36C24220B0002-014.pdf

PDF Posted

Attached to
561-19-127 Hazardous Floor Replacement Federal contract opportunity
Solicitation number
36C24220B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document contains a federal contract solicitation and related project specifications for hazardous floor replacement services. The solicitation is for Project Number 561-19-127 to replace approximately 8,300 square feet of flooring in multiple rooms and corridors of Buildings 1 and 18 at the East Orange Campus of the Veterans Health Administration Veterans Integrated Service Network 2. The work includes removal of existing carpet and vinyl flooring and installation of new medical-grade seamless vinyl sheet, vinyl composition tile, luxury vinyl tile, and rubber flooring with a 6-inch cove base. The project completion deadline is 120 calendar days. The estimated value is between $250,000 and $500,000. The solicitation will be posted on www.fbo.gov on or about November 16, 2019. Responses are due in hard copy and must be submitted by a verified Veteran-Owned Small Business. The work requires performance and payment bonding and adherence to specifications in Section 09 65 13 of the provided documents.

36C24220B0002 096513-resbase.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 561-19-127 Hazardous Floor Replacement, newest first.
File Type Posted
36C24220B0002-0002004.pdf PDF
36C24220B0002-0002007.pdf PDF
36C24220B0002-0002006.pdf PDF
36C24220B0002-0002002.pdf PDF
36C24220B0002-0002003.pdf PDF
36C24220B0002-0002001.docx DOCX document
36C24220B0002-0002005.pdf PDF
36C24220B0002-0002000.docx DOCX document
36C24220B0002-0001001.pdf PDF
36C24220B0002-0001002.xlsx XLSX spreadsheet
36C24220B0002-0001003.pdf PDF
36C24220B0002-0001000.docx DOCX document
36C24220B0002-010.pdf PDF
36C24220B0002-005.pdf PDF
36C24220B0002-002.pdf PDF
36C24220B0002-017.pdf PDF
36C24220B0002-013.pdf PDF
36C24220B0002-018.pdf PDF
36C24220B0002-007.pdf PDF
36C24220B0002-009.pdf PDF
36C24220B0002-015.pdf PDF
36C24220B0002-001.docx DOCX document
36C24220B0002-008.pdf PDF
36C24220B0002-012.pdf PDF
36C24220B0002-004.pdf PDF
36C24220B0002-019.pdf PDF
36C24220B0002-011.xlsx XLSX spreadsheet
36C24220B0002-006.pdf PDF
36C24220B0002-016.pdf PDF
36C24220B0002-003.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC, EAST ORANGE PROJECT #561-19-127

Hazardous Floor Replacement Project

09 65 13-1

SECTION 09 65 13

RESILIENT BASE AND ACCESSORIES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the installation of vinyl or rubber base.

1.2 RELATED WORK

A. Color and texture: As indicated on FINISH SCHEDULE.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of each product.

2. Base material manufacturer's recommendations for adhesives.

3. Application and installation instructions.

C. Samples:

1. Base: 150 mm (6 inches) long, each type and color.

2. Adhesive: Literature indicating each type.

1.4 DELIVERY

A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.

B. Materials from containers which have been distorted, damaged or opened prior to installation will be rejected.

1.5 STORAGE

A. Store materials in weather tight and dry storage facility.

B. Protect material from damage by handling and construction operations before, during, and after installation.

1.6 APPLICABLE PUBLICATIONS

A. The publication listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society for Testing and Materials (ASTM):

F1861-02 .........................................Resilient Wall Base

PART 2 - PRODUCTS

2.1 GENERAL

Use only products by the same manufacturer and from the same production run.

09 65 13-2

2.2 RESILIENT BASE

A. ASTM F1861, 3 mm (1/8 inch) thick, 150 mm (6 inches) high, Type TP Rubber, Thermoplastics, Group 2-layered with molded top. Style B-cove.

B. Where carpet occurs, use Style A-straight.

C. Use only one type of base throughout.

2.3 ADHESIVES

Use products recommended by the material manufacturer for the conditions of use.

PART 3 - EXECUTION

3.1 PROJECT CONDITIONS

A. Maintain temperature of materials above 21o C (70 °F), for 48 hours before installation.

B. Maintain temperature of rooms where work occurs, between 21o C and 27o C (70oF and 80oF) for at least 48 hours, before, during, and after installation.

C. Do not install materials until building is permanently enclosed and wet construction is complete, dry, and cured.

3.2 BASE INSTALLATION

A. Location:

1. Unless otherwise specified or shown, where base is scheduled, install base over toe space of base of casework, lockers, and where other equipment occurs.

2. Extend base scheduled for room into adjacent closet, alcoves, and around columns.

B. Application:

1. Apply adhesive uniformly with no bare spots.

2. Set base with joints aligned and butted to touch for entire height.

3. Before starting installation, layout base material to provide the minimum number of joints with no strip less than 600 mm (24 inches) length.

a. Short pieces to save material will not be permitted.

b. Locate joints as remote from corners as the material lengths or the wall configuration will permit.

C. Form corners and end stops as follows:

1. Score back of outside corner.

2. Score face of inside corner and notch cove.

D. Roll base for complete adhesion.

3.3 CLEANING AND PROTECTION

A. Clean all exposed surfaces of base and adjoining areas of adhesive spatter before it sets.

B. Keep traffic off resilient material for at least 72 hours after installation.

C. Clean and polish materials in the following order:

09 65 13-3

1. After two weeks, scrub resilient base, sheet rubber and treads materials with a minimum amount of water and a mild detergent. Leave surfaces clean and free of detergent residue. Polish resilient base to a gloss finish.

2. Do not polish tread and sheet rubber materials.

D. When construction traffic is anticipated, cover tread materials with reinforced kraft paper and plywood or hardboard properly secured and maintained until removal is directed by the Resident Engineer.

E. Where protective materials are removed and immediately prior to acceptance, replace damaged materials and re-clean resilient materials. Damaged materials are defined as having cuts, gouges, scrapes or tears and not fully adhered.

- - - E N D - - -