100_Percent_dwg_pdf.pdf
PDF 36 MB Posted
- Solicitation number
- 36C24418B0577
About this file
100 Percent dwg pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24418B0577-0003003.pdf | ||
| 36C24418B0577-0003004.pdf | ||
| 36C24418B0577-0003000.docx | DOCX document | |
| 36C24418B0577-0003001.pdf | ||
| 36C24418B0577-0003006.pdf | ||
| 36C24418B0577-0003005.pdf | ||
| 36C24418B0577-0003002.pdf | ||
| 36C24418B0577-0001000.docx | DOCX document | |
| 36C24418B0577.docx | DOCX document | |
| 100_percent_Bid_Set_Specs_Combined.pdf | ||
| 36C24418B0577-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION LEGEND
PIPING TO BE DEMOLISHED
PIPE TURNS UP
PIPE TURNS DOWN
CONTINUATION
TIE POINT INTO EXISTING
SHUT-OFF VALVE (BALL VALVE)
SPRINKLER PIPINGFP
CAPPED PIPE
INDICATING VALVE WITH TAMPER
SWITCH
FLOW SWITCH
LIGHT HAZARD - 0.10 GPM/1500 SQ. FT.
ORDINARY HAZARD GROUP 1 - 0.15 GPM/1500 SQ. FT.
ORDINARY HAZARD GROUP 2 - 0.20 GPM/1500 SQ. FT.
QUICK RELEASE, CONCEALED
HORIZONTAL SIDEWALL SPRINKLER
FM APPROVED QUICK RESPONSE,
UPRIGHT SPRINKLER
BACK FLOW PREVENTER
SHUT-OFF VALVE (GATE VALVE)
FS
SIGHT GLASS
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:5
A
M
F-001
FIRE PROTECTION LEGEND,
ABBREVIATIONS, AND GENERAL NOTES
1 3SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
1 THESE FIRE PROTECTION DRAWINGS ARE DIAGRAMMATIC IN NATURE. HOWEVER SPRINKLER HEAD TYPES AND APPROXIMATE LOCATIONS HAVE BEEN ESTABLISHED. THE FIRE PROTECTION LAYOUT INDICATED IS FOR REFERENCE ONLY. FINAL SYSTEM LAYOUT AND PIPE ROUTING
SHALL BE DETERMINED BY THE FIRE PROTECTION CONTRACTOR AND SHALL TAKE INTO CONSIDERATION THE BUILDING STRUCTURE, ARCHITECTURAL FEATURES AND SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES. THE FIRE PROTECTION CONTRACTORS SHALL
PROVIDE WORKING DRAWINGS IN ACCORDANCE WITH NFPA 13 FOR REVIEW AND APPROVAL BY THE ENGINEER, ARCHITECT, AND COR.
2 COORDINATE FINAL SPRINKLER PLACEMENT AND PIPE ROUTING BETWEEN TRADES.
3 PLACE SPRINKLERS IN THE CENTER OF THE CEILING TILE IT IS SHOWN IN.
4 INSTALL VALVES IN A READILY ACCESSIBLE POSITION FOR OPERATION.
5 CONDUCT WORK IN ACCORDANCE WITH NFPA 13-2016, THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, FIRE PROTECTION DESIGN
MANUAL 6TH EDITION, AND OTHER APPLICABLE CODES AND STANDARDS.
6 DESIGN OFFICE SPRINKLERS TO BE ORDINARY HAZARD QUICK RESPONSE SPRINKLERS WITH LIGHT HAZARD DENSITY OF 0.10 GPM/SQ. FT.
INITIAL DESIGN AREA BEFORE REDUCTION AS FOLLOWED BY NFPA 13 SHALL BE 1,500 SQ. FT.
7 DESIGN ELECTRICAL ROOM SPRINKLERS TO BE ORDINARY HAZARD QUICK RESPONSE SPRINKLERS, 0.15 GPM/SQ. FT. OVER THE ROOM OR
1,500 SQ. FT. BEFORE REDUCTION. USE THE LESSER OF THE TWO VALUES.
8 PROVIDE A COMPLETE AND WORKING WET PIPE SPRINKLER SYSTEM THAT IS IN COMPLIANCE WITH THE CONTRACT DOCUMENTS AND NFPA 13.
9 NOTIFIY THE COR AND OBTAIN APPROVAL PRIOR TO THE OPERATION (OPENING OR CLOSING) OF ANY VALVES CONTROLLING WATER TO THE
DOMESTIC OR FIRE SYSTEMS,
10 PROVIDE PIPING OFFSETS AS REQUIRED TO AVOID DUCTWORK, STRUCTURE, OTHER TRADES OR OTHER OBSTRUCTIONS.
11 INSTALL PIPING ABOVE CEILINGS IN AREAS WITH FINISHED CEILINGS. SPRINKLERS WILL BE RECESSED IN THESE AREAS. IN AREAS WITH EXPOSED STRUCTURE, PIPING SHALL BE EXPOSED AND PAINTED TO MATCH ADJACENT SURFACES.
12 DESIGN PIPING BY HYDRAULIC CALCULATION WITH THE AVAILABLE 2" MAIN DRAIN SUPPLY PRESSURE OF 50 PSI, 48 PSI RESIDUAL PRESSURE.
13 DESIGN KITCHEN, MAINTENANCE SHOP, AND STORAGE ROOM SPRINKLERS TO BE ORDINARY HAZARD GROUP 2 QUICK RESPONSE SPRINKLERS, 0.20 GPM/SQ. FT. OVER THE ROOM OR 1,500 SQ. FT. BEFORE REDUCTION. USE THE LESSER OF THE TWO VALUES.
FIRE PROTECTION GENERAL NOTES
4 4 4
4 4 4
4 4 4 4 4 4
1½1½
1½
1 1
1/4 1/4 1½
2½
½
2½
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1
1 1
1 1
11 111/4
½
1 1
1 1
½
1 1 1
½
1½
1½
2½
½
½
½
½
½
½
½
½
½
TYPICAL FOR FLOOR
TYPICAL FOR FLOOR
TYPICAL FOR FLOOR
TYPICAL FOR FLOOR
TYPICAL FOR FLOOR
FS
FS
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
11.4
B
C
D
E
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
ETR -
FDC
ETR - BUILDING
58 SPRINKLER
RISER
ETR - 4"
STANDPIPE
UP TO 1ST
FLOOR WITH
2-1/2" HOSE
VALVE
ETR - 4"
STANDPIPE
UP TO 1ST
FLOOR WITH
2-1/2" HOSE
VALVE
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:5
A
M
FD100
BASEMENT FIRE PROTECTION
DEMOLITION PLAN
2 3SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
A CONTRACTOR SHALL FIRE STOP ALL
PENETRATIONS.
B REFER TO GI005 FOR PHASING PLANS. PROVIDE
TEMPORARY PIPING CONNECTIONS TO MAINTAIN
ACTIVE SPRINKLERS IN AREAS OUTSIDE OF THE
CURRRENT CONSTRUCTION PHASE.
SCALE: 1/8" = 1'-0"1
BASEMENT FIRE PROTECTION DEMOLITION PLAN
1 DEMOLISH FIRE PROTECTION PIPING, HANGERS,
SPRINKLER HEADS, AND SUPPORTS COMPLETE AS
INDICATED.
2 DEMOLISH FIRE HOSE CABINET AND BRANCH LINE TO
ISOLATION VALVE.
REF.
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
11.4
B
C
D
E
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
DELIVERY
B11A
TUNNEL
WEST
T58-59
MEN
B09B
STAIR
B05
MECH.
B00-B3
TILE
STORAGE
B07B
TOILET
B08B
STAIR
B10
VEST.
B09
WOMEN
B09A
TESTING
B08A
BREAK
B08
LOCKSMITH
B07
VEST.
B02
CORRIDOR
B00-A
F.A.
B00-B2
STOR.
B04B
MAINT.
SHOP
B07A
ELEC
B03A
WAIT.
B04C
MEN
B02A
RECEP.
B04D
INT.
B04G
INT.
B04J
OFFICE
B04K
INT.
B04M
OFFICE
B04L
FOOD
PREP
B13
GIP
ROOM
B15
FLEX
OFF.
B01C
FLEX
OFF.
B01B
FLEX
OFF.
B01A
BREAK
B04H
TOILET
B04A
STOR
B12B
TUNNEL
EAST
T58-139
LOCKSMITH
STORAGE
B06
FOOD
SERVICE
STORAGE
B01
CORRIDOR
B00-B
OPEN
OFFICE
B03
IT
ROOM
B14A
EMS
B14
ELEVATOR
SERVICE
RM.
B15A
FOOD
PREP
B11
STOR
B12A
MED
STOR.
B04E
INT.
B04F
WOMEN
B02B
FOOD
PREP
B13A
CONF.
B03D
CORR.
B04
(TYP) 1
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:0
A
M
FP100
BASEMENT FIRE PROTECTION PLAN
3 3SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
A CONTRACTOR SHALL FIRE STOP ALL
PENETRATIONS.
B REFER TO GI005 FOR PHASING PLANS. PROVIDE
TEMPORARY PIPING CONNECTIONS TO MAINTAIN
ACTIVE SPRINKLERS IN AREAS OUTSIDE OF THE
CURRRENT CONSTRUCTION PHASE.
SCALE: 1/8" = 1'-0"1
BASEMENT FIRE PROTECTION NEW WORK
1 PROVIDE FIRE SPRINKLERS, FIRE PROTECTION PIPING,
HANGERS, AND SUPPORTS COMPLETE. PROVIDE
SPRINKLER HEADS IN MAINENANCE, MECHANICAL, AND
ELECTRICAL SPACES WITH SAFETY CAGES.
2 ORDINARY HAZARD
3 ORDINARY HAZARD GROUP 2
A/E ARCHITECT / ENGINEER
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVE
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT AND
CENTRAL SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
02 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
PLUMBING ABBREVIATIONS
V
SAN
PLUMBING LEGEND
GATE VALVE
GLOBE VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
BALANCING VALVE (CIRCUIT SETTER)
FE
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° or 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
LIMIT OF DEMOLITION
WATER HAMMER ARRESTOR
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
STRAINER
THERMOMETER
PRESSURE GAUGE
FLOW ELEMENT
TEMPERATURE SENSOR (AQUASTAT)
T
SANITARY SEWER PIPING
VENT PIPING
DOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER PIPING
DOMESTIC HOT/COLD WATER RETURN
NON POTABLE
CONTINUATION
STORM WATER
SAN
SD
FIRE SUPPRESSIONFS
SANITARY SEWER PIPING (UNDER SLAB)
NATURAL GAS
COMPRESSED AIR
VACUUM
PIPING TO BE DEMOLISHED
OXYGEN
MV
MA
NG
O
PROJECT LIMITS OF WORK
MATCHLINE
PD104
PD103
WATER HAMMER ARRESTOR SCHEDULE
MARK FIXTURE UNIT RATING
A 1 - 10
B 11 - 32
C 33 - 60
D 61 - 113
E 114 - 154
F 155 - 330
1 CONFORM TO APPLICABLE LOCAL, STATE, NATIONAL CODES, AND VA STANDARDS.
2 INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3 OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4 PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS , OF A SUITABLE GRADE FOR THE PURPOSES INCORPORATED IN THE WORK.
5 SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THE EQUIPMENT SPECIFIED. EQUIPMENT OR MATERIAL DEVIATIONS FROM
INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR.
6 INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
7 PROVIDE FLUSH VALVE FIXTURES WITH PISTON TYPE WATER HAMMER ARRESTOR(S) SIZED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
8 PROVIDE SANITARY SEWER PIPING LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. PROVIDE SANITARY VENT PIPING ABOVE THE CEILING OR WITHIN
WALLS UNLESS NOTED OTHERWISE.
9 SUPPORT PIPING SYSTEM AS REQUIRED BY LOCAL, STATE, AND NATIONAL CODES, SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10 FIRESTOP PIPING PENETRATIONS THROUGH NEW OR EXISTING WALLS OR FLOORS TO EQUAL THE RATING OF THE NEW OR EXISTING WALL OR FLOOR.
11 TEST PLUMBING SYSTEM AS REQUIRED PER LOCAL, STATE, AND NATIONAL CODES, AND VA STANDARDS.
12 COORDINATE PLUMBING EQUIPMENT INSTALLATION WITH OTHER CONTRACTING FIELDS.
13 DISINFECT THE DOMESTIC WATER SYSTEM IN ACCORDANCE WITH LOCAL, STATE, AND NATIONAL CODES, AND VA STANDARDS.
14 PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
16 COORDINATE ANY PLUMBING SYSTEM SHUTDOWN WITH THE COR 1 WEEK IN ADVANCE.
17 PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK.
18 SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
19 INSTALL ESCUTCHEONS IN PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
20 PIPES SHALL NOT BE ROUTED ABOVE TELECOM OR ELECTRICAL ROOMS.
PLUMBING GENERAL NOTES
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:0
A
M
P-001
PLUMBING LEGEND, ABBREVIATIONS,
AND GENERAL NOTES
1 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
2) SENSORS SHALL BE BATTERY POWERED.
NOTES
1) ADA BOTTOM OUTLET, BASE SHALL HAVE STRAIGHT SIDES AT FLOOR.
P-811 ICE MAKER BOX - - 1/2 - N/A N/A NO
P-808 WASHER WALL BOX 2 1.5 1/2 1/2 N/A N/A NO
P-707 EMERGENCY SHOWER/EYEWASH 2 1.5 3/4 3/4 N/A N/A NO
P-608 WATER COOLER 2 1-1/2 1/2 - N/A N/A N/A
P-524 KITCHEN SINK 2 1-1/2 1/2 1/2 N/A N/A N/A
P-521 LAUNDRY TUB 2 1-1/2 1/2 1/2 NO N/A NO
P-418 ADA LAVATORY 2 1-1/2 1/2 1/2 NO N/A YES
P-101 WATER CLOSET FLOOR MTD (NOTE 1) 4 2 1 - N/A N/A YES
IN IN IN IN
MARK DESCRIPTION
WASTE PIPE VENT PIPE COLD WATER HOT WATER
WRIST BLADE HANDLES FOOT PEDALCONTROL ELECTRIC SENSOR
PLUMBING FIXTURE SCHEDULE
C.O
1½"S.P
½"C.W
1¼"CW1¼"CW
3/4"H.W
3/4"H.W
½"H.W
3/4"H.W
½"H.W
"H .W
1½"S.P
"C
.W
"S .P
4"S.P6"S.P
½"C.W ½"H.W
½"H.W.R.C 1¼"H.W 2"C.W
2½"W.P
1"C.W 1"H.W
3"
5"W.P
4"S.P 3/4"C.W 3/4"H.W
½"H.W.R.C
3/4"H & C.W TO
CT-22 ON 1st FLOOR
¼"H.W.R.C 3/4"H.W
2"C.W
2"
3/4"
1½"C.W & 3/4"H.W
TO P-1 & P-66
ON 1st FLOOR
1½"C.W & 3/4"H.W
TO 1ST
3"F.D
6"S.P
2"W.P
DRAIN
2"
3"
3"
2"DRN & P-TRAP
2"W.P ABV.FLR.CONN
TO LAUNDRY CHUTE
3/4"C.W 3/4"H.W
½"H.W.R.C 1"H.W 1"C.W
5"S.P
3"
2"W.P-V.P
1½"V.P 2"V.P
1"C.W 1"H.W 1"
2"C.W & 1¼"H.W
3" 3"
3"D.S 3"D.S
C.O C.O
3/4"C.W3/4"C.W
3"
3"
2"
3/4"C.W 3/4"C.W
5" 2" C.O
2"
4"
C.O 6"
4"
3"
4"
4"
3"
C.O
C.O
C.O
C.O 3"
3"
5"
3"W.P
2"
2"
2"
5"
6"
C.O
3/4"
1¼" 1½"
½"
4"
1¼"
4"
4"
3/4" 1"
1½"C.W 3/4"H.W
3"
2"W.P
½"H.W.R.C 3/4"H.W
1"C.W
TO THERMOVALVE
& BARBERS LAV'S
3"W.P
C.O
C.O
C.O
4"
1½"
3/4"C.W
4"S.P 2½"C.W
TO W.C'S
5"
5"
2"V.P
½"C.W ½"H.W
2"W.P
3/4"C.W TO COOLER
3/8"PLUGGED TEE
2"W.P 2"V.P
3"S.P
½"H.W.R.C 1"H.W 1½"C.W
1¼"C.W
3/4"H.W TO TOILET
4"S.P
½"H.W.R.C 3/4"H.W 1¼"C.W
4"S.P 2"V.P 3"W.P-2"V.P
4"
4"S.P
½"H.W.R.C 1"H.W 1½"C.W
3/4"H.W 1½"C.W
C.O 2"W.P
½"H.W.R.C 1"H.W 1"C.W
3"W.P(C.I)
3"W.P(C.I)
3"W.P(C.I)
½"H.W.R.C 1"H.W 1"C.W
½"H.W.R.C 3/4"H.W 3/4"C.W
½"H.W.R.C 3/4"H.W 3/4"C.W
3/4"H.W 3/4"C.W
3"F.D
6"SANITARY SEWER
6"
C.O
4"
3"F.D
C.O
3"D.S3"D.S
C.O 3" 3"
3"
C.O
3/4"C.W3/4"C.W
3/4"C.W 3/4"C.W
2"
C.O 3"3"
C.O
3"
5"
4"4"
4"
4"
4"W.P-2"V.P(C.I) 4"S.P
2½"C.W TO W.C'S
2"W.P-V.P(C.I) 3/4"C.W 3/4"C.W
3/4"C.W
C.O
5"
5"
2"
3"
½"T.W.R.C ½"I.W
2"W.P
3/8"I.W
3/4"C.W
3"
3"
2"
C.O
4"
3/4" 1¼"
1½" 1" 1¼"
½"
3/4"
½"H.W.R.C 1¼"H.W 2"C.W
½"H.W.R.C 3/4"H.W 1"C.W
2"
2" 2"
2"W.P
4"
3"S.P
5"
4" 6"
4"
4"S.P
TO COOLER
TO D.F
C.O
½"H.W.R.C 3/4"H.W 3/4"C.W
1 1
FS
FS
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
11.4
B
C
D
E
F
G
G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
DISHWASHER
SPRAY
SINK
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:0
A
M
PD100
BASEMENT PLUMBING DEMOLITION
PLAN
2 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
1 DEMOLISH FIXTURE AND ALL ASSOCIATED PIPING TO
POINT INDICATED, INCLUDING BUT NOT LIMITED TO,
VENT, DRAIN, DOMESTIC COLD WATER, AND DOMESTIC
HOT WATER PIPING.
2 CAREFULLY REMOVE AND STORE PLUMBING FIXTURE
TO SUPPORT WALL FINISH WORK. ROUGH-IN IS
EXISTING TO REMAIN.
SCALE: 1/8" = 1'-0"1
BASEMENT PLUMBING DEMOLITION PLAN
A CONTRACTOR SHALL FIRE STOP ALL
PENETRATIONS.
B REFER TO GI005 FOR PHASING PLANS. PROVIDE
TEMPORARY PIPING CONNECTIONS TO MAINTAIN
ACTIVE SPRINKLERS IN AREAS OUTSIDE OF THE
CURRRENT CONSTRUCTION PHASE.
9 10 11
13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
11.4
B
C
D
E
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N E
L E
C T
R
IC
C A
R T
P A
R K
IN
G
G A
S E
N G
IN
E
C A
R T
P A
R K
IN
G
ELECTRIC CART
CHARGING STATION
PREFAB. CONC.
WHEEL STOP
STRIPING
S L O
P E
:2
M
A X
NEW CONC. RAMP
NEW CONC. LANDING
STEEL HANDRAILS
EXISTING SIDEWALK TO REMAIN
NEW ASPHALT
PAVING AND BASE
EXISTING CONCRETE SIDEWALK
ALIGN
NEW CONC. SIDEWALK
NEW CONCRETE
RETAINING WALL
STEEL GUARDRAIL
NEW CONC.
RETAINING WALL
NEW STEEL GUARDRAIL
NEW STEEL HANDRAIL
NEW CONC. STAIR
D O
W N
NEW LANDING TO MATCH
EXISTING LEVEL OF
EXISTING LANDING
SIDEWALK TO ALIGN
WITH LEVEL OF
EXISTING SIDEWALK
A R
E A
O F
L
IG
H T
W E
L L
SLOPE 1:20 MAX.
AREA OF NEW CONCRETE SIDEWALK
BAR GRATING
TOP OF GRATING
CONC.
SIDEWALK -
ALIGN W/ ADJ.
CONC.
SIDEWALK
CONC. RAMP
NO PARKING
6"6"
6"6"
10"10"
10"10"
10"10"
REFER TO PP200 FOR CONTINUATION.
REFER TO PP200 FOR CONTINUATION.
ETR
ETR
ETR
E T
R
S T
O R
M B
E L O
W
ETR STORM MANHOLE 11' DEEP.
6"6" 6"6"
6"6"
6"6"
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:2
A
M
PS100
PLUMBING SITE PLAN
3 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1
COURTYARD GRADE
1 PROVIDE SITE STORM WATER PIPING. TRENCH,
BACKFILL, GRADE, AND SEED TO MATCH EXISTING
ADJACENT CONDITIONS.
2 PROVIDE CONCRETE CATCH BASIN AND STORM
GRATE.
3 PROVIDE SITE STORM WATER MANHOLE. EXCAVATE,
BACKFILL, GRADE, AND SEED TO MATCH EXISTING
ADJACENT CONDITIONS.
4 PROVIDE TRENCH DRAIN.
5 PROVIDE PERFORATED FRENCH DRAIN AND SEDIMENT
WRAP.
1 2
3 4 5 6 7 8 9 10 11 12
13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
14.1 4.9
A
B
C
D
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
E
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
11.4
B
C
D
E
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
N
DELIVERY
B11A
TUNNEL
WEST
T58-59
MEN
B09B
STAIR
B05
MECH.
B00-B3
TILE
STORAGE
B07B
TOILET
B08B
STAIR
B10
VEST.
B09
WOMEN
B09A
TESTING
B08A
BREAK
B08
LOCKSMITH
B07
VEST.
B02
CORRIDOR
B00-A
F.A.
B00-B2
STOR.
B04B
MAINT.
SHOP
B07A
ELEC
B03A
WAIT.
B04C
MEN
B02A
RECEP.
B04D
INT.
B04G
INT.
B04J
OFFICE
B04K
INT.
B04M
OFFICE
B04L
FOOD
PREP
B13
GIP
ROOM
B15
FLEX
OFF.
B01C
FLEX
OFF.
B01BFLEX
OFF.
B01A
BREAK
B04H
TOILET
B04A
STOR
B12B
TUNNEL
EAST
T58-139
LOCKSMITH
STORAGE
B06
FOOD
SERVICE
STORAGE
B01
CORRIDOR
B00-B
OPEN
OFFICE
B03
IT
ROOM
B14A
EMS
B14
ELEVATOR
SERVICE
RM.
B15A
FOOD
PREP
B11
STOR
B12A
MED
STOR.
B04E
INT.
B04F
WOMEN
B02B
FOOD
PREP
B13A
CONF.
B03D
CORR.
B04
1 1
P-808
P-707
P-811
P-524
P-418 P-418
P-418
P-101
P-101
P-521
P-418P-524
P-811
P-418
P-101
P-101
1"1"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
1/
4"
1/ 4"
3/ 4"
3/ 4"
2"2"
1P-101
P-608
DISHWASHER
SPRAY
SINK
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:1
A
M
PP100
BASEMENT DOMESTIC WATER PLAN
4 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
1 PROVIDE FIXTURE, PIPING, HANGERS, AND SUPPORTS
COMPLETE.
3 CLEAN AND REINSTALL EXISTING FIXTURE. CONNECT
FIXTURE TO EXISTING ROUGH-IN.
4 PROVIDE TRAP PRIMER. WORK IN THE BASEMENT PIPE
SPACE SHALL BE CONSIDERED AS CONFINED SPACE
ENTRY. PP100
5 PROVIDE DUMP VALVE WITH TIMER.
A SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL
AS REQUIRED.
B ALL PIPING SHALL BE CONCEALED IN THE PLENUM
SPACE OR WALLS UNLESS NOTED OTHERWISE.
C REFER TO ARCHITECTURAL PLANS FOR RATED
WALL LOCATIONS.
D ALL HANGER SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT.
E ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING UNLESS
OTHERWISE INDICATED.
SCALE: 1/8" = 1'-0"1
BASEMENT DOMESTIC WATER PLAN
2 3 4 5
12 13 14 15 16 17 18
5.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
D
E
F
G G.2
K
G.3
J
3/4"3/4"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:1
A
M
PP101
ATTIC DOMESTIC WATER PLAN
5 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTSSCALE: 1/8" = 1'-0"1
ATTIC DOMESTIC WATER PLAN
1 CONNECT TO EXISTING 3/4" DCW IN ACCESSIBLE
SECOND FLOOR PIPE CHASE AND ROUTE TO ATTIC.
2 CONNECT TO CLEAN STEAM GENERATOR. REFER TO
DRAWING MH401.
3 PROVIDE ZERO TDS FILTER. INSTALL OVER AN
INDUSTRY STANDARD WATER HEATER DRAIN PAN.
PROVIDE 3/4" COPPER DRAIN TO NEAREST FLOOR
DRAIN.
4 PROVIDE BACKFLOW PREVENTOR.
A CONTRACTOR SHALL FIRE STOP ALL
PENETRATIONS.
B REFER TO GI005 FOR PHASING PLANS. PROVIDE
TEMPORARY PIPING CONNECTIONS TO MAINTAIN
ACTIVE SPRINKLERS IN AREAS OUTSIDE OF THE
CURRRENT CONSTRUCTION PHASE.
FS
FS
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
11.4
B
C
D
E
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
P-808
P-707
P-811
P-524
P-418
P-418
P-418
P-101
P-101
P-521
P-418
P-524
P-811
P-418
P-101
P-101
5"5"
4"4"
5"5" 5"5"
5"5"
3"3" 4"4" 4"4"4"4"
2"2"
2"2"
2"2"
6"6"
6"6"
6"6"
6"6" 6"6"
4"4"
4"4"
6"6"
P-418
P-418
P-101
5"5"
P-608
REFER TO PS100 FOR CONTINUATION
REFER TO
PS100 FOR
CONTINUATION
6"6"
CO
CO
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:1
A
M
PP200
PLUMBING BASEMENT SANITARY PLAN
6 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTSSCALE: 1/8" = 1'-0"1
BASEMENT SANITARY PLAN
1 PROVIDE PIPING, HANGERS, AND SUPPORTS
COMPLETE. WORK IN THE BASEMENT PIPE SPACE
SHALL BE CONSIDERED AS CONFINED SPACE ENTRY.
2 CONNECT FIXTURE TO EXISTING ROUGH-IN.
3 PROVIDE RAIN LEADER PIPING, HANGERS, AND
SUPPORTS COMPLETE IN CRAWL SPACE.
A SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL
AS REQUIRED.
B ALL PIPING SHALL BE CONCEALED IN THE PLENUM
SPACE OR WALLS UNLESS NOTED OTHERWISE.
C REFER TO ARCHITECTURAL PLANS FOR RATED
WALL LOCATIONS.
D ALL HANGER SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT.
E ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING UNLESS
OTHERWISE INDICATED.
2 3 4 5 6 7 8 9 10 11
5.7 6.7 7.4 7.8 8.9 10.1 11.27.9 11.1
11.4
B
C
D
E
F
G G.2
A.8
B.8
C.9
AC-1
3/ 4"
3/ 4" 3/4"3/4" 3/4"3/4"
3 UP TO
BASEMENT
LEVEL
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:1
A
M
PP300
PLUMBING SUB-BASEMENT
COMPRESSED AIR PLAN
7 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1
SUBBASEMENT COMPRESSED AIR PLAN
2 PROVIDE ROUTINE MAINTENANCE.
3 PROVIDE PIPING, HANGERS, AND SUPPORTS
COMPLETE.
A SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL
AS REQUIRED.
B ALL PIPING SHALL BE CONCEALED IN THE PLENUM
SPACE OR WALLS UNLESS NOTED OTHERWISE.
C REFER TO ARCHITECTURAL PLANS FOR RATED
WALL LOCATIONS.
D ALL HANGER SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT.
E ALL PIPES SHALL BE INSTALLED PARALLEL AND
FS
FS
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
11.3
B
C
D
E
F
G G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
1/2"1/2"
1/2"1/2"
1/2"1/2" 1/2"1/2"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
DOWN TO
SUB-
BASEMENT
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:2
A
M
PP301
PLUMBING BASEMENT COMPRESSED
AIR PLAN
8 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1
BASEMENT COMPRESSED AIR PLAN
1 PROVIDE WALL MOUNTED COMPRESSED AIR HOSE
REEL. MOUNT PER MANUFACTURER'S
RECOMMENDATIONS. PROVIDE AIR FILTER.
2 PROVIDE PIPING, HANGERS, AND SUPPORTS
COMPLETE.
3 PROVIDE END OF RUN BLOW DOWN WITH 3/4 BALL
VALVE APPROXIMATELY 5'-0" AFF"
A SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL
AS REQUIRED.
B ALL PIPING SHALL BE CONCEALED IN THE PLENUM
SPACE OR WALLS UNLESS NOTED OTHERWISE.
C REFER TO ARCHITECTURAL PLANS FOR RATED
WALL LOCATIONS.
D ALL HANGER SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT.
E ALL PIPES SHALL BE INSTALLED PARALLEL AND
FINISHED FLOOR
FINISHED WALL
VACUUM
BREAKER TUBE
GRAB BAR, SEE
ARCH.
DRAWINGS
[8 m m
[4 m m
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L
D R
A W
IN
G
S
ELECTRONIC
SENSOR
OVERRIDE
BUTTON
MINIMUM 16 GAGE GALVANIZED
STEEL PLATE 12"x48" [300x1200mm] MIN. SECURED TO
A MIN. 4 STUDS PER LAVATORY
TYP. 1/8" 1/4"
TYP. [3mm] [6mm]
1/4" [6mm] MOLLY BOLT HOLLOW WALL ANCHOR
(1 EA. SIDE OF LAV)
PLAN
NOTE:
1. AT LAVS WITH FOOT PEDAL CONTROLS
PROVIDE AN ADDITIONAL 16 GAGE GALVANIZED
STEEL PLATE 12"x16" [300sx600mm] SECURED TO
A MINIMUM OF 2 STUDS PER FOOT PEDAL
2. PROVIDE 20 GAGE STUDS WHEN
HEIGHT EXCEEDS 12'-0" [3600mm]
STEEL WALL PLATE
WALL ANCHOR
STUDS
STEEL HANGER BY LAV MFGR
AA
FOR FIXTURE
HEIGHT SEE
ARCHITECTURAL
DRAWINGS
MIN. 5 1/4"
[131mm] GALV/
MACHINE BOLTS
WELDED TO PLATE
MIN. (3) 1/4"
[6mm] MACHINE
BOLTS W/ DOUBLE
LOCK NUTS ON
BACK SIDE
SECTION A
[9 m m
T O
F L O
O R
V A
R
IE
S
1/8" NPT PORT SEAL WITH
BRASS HEX HEAD PLUG USING
TEFLON TAPE (2 PL.)
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL
TO WALL
FINISHED
FLOOR
ESCUTCHEON
LOOSE
KEY STOP
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L D
R A
W
IN
G S
8"
/4
QUICK CLOSING
VALVE
WATER HAMMER ARRESTOR
ISOLATION VALVE
OUTLET
PROVIDE MEANS OF
ACCESS FOR SERVICING
#4 HOOPS
AND #4
VERTICAL
AT 18"
#4 AT 12" O/C EACH WAY
NOTE 4
5"
MIN
PRECAST
CONCRETE
(TYP)
12" MIN
CONCRETE
COLLAR
TRACER
WIRE (ST-
G30GEN-3)
1" MIN
MORTAR
CONCRETE FILL
9'-0" SQUARE FOR 6'-0" MANHOLE
8"
BARREL SECTIONS AS
NECESSARY
6'-0" MIN4-1/8"
MIN
6"
MIN
3" OR 6" GRADE
RINGS AS REQUIRED.
12" MAX HEIGHT
MASTIC SEAL
SIDE WALK SURFACE
OVER CONCRETE
COLLAR
GROUT
DUCTILE IRON FRAME
AND COVER SUITABLE
FOR TRAFFIC
DETAIL KEYED NOTES
1) TERMINATE ALL PIPING AT LEAST 3" INTO MANHOLE.
2) CLEAN ALL JOINTS AND INSTALL SEALING GASKETS.
3) GROUT WATER STOP (TYP)
4) TEST STATION WITH 6" CONCRETE COLLAR.
5)MASTIC AND/OR GROUT FOR WATER TIGHT SEAL AND
THE PREVENTION OF DISPLACEMENTOFG RINGS AND
COVER.
NOTE 5
NOTE 2
NOTE 1
NOTE 3
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:2
A
M
PP501
PLUMBING DETAILS
9 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
SCALE: N.T.S.2
WATER CLOSET DETAIL-SENSOR OPERATED
SCALE: N.T.S.1
LAVATORY MOUNTING DETAIL
SCALE: N.T.S.4
DUAL PORT SHUT-OFF VALVE WITH LOCKING HANDLE
SCALE: N.T.S.3
TYPICAL WHEELCHAIR LAVATORY DETAIL
SCALE: N.T.S.5
WATER HAMMER ARRESTOR DETAIL
SCALE: N.T.S.6
MANHOLE DETAIL
2"2"
2"2"
1 1/2"1 1/2"
2"2"
2"2"
4"4" 4"4"
4"4"
4"4" 4"4"
3"3"
2"2"
5"5"
3"3"
5"5"
2"2"
5"5"
2"2"
4"4" 4"4"
4"4"
2"2"
1 1/2"1 1/2"
2"2"
1 1/2"1 1/2" 4"4"
4"4"
4"4"
5"5"
2"2"
2"2"
2"2" 2"2"
2"2"
4"4"
1/
2 "
1/ 2 "
2"2"
1 1/2"1 1/2"
1 1/2"1 1/2"
2"2" 4"4"
4"4"
4"4"
2"2"
2"2"
1 1/2"1 1/2"
2"2"
1 1/2"1 1/2"4"4"
4"4"
4"4"
2"2"
2"2"
2"2"
4"4"
4"4"
4"4"
4"4"
4"4" 2"2"
1 1/2"1 1/2"
1 1/2"1 1/2"
4"4"
2"2"
6"6"
6"6"
6"6"
2"2"
6"6"
6"6"
4" FD
wco co
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:2
A
M
PP901
SANITARY RISERS
10 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
SCALE:1
SANITARY ISOMETRIC 1 SCALE:2
SANITARY ISOMETRIC 2
SCALE:3
SANITARY ISOMETRIC 3
1"1" 1/ 2"
1/ 2"
3/4"3/4"
1 1/4"1 1/4"
1"1"
1/2"1/2"
3/4"3/4" 1"1"
1/2"1/2" 1"1"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
P-811
1/2"1/2"
1"1"
1"1"
1/2"1/2"
1"1"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1"1"
1/2"1/2"
1/2"1/2"
1/ 2"
1/ 2" 3/
4" 3/
4"
1/
2"
1/ 2"
1"1"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1"1"
1/2"1/2"
3/4"3/4"
1 1/2"1 1/2"
3/4"3/4"
2"2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
3/4"3/4"
2"2"
2"2"
1/2"1/2"
1/2"1/2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1/2"1/2"
1/2"1/2"
1"1" 2"2"
3/4"3/4"
2"2"
1/2"1/2"
1/2"1/2"
P-521
P-808 P-707
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
ACG Project Number
17-113
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/2
/2
:5
:2
A
M
PP902
DOMESTIC WATER RISERS
11 11SJP
JMN
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04-27-18
542-15-203
100% CONSTRUCTION DOCUMENTS
SCALE:1
DOMESTIC WATER ISOMETRIC 1
SCALE:2
DOMESTIC WATER ISOMETRIC 2
SCALE:3
DOMESTIC WATER ISOMETRIC 3
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D CONDENSATE DRAIN
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR (CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
T
CO2 CARBON DIOXIDE
THERMOSTAT
SUPPLY DIFFUSER
RETURN DIFFUSER/GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
EG-88 2000 DIFFUSER TAG | DIFFUSER CFM
LINEAR SLOT DIFFUSER
BALANCING DAMPER
(RECTANGULAR)
BALANCING DAMPER
(ROUND)
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN DIRECTION
OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE DIMENSIONS:
WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
SIDE MOUNTED GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
MECHANICAL LEGEND
HPS
LPS
LPR
CHWS
CHWR
HIGH PRESSURE STEAM PIPING
(60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OUTLET
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MOTORIZED CONTROL VALVE
STEAM TRAPCOND CONDENSATE DRAIN LINE
HPR HIGH PRESSURE STEAM
CONDENSATE RETURN
HHWS
HHWR
HEATING HOT WATER SUPPLY PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMITS OF DEMOLITION
INLINE CENTRIFUGAL PUMP
TANGENTIAL AIR SEPARATOR
EXPANSION TANK
WALL-MOUNTED INDOOR
SPLIT-SYSTEM
SPLIT-SYSTEM CONDENSING UNIT
UTILITY SET EXHAUST FAN
STEAM PRESSURE
REDUCING STATION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY DUCT
BRANCH (CONICAL TAP)
TERMINAL UNIT
CHECK VALVE
MECHANICAL GENERAL NOTES
1 CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2 INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3 OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4 PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5 PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
6 EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7 PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8 INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9 INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10 COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF OTHER TRADES.
11 PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH OTHER TRADES PRIOR TO INSTALLATION.
12 PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13 PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 26.
14 COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND PIPING IN THE FIELD. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE
DRAWINGS.
15 VERIFY DIMENSIONS IN FIELD BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16 NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17 REFER TO ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18 INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES.
19 PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT.
20 SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21 INSTALL ESCUTCHEONS IN PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22 REVIEW DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH THE COR.
23 INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE NOT
ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24 INSTALL PIPING FREE OF SAGS AND BENDS.
25 INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26 PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27 PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
a. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
b. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND
OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
c. CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN WHERE THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED.
d. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
e. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE, OR RECONFIGURE WORK LACKING
COORDINATION.
HVAC DESIGN DATA
DESIGN CONDITIONS
SUMMER WINTER LOWEST AVERAGE
ANNUAL DEWPOINTDRY BULB WET BULB % HUMIDITY TEMP DEWPOINT % HUMIDITY
OUTDOOR DESIGN CONDITIONS 86.0 °F 77.0 °F 67 15.0 °F 13.0 °F 64 3
CORRIDOR 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
ELECTRICAL AND OIT 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
STORAGE 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
MAINTENANCE 75.0 °F 65.3 °F 60 68.0 °F 50.0 °F 20 28
LOCKER ROOM 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
LOUNGE 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
KITCHEN PRODUCTION 78.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
TOILETS 75.0 °F 65.3 °F 60 70.0 °F 50.0 °F 20 28
DEDUCT ALTERNATES
1 NONE
NOTES:
1. ELECTRICAL EQUIPMENT ROOMS WITHOUT INTERNAL HEAT GAIN HAVE NO TEMPERATURE REQUIREMENTS. ELECTRICAL EQUIPMENT ROOMS WITH
HEAT GAIN ARE REQUIRED TO BE 86 SUMMER/40 WINTER, BUT HAVE BEEN DESIGNED TO ADJACENT SPACE TEMPERATURES DUE TO THEIR SMALL
SIZE.
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: ACG Project Number 17-113
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
4/
/2
2:
:4
P
M
M-001
MECHANICAL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES
1 12SJP
SWR
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04/27/2018
542-15-203
100% BID DOCUMENTS
F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.9 4.1 14.9 16.15.7 6.7 7.4 7.8 8.9 10.1 11.2 11.6 12.3 13.37.9 11.1
14.14.9
A
B
C
D
F
G
G.2
H
K
L
M
G.3
J
H.6
H.8
G.7
A.8
B.8
C.9
N
4 (TYP)
(TYP)
5 (TYP)
ETR DISHWASHER
EXHAUST FAN AND
DUCTWORK.
24x1018x814x8
16x10
20x10 x1 x8
24x12 x1
36x12 x1
30x12
9x
8x4
8x6 x4 x6
24x10 16x6 x8 x6 x1 x8 x4
14x8 14x6
16x612 x6
12x6 x6
8x
8x6
8x4
8x4 30x12
16x416x4
16x4 16x4
16x416x4
MH201
MH201 1
MH201
MH201 5
MH201
MH201 7MH20112
MH201 6
MH201
MH201
OUTLINED WORK TAKES
PLACE IN PIPE BASEMENT
MH201
MH201
MD101
MH201
12x6 12x6 15
ETR FIRE DAMPER
ETR FIRE DAMPER
ETR FIRE DAMPER
ETR FIRE DAMPER
ETR FIRE DAMPER
ETR FIRE DAMPER
8x6
10x6 8x6 10x6 10x6 10x6
8x68x68x6
10x8 10x8
8x6
8x4
8x6
8x4
12x4
16x4
12x12
50x10
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 3/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 3/4"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 3/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 3/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1 1/4"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 3/4"
D 1"
ETR RISER
HHWS / HHWR 1 1/2"
CHWS / CHWR 1 1/2"
D 1 1/2"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1 1/2"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 3/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 1"
CHWS / CHWR 1"
D 1"
ETR RISER
HHWS / HHWR 1 1/4"
CHWS / CHWR 1 1/4"
D 1"
ETR RISER
HHWS / HHWR 3/4"
CHWS / CHWR 3/4"
D 1"
MH101
MH101
9 10
A.8
3/4" LPR
2" LPR
2" LPS
3/4" LPS
ETR
ETR
ETR
ETR
NSCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
# 58
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: ACG Project Number 17-113
SHEET NOTES:
FULLY SPRINKLERED
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
4/
/2
2:
:5
P
M
MD101
BASEMENT MECHANICAL DEMOLITION
PLAN
2 12SJP
SWR
RENOVATE BUILDING 58
BASEMENT &
INFRASTRUCTURE
COATESVILLE VAMC
COATESVILLE, PA 19320
17-113
04/27/2018
542-15-203
100% BID DOCUMENTS
SCALE: 1/8" = 1'-0"1 BASEMENT MECHANICAL DEMOLITION PLAN
1 DEMOLISH FLOOR MOUNTED FCU. DEMOLISH 3/4" HOT WATER AND
3/4" CHILLED WATER PIPING AND INSULATION TO ETR RISER AND
CAP. TYPICAL FLOOR MOUNTED FCU PICTURED ON 1/MH201.
2 DEMOLISH DUCTWORK, HANGERS, INSULATION, AND SUPPORTS
COMPLETE. DEMOLISH DUCTWORK TO UNDERSIDE OF DECK
ABOVE AND PROVIDE TEMPORARY DUCT CAP.
3 DEMOLISH DUCTWORK, HANGERS, AND SUPPORTS COMPLETE TO
FLOOR LEVEL. PICTURED ON 4/MH201.
4 DEMOLISH CEILING MOUNTED FCU, HANGERS, SUPPORTS, PIPING,
AND INSULATION COMPLETE. DEMOLISH HOT WATER AND CHILLED
WATER TO ETR RISER AND CAP.
5 DEMOLISH STEAM RADIATOR PIPING AND INSULATION COMPLETE.
DEMOLISH PIPING FLUSH TO FLOOR AND CAP.
6 DEMOLISH EXHAUST FAN, LOUVER, AND SUPPORTS COMPLETE.
PICTURED ON MH201.
7 DEMOLISH OUTSIDE AIR LOUVER AND SUPPORTS COMPLETE.
PICTURED ON MH201.
8 DEMOLISH…