526-24-501 Replace Hot Water Heaters RFI answers.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C24224Q0904
About this file
This document contains the Questions and Answers for Solicitation 36C24224Q0904 to Replace Hot Water Heaters at various buildings under Project No. 526-24-501. The solicitation was issued under NAICS code 238220 for specialty trade contractors. The government has updated the Limitation on Subcontracting document and attached it to Solicitation Amendment 0001. The solicitation specifies the required heat exchanger models for each building location: Building 100 Ground Floor - Leslie model E600 L Skidded Heaters; CLC Building 106 - Leslie model E600 L Skidded Heaters; Research Building 105 - Leslie model E600 L Skidded Heaters; and Penthouse Floor Building 100 - Leslie model E300 L Skidded Heaters. This Q&A document provides clarification on the required equipment to ensure all bidders are proposing the same specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24224Q0904 0001 Replace Hot Water Heaters.docx | DOCX document | |
| S04 SITE VISIT SIGN IN SHEET HOT WATER HEATER.pdf | ||
| Updated Limitation on subcontracting blank.docx | DOCX document | |
| 36C24224Q0904_2.docx | DOCX document | |
| Limitation on subcontracting blank.docx | DOCX document | |
| BRONX Wage Determination.pdf | ||
| 36C24224Q0904_1.docx | DOCX document | |
| S02 36C24224Q0904 Hot Water heaters Bronx.docx | DOCX document | |
| Buy American Certificate.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. 526-24-501 Solicitation 36C24224Q0904 Replace Hot Water Heaters RFI Questions and Answers
1) Given this solicitation was issued under NAICS 238220, that is, a specialty trade contractor NAICS code, according to the Bureau of Labor Statistics, can the government amend the limitation on subcontracting to special trade contractors?
Answer: The Limitation on Subcontracting document has been updated and attached to the Solicitation Amendment 0001.
2) As per our walkthrough, please specify a manufactory and model numbers for the heat exchangers so all bidders are bidding on the same thing.
Answer:
· Ground Floor Building 100: Leslie model E600 L Skidded Heaters
· CLC Building 106: Leslie Model E600 L Skidded Heaters
· Research Building 105: Leslie Model E600 L Skidded Heaters
· Penthouse Floor Building 100: Leslie Model E300 L Skidded Heaters (The Penthouse shall require a different skidded heater because it doesn’t use as much volume/capacity of water)