECHANICAL

DRAWINGS FOR LOCATIONS OF PIPING PENETRATIONS AS REQUIRED.

NEW HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

REPAIR RATED MASONRY WALL - SEE MECHANICAL DRAWINGS FOR NEW WATER

LINE CONNECTIONS. SEE DETAIL 2/AE500.

- SEE PLAN NOTE #3, REMOTE LOCATION - SEE MECHANICAL DRAWINGS.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PATCH SUSPENDED ACOUSTIC CEILING. MATCH CEILING TILE GRID TYPE OF

EXISTING ADJACENT CEILING.

REMOTE

D1

D2

D2

D3

D4

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

NORTH

NORTH

NORTH

NORTH

REMOTE

D5

D2

D3

D1

D1 1

WINDOW

TYPE

WINDOW

TYPE

WINDOW

TYPE

WINDOW

TYPE

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

NORTH

REMOVE EXISTING WINDOW, SEE DETAIL 4/AE500. MAINTAIN TEMPORARY

WEATHER-TIGHT CONDITION UNTIL WINDOW IS REPLACED.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PROVIDE NEW WINDOW. SEE DETAIL 4/AE500.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

D1

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

D2

D4

D1D2REMOTE

3REMOTE

D5 D4

D3 www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

REMOVE PORTION OF EXISTING SUSPENDED ACT CEILING AS REQUIRED FOR

INSTALLATION OF NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS.

REPAIR RATED MASONRY WALL - REMOTE LOCATION - SEE MECHANICAL

DRAWINGS FOR NEW WATER LINE CONNECTIONS. SEE DETAIL 2/AE500.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRANCE.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

REMOVE EXISTING SUSPENDED ACOUSTIC CEILING.

NEW FAN COIL UNIT - SEE MECHANICAL DRAWINGS. BOTTOM OF UNIT TO BE WITH

EXISTING ADJACENT SUSPENDED ACT CEILING. REFER TO MECHANICAL

DRAWINGS FOR LOCATIONS OF PIPING PENETRATIONS AS REQUIRED.

NEW HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

REPAIR RATED MASONRY WALL - REMOTE LOCATION - SEE MECHANICAL

DRAWINGS FOR NEW WATER LINE CONNECTIONS. SEE DETAIL 2/AE500.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PATCH SUSPENDED ACOUSTIC CEILING. MATCH CEILING TILE AND GRID TYPE OF

EXISTING ADJACENT CEILING.

INSTALL SUSPENDED ACOUSTIC CEILING AT 8'-0" A.F.F.

REMOTE

D1

D2

D3

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

D4

NORTH

ROOM 105G

ROOM 105F

NORTH

D5

3 2

3 2

3 2

3 2

9A

10 9

9A 9

3 2

3 2 www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

NORTH

NORTH

NORTH

ROOM 158B

ROOM 237

ROOM 125A

ROOM 115

NEW HUMIDIFIER (WALL-MOUNTED) - SEE MECHANICAL DRAWINGS. REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS OF PIPING PENETRATION AS REQUIRED.

PROVIDE PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY.

PROVIDE STICKY FLOOR MAT AT WORK AREA ENTRY.

PROVIDE PROTECTIVE PLASTIC BARRIER. PROVIDE CONSTRUCTION SIGN TO

PREVENT ENTRY.

1. REFER TO SHEET AE101 FOR GENERAL SHEET NOTES.

1HR RATED

2HR RATED

20MIN RATED

CLEAN, PRIME AND PAINT

EXISTING STEEL ANGLE

CAULK ALL AROUND

FOAM INSULATION

PAN

SECURE W/4" (102mm) CLIPS 18" (457mm) OC

NEW INTERIOR SNAP TRIM

SECURE TO EXISTING FRAME

SEAL ALL AROUND

NEW INTERIOR CASING

EXISTING CEILING DROP BELOW

WINDOW HEAD VARIES- SEE

WINDOW SCHEDULES

TREATED WOOD BLOCK AS

REQUIRED

HEAD DETAIL

FOAM INSULATION

CAULK ALL

AROUND

SILL DETAIL

SECURE TO EXISTING

FRAME

SEAL ALL AROUND

NEW INTERIOR CASING

TREATED WOOD

BLOCK AS REQUIRED

NEW INTERIOR SNAP

TRIM

SECURE W/4" (102MM)

CLIPS 18" (457MM) OC

1" (25mm)

INSULATED

GLASS

JAMB DETAIL

PAN

CAULK ALL

AROUND

1" (25mm)

INSULATED GLASS

SECURE W/4" (102mm) CLIPS 18" (457mm) OC

INTERIOR TRIM

INTERIOR CASING SEAL ALL AROUND

TREATED WOOD BLOCK

AS REQUIRED

SECURE TO EXISTING

FRAME

FOAM INSULATION

SEE DETAIL 5/AE500

FOR HEAD, JAMB

AND SILL DETAILS

C

7'-0"

3'-8"

NOTE:

WINDOW DIMENSIONS SHOWN

ARE APPROXIMATE. G.C. VERIFY

ACTUAL WINDOW DIMENSIONS.2'-10"

2'-0"

B

2'-0"

3'-0"

SEE DETAIL 5/AE500

FOR HEAD, JAMB AND

SILL DETAILS

A

FIXED

SEE DETAIL 4/AE500

FOR HEAD, JAMB

AND SILL DETAILS

FIXED FIXED

4"4" 4" 4"

WATER PIPES, SEE

MECHANICAL SHEETS.

FLOOR

CEILING

FLOOR

CEILING

PROVIDE CONTINUOUS 4" X 1/4 "

STEEL FLAT BAR LINTEL

CONTINUOUS 4" X 1/4 "

STEEL FLAT BAR LINTEL

REMOVE PORTION OF EXISTING

MASONRY AS REQUIRED TO

PERFORM WORK. SEE

MECHANICAL DRAWINGS FOR

ADDITIONAL INFO.

EXISTING MASONRY SHAFT

MINERAL WOOL FILL WITH

FIRESTOP SEALANT.

SEE DETAIL 1/A-500.

1/2 CMU BLOCK INFILL.

CMU BLOCK INFILL.

NOTE:

PATCH/ REPAIR FINISHES AT AREA OF WORK TO MATCH

EXISTING ADJACENT FINISHES AT SHAFT. TO REMAIN.

DEMOLITION PARTIAL ELEVATION NEW WORK PARTIAL ELEVATION

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

ARCHITECTURAL DETAILS

SJP SWR

AE500

1 UL DETAIL-THROUGH PENETRATION FIRE STOP SYSTEM

SCALE: NTS

3 WINDOW TYPES

SCALE: NTS

4 WINDOW DETAILS - FIXED WINDOW

SCALE: NTS

2 ELEVATION AT PIPE SHAFT

SCALE: NTS

AE001-A-001
AE101-A101
AE102-A102
AE103-A103
AE104-A104
AE105-A105
AE106-A106
AE107-A107
AE108-A108
AE500-A500
AE001-A001.pdf
Sheets and Views
AE001-A-001
AE500-A500.pdf
Sheets and Views
AE500-A500

File details come from the government source that posted it.