StartUpChecklist.docx
DOCX document 13 KB Posted
- Attached to
- Y1DA--526-22-207 - AHU's Coil Replacement Federal contract opportunity
- Solicitation number
- 36C24222Q0599
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in Sheet.pdf | ||
| 36C24222Q0599 0001.docx | DOCX document | |
| A-1_100-H158 Schedules.pdf | ||
| A-1_100-HVAC Schedules.pdf | ||
| A-1_100-H32 3rd Floor Plan-Area-B.pdf | ||
| A-1_CHW Coil Replacement GF Research Redline 1.pdf | ||
| A-1_100-H157 Schedules 2F 3B CHW Cooling Coil.pdf | ||
| A-1_100-H113 2F Mechanical Service Bay Plans.pdf | ||
| A-1_100-H156 Schedules.pdf | ||
| A-1_100-H155 Schedules.pdf | ||
| 36C24222Q0599_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
StartUpChecklist
| Item |
| Task |
| Pass |
| Fail |
| Notes |
| 1 |
| Confirm Chilled water temperature. Record Water Temp Supply and Return. |
| 2 |
| Confirm Chilled water flow. Record Flow values. |
| 3 |
| Confirm local coil isolation valves operate properly. |
| 4 |
| Check system for water leaks and proper installation. |
| 5 |
| Check AHU for proper duct installation. |
| 6 |
| Check piping insulation. |
| 7 |
| Check condensation drip pan for proper flow to local drain. |
File details come from the government source that posted it. Updated .