This is a request for proposal for design-build services to replace an oxygen tank at a Veterans Affairs Medical Center in New York. The scope of work includes design, site preparation, construction, and commissioning of a new oxygen tank. Key details are that the contractor will provide turnkey services including all labor, materials, design, and supervision. The project must be completed within 120 days of the notice to proceed, which is anticipated to be issued by May 30, 2022. The solicitation is set aside for total small business and has a cost range between $500,000 to $1,000,000. Interested parties must attend the scheduled site visit on February 16, 2022 and submit proposals in accordance with the instructions and evaluation criteria provided in the request for proposal.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA-- REPLACE OXYGEN TANK | 630-22-116, newest first.
File Type Posted
36C24222R0033 0003.docx DOCX document
36C24222R0033 0002.docx DOCX document
KBA OXYGEN TANK 6000 Gals.pdf PDF
9000 Gallon Tank.pdf PDF
36C24222R0033 0001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE

DOCUMENTS (

Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24222R0033 X 02-02-2022 630-22-116 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904

PIERCE,SHARON

Sharon.Pierce@va.gov

Replace Oxygen Tank Project Number: 630-22-116 at VA New York Harbor Healthcare System.

This is a TWO-PHASE DESIGN BUILD ACQUISITION - ALL Qualified Offerors may submit for Phase I. After Phase I evaluation, selected Ph. II Offerors will be notified for Ph. II submission.

The NAICS code for this procurement is 236220 and the size standard is $39.5 million

Magnitude of Construction $500,000.00 and $1,000,000.00

This a Total Small Business Set-Aside Procurement.

The anticipated award date of the proposed contract is on or before May 30, 2022. Potential contractors must be registered in SAM (www.betasam.gov),VetBiz (www.vetbiz.gov) and Dun & Bradstreet (www.dnb.com) at time of offer submission and before award of this procurement.

The period of performance shall be 150 calendar days from Notice to Proceed.

A site visit is scheduled for February 16, 2022 11 :00am at the NYHHS, Manhattan Campus, 423 E. 23rd St., New York, NY 10010 .

Meet at Front elevators in main building - COR Amer Romhen (347) 322-8620

Interested bidders are strongly advised to attend

X X 52.211-10 X 2:00pm

EST

03-04-2022 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468-3904 Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS6
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS23
2.1 52.215-5 FACSIMILE PROPOSALS (OCT 1997)23
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)23
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)23
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)24
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)25
2.6 52.228-1 BID GUARANTEE (SEP 1996)26
2.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)27
2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)27
2.9 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)28
2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)28
2.11 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE ACQUISITION PLAN (SEP 2019)28
2.12 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)29
REPRESENTATIONS AND CERTIFICATIONS30
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION)30
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)33
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)36
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)38
GENERAL CONDITIONS41
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)41
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)41
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)42
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)43
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)43
4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)47
4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)47
4.8 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION)49
4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (NOV 2021)49
4.10 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)53
4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS54
4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)54
4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)56
4.14 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)57
4.15 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)58
4.16 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)58
4.17 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)58
4.18 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)60
4.19 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION)61
4.20 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)63
4.21 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)63
4.22 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)63
4.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)66
4.24 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)67
4.25 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)68
4.26 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)69
4.27 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)69
4.28 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)69
4.29 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)71
4.30 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)71
4.31 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)72
4.32 PARTNERING98
4.33 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES99
4.34 OWNERSHIP OF ORIGINAL DOCUMENTS99
4.35 RETENTION OF REVIEW DOCUMENTS99
4.36 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION99
4.37 COORDINATION WITH MEDICAL CENTER100
4.38 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR100
ATTACHMENTS101
ATTACHMENT 1 - RELEASE OF CLAIMS101

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

PROPOSAL EVALUATION/SELECTION CRITERIA

Two-Phase Design-Build Selection and Evaluation Procedures I. General Information for Proposal Evaluation/Selection Criteria:

A. This project will be solicited as a firm fixed price best value contract. The solicitation will be conducted as a two-phased Design Build in accordance with FAR 36.3. The A/E and Construction Contractor team will be required to submit information in two phases.

B. The Technical approach, Specialized experience, and Technical Competence factors when combined are significantly more important than the remaining three factors. Each evaluation factor, other than Technical will be weighted approximately equal.

C. For Phase I: Proposals consisting of Phase 1 Criteria will be accepted from all verified SB offerors. Phase I proposals will be evaluated to determine which offerors will submit proposals in Phase II.

D. For Phase II: Only a maximum of the three most highly rated Phase I proposals will be invited to submit a Phase II Proposal consisting of Phase II Criteria.

E. Phase I and Phase II: The Contracting Officer, with the assistance of qualified Technical Evaluators, will evaluate Technical Sections of each proposal to determine the offeror’s ability to accomplish the work as set forth in this solicitation. Technical evaluations will be based solely on the evaluation factors and criteria detailed below in PHASE I and PHASE II Criteria Sections.

II. Award A. This procurement will be a single award on a Best Value basis resulting from this solicitation to the responsible Offeror, whose technical/cost relationship represents the best value to the Government. Therefore, all offerors are advised that their best terms and conditions should be presented in their initial proposals and that offerors should not to assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. Each Contractor’s proposal shall address the evaluation factors as incorporated under the Proposal Criteria header in this solicitation. Failure to provide the information needed for each factor will result in the proposal being considered non-responsive.

B. Award of a conforming proposal may be made without discussions, except for minor clarifications, if deemed to be within the best interests of the Government. However, offerors are advised that discussions/negotiations may occur if deemed necessary.

C. The Government will award a firm fixed-price Design-Build contract to that responsible Offeror whose proposal, conforming to the solicitation, is fair and reasonable, and has been determined to be most advantageous to the Government, considering quality, price and other factors. The Government reserves the right to accept other than the lowest priced offer. The Government reserves the right to make cost/technical tradeoffs that are in the best interest and to the advantage of the Government. The right is also reserved to reject any and all offers.

III. Proposal submittal:

A. Offers shall be based on this solicitation. Offers will be in the format stipulated elsewhere in this section B. All copies must be labeled with the Offeror’s name, business address, and with the solicitation number clearly marked.

C. Carefully follow “Instructions, Conditions, and Notices to Offerors.” Offerors shall affix their names and return addresses in the upper left corner of the Offeror’s envelope. Envelopes containing offers must be sealed. Offeror’s shall include all required Representations and Certifications.

D. Failure to provide all information requested will adversely affect the evaluation of an offer. A proposal that merely reiterates or promises to accomplish the requirements of the solicitation will be considered to be less than fully acceptable. The information submitted should be complete and concise, but not overly elaborate. Reliance on promotional brochures, except where specifically required, is discouraged. If information is applicable to more than one evaluation criterion, it must be repeated for each criterion where it is applicable.

E. All commitments made in the proposal, if accepted by the Government, will become part of the resultant contract.

F. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall— Mark the title page with the following legend:

“This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets].”

Mark each sheet of data it wishes to restrict with the following legend:

“Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal” G. Offers shall submit one (1) electronic (PDF) copy. Proposals shall be no smaller than point 12 font size. Further, margins shall be no less than one (1) inch on all sides. The font size and margins prepared by the government on the SF 1442 shall remain as formatted by the government. Additional addenda and/or supplements beyond the descriptions below are not to be provided and will not be considered. NO FAXED PROPOSALS WILL BE ACCEPTED.

Electronic copies (PDF only) should be sent to: Sharon.Pierce@va.gov. The overall size of the electronic file shall not exceed 8MB; if additional space is required, divide the file into segments with each file size less than 8MB and email each file attachment separately. No more than the first 2 files at 8MB each will be considered.

IV.

PHASE I Proposal Format & Criteria Offerors are to submit one (1) electronic copy (via email) of their proposal. Offerors shall prepare Technical Proposals with the Selection Criteria and Evaluation Factors, in terms of both content and organization, to facilitate evaluation.

Offerors shall follow Solicitation instructions and proposal organization, appearance, & completeness.

A. COVER PAGE: Include: solicitation number, project title, company particulars to include DUNS number, tax id number (TIN), principle points of contact, email address, mailing address, phone numbers, etc B. TAB 1: SF 1442, acknowledgement of any amendments C. TAB 2: Technical Approach :

Describe how the project will be developed to achieve all the objectives of both the design and construction objectives of the project.

Technical Approach - Evaluation Criteria

Low Risk
Offeror exceeds objectives, for both design and construction. Contains significant strengths and no significant weaknesses.
Moderate Risk
Offeror satisfies objectives for both design and construction. There is an overall moderate degree of risk in meeting objectives.
High Risk
Offeror does not satisfy the objectives, for both design and construction. There is a very high and unacceptable risk in meeting the VA’s requirements.

D. TAB 3: Technical Qualifications :

· Briefly identify 3 to 5 projects showing specialized experience and technical competence for projects which are similar in scope and cost. Describe how the experience and competence is related to this project.

· Explain ability to obtain the necessary resources, to include specialized experience and technical competence, to perform this project (include prime and subcontractor(s)).

Technical Qualifications - Evaluation Criteria

Low Risk
Offeror exceeds requirements; identified projects are very similar in size and scope. Experience and competence are clearly defined and is closely related to this project. Offeror has clearly described how they will obtain the necessary resources, to include specialized experience and competence, for performing this project. Contains significant strengths and no significant weaknesses. There is an overall low degree of risk in meeting the VA’s requirements.
Moderate Risk
Offeror satisfies requirement; identified projects that are somewhat similar in size and scope. Experience and competence are not closely related to this project. Offeror has described how they will obtain the necessary resources, to include specialized experience and competence, for performing this project. Contains a few significant strengths and few significant weaknesses. There is an overall moderate degree of risk in meeting the VA’s requirements.
High Risk
Offeror does not satisfy requirement of the project; has not identified and described projects that are similar in size and scope. Experience and competence lacks relevance to this project. Offeror has not clearly described how they will obtain the necessary resources, to include specialized experience and competence, for performing this project. There is a very high and unacceptable risk in meeting the VA’s requirements.

E. TAB 4: Past Performance and Experience :

· Identify and describe relevant and recent past performance of the offeror’s team (including the architect-engineer and construction members). Relevant performance means projects involving design build projects of a similar type for a medical center work and similar price range, and the offeror served as the Prime Contractor. Recent is defined as performance within the last five (5) years through the solicitation release date. Identify a minimum of 3, but no more than 5 projects.

i. Each past performance shall include the following:

a) Description of project and dollar value

b) Identify all major subcontractors

c) Project completion compared to initial period of performance

ii. Each may be from the following Experience categories:

a) Team Experience: Identify any projects that the designer and prime contractor have previously contractually teamed together to accomplish a project.

b) Constructor/Key Subs and/or Designer: Include examples, within the last 3 years (5 years for design firms), of design/build projects, in which the designer and/or constructor or key trade subcontractors have been involved, if any.

c) Joint Ventures: If Offeror represents the combining of two or more companies for the purpose of this RFP, then each company must list project examples, related to its role for this project.

d) Prime Contractor Experience: Provide examples of projects, within the last 3 years, in which the prime contractor has been involved, which are similar to this project in scope and magnitude

e) Design Firm(s) Experience: Provide examples of projects, within the last 5 years, in which each design firm has been involved, which are similar in scope and magnitude to their role on this project.

Past Performance and Experience - Evaluation Criteria

Low Risk
Offeror exceeds requirements; identified and described in detail (addressing a-c of section i), design-build projects that are similar in size and scope. Offeror design-build team has previous experience working together on design-build projects. Contains significant strengths and no significant weaknesses. There is an overall low degree of risk in meeting the VA’s requirements.
Moderate Risk
Offeror has identified and described in detail (addressing a-c of section i), design-build projects, but lack similarities in size or scope. Offeror design-build team does not have previous experience working together, but each has participated in design-build projects individually. Contains a few significant strengths and few significant weaknesses. There is an overall moderate degree in meeting the VA’s requirements
High Risk
Offeror has identified and described in some detail (addressing a-c of section i), design-build projects, but are not similar in size or scope. Offeror design-build team does not have previous experience working together, and lack experience in design-build projects. There is a very high and unacceptable risk in meeting the VA’s requirements.

B.

F. TAB 5: Capability to Perform:

This factor evaluates the ability of the Construction firm to perform given their current projected workload and the availability of their key personnel, to accomplish the project in the required time. Contractor to provide demonstrated compliance to performance schedules, adherence to timelines for deliverables, the ability to meet unusual time constraints and methods of project management Capability to Perform - Evaluation Criteria

Offeror exceeds requirements; identified and described in detail (addressing a-c of section i), design-build projects that are similar in size and scope. Offeror design-build team has previous experience working together on design-build projects. Contains significant strengths and no significant weaknesses. There is an overall low degree of risk in meeting the VA’s requirements.

Offeror has identified and described in detail (addressing a-c of section i), design-build projects, but lack similarities in size or scope. Offeror design-build team does not have previous experience working together, but each has participated in design-build projects individually. Contains a few significant strengths and few significant weaknesses. There is an overall moderate degree in meeting the VA’s requirements

Offeror has identified and described in some detail (addressing a-c of section i), design-build projects, but are not similar in size or scope. Offeror design-build team does not have previous experience working together, and lack experience in design-build projects. There is a very high and unacceptable risk in meeting the VA’s requirements.

V. PHASE II Proposal Format & Criteria Offferors from Phase I, will be notified by the Contracting Officer if they are selected to submit a Phase II Proposal.

Offerors are to submit one (1) electronic copy (via email). Offerors shall prepare Technical Proposals with the Selection Criteria and Evaluation Factors in mind, in terms of both content and organization, to facilitate evaluation.

BID GUARANTEES ARE REQUIRED FOR PHASE II. See 52.228-1 BID GUARANTEE.

Offerors shall follow Solicitation instructions and proposal organization, appearance, & completeness.

A. COVER PAGE: Include solicitation number, project title, company particulars to include Dunns number, tax id number, principle points of contact, email address, mailing address, phone numbers, etc

B. TAB 1: Design Concepts (10 pages max. drawings are not included in page count.):

· Offeror shall include proposed design solution. Package shall include a general site layout, a general utility layout, expected demolition work, and a detailed description of the proposed solution.

· The Offeror shall describe the plan for phasing the work so that the facility remains operational while utilities are realigned. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the facility within any specified time limits.

· Describe any technical difficulties that may be encountered in a project of this type. Provide a risk management plant that address preventative measures or solutions to overcome these issues.

Design Concept - Evaluation Criteria

Low Risk
Offeror exceeds requirements of this project; provided design solution, based on the 30% drawing, addresses all items in scope of work/General Requirements. The proposed solution clearly addresses a feasible general site layout, general utility layout, and expected demolition. Phasing plan is practical. Risk management plan identifies potential technical difficulties and comprehensively addresses mitigation. Contains significant strengths and no significant weaknesses. There is an overall low degree of risk in meeting the VA’s requirements.
Moderate Risk
Offeror satisfies requirement of this project; provided design solution, based on the 30% drawing, addresses most items in scope of work/General Requirements. The proposed solution addresses a general site layout, general utility layout, and expected demolition, but potential issues are seen. Phasing plan is practical. Risk management plan identifies potential technical difficulties, but does not clearly or accurately addresses mitigation. Contains a few significant strengths and few significant weaknesses. There is an overall moderate degree in meeting the VA’s requirements.
High Risk
Offeror does not satisfy requirements of the project; provided design solution lacks relevance to the 30% drawing and does not address all criteria in scope of work/General Requirements. The proposed solution does not address a general site layout, general utility layout, and expected demolition. Phasing plan is not provided. Risk management plan is not provided or lacks clear definition of potential technical difficulties and/or solutions. There is a very high and unacceptable risk in meeting the VA’s requirements

C. TAB 2 Management Approach (10 pages max):

· Describe how 15% of the cost of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns (i.e. supervision, specific trade, design, etc)

· The team’s planning, team organization and responsibilities and capability to perform. technical and management approach to include project delivery philosophy, quality planning, team organization and responsibilities and capability to perform.

· Provided Quality Assurance/Quality Control Plan (approach to safety and compliance with infection control, projects plans and specifications). Demonstrate knowledge of and experience complying with OSHA, NFPA and VA requirements for safety during construction. Describe methods to be used to ensure that an OSHA certified Competent Person will maintain a presence at the work site whenever work is being done. Describe methods to be used to ensure all workers shall have received the required minimum 10-hour OSHA training.

· Project Organizational Chart and Narrative - Include team members submitted under Project Personnel Experience below. Clearly describe the prime responsible firm (or firms if a J/V) and individuals as well as the roles and responsibilities of individuals proposed as consultants and sub contractors. Provide a list all consultants and all proposed major subcontractors, including telephone number, address, and name of contact.

· Provide a progress schedule which should be scaled for time beginning with the Notice to Proceed and concluding with contract completion. Include the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. The detailed schedule, will indicate specific tasks with dates for each step of the process including:

i. Design Period: The design period sub periods (i.e., first and second reviews, other meetings, internal QUALITY ASSURANCE /QUALITY CONTROL plan reviews, etc.).

ii. Construction Period: Mobilization; Demolition method and sequencing; Excavation; Structure Completion; Exterior finishing; Procurement and installation of equipment; Interior installation and phasing; Provisions for overtime or shift work; Site utilities, Tests and final inspection.

iii. General Project Delivery Schedule and Narrative - Show relationships between construction document development/completion (including required review activities) and construction activities for (at a minimum, utility relocation, excavation, substructure, structure, exterior façade, interior finishes, building systems, and site development.

iv. The Offeror shall specify how much allowance has been made for bad weather in the schedule, the days of the week and the hours of construction operations during each phase of the work, and the percentage of contract completion that will be achieved at the end of each month of the contract.

Management Approach - Evaluation Criteria

Low Risk
Offeror exceeds requirements of this project; management approach is well defined and addresses all factors. Project schedule is comprehensive of all work involved. Contains significant strengths and no significant weaknesses. There is an overall low degree of risk in meeting the VA’s requirements.
Moderate Risk
Offeror satisfies requirement of this project; management approach addresses all factors, but not in significant detail. Project schedule is comprehensive of all work involved. Contains a few significant strengths and few significant weaknesses. There is an overall moderate degree in meeting the VA’s requirements.
High Risk
Offeror does not satisfy requirements of the project; management approach does not address all factors. Project schedule is vague and lacks detail. There is a very high and unacceptable risk in meeting the VA’s requirements

D. Tab 3 Proposed Team :

· Project Personnel Experience (Specialized experience and technical competence). The Offeror shall demonstrate the relevant experience of key project personnel. Supply this biographical data for key personnel for at least the following:

· Overall Project Manager

· Design Project Manager

· Construction Project Manager

· Architect/Engineer

· Safety Manager

· Quality Control Manager

· Superintendent

· Biographical data shall include the following:

· Name of individual.

· Company employed by.

· Company position title.

· Years with the company.

· Describe work experience with projects that were completed by the design build process, were medical facilities and/or work of similar nature

· An indication of which (if any) projects submitted under Relevant Experience the individual participated in and what the individuals responsibility was for that project

· Position that the individual will hold in regard to this contract/project team, description of duties and what percentage of the individual’s time would be committed to the project during both the design and construction phases.

Proposed Team - Evaluation Criteria

Low Risk
Offeror exceeds requirements; all key personnel have relevant experience. Contains significant strengths and no significant weaknesses. There is an overall low degree of risk in meeting the VA’s requirements.
Moderate Risk
Offeror satisfies requirements; some key personnel have relevant experience. Contains a few significant strengths and few significant weaknesses. There is an overall moderate degree of risk in meeting the VA’s requirements.
High Risk
Offeror does not satisfy requirements; key personnel factors are not addressed and/or key personnel lack relevant experience. There is a very high and unacceptable risk in meeting the VA’s requirements

E. Tab 4: Offer Guarantee/Bid Bond

F. Tab 5: Price /Price Breakdown

· Pricing shall be formatted in a section that can be easily removed from the rest of the Offeror’s Proposal so it can be independently evaluated. Pricing shall be: broken down by trade, profit, overhead, and contain a total cost for the entire project.

36C24222R0033

Page 1 of

Page 1 of

STATEMENT OF WORK

REPLACE OXYGEN TANK

Project Title: Replace Oxygen Tank Project No: 630-22-116

Introduction/Background

The VA New York Harbor Healthcare System is dedicated to providing quality health care to veterans using the abilities of all employees supported by our commitment to education and research.

We are recognized locally, regionally, and nationally as a leader in quality patient care, positive customer service, medical/allied health education, health-related research and employment opportunities. We seek to be the provider of choice of veterans and the community by offering an efficient, integrated quality health care system capable of providing a full range of primary, specialty and chronic health care services in a system that is readily accessible and responsive to change.

Our key business drivers are quality, financial integrity, patient satisfaction and employee satisfaction.

Scope of Work

Project Title : Replace Oxygen Tank Project No. 630-22-116 for the Veteran’s Affairs Medical Center, 423 East 23rd Street, New York, NY 10010 in accordance with manufacturer equipment drawings & specifications and VA specifications at http://www.cfm.va.gov/til/spec.asp including General Requirements 01 00 00 and Design Build 00 11 21, for a full turn-key project.

Provide turnkey services to include all labor, materials, equipment, and supervision necessary to Replace Oxygen Tank(Site Prep only per related work 1.2) that next to the Engineering building, BLDG No. 2 for the Veteran’s Affairs Medical Center, 423 East 23rd Street, New York, NY 10010 in accordance with manufacturer equipment drawings & specifications and VA specifications at http://www.cfm.va.gov/til/spec.asp including General Requirements 01 00 00 and Design Build 00 11 21, for a full turn-key project. Work shall meet all VA design guidelines and requirement; contractor must complete training at https://www.tms.va.gov/plateau/user/login.jsp

This item of work generally includes, but is not necessarily limited to the following:

1. Install temporary oxygen supply system as noted on the plans.

2. Remove 6000-gallon permanent oxygen tank located at the north end of Building No. 2.

3. E. Provide and install new 6000-gallon liquid oxygen tank on prepared foundation.

4. F. Certify and put in service the new main oxygen tank.

5. G. Remove the temporary oxygen supply system.

6. H. Remove portion of the existing slab in oxygen tank room in Building No. 2.

7. Coordinate and install new 6000/ 9000-gallon liquid oxygen tank on prepared foundation.

8. Coordinate / Certify and put in service the new main oxygen tank.

9. Perform all necessary structural work associated with the installation of the new foundation pad for the permanent replacement tank.

1.1 RELATED WORK

1. Provide Feasibility Study for Oxygen Tank (options 6000-gal tank, cost proposal / 9000 gal, cost etc.)

2. Turn-key Design/Site Prep with drawings to include:

a. 50’ soil bore at the location for Geotech testing of site

b. Structural engineered drawings for new bulk LOX concrete pad

c. Structural engineered drawings for the existing 1 story building

d. Shoring Plans for existing concrete roof to facilitate demolition of the northern 25+/-% of structure

e. Architectural drawings of a new exterior wall to match existing in height and appearance after demolition and new structural elements have been installed

f. Provide Mechanical, Electrical, Plumbing, (MEP) Drawings

g. Provide As built drawings of performance at project completion

3. Performance of design drawings to provide an engineered structural pad for new LOX tanks per vendor requirements and final connections of electrical and alarm with vendor installation.

4. Shoring and Demolition of 25+/- percent of the existing one-story building structure that currently houses the existing bulk LOX tanks to include footings, walls and roof.

5. See reference drawing from KBA Engineering P.C (G200, G201 and G202 for 6000). For 9000-gal tank refer Air Products DWGS

6. Drawings are for reference only. contractor to verify all field conditions.

7. Contractor to provide new design for new equipment and submit for approval.

8. Reference Document: Design shall be in accordance with these documents. These include all related VA Specifications found on website http://www.cfm.va.gov/til/spec.asp, including those specifically listed below, and the following:

1. Reference to Reports and recommendation prepared by Vendor

1. Final Site Preparation Support Documents prepared by Vendor.

1. VA Specifications and Design Guides:

1. Seismic Restraint, Spec 13 05 41

1. Safety Requirements, Spec 01 35 26

1. Oxygen Tanks and Temporary Oxygen Supply, Specs 22 63 01

1. VA PG-18-15

1. VA spec 00 11 21

9. Provide Feasibility Study for Oxygen Tank (options 6000-gal tank, cost proposal for 9000-gal, cost proposal etc.)

10. A Reconfigure Building #2 to accommodate both a larger tank and larger vaporizers.

1. Primary work would be to cut out the concrete roof between the existing concrete roof beams one each side of the existing primary tank roof opening over both bays of Building No. 2. Treat all cut and exposed concrete surfaces with approved water proofing sealant.

1. Remove existing cut concrete roof beam in its entirety back to building perimeter walls.

1. Create a new room within the south bay to specifically house the hydraulic equipment for the parking lot lifts. This room would be constructed of 2-hour fire rated CMU partition walls floor to ceiling, with a two-hour fire rated exterior insulated door and install a 4-inch-high threshold to prevent a hydraulic oil leak from coming into the oxygen storage area and to prevent rainwater from migrating into the hydraulic pump room. On both sides of new CMU Walls, Coat new CMU walls with exterior grade sealant/filler and paint with two coats of exterior grade paints.

1. Remove the existing CMU partition wall that separates the two bays.

1. Remove existing concrete floor within area outside the new hydraulic pump room. Excavate down 24 inches below the existing 6-inch-thick concrete floor. Compact ground brings back in 14 inches of structural graded fill.

1. Install a new 16-inch-thick slab reinforced and material specified similar to the seismic slab currently provided to the projects group. Grade the slab such that it is 1-1/2 inches higher at the back side and slopes to the overhead doors.

1. Install new all-weather outdoor LED lighting on the underside of the remaining concrete roof beams at 8-foot centers.

1. Remove all existing wall and ceiling conduits, install all new electrical conduits, junction boxes, light switches, power receptacles and disconnect switches along walls located no lower than 8 inches above the Sandy Storm high water mark.

1. Replace the single membrane roofing atop the remaining concrete roof, including installing a new 8-inch-high pressure treated 10-inch-wide curb along the length of the concrete roof remaining and flash the tops and sides of the exposed concrete roof beams remaining as well as the roof parapet. Install handrail along all roof accessible areas to the removed roofing area.

1. Tuck point repair the exterior walls.

1. Replace both bays roll-up doors with new galvanized steel exterior roll- up security grill doors, track and power actuators, similar to the North bay door existing.

1. Power wash existing interior masonry walls with minimum 7500 psi waterpower washer to remove lose materials, seal masonry and coat with exterior grade coating system.

j. Sections below as applicable to site prep contractor.

Other Requirement

1. Submit in writing results of the on-site walkthrough and the project requirements set forth by VA NYHHS Engineering Service. Contractor will specify appropriate equipment to complete project outcome or suggest alternate plan and/or equipment that will effectively provide the same purpose.

2. Warranty the entire installation for a minimum of one year from the date of acceptance by the VA NYHHS Engineering Service.

3. Provide a designated supervisor present and in responsible charge on the project site ensure construction safety.

4. Provide all labor, materials, transportation and equipment to complete all necessary repairs and installations.

5. Perform all work pursuant to a plan approved by the VA NYHHS Engineering Service.

6. Provide third party independent inspection reports.

7. Provide competent instruction to VA personnel regarding the operation of equipment and accessories installed under this contract. Instruction shall commence after completion of all work and at the time and place directed by the Resident Engineer.

8. Provide Written instructions in triplicate relative to care, adjustments and operation of all equipment and accessories to the Resident Engineer.

Place of Performance / Delivery

NYHHCS New York Campus:

423 East 23rd Street New York, NY 10010

Travel/Parking

The contractor will be responsible for their travel and parking. Due to other construction projects and limited parking available at the site, contractor must coordinate any required parking needs with the assigned COR and the Police Service. Details of any vehicles entering the site must be provided in advance. (Driver’s Full Name, Driver’s License Number, Vehicle Description, Vehicle License Plate Number)

Government-Furnished Property

Contractor will not need any government furnished equipment or property.

Education and Training Requirements

The Vendor shall be responsible for ensuring that vendor employees providing work on the required equipment are fully trained and completely competent to perform the required work.

VA Service Point(s) of Contacts

COR: Amer Romhen Amer.Romhen@va.gov 212-686-7500x7288

VA Patient Privacy and Network Infrastructure

None of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors that will come on site for install will not need access to VA network. All contractors must comply with VA regulation and complete the following training: “VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or use to VA Sensitive Information.”

· Reference the attached Handbook 6500.6 Appendix A - Checklist for Information Security in the initiation phase of acquisitions.

· The system does not transmit or maintain electronic Protected Health Information. A Manufacturer Disclosure Statement for Medical Device Security (MDS2) form in not applicable.

· A VA Directive 6550 Pre-Procurement Assessment form is not applicable.

Recalls

The Vendor shall immediately notify all affected VA Medical Centers and designated POC in the event of a device recall, removal, required adjustment, or required modification that is suggested or mandated by the Vendor, distributor, manufacturer, or any regulatory or government agency. The following information shall be included in this notification:

· A complete item description and identification (to include lot and serial numbers where applicable);

· Administrative identification data including order numbers and order date.

· Reasons for recall, removal, adjustment, or modification; and

· Instructions for appropriate corrective action.

Defective Items/ Warranty

Equipment will come with already established manufacturer’s warranty.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.215-5 FACSIMILE PROPOSALS (OCT 1997)

(a) Definition. "Facsimile proposal," as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.

(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.

(c) The telephone number of receiving facsimile equipment is: email submissions.

(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document—

(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;

(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and

(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.

(e) The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.

(End of Provision)

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
22.6 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S.